HomeMy WebLinkAboutCOW 2005-03-28 Item 5B.1 - Bid Award - Frank Coluccio Construction for Strander Boulevard Stormwater Pump Station #17 Construction for $1,566.424 COUNCIL A GENDI S vrvosis
I
o Initials ITEM No,
J I ANA 7 Meeting Date Prepared by 1 Mayors review Council review
3/28/05 BG ,,t,r L
ITEM INFORMATION
CAS NUMBER: 05-046 I ORIGINAL AGENDA DATE: MARCH 28, 2005
AGENDA ITEM TITLE Bid Award for construction of the Strander Blvd Upgrade Pump Station #17
CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other
Mtg Date tbltg Date ibltg Date Mtg Date Mg Date 3/28/05 flits Date Aft Date:
SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P &R Police PWI
SPONSOR'S The project was advertised on February 7 and 14, 2005 and nine bids were opened on
SUMMARY March 1, 2005. The low bid from Prospect Construction made a math error and requested
bid relief. The second lowest bidder, Americon, Inc. failed to enter a bid amount and also
requested bid relief. The third low bidder, Frank Coluccio Construction submitted a bid
with no errors or irregularities and references reported that Coluccio performs quality
work.
REVIEWED BY COW Mt CA &P Cmte F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DA1'I✓: 3/22/05
RECOMMENDATIONS:
SPONSOR /ADMIN. Award contract to the Frank Coluccio Construction Co.
COMMllTER Forward to COW and Regular with approval.
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$1,566,424.00 $2,177,000.00
Fund Source: 412 Surface Water (page 122, 2005 CIP)
Comments: Transferring $100,000 from GIS Inventory and $220, 000 from Annual Small Drainage Program
MTG. DATE 1 RECORD OF COUNCIL ACTION
3/28/05
MTG. DATE ATTACHMENTS
3/28/05 Information Memo dated March 9, 2005
Bid Tabulation
Bid Relief Request Letters from Prospect and Americon
Utilities Committee Meeting Minutes from March 22, 2005
1
INFORMATION MEMO
To:
Mayor Mullet
Public Works Directo~
March 9, 2005
Strander Boulevard Storm water PumP Station #17
Road and Draina2e Improvements
Project No. 86-DR01
Bid Award
From:
Date:
Subject:
ISSUE
Award the bid for the Strander Boulevard Stonnwater Pump Station #17 Road and Drainage Improvement
project to Frank Coluccio Construction Company, of Seattle, Washington, in the amount of $1,566,424.00.
BACKGROUND
The existing gravity conveyance system along Strander Blvd between Andover Park East and the Green River
is undersized and flooding occurs during heavy rain and high river events.
This project will install a new pump station at Bicentennial Park, a new larger conveyance system between the
intersection of Strander Blvd/Andover Park East and the Green River, and abandon the existing stonn system
and outfall to the river.
ANALYSIS
This project was advertised on February 7 and 14,2005. Nine bids were received and they were opened on
March 1, 2005. The bids were checked and tabulated. Several minor math errors were found and corrected.
The apparent low bidder, Prospect Construction, was notified of the results and asked to confinn their bid
amounts. After further review, Prospect realized that they had made an $89,885 error by not including the
cost for trench backfill in the unit price for pipe installation and requested bid relief for this project.
Two errors were found with the second place bidder, Americon, Inc., in that they had failed to enter a bid
amount for one of the bid items and they had not included tax within the individual bid items but had added
tax to the overall project. These errors caused Americon's bid to be irregular and grounds for rejection by the
City. Americon was contacted and they also requested bid relief from this project. Letters are attached.
The third low bidder, Frank Coluccio Construction Company, submitted a bid with no errors or irregularities.
References were checked on similar projects and all reported that Coluccio perfonned quality work and
recommended them for this project.
BUDGET
A total of $1,520,000 was budgeted for construction of this project. This amount included $1,270,000 from
the 412 fund and $250,000 from the Annual Streets Overlay and Repair Program in the 104 Fund. It is
recommended that funding from other surface water projects be used to complete the construction this
summer. The Strander project is of high importance; all pennits have been obtained from federal and state
agencies, there are time constraints for construction within the river, and the pavement within the project is
failing.
Mayor Mullet
Page 2
March 9, 2005
Funding would be obtained from the 2005 Annual Neighborhood Drainage Program ($220,000) and from the
GIS Inventory ($100,000). The Neighborhooq Drainage Program would still fund the ditch enclosure along
4200 Ave S in Allentown as part of the Allentown/Foster Point Water and Sewer Improvement project and
drainage improvements to 49th Ave S as part of the 2005 Overlay & Repair Program. The third phase of the
GIS effort to map existing storm drainage systems would be delayed until later in the year unless funding
allows an earlier start.
BUDGET AND BID SUMMARY
Design Engineering (PACE)
Design Engineering Supplement (PACE)
Construction (Coluccio)
Annual Overlay & Repair
Construction Engineering
PSE Power Connection
Pump Station Controller Panel
Contingency (10%)
Subtotal
Transfer from GIS Inventory
Transfer from Annual Drainage Program
Total
RECOMMENDATION
Actual
$ 192,745.00
18,425.00
1,566,424.00
204,386.00
6,000.00
30,000.00
156.642.40
$ 2,174,622.40
0.00
0.00
$ 2,174,622.40
Budeet
$ 185,000.00
0.00
1,270,000.00
250,000.00
152,000.00
0.00
0.00
0.00
$ 1,857,000.00
100,000.00
220,000.00
$ 2.177.000.00
Award the construction contract to Frank Coluccio Construction Company in the amount of $1 ,566,424.00.
attachment: Bid Tabulation
Prospect Construction Bid Relief Request
Americon, Inc., Bid Relief Request
(p:Projects\A- DR Projects\86DROlllnfo Memo Bid Award Strander)
R~~R~~;~;
PH. (253) 939-9306
Fx. (2 53) B 52 - BOB B
March 1, 2005
RECEIVED
MAR 0 2 2005
TUKW/LA
PUBLIC WORKS
Bob Giberson
Tukwila City Engineer
City of Tukwila
6300 South center Boulevard, Suite 100
Tukwila, WA 98188
RE: Notice of Bid Error
Strander Boulevard Stormwater Pump Station #~ 7
Project No. 86-DR01 .
Dear Sir,
After reviewing our bid for the Strander Boulevard Stormwater Pump Station #17,
we have discovered a substantial error and request relief from our bid. During
the preparation of our bid an error occurred which failed to total the cost of select
backfill aggregates for the pipe items. The total of this error is $89,885.00.
As backup we have attached the Excel spreadsheets used at bid time, marked
"BID FORM", and corrected spreadsheets marked "CORRECTED". The detail
sheets show bid item assemblies, which include materials, labor, equipment,
rentals and subcontract costs for each item. The totals of these assemblies are
linked to the corresponding cells on the summary sheet and then totaled for the
project.
We regret the need to request relief, but on a project of this size the error is
insurmountable. Should you have questions or need further explanation please
contact me at 253-939-9306.
Sincerely,
Prospect Construction
~~
Mike McFarland
Attachment:
PCI
P.O. BOX B7B AUBURN, WA 9B071-0B7B
FROM FAX` 42543266So 1.1 ir. 08 2005 02: 28PM Pi
1 t
1
i 1. t r
I
>i
S.
3 March 8, 2005
to
c4
q
C Ryan Larsen
C City of Tukwila
CA
Department of Public Works
0.300 Southcenter Blvd, Suite 100 VIA FAX: (206) 431 -3665
6 Tukwila, WA 98188
w
a RE: Strander Boulevard Stormwater Pump Station No. 17 Project#: 86 -DROI
Dear Mr. Larsen:
r
This letter is to notify you that an error was made when calculatigg the taxes in our bid on the
referenced project.
We respectfully request that our bid for that projc-;t be withdrawn.
CA
C
We apologize for any inconvenience this may cause and look forward to working with you on
c4 ftiture projects.
ce °Iyi ki)cmoSti•-)L....._
74' Earl M. Soushek
esident
U .i r I
Ci e
0
C4
rn
O
.7 S
V
X r t
W
J
23 SE 272 Street, Maple 'Valley, WA 98038 Phone: (425) 432 -2444 Fax: (425) 432 -6698
Utilities Committee
March 22, 2005
Present:
Dave Fenton, Chair; Joan Hernandez, Jim Haggerton
Jim Morrow, Frank Iriarte, Gail Labanara, Bob Giberson, Pat Brodin,
Ryan Larson, Mike Ronda, Lucy Lauterbach
*
1. Strander Blvd Storm Water Pump Station and Road Bid Award A project to replace the
gravity storm drainage line along Strander Blvd between Andover Park East and the Green River
is needed. Flooding currently exceeds the pipe's capacity, and a larger pipe will replace the
current facilities and a new pump station will be built. Errors were found in the two lowest bid
prices, so the third lowest bidder is the bid award recipient. Because the cost was higher than
anticipated, funds from neighborhood drainage and future GIS mapping will be used to
supplement the project budget. The contractor is Frank Coluccio and the cost is $1.566 million.
Recommend bid award to COW and Reeular Meetines.
2 Strander Blvd. Storm Water Pump Station and Road Construction Services If they had
time staff would supply the contract project management for this project. Due to their high
workload, they negotiated an agreement with Penhallegon Associates for the work. Public Works
already has a contract with Penhallegon to provide design. One supplement is for additional
design work for $18,425 and the second supplement is for construction management for
$204,386.00. Information only.
3. Cascade View Drainaee Improvement Proiect Both Water District 125 and Val Vue have
projects they would like to do to coincide with the city's street and drainage work in Cascade
View. The city has prepared interlocal agreements with both utilities. The city will incorporate
the utility work into the city project for the Val Vue Sewer district, but the bid was too high for
Water District 125, so they will be responsible for their own work. The two interlocal
agreements spell out the responsibility of both utilities and the city's responsibilities.
Recommend two interlocal aereements to COW and Council for approval.
4. Cascade View Draina2e Proiect Bid Award The Cascade View Drainage project was bid
in February and early March of this year. Three bids were received, and the lowest bid was
accepted. The project budget was $4~2 million, and the lowest bid was $3.96 million. SCI was
the low bidder. The city has worked with this contractor on many projects throughout the city,
including S. 134th, S. 160th and East Marginal Way. Val Vue Sewer work in Item 2 will be
completed for $76,704 bringing the total bid award to $4,039,204.00. Recommend bid award to
SCI Infrastructure for $4,039,204 to COW and RelWlar Meetines.
5. Cascade View Drainaee Construction Manaeement Services The city first had a contract
with KPG for design of the Cascade View Drainage in 2003. The city staff will provide
construction engineering for the project, and KPG will provide construction engineering
assistance. Information only.