HomeMy WebLinkAbout06-037 - WA State Department of Transportation (WSDOT) - Tukwila Urban Center Pedestrian-Bicycle Bridgev71Washington State
Department of Twansportation
06-037 (a)
Council Approval 12/5/11
Local Agency Agreement Supplement
Agency
City of Tukwila
Supplement Number
1
Federal Aid Project Number
STPE-1320(002)
Agreement Number
LA 6065
CFDA No. 20.205
(Catalog of Federal Domestic Assistance)
The Local Agency desires to supplement the agreement entered into and executed on April 20,2006
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Project Description
Name Tukwila Urban Center Pedestrian/Bike Bridge over Green River
Length 0.64 mile
Termini approximately between Baker Blvd (if extended) and Longacres Way (if extended)
Description of Work ❑ No Change
Non -motorized bridge over Green River and wayfmding approach improvements along Baker Blvd to include bike lanes, trail
connector to the Interurban Trail east of West Valley Highway, and a new pedestrian signal on West Valley Highway
Reason for Supplement
Obligation of additional Enhancement Funds and CMAQ Funds
Does this change require additional Right of Way or Easements? ❑ Yes ® No
Typeof Work
Estimate of Funding
(1)
Previous
Agreement/Suppl.
(2)
Supplement
(3)
Estimated Total
Project Funds
(4)
Estimated Agency
Funds
(5)
Estimated
Federal Funds
PE a. Agency
b. Other Conslt. STPE 100%
190,000.00
500,000.00
690,000.00
690,000.00
c. Other Conslt. CMAQ 86.5%
868,015.00
868,015.00
117,182.00
750,833.00
Federal Aid d. State
Participation
10,000.00
10,000.00
10,000.00
Ratio for PE e. Total PE Cost Estimate (a+b+c+d)
200,000.00
1,368,015.00
1,568,015.00
117,182.00
1,450,833.00
Right of Way f. Agency
g. Other
Federal Aid h. Other
Participation
Ratio for RW i. State
j. Total R/W Cost Estimate (f+g+h+i)
Construction k. Contract
I. Other
m. Other
n. Other
o. Agency
Federal Aid
Participation p. State
Ratio for CN q. Total CN Cost Estimate (k+4+m+n+o+p)
r. Total Project Cost Estimate (e+i+q)
200.000.00
1.368.015.00
1.568.015.00
117.182.00
1.450.833.00
The Local Agency further stipulates that pursuant to said Title 23, regulations and po icies and procedures, and as a condition
to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions.
Agency Offal
,,rh
Title M
DOT Form 140-041 EF
Revised 1/2007
Washington State
By
partment of ansportation
Director of Highways and Local Programs
Date Executed
/5/o 7 oQ/G/iuA-e-S
AR 0 5 2012
‚7)Washington State
Department of Transportation
06-037(a)
Council Approval 12/5/11
Local Agency Federal Aid
Project Prospectus
DOT Form 140-101 EF
Revised 11/10
Page 1 of 3
• Previous Editions Obsolete •
Date
02/09/2012
Prefix
Route
( )
Central Contractor
Registration Exp.Date
07/20/2013
Federal Aid
Proiect Number
Federal Employer
Tax ID Number
91-6001519
Local Agency(WSDOT
Proiect Number
90510403
Use Only
Agency
City of Tukwila
Federal Program Title
0 20.205 ❑ Other
Project Title
Tukwila Urban Center Pedestrian/Bicycle Bridge over Green
River
Start Latitude N 47.452545
Start Longitude W -122.262442
End Latitude N47459896
End Longitude W -122.262249
Project Termini From -- To
Baker Blvd (if extended) S 168th St
Nearest City Name
Tukwila
Project Zip Code
98188
From: To:
Length of Project
0.64 mile
Award
0
Type
Local ❑ Local Forces ❑ State ❑ Railroad
Federal
►��
Agency
FHWA ❑ Others
City Number
1320
County Number
17
County Name
King
WSDOT Region
Northwest Region
Congressional District
9
Legislative Districts
11
Urban Area Number
1
TMA / MPO / RTPO
PSRC
Phase
Total
Estimated Cost
(Nearest Hundred Dollar)
Local Agency
Funding
(Nearest Hundred Dollar)
Federal Funds
(Nearest Hundred Dollar)
Phase Start
Date
Month Year
P.E.
$1,568,100
$117,200
$1,450,900
5/06
RNV
$600,000
$120,000
$480,000
1/14
Const.
$7,500,000
$2,400,000
$5,100,000
1/15
Total
$9,668,100
$2,637,200
$7,030,900
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width
n/a
Number of Lanes
n/a
n/a
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
Design and preliminary engineering of a new pedestrian/bicycle bridge across the Green River, connecting the Tukwila Urban
Center "core" to the Sounder Commuter Rail/Amtrak Station and surrounding neighborhood of transit -oriented development.
This will improve public access to the station from all parts of the center and provide a direct, safe and enjoyable walking and
bicycling experience. The high level of urban amenity will attract the types and densities of uses envisioned in a regional center.
The bridge type will be a twin -tied arch bridge. The design includes way -finding approaches to the bridge on both sides of the
Green River to provide loeical and useable approaches for all users.
Local Agency Contact Person
Cyndy Knighton
Title
Senior Engineer
Phone
206-431-2450
Mailing Address
6300 Southcenter Blvd, Suite 100
City
Tukwila
State
WA
Zip Code
98188
By ---6d AY)-eil*frl
Project Prospectus Approval Approving Authority
Title Public Works Director Date 2 —ci —1 z --
DOT Form 140-101 EF
Revised 11/10
Page 1 of 3
• Previous Editions Obsolete •
Agency
City of Tukwila
Project Title
Tukwila Urban Center Pedestrian/Bicycle Bridge
Date
02/09/2012
Type of Proposed Work
Project Type (Check all that Apply)
Roadway Width
n/a
Number of Lanes
n/a
e New Construction 0 Path / Trail ❑ 3-R
Others
❑ Reconstruction 0 Pedestrian / Facilities ❑ 2-R
%
❑ Railroad ❑ Parking ❑ Other
0 Bridge
❑ Urban
Geometric Design Data
Description
Others
Through Route
%
Crossroad
Federal
Functional
Classification
❑ Urban
IN Principal Arterial
• Minor Arterial
• Collector
❑ Urban
• Principal Arterial
• Minor Arterial
• Collector
❑ Rural
• Major Collector
• Minor Collector
• Access Street/Road
❑ Rural
• Major Collector
■ Minor Collector
• Access Street/Road
Terrain
• Flat
•
Roll • Mountain
• Flat
• Roll • Mountain
Posted Speed
Design Speed
Existing ADT
Design Year ADT
Design Year
Design Hourly Volume (DHV)
Performance of Work
Preliminary Engineering Will Be Performed By
KPFF (Consultant)
Others
100
%
Agency
%
Construction Will Be Performed By
TBD
Contract
100
%
Agency
ok
Environmental Classification
El Final ® Preliminary
O Class I - Environmental Impact Statement (EIS)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreement
❑ Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreement
® Class II - Categorically Excluded (CE)
Projects Requiring Documentation
(Documented CE)
Environmental Considerations
Bridge will cross the Green River, a major salmon -bearing river in a flood plain. Appropriate environmental considerations are
required including fisheries, river control, and archeological. Impacts to adjacent businesses and homeowners require
consideration of noise and environmental justice.
DOT Form 140-101 EF
Revised 11/10
Page 2 of 3
Agency
City of Tukwila
Project Title
Tukwila Urban Center Pedestrian/Bicycle Bridge
Date
02/09/2012
Right of Way
❑ No Right of Way Required
* All construction required by the
contract can be accomplished
within the existing right of way.
Right of Way Required
❑ No Relocation
1 Relocation Required
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
Coordination with footing placement and approach trails will be required so as to not negatively impact SPU's 60"
water main. No relocation of the main will occur. Footings will also be designed around the existing Green River
levee on the west side of the river to allow for future stepping of the levee. No relocation of the levee will occur with
this project. One existing single family home will need to be demolished for the east footing and landing area.
Relocation of the existing homeowner is likely to be required.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project?
El Yes ® No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and
is not inconsistent with the agency's comprehensive plan for community development.
Date a'/3•/ai
DOT Form 140-101 EF
Revised 11/10
Agency City of Tukwila
Page 3 of 3
• Previous Editions Obsolete •