Loading...
HomeMy WebLinkAboutReg 2005-05-16 Item 5C - Final Acceptance - Fort Dent Stormwater Pump Station #19 and Drainage by Western Engineering Constructors for $240,014.30 p COUNCIL AGENDA SiwoPsis r' sy Initials ITEM No. X 14, t j Meeting Date Prepared by 1 Mayor's review Council review 5/16/05 1 BG 1 f`S rsoa I I I ITEM INFORMATION CAS NUMBER: 05-077 ORIGINAL AGENDA DATE: MAY 16, 2005 AGENDA ITEM TITLE Accept as complete Fort Dent Stormwater Pump Station #19 and release retainage. CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date:5/ 96/05 SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P&R Police PI7 SPONSOR'S The contract with Western Engineering Constructors, Inc. is complete for the Fort Dent SUMMARY Stormwater Pump Station #19 and Drainage Project. Construction began September 20, 2004 and was substantially completed on December 31, 2004. Additions amounted to $16,935.78. The total contract amounted to $240,014.30. REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte Utilities Cmte Arts Comm. Parks Comm. Planning Comm. DA'Z'E: 5/03/05 RECOMMENDATIONS: SPONSOR /ADMIN. Accept contract as complete and authorize release of retainage. COMMITILE Accept contract and forward to Consent agenda for approval. COST IMPACT FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $240,014.30 $293,824.00 Fund Source: 301 Land Acquisition Park Development (page 12, 2005 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION 5/16/05 1 MTG. DATE ATTACHMENTS 5/16/05 Information Memo dated April 27, 2005 Notice of Completion of Public Works Contract 04 -080 Utilities Committee Meeting Minutes from May 3, 2005 INFORMATION MEMO To: ~ ~ Mayor Mullet From: -~~vPublic Works Director Date: April 27, 2005 Subject: Fort Dent Stormwater Pump Station #19 and Drainage Project Completion and Acceptance ISSUE Accept construction contract as complete and authorize release of retainage in the amount of $11,030.07. BACKGROUND The Notice to Proceed for Contract No. 04-080 with Western Engineering Constructors, Inc., of Seattle, Washington, was issued on September 20, 2004, for the construction of Project No. 03-DR04. The project upgraded the stormwater pump station at Fort Dent, which was discovered to be in disrepair and without sufficient capacity. This contract was completed on December 31, 2004. Additions included reinforcing the grass near the pump station to allow Public Works maintenance vehicle access without destroying the park lawn. Closeout paperwork has been completed and verified, and the project is now ready for final acceptance. The contract cost is summarized as follows: Contract Award Amount Additions Subtotal Sales Tax @ 8.8% Total Amount Paid (incl. retainage) $ 203,665.60 16,935.78 $ 220,601.38 19,412.92 $ 240,014.30 RECOMMENDATION It is recommended that this contract be forwarded to the Tukwila City Council on the consent agenda for formal acceptance and authorize the release of the retainage, subject to the standard claim and lien release procedures. BG:ad attachment: Notice of Completion of Public Works Contract (p:Projects\A- DR Projects\03DR04\\Jnfo Memo Closeout - Western Engrg) . State ofWashmgton ~ ~ Department of Revenue fA. PO Box 47474 REVENUE Olympia WA 98504-7474 Contractor's Registration No. (UBI No.) 601 421 001 Date 4/11/05 NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT From: City of Tukwila 6200 Southcenter Blvd. Tukwila, W A 98188 Date Assigned Notice is hereby given relative to the conlpletioll of contract or project described below DescriptiOn of Contract Contract Number Fort Dent Stormwater Pump Station #19 and Drainage (03-DR04) 04-080 Contractor's Name Telephone Number Western Engineering Constructors, Inc. 206-524-5554 Contractor's Address P.O. Box 84567, Seattle, WA 98124-5867 Date Work Commenced Date Work Completed Date Work Accepted 9/20/04 12/31/04 Surety or Bondmg Company Travelers Casualty and Surety Company of America Agent's Address USI Northwest, 1001 4th Ave., Suite 1800, Seattle, W A 98154 Contract Amount $ 203,665.60 Additions $+ 16,935.78 Reductions $- 0.00 Sub-Total $ 220,601.38 Amount of Sales Tax Paid at 8.8% $ 19,412.92 (If various rates apply, please send a breakdown.) TOTAL $ 240,014.30 Liquidated Damages $ 0.00 Amount Disbursed $ 228,984.23 Amount Retained $ 11,030.07 TOTAL $ 240,014.30 Comments: Finance Approval -:-.--....... ~, ". *- "\ :. I cS.-._ - . f\ 1.) Signature Type or Print Name Diane Jaber Phone Number 206-433-1871 The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, PO Box 47474, Olympia, W A 98504-7474, immediately after acceptance of the work done under this contract. NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Department's certificate, and then only in accordance with said certIficate. To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753-3217. Teletype (ITY) users please call (800) 451-7985. You may also access tax information on our Internet home page at http://dor.wa.gov. REV 31 0020e (6-27-01) Utilities Committee lvfay 3, 2005 Present: Dave Fenton, Chair; Joan Hernandez, Jim Haggerton Jim Morrow, Frank marte, Bob Giberson, Gail Labanara, Pat Brodin, Lucy Lauterbach 1. W ater~ Power~ and Gas for Tukwila Vallev South Ji~ said there is a very tight time frame if the City is to design the 'water system for La Pianta. Highline Water Service serves the Tukwila Valley South area, but they do not have the capacity to design the system in-house. Highline's policy is for the developer to pay the costs of the design and construction of a new water system. The water pipe systeql needs to be designed with the other pipes (sewer and surface water) in the public right-of-way. Puget Sound Energy is dealing with La Pianta separately, though if their lines need to be sited in the right-of-way those lines will need to be coordinated also. The cost of designing the \vater line is $70,000 to be added to the David Evans contract. Committee members asked if Evans is able to compete the work by November, 2005 and were told he can. Funding for the water design and construction is still undecided. It may be a combination of La Pianta, Tukwila, and Highline. La Pianta wants the city to fund the water through grants and bonds. Highline will share in the cost of the major spine running do\vn the Southcenter extension, because the new pipe is a replacement for the pipe in the current road. Highline thinks the difference in the cost between the size of their current pipe and the cost of the new larger pipe should be paid by La Pianta. La Pianta wants the cost to be paid by city grants and bonds. The discussions about who pays ho\v much will continue. The design by David Evans will proceed to COW and Regular Meetings. Recommend desien bv David Evans for $70~OOO to CO'Vv. '>f= 2. Fort Dent Stormwater Pump Station #19 and Drainaee The pump station at Fort Dent was found to be undersized, in poor condition, and unable to completely pump the stonn water. Staff awarded a contract to Western Engineering Constructors to upgrade the pump station and install a compatible control panel and related equipment. Added work included grass crete to prevent maintenance vehicles ITom sinking into the soft grass between the pump station and the parking lot. It was a successful project, done by a good contractor. All runoff from Fort Dent goes to tbe pond, and the pump station then pumps it into the river. Recommend contrllct acceptance and release of retaina2e to consent a2enda of a Re2ular Meetin2. 3. 420d Ave. Brid2e Repair Last year this bridge had an erosion problem that was due to surface water runoff. That was repaired, and now a ne\v and serious problem has emerged. Due to the bridge being on a turn of the river where there is an eddy swirling at the bridge supports, dirt has eroded around the supports. After studying the problem, staff detenmned that a proper repair would be to install sheet piling. Funds are available in the bridge program to do the work. Staffwill hire a contractor and get emergency exemptions from Fish and Wildlife and SEP A Shoreline requirements. Dave said the pictures in the packet told the story of how badly the repair was needed. Recommend emen!encv declaration to COW and Re2ular Council for approval.