HomeMy WebLinkAboutReg 2005-11-07 Item 4C - Turnover - Public Infrastructure at Department of Homeland Security (South 126th Street / 34th Avenue South) COUNCIL AGENDA SYNOPSIS
tt sr` �s'y S Imttals ITEm No.
10 i t1VIeettng Date 1 Prepared by 1 Mayor's review Council nvtew 1
tsi‘
1 11/07/05 1 Drgorn 1__
C
ITEM INFORMATION
CAS NUMBER: 05-139 I ORIGINAL AGENDA DATE. NOVEMBER 7, 2005
AGENDA ITEM TITLE Turnover of Public Infrastructure at Department of Homeland Security
Within and Adjacent to S 126 St and 34 Ave S
CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other
Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date Mfg Date Mtg Date 11 /07/05
SPONSOR Council Mayor Adm Svcs DCD Finance 111 Fire Legal 111 P&R Police PIV
SPONSOR'S Accept turnover of storm drainage system and street infrastructure as part of the
SUMMARY development at the Department of Homeland Security (DHS) Seattle District Office at
12400 Tukwila Int'I Blvd. These improvements are valued at $72,105.72 and are located at
S 126 St and 34 Ave S. Public Works staff inspected the facilities and all permits were
signed off and ready for turnover.
REVIEWED BY COW Mtg CA &P Cmte F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DATE. 10/24/05
RECOMMENDATIONS:
SPONSOR /ADMIN. Accept turnover of public infrastructure.
COMMIII hE Forward to Regular Consent Agenda with acceptance,
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$0.00 $0.00 $0.00
Fund Source:
Comments
MTG. DATE RECORD OF COUNCIL ACTION
1 11/07/05
1
1 MTG. DATE ATTACHMENTS
1 11/07/05 Information Memo with site maps dated October 18, 2005
Transportation Committee Minutes from October 24, 2005
1
INFORMATION MEMO
To:
From
Date:
Subject:
Mayor Mullet
Public Works Direct~
October 18, 2005
Turnover of Street and Storm Drainage Facilities
Within and Adjacent to S 126th St and 34th Ave S
ISSUE
Accept turnover of storm drainage system (constructed within a public easement) and street
infrastructure (constructed within public right-of-way) as part of the development known as the
DHS - Seattle District Office Development.
DHS - Seattle District Office
Permit No. D03-128
Site Address - 12400 Tukwila International Blvd., Tukwila
Parcel No. 102304-9082
BACKGROUND
The DHS - Seattle District Office Development is now completed. As a condition of the
development, the DHS - Seattle District Office Development included the construction of 132
LF of 12-inch storm pipe, two (2) Type I catch basins, 350 LF of curb and gutter, two (2) wheel
chair ramps, 1,750 SF of 5-foot wide concrete sidewalks, and 2,722 SY of asphalt pavement.
The value of the transferred assets, from the Developer to the City of Tukwila, is $72.105.72.
Conditions were placed on the development to provide the following turnover documents'*
1. Letter from owner requesting turnover
2. List of Materials/Costs (City format)
3 Deed of Conveyance of Public Improvements
4. Easement for Storm Drainage (Public)
5. Two-year maintenance bond
6 As-built plans and CD for proposed public facilities
The proposed public facilities have been constructed to City standards and inspected by Public
Works staff and are now ready for turnover as public infrastructure.
RECOMMENDATION
Request Transportation Committee to move to consent agenda to authorize Mayor to sign
acceptance forms.
attachments: maps
Development file: DH5 I 5 126th 5t and 34th Ave 5
(p:alicelddhssl26thstl 01805Vnfomemo1 01805)
*NOTE: All documents are available at Public Works and will be presented at the meetin~s.
DHS / SEATTLE DISTRICT OFFICE
126th STREET & 34TH AVE. SOUTH
INFRASTRUCTURE TURNOVER
STREET & STORM DRAINAGE
IMPROVEl\tIENTS
D03-128
~ -:-:. .
/~LA~
@
. I'
iVICINITY MAP
j I NOT TO SCALE
N C:>RTH
NQ SCALE
~
-- I
DHS SEATTLE DISTRICT OFFICE
126th STREET & 34TH AVENUE SOUTH
INFRASTRUCTURE TURNOVER
STREET & STORM DRAINAGE
llVIPROVEMENTS
D03-128
-'!FIy8~... .;l~~~ f}
QOI02 0'0'
2/eo <)
I)))
/;11
I ~I I
I~ I
~ I
---~~ L.-L_I_
=VENUj:~J\ .'-["g- - -
a :- T - - I 30 20j)
~ I ~ I ~~3 ~
'" 0' tuli!i~;= w
.~ r ~ cr "I ill ~~g ~~~
~ I livi ~~I ~\1E ~~i!'
:2 ~ VI '< --.J "Slool :ag ~51~
~- I-t~ ~. ~5~ ~~:
z. d I IQ F=I Z Z ~ 8::> ~
ON lD \1.111)::)
~ _0 -" --1 u ~ ~~S
NO'....O,.. ~ I -~ I. >- ~ i3
1J.76' -~ - - -1 g~ ~ ~~~
. . ~ 119.96' ~ IN e:: g e.
241.71 -, NO"'6'O", ~ ~
. en ,
367.57' ;"'~ ~I 1 ~
o ~r ,.
8~~ I ~
_~:z ~ J:
" 34TI1.,AVEh'UE SOl111-l
~
NC>RTH
r-_r
Q ~ I~ zoo
SCALE: 1. ~ ~ Zoo I
NOI',6'02'E
[XlSnNG
BlDG '2.1-0~
I -
~
....0' _~~1,
t-~'/; '/;1~
eV'..(/!~~ ~c.
t!" ~.
..
r;
..,
SITE
.,,;?
NO!=46WE 244.or -
~..
..
~
"
r
~
z
~"
....0' ~_~~~'/;
'-" .,..~ ~1'
~ (/!~~) ~c.
t!" 'J' 6,0'
>-
z
I I~
",,0
" \w::1
';1g
I I~g
o:t3
I@ 13s
':f T
;~! I
I I
60201
,,0' ~~~1^",,'/;
t-~ .<f"Y
'0"" a~Q)~\..c..
IS""~ 6,0\
..
~
N
"JJ..06"
SOI.-4e..02.....v 562.98'
26D.Ob'
-'
~
~
~
~
_ _ _ _ ~'c.E~o__
~'.
:-0
"'"
r",
~'"
z
ZQlli:
,"CIL
Q!'7.;,04,. qeg~
.g\
~\
'<>\
~\
-;.,1
-:>\
1'9:i,'
.,;(
7
.C.
ZQ!!f:
I!IcjH
bQ.OO
f\.\ &1"~.~1\. ~
~:~.O~
NOI'WO"! ,oo.c" ~' 'U7S' (C) 0
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ~ ~'U9' (Pt _"-- ::'1
"O"'S'02'( 2580.05' (M) BASIS or BtAAJl<C 5tC1JQN''''' - - - - -;:;.- ~ ....
, N'2'1>0~~0"co' - - ~ ;,
22...5 -<0' >'O~"iI . '" ~
) .\ _ N\2'1 _ - Co 3 6 ~
51\.St ;..I.. 'a\..\/O, ~i _____ _ - 0, ~:I .I:
3'2."1' N01-S1'01'" ~ -<:Q!-I,b.1\Otl ~ _ - ;-"'1;: o~
V\N.\~-- ~- 91s..B -- ..,~,.. 1-,...
~ ~ 1\Ji-'~ ----=:::!p .S!"\.\,\O. \) - - Ii iIi ~ if" ~
~\'il~~~ ~o~)~ SfI-g9l!"s!"\. _ - -- ~~~ \i;!q~
V2ttw~a::U tiJ'1""l --
~o!\:!\:;1c._ _ - - ~
~ --
--
,oM'
'M'
G) . f~ WONVw.DtT -,$ NOTtO
+ . rOJHO stCncH CCR.!iOf AS h'OltO
~ . rOUNO OU1J\TtR S(COOIt CO<."" AS NOTE!)
(M) . ll(A"",to WMG(C>STA'ICt
(CJ . BtA'>h'C(C>STANct PER CiJ.o..unClIS
(PJ . 6EAR1>iG;o;STMct PER "ECCoWtO FUT
-
UNE TABLE
UNE T BEJJijNG
l. ..
tj I.~ .
17 HM"IH'
DISTANCE
-
ASSESSOR'S IVlAP
DHS SEATTLE DISTRICT OFFICE
126TH STREET AND 34TH AVENUE SOUTH
INFRASTRUCTURE TURNOVER
STREET AND STORM DRAINAGE IMPROVEMENTS
D03-128
LOT 8 102304-9082
PUBLIC STORM DRAINAGE EASEMENT
"
Transportation Committee
October 24, 2005
Present: Jim Haggerton, Chair; Joe Duffie, Pam Carter
Jim Morrow, Frank lriarte, Gail Labanara, Bob Giberson, Pat Brodm, Kevin
,V 1. Turnover ::::~~::c:o:::::a:: Homelaud $:ccuritv (DHS) A storm draiuage system and
"" street infrastructure in the public easements on S 126th and 34th Ave S included sidewalks, curb
and gutter, and wheelchair ramps All were constructed to City standards and are ready for
turnover to the City. Their value is $7;2,105.72. Authorize mayor's signature on accepting
turnover infrastructure to consentiagenda of a Regular "Meeting.
2. Turnover of Traffic Signal, Street and Storm Drains at DHS These facilities were built in
the public right of way/easement along Tukwila International Blvd. They include a long list of
items related to the traffic light, crosswalk, and pedestrian walks, as well as storm drain catch
basins and pipes. The value of these turnover facilities is $345,132.59. Authorize mayor's
signature on accepting turnover facilities to consent agenda of a Regular Meeting.
3. Tukwila International Boulevard Phase I Undergrounding Property owners on TIB need
to underground their ~ower. Those south of S. 144th need to have it done by November 1S\ and
those north of S. 144t1 need to have it done by December 8th. Each property is different. Some
can get power from an alley in back of them, some have finished their undergrounding, and
others have not even begun. If the undergrounding is not completed by the 90-day deadline,
current law authorizes the work to be done by the City and the property to have a lien placed on
it. Staff will continue working with the owners to encourage their hook ups. Information.
4. Budget Review The Committee finished its review of the transportation- related CIP and
budget book items. They were able to complete their thorough review of both ClP items as well
as budget pages. Budget review complete.
~~ ~, Committee chair approval
{/ Minutes by LL