HomeMy WebLinkAbout05-086 - WA State Department of Transportation (WSDOT) - Tukwila Urban Access Improvement (Klickitat)06/20/06 14 28 FAX 206 440 4806 MYR ort.ttAituJ tgi
P 0Ol
FAX NO, 3� 56822
JUN -20-2008 TUE 01 20 PM
Washington Slate
Department of transportation
Agency
City of Tukwila
Federal Aid
Federal Number
STPD -1037(003)
OS -6% (e.,)
Local Agency Agreement Supplement
Agreement Number
LA -5950
The Local Agency desires to supplement the agreement entered into and executed on
Supplement Number
1
CFA No 20,205
(Catalog of Federal Domestic Ass'slance)
Ail provisions In tho basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are describod as follows.
Project Description
Name Tukwila Urban Access Improvement
Termini _
Description of Work 27 No Change
Length 0.23
Reason for Supplement
Round 2 Awards n F FPY2005 Section 117 Pro}ect -- additional funding made available totalling S983 928
Type of Work
Estimate of Funding _
Pr vious
A•reement/5u..1.
2
Supplement
(3)(4)
Estimatd Total
Project Funds
Estimated Agency
Funds
(5)
Estimated
Federal Funds
FE a Anency
,
973,928,00
973,928.00
100 % b. other Consultant
G51,333.00
322,595,00
_
c. Cuter
Federal Aid d State �_^
10,000.00
10,000.00
10,000 00
933,92$.00
Participation
Ratio for FE o. Total Piz Cost SsUmato (a+b+c+d)-
661,333.00
322,595,00
9$3,92$.00
Right Way
of f, Agency ,-
iiv
4 o Jnor--
Post -its' Fax
Note 7671
1
Federal Aid th,
h otter
D * ut
`eta fj ! 1,4.,yt5� /1
�
Participation
RaUo for RW 1- Stale
To -111.41%1 J 11//�P°i$ .-k:' �
From
/4. y s�'!f c;. ��v
j. Total RAN Cost Estimate (r+g+h+l)
�J
co.met37pd,hie.aJ it e,.,�
Co.
,/A
Construction k. contract
-
Phone*
Phone 11
I. Other
Fax #
Fax IF
-
m- Other
n Other
__ _ --
_ _��
.
o. Agency
Federal Aid Slate
Participation P' te
Ratio for CN Total CN Cost Estimate (k+i-m4n+fl )
q,
r Total Project Cost Estimate (e+j+q)
661,333.00
322,595.00
953,928.00
983,923.00
The Local Agency further stipulates that pursuant to said Tine 23 regulations and policies and procedures, an as a con on
to payment of the Foceral funds obligat❑d, it accepts end will comply with the applicable provisions.
Dep rtment of Trayfsportation
Agency Offici -1
E3yeti__ 1N/ VY\ L&CS:LLA---
Title pyo
00T Farm 140-041 EF
Ravised 4l2CC3
Washington S
By
Assistant Secretary for Fig
Date Executed
ways and Local Programs
__AER262aa6
/
o--7/ ��
sar:�
Washington State
Department of Transport_.___
Agency City of Tukwila
Address 6200 Southcenter Boulevard
Tukwila, WA 98188
Local ,-agency Agreement
CFDA No 20.205
(Catalog of Federal Domestic Assistance)
STPD- \0-Yt(00S)
Project No
Agreement No
z 595 0
For OSC WSDOT Use Only
The Local Agency having complied, or hereby agreeing to comply with the terms and conditions set forth in (1) Title 23 U S. Code Highways, (2) the
regulations issued pursuant thereto, (3) Office of Management and Budget Circulars A 102, A-87 and A 133 (4) the policies and procedures
promulgated by the Washington State Department of Transportation, and (5) the federal aid project agreement entered into between the State and
Federal Government, relative to the above project, the Washington State Department of Transportation will authorize the Local Agency to proceed on
the project by a separate notification. Federal funds which are to be obligated for the project may not exceed the amount shown herein on line r column
3 without written authority by the State, subject to the approval of the Federal Highway Administration. All project costs not reimbursed by the Federal
Government shall be the responsibility of the Local Agency
Project Description
Name Tukwila Urban Center Access Improvements (Klickitat)
Length 0.23
Termini
Description of Work
Design of a grade separated facility primarily at the Klickitat/Southcenter Parkway intersection. Southbound traffic on Southcenter Parkway will travel
under a partial lid suppdrting Klickitat Drive. Provisions would be made to accomodate turning movements both to and from Klickitat Drive and allow
for driver selection of most appropriate route as motorists approach the Southcenter Parkway/Strander Boulevard intersection. Southcenter Parkway will
be widened to the east, toward Southcenter Mall No changes to the 1-5 off -ramps are anticipated. A new signal at the Klickitat Drive/SB 1-5 On-ramp on
the west side of 1-5 will also be included.
Agency Offic'al�'{��
By
Title Mayor
Washington State Department of Transp1prtation
l.) C By
DOT Form 140-039 EF
Revised 01/2004
1
Assistant Secretary for Highways and Loc4Mgr`an73 ZJCl5
Date Executed
Type of Work
Yp
Estimate of Funding
(1)
Estimated Total
Project Funds
(2)
Estimated Agency
Funds
(3)
Estimated
Federal Funds
PE
100 %b.
a Agency
Other Consultant
651,333 00
651,333 00
Federal Aid
Participation
Ratio for PE
c. Other
d State
10,000 00
10,000 00
e Total PE Cost Estimate (a+b+c+d)
661,333 00
661,333 00
Right of Way
f Agency
q. Other
Federal Aid
Participation
Ratio for RW
h Other
i State
j Total R/W Cost Estimate (f+g+h+i)
Construction
%
fr Contract
I Other
m Other
n Other
o Agency
Federal Aid
Participation
Ratio for CN
p State
q Total CN Cost Estimate (k+I+m+n+o+p)
r Total Project Cost Estimate (e+j+q)
661,333 00
661,333 00
Agency Offic'al�'{��
By
Title Mayor
Washington State Department of Transp1prtation
l.) C By
DOT Form 140-039 EF
Revised 01/2004
1
Assistant Secretary for Highways and Loc4Mgr`an73 ZJCl5
Date Executed