Loading...
HomeMy WebLinkAbout05-086 - WA State Department of Transportation (WSDOT) - Tukwila Urban Access Improvement (Klickitat)06/20/06 14 28 FAX 206 440 4806 MYR ort.ttAituJ tgi P 0Ol FAX NO, 3� 56822 JUN -20-2008 TUE 01 20 PM Washington Slate Department of transportation Agency City of Tukwila Federal Aid Federal Number STPD -1037(003) OS -6% (e.,) Local Agency Agreement Supplement Agreement Number LA -5950 The Local Agency desires to supplement the agreement entered into and executed on Supplement Number 1 CFA No 20,205 (Catalog of Federal Domestic Ass'slance) Ail provisions In tho basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are describod as follows. Project Description Name Tukwila Urban Access Improvement Termini _ Description of Work 27 No Change Length 0.23 Reason for Supplement Round 2 Awards n F FPY2005 Section 117 Pro}ect -- additional funding made available totalling S983 928 Type of Work Estimate of Funding _ Pr vious A•reement/5u..1. 2 Supplement (3)(4) Estimatd Total Project Funds Estimated Agency Funds (5) Estimated Federal Funds FE a Anency , 973,928,00 973,928.00 100 % b. other Consultant G51,333.00 322,595,00 _ c. Cuter Federal Aid d State �_^ 10,000.00 10,000.00 10,000 00 933,92$.00 Participation Ratio for FE o. Total Piz Cost SsUmato (a+b+c+d)- 661,333.00 322,595,00 9$3,92$.00 Right Way of f, Agency ,- iiv 4 o Jnor-- Post -its' Fax Note 7671 1 Federal Aid th, h otter D * ut `eta fj ! 1,4.,yt5� /1 � Participation RaUo for RW 1- Stale To -111.41%1 J 11//�P°i$ .-k:' � From /4. y s�'!f c;. ��v j. Total RAN Cost Estimate (r+g+h+l) �J co.met37pd,hie.aJ it e,.,� Co. ,/A Construction k. contract - Phone* Phone 11 I. Other Fax # Fax IF - m- Other n Other __ _ -- _ _�� . o. Agency Federal Aid Slate Participation P' te Ratio for CN Total CN Cost Estimate (k+i-m4n+fl ) q, r Total Project Cost Estimate (e+j+q) 661,333.00 322,595.00 953,928.00 983,923.00 The Local Agency further stipulates that pursuant to said Tine 23 regulations and policies and procedures, an as a con on to payment of the Foceral funds obligat❑d, it accepts end will comply with the applicable provisions. Dep rtment of Trayfsportation Agency Offici -1 E3yeti__ 1N/ VY\ L&CS:LLA--- Title pyo 00T Farm 140-041 EF Ravised 4l2CC3 Washington S By Assistant Secretary for Fig Date Executed ways and Local Programs __AER262aa6 / o--7/ �� sar:� Washington State Department of Transport_.___ Agency City of Tukwila Address 6200 Southcenter Boulevard Tukwila, WA 98188 Local ,-agency Agreement CFDA No 20.205 (Catalog of Federal Domestic Assistance) STPD- \0-Yt(00S) Project No Agreement No z 595 0 For OSC WSDOT Use Only The Local Agency having complied, or hereby agreeing to comply with the terms and conditions set forth in (1) Title 23 U S. Code Highways, (2) the regulations issued pursuant thereto, (3) Office of Management and Budget Circulars A 102, A-87 and A 133 (4) the policies and procedures promulgated by the Washington State Department of Transportation, and (5) the federal aid project agreement entered into between the State and Federal Government, relative to the above project, the Washington State Department of Transportation will authorize the Local Agency to proceed on the project by a separate notification. Federal funds which are to be obligated for the project may not exceed the amount shown herein on line r column 3 without written authority by the State, subject to the approval of the Federal Highway Administration. All project costs not reimbursed by the Federal Government shall be the responsibility of the Local Agency Project Description Name Tukwila Urban Center Access Improvements (Klickitat) Length 0.23 Termini Description of Work Design of a grade separated facility primarily at the Klickitat/Southcenter Parkway intersection. Southbound traffic on Southcenter Parkway will travel under a partial lid suppdrting Klickitat Drive. Provisions would be made to accomodate turning movements both to and from Klickitat Drive and allow for driver selection of most appropriate route as motorists approach the Southcenter Parkway/Strander Boulevard intersection. Southcenter Parkway will be widened to the east, toward Southcenter Mall No changes to the 1-5 off -ramps are anticipated. A new signal at the Klickitat Drive/SB 1-5 On-ramp on the west side of 1-5 will also be included. Agency Offic'al�'{�� By Title Mayor Washington State Department of Transp1prtation l.) C By DOT Form 140-039 EF Revised 01/2004 1 Assistant Secretary for Highways and Loc4Mgr`an73 ZJCl5 Date Executed Type of Work Yp Estimate of Funding (1) Estimated Total Project Funds (2) Estimated Agency Funds (3) Estimated Federal Funds PE 100 %b. a Agency Other Consultant 651,333 00 651,333 00 Federal Aid Participation Ratio for PE c. Other d State 10,000 00 10,000 00 e Total PE Cost Estimate (a+b+c+d) 661,333 00 661,333 00 Right of Way f Agency q. Other Federal Aid Participation Ratio for RW h Other i State j Total R/W Cost Estimate (f+g+h+i) Construction % fr Contract I Other m Other n Other o Agency Federal Aid Participation Ratio for CN p State q Total CN Cost Estimate (k+I+m+n+o+p) r Total Project Cost Estimate (e+j+q) 661,333 00 661,333 00 Agency Offic'al�'{�� By Title Mayor Washington State Department of Transp1prtation l.) C By DOT Form 140-039 EF Revised 01/2004 1 Assistant Secretary for Highways and Loc4Mgr`an73 ZJCl5 Date Executed