CAS NUMBER: 05-050 1 ORIGINAL AGENDA DATE: MARCH 28, 2005
AGENDA ITEM TITLE Cascade View Drainage Improvements Consultant's Supplement with KPG, Inc.
CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other
Mtg Date rlitg Date Mtg Date Ml ftg Date Mtg Date Mtg Date i11tg Date: 3/28/05
SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P&R Police PIV
SPONSOR'S In December 2004, KPG began design of the Cascade View Drainage Improvement Project.
SUMMARY Final design is complete and the bid award for construction is underway. This supplement
is for KPG to perform construction management services for a fee not to exceed
$49,923.60. The majority of the construction management will be completed in- house.
REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DA'I E.: 3/22/05
RECOMMENDATIONS:
SPONSOR /ADMIN. Authorize Mayor to sign the supplement with KPG, Inc.
COM fII I EE Authorize Mayor to sign supplement and forward to COW
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$49,923.60 $568,000.00
Fund Source: 412 Surface Water (page 121, 2005 CEP)
Comments:
MTG. DATE 1 RECORD OF COUNCIL ACTION
3/28/05 1
MTG. DATE ATTACHMENTS
3/28/05 1 Information Memo dated March 16, 2005
1 Consultant Supplement with Scope of Work
Utilities Committee Meeting Minutes from March 22, 2005
1
INFORMATION MEMO
To:
From:
Date:
Subject:
Mayor Mullet
Public W orks Directo~
March 16, 2005
Cascade View Drainage Improvement Project
Project No. OO-DR06
Supplemental Agreement - Construction :Management Services
ISSUE
Authorize the Mayor to sign a contract supplement for construction management services for
the Cascade View Drainage Improvement project.
BACKGROUND
KPG, Inc., of Seattle, Washington, and the City of Tukwila entered into Contract No. 03-148
for design services related to the Cascade View Drainage Improvement project in 2003. City
staff will provide construction engineering for this project and this supplement will provide
construction engineering assistance from KPG, Inc.
ANALYSIS
A contract supplement for construction services has been negotiated for a fIxed fee not to
exceed $49,923.60. Construction services will include attendance at the pre-construction
conference and public meeting, contract submittal review, materials testing, and on-call project
support.
Base Contract
Construction Services Supplement
TOTAL
$ 512,005.18
49.923.60
$ 561.928.78
RECOMMENDATION
Authorize the Mayor to sign Supplemental Agreement No.1 to Contract No. 03-148 with
KPG, Inc., in the amount of $49,923.60.
RL:ad
attachment: KPG Supplemental Agreement No. I
(p:ProjeaslA- DR ProjcctslOODR06\Dcsignllnfu Memo KPG CoosttucUon 5uppl=)
SUPPLEMENTALAGREEMEl\'TNo.l
AGREEMENT No. 03-148
PROJECT No. OO-DR06
City ofTukwila
Public Works Department
6300 Southcenter Boulevard #100
Tukwila, W A 98188
KPG, Inc.
753 - 9th Avenue N.
Seattle, WA 98109
PROJECT: Cascade View Drainage Improvements
This SUPPLEMENTAL AGREEIvIENT NO. 1 is to supplement the agreement entered into with KPG,
Inc. and the City ofTukwila, which was executed on the17tD. day of November, 2003.
All provisions in the basic agreement remain in effet, except as expressly modified as follows:
,
Article 2, Scope of Services, shall be modified as follows:
The COllsultant agrees to provide construction support services as requested by the City in accordance
with the scope of work included as Exhibit A.
Article 3, Time for Performance, is ameIlded to change the number of calendar days for completion of
the work to read:-
Work under this contract shall commence upon the giving or written notice by the City to the Consultant
to proceed. The Consultant shall perform all services and provide all work product required pursuant to
this Agreement hv Mav 31, 2006. unless an extension of such time is granted in writing by the City.
Article 4, Paynient, shall be modified as follows:
Payment fo,-"_ work provided by Consultant shall be made as provided on Exhibit B, attached hereto,
provided that the total amount of payment to the Consultant for this work not exceed $49,923.60 without
express written modification of the Agreement signed by the City. The new total contract shall not exceed
$561,928.78 without express written modification of the Ag,.eementsigned by the City.
IN WITNESS WHEREOF, the parties hereto have set their hands and seals this
of ,2005.
day
APPROVED:
APPROVED:
CITY OF TUKWILA
KPG, INe.
~~
Nelson Davis
Principal
Steven M. Mullet
Mayor
Attested:
Jane E. Cantu, City Clerk
Exhibit A
City of Tukwila
Cascade View Drainage Improvements
OO-DROB
Construction Support Services Amendment
_ KPG, Inc
Supplemental Agreement No.1
March 17, 2005
The Consultant shall provide engineering support and testing services to assist the City
during construction of the- Cascade View Improvements as outlined below:
Task 10
Construction Support Services
10.1 The Consultant shall provide continuous project management throughout the
construction duration. This includes management of staff, contracting with a City
approved testing subconsultant and preparation of monthly invoices and
progress reports. Day to day coordination and scheduling of the testing
subconsultant will be by the City's authorized field representative.
10.2 The Consultant will attend the pre-construction conference as well as a
neighborhood public meeting with the City, Contractor, and affected utility
providers.
10.3 The Consultant will assist the City in reviewing submittals.
10.4 The Consultant will attend up to 8 project progress meetings as deemed
necessary and requested by the City field representative.
10.5 The Consultant will assist in the review of changed conditions as they arise and
make recommendation to the City for field changes/change orders. This may
also include on-call support as technical or property issues arise during
construction.
The construction duration is anticipated to be 300 calendar days with a construction start
date of mid to late May 2005.
Hour and Fee Estimate
Cascade View Drainage Improvements
Construction Support Services
Utilities Committee
March 22, 2005
Present:
Dave Fenton, Chair; Joan Hernandez, Jim Haggerton
Jim Morrow, Frank Iriarte, Gail Labanara, Bob Giberson, Pat Brodin,
Ryan Larson, Mike Ronda, Lucy Lauterbach
1. Strander Blvd Storm Water Pump Station and Road Bid Award A project to replace the
gravity storm drainage line along Strander Blvd between Andover Park East and the Green River
is needed. Flooding currently exceeds the pipe's capacity, and a larger pipe will replace the
current facilities and a new pump station will be built. Errors were found in the two lowest bid
prices, so the third lowest bidder is the bid award recipient. Because the cost was higher than
anticipated, funds from neighborhood drainage and future GIS mapping will be used to
supplement the project budget. The contractor is Frank Coluccio and the cost is $1.566 million.
Recommend bid award to COW and Re!!Ular Meetine:s.
2 Strander Blvd. Storm Water Pump Station and Road Construction Services If they had
time staff would supply the contract project management for this project. Due to their high
workload, they negotiated an agreement with Penhallegon Associates for the work. Public Works
already has a contract with Penhallegon to provide design. One supplement is for additional
design work for $18,425 and the second supplement is for construction management for
$204,386.00. Information only.
3. Cascade View Drainae:e Improvement Project Both Water District 125 and Val Vue have
projects they would like to do to coincide with the city's street and drainage work in Cascade
View. The city has prepared interlocal agreements with both utilities. The city will incorporate
the utility work into the city project for the Val Vue Sewer district, but the bid was too high for
Water District 125, so they will be responsible for their own work. The two interlocal
agreements spell out the responsibility of both utilities and the city's responsibilities.
Recommend two interlocal ae:reements to COW and Council for approval.
4. Cascade View Drainae:e Project Bid Award The Cascade View Drainage project was bid
in February and early March of this year. Three bids were received, and the lowest bid was
accepted. The project budget was $4,2 million, and the lowest bid was $3.96 million. SCI was
the low bidder. The city has worked with this contractor on many projects throughout the city,
including S. 134th, S. 160th and East Marginal Way. Val Vue Sewer work in Item 2 will be
completed for $76,704 bringing the total bid award to $4,039,204.00. Recommend bid award to
SCI Infrastructure for $4.039.204 to COW and Re!!Ular Meetine:s.
*
5. Cascade View Drainae:e Construction Manae:ement Services The city first had a contract
with KPG for design of the Cascade View Drainage in 2003. The city staff will provide
construction engineering for the project, and KPG will provide construction engineering
assistance. Information onlv.