Loading...
HomeMy WebLinkAbout06-037 - WA State Department of Transportation (WSDOT) - Tukwila Urban Center Pedestrian-Bicycle Bridgev71Washington State Department of Twansportation 06-037 (a) Council Approval 12/5/11 Local Agency Agreement Supplement Agency City of Tukwila Supplement Number 1 Federal Aid Project Number STPE-1320(002) Agreement Number LA 6065 CFDA No. 20.205 (Catalog of Federal Domestic Assistance) The Local Agency desires to supplement the agreement entered into and executed on April 20,2006 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Project Description Name Tukwila Urban Center Pedestrian/Bike Bridge over Green River Length 0.64 mile Termini approximately between Baker Blvd (if extended) and Longacres Way (if extended) Description of Work ❑ No Change Non -motorized bridge over Green River and wayfmding approach improvements along Baker Blvd to include bike lanes, trail connector to the Interurban Trail east of West Valley Highway, and a new pedestrian signal on West Valley Highway Reason for Supplement Obligation of additional Enhancement Funds and CMAQ Funds Does this change require additional Right of Way or Easements? ❑ Yes ® No Typeof Work Estimate of Funding (1) Previous Agreement/Suppl. (2) Supplement (3) Estimated Total Project Funds (4) Estimated Agency Funds (5) Estimated Federal Funds PE a. Agency b. Other Conslt. STPE 100% 190,000.00 500,000.00 690,000.00 690,000.00 c. Other Conslt. CMAQ 86.5% 868,015.00 868,015.00 117,182.00 750,833.00 Federal Aid d. State Participation 10,000.00 10,000.00 10,000.00 Ratio for PE e. Total PE Cost Estimate (a+b+c+d) 200,000.00 1,368,015.00 1,568,015.00 117,182.00 1,450,833.00 Right of Way f. Agency g. Other Federal Aid h. Other Participation Ratio for RW i. State j. Total R/W Cost Estimate (f+g+h+i) Construction k. Contract I. Other m. Other n. Other o. Agency Federal Aid Participation p. State Ratio for CN q. Total CN Cost Estimate (k+4+m+n+o+p) r. Total Project Cost Estimate (e+i+q) 200.000.00 1.368.015.00 1.568.015.00 117.182.00 1.450.833.00 The Local Agency further stipulates that pursuant to said Title 23, regulations and po icies and procedures, and as a condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. Agency Offal ,,rh Title M DOT Form 140-041 EF Revised 1/2007 Washington State By partment of ansportation Director of Highways and Local Programs Date Executed /5/o 7 oQ/G/iuA-e-S AR 0 5 2012 ‚7)Washington State Department of Transportation 06-037(a) Council Approval 12/5/11 Local Agency Federal Aid Project Prospectus DOT Form 140-101 EF Revised 11/10 Page 1 of 3 • Previous Editions Obsolete • Date 02/09/2012 Prefix Route ( ) Central Contractor Registration Exp.Date 07/20/2013 Federal Aid Proiect Number Federal Employer Tax ID Number 91-6001519 Local Agency(WSDOT Proiect Number 90510403 Use Only Agency City of Tukwila Federal Program Title 0 20.205 ❑ Other Project Title Tukwila Urban Center Pedestrian/Bicycle Bridge over Green River Start Latitude N 47.452545 Start Longitude W -122.262442 End Latitude N47459896 End Longitude W -122.262249 Project Termini From -- To Baker Blvd (if extended) S 168th St Nearest City Name Tukwila Project Zip Code 98188 From: To: Length of Project 0.64 mile Award 0 Type Local ❑ Local Forces ❑ State ❑ Railroad Federal ►�� Agency FHWA ❑ Others City Number 1320 County Number 17 County Name King WSDOT Region Northwest Region Congressional District 9 Legislative Districts 11 Urban Area Number 1 TMA / MPO / RTPO PSRC Phase Total Estimated Cost (Nearest Hundred Dollar) Local Agency Funding (Nearest Hundred Dollar) Federal Funds (Nearest Hundred Dollar) Phase Start Date Month Year P.E. $1,568,100 $117,200 $1,450,900 5/06 RNV $600,000 $120,000 $480,000 1/14 Const. $7,500,000 $2,400,000 $5,100,000 1/15 Total $9,668,100 $2,637,200 $7,030,900 Description of Existing Facility (Existing Design and Present Condition) Roadway Width n/a Number of Lanes n/a n/a Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) Design and preliminary engineering of a new pedestrian/bicycle bridge across the Green River, connecting the Tukwila Urban Center "core" to the Sounder Commuter Rail/Amtrak Station and surrounding neighborhood of transit -oriented development. This will improve public access to the station from all parts of the center and provide a direct, safe and enjoyable walking and bicycling experience. The high level of urban amenity will attract the types and densities of uses envisioned in a regional center. The bridge type will be a twin -tied arch bridge. The design includes way -finding approaches to the bridge on both sides of the Green River to provide loeical and useable approaches for all users. Local Agency Contact Person Cyndy Knighton Title Senior Engineer Phone 206-431-2450 Mailing Address 6300 Southcenter Blvd, Suite 100 City Tukwila State WA Zip Code 98188 By ---6d AY)-eil*frl Project Prospectus Approval Approving Authority Title Public Works Director Date 2 —ci —1 z -- DOT Form 140-101 EF Revised 11/10 Page 1 of 3 • Previous Editions Obsolete • Agency City of Tukwila Project Title Tukwila Urban Center Pedestrian/Bicycle Bridge Date 02/09/2012 Type of Proposed Work Project Type (Check all that Apply) Roadway Width n/a Number of Lanes n/a e New Construction 0 Path / Trail ❑ 3-R Others ❑ Reconstruction 0 Pedestrian / Facilities ❑ 2-R % ❑ Railroad ❑ Parking ❑ Other 0 Bridge ❑ Urban Geometric Design Data Description Others Through Route % Crossroad Federal Functional Classification ❑ Urban IN Principal Arterial • Minor Arterial • Collector ❑ Urban • Principal Arterial • Minor Arterial • Collector ❑ Rural • Major Collector • Minor Collector • Access Street/Road ❑ Rural • Major Collector ■ Minor Collector • Access Street/Road Terrain • Flat • Roll • Mountain • Flat • Roll • Mountain Posted Speed Design Speed Existing ADT Design Year ADT Design Year Design Hourly Volume (DHV) Performance of Work Preliminary Engineering Will Be Performed By KPFF (Consultant) Others 100 % Agency % Construction Will Be Performed By TBD Contract 100 % Agency ok Environmental Classification El Final ® Preliminary O Class I - Environmental Impact Statement (EIS) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreement ❑ Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreement ® Class II - Categorically Excluded (CE) Projects Requiring Documentation (Documented CE) Environmental Considerations Bridge will cross the Green River, a major salmon -bearing river in a flood plain. Appropriate environmental considerations are required including fisheries, river control, and archeological. Impacts to adjacent businesses and homeowners require consideration of noise and environmental justice. DOT Form 140-101 EF Revised 11/10 Page 2 of 3 Agency City of Tukwila Project Title Tukwila Urban Center Pedestrian/Bicycle Bridge Date 02/09/2012 Right of Way ❑ No Right of Way Required * All construction required by the contract can be accomplished within the existing right of way. Right of Way Required ❑ No Relocation 1 Relocation Required Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project Coordination with footing placement and approach trails will be required so as to not negatively impact SPU's 60" water main. No relocation of the main will occur. Footings will also be designed around the existing Green River levee on the west side of the river to allow for future stepping of the levee. No relocation of the levee will occur with this project. One existing single family home will need to be demolished for the east footing and landing area. Relocation of the existing homeowner is likely to be required. FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? El Yes ® No Remarks This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Date a'/3•/ai DOT Form 140-101 EF Revised 11/10 Agency City of Tukwila Page 3 of 3 • Previous Editions Obsolete •