Loading...
HomeMy WebLinkAboutReg 2005-02-07 Item 5D - Final Acceptance - Boeing Access Road Bridge Deck Rehabilitation by Concrete Barrier Inc for $509,478.93 COUNCIL AGENDA SYNOPSIS o sy T, ,ialr flaw No. q l i 1 a i l Mee/ark 1 Prepared 1 1 lfa or''re iri 1 Grath n:Yea 1 i- u i= 1 2/07/05 I BG ?MN N AAA^ I PS i� 1 ITEM INFORMATION I CAS NUMBER: 05-012 IORIGLNALAGENDA DATE: FEBRUARY 7, 2005 AGENDA ITEM TITLE Accept as complete Boeing Access Rd Bridge Deck Rehabilitation Project and release retainage. CATEGORY Discussion Motion Resofittion Ordinance Bid Award Public Heating Other Mfg Date .Aftg Date lttg Date 2Ug Date fts Deie Aftg Date lbg Date: 2 /07/05 I SPONSOR Counal 'Vigor Ado; Svcs DCD Finance Fin Legal P &R Police PIF 1 SPONSOR'S The contract with Concrete Barrier, Inc. is complete for the Boeing Access Road Bridge SU\LALARY Deck Repair Project (over the railroad tracks). Construction began July 6, 2004 and was substantially completed on September 7, 2004. Unit price overruns amounted to $65,336.93 due to increased depth of bridge deck removal, repair and additional overlay. The total contract amounted to $509,478.93. REVIEWED BY COW Mtg. CA &P Cmte F&S Cmte Transportation Cmte Utilities Cmte Arts Comm. Parks Comm. Manning Comm. DATE: 1/24/05 RECOMMENDATIONS: SPONSOR /AD\DN. Accept contract as complete and authorize release of retainage. CoM MrrrEE Accept contract and forward to Consent agenda for approval. COST IMPACT FUND SOURCE 1 EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $509,478.93 $834,000.00 Fund Source: 104.01 Bridge Inspections Repairs (page 33, 2004 (211') Comments: 1 MTG. DATE RECORD OF COUNCIL ACTION j 2/07/05 MTG. DATE ATTACHMENTS 2/07/05 Information Memo dated January 19, 2005 Notice of Completion of Public Works Contract 04-065 Transportation Committee Meeting Minutes from January 24, 2005 1 Th'FOR1V1ATION wffiMO To: From: Date: Subject: Mayor Mullet Public Works Directo~ January 19,2005 Boein!!: Access Road Brid!!:e Deck Rehabilitation Project Completion and Acceptance ISSUE Accept construction contract as complete and authorize release of retainage in the amount of $25,473.94. BACKGROUND The Notice to Proceed for Contract No. 04--065 with Concrete Barrier, Inc., of Mukilteo, Washington, was issued on July 6, 2004, for the construction of Project No. 04-RW03. The project provided bridge deck repair and overlay for the Boeing Access Road bridge over the railroad tracks. This contract was substantially completed on September 7,2004. There were no change orders for this contract. The unit price overruns amounted to $65,336.93, primarily due to increased depth of bridge deck removal, repair and bridge deck overlay. Closeout paperwork has been completed and verified, and the project is now ready for final acceptance. The contract cost is summarized as follows: Contract Award Amount Unit Price Overruns Sales Tax (N/A Rule 171) Total Amount Paid {incl. retainage} $ 444,142.00 65,336.93 0.00 $ 509.478.93 RECOMNIENDATlON It is reco=ended that this contract be forwarded to the Tukwila City Council on the consent agenda for formal acceptance and authorize the release of the retainage, subject to the standard claim and lien release procedures. BG:ad attachment: Notic<: of Completion of Public Works Contract C?-~_"'_A""LrQV.W~lo!=x>~_C3!) I 4 State of Washington IJepartr ent of Revenue PO Box 17-174 S \OE Olympia WA 98504-7474 Contractor's Registration No. (UBI No.) 179 017 188 Date 10/14/04 NOTICE OF COVIPLETION 01' PUBLIC WORKS CONTRACT From: aIDe18c Addfess of Public A,gene.i '_j Department Ilse On1k d Assigned To City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Date Assigned Notice is hereby given relative to the completion of contract or project described below Description of Contract Contract Number Boeing Access Road Bridge Deck Rehabilitation (No. 04 -RW03) 1 04-065 Contractor's Name Telephone Number Concrete Barrier, Inc. 425- 353 -7064 Contractor's Address 13036 Beverly Park Road, Mukilteo, WA 98275 -5846 Date Work Commenced Date Work Completed Date Work Accepted 7/6/04 9/7/04 Surety or Bonding Company United States Fidelity and Guaranty Company (Bond No. TC6177) i Agent's Address Bush, Cotton Scott, LLC, P.O. Box 3018, Bothell, WA 98041 -3018 Contract Amount S 444,142.00 Additions S r 65,336.93 Liquidated Damages S 0.00 Reductions S 0.00 Sub -Total S 509,478.93 Amount Disbursed S 484,004.99 Amount of Sales Tax Paid at 0.0 S 0.00 Amount Retained S 25,473.94 o various rates apply, please send a breakdown.) TOTAL S 509,478.93 TOTAL S 509,478.93 l Z Pisbiirs ng Offieer ._1 Comments: Sales Tax Rule 171 applies. Signature Type or Print Name Diane Jaber Finance Approval Phone Number 206 -433 -1871 J The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, PO Box 47474, Olympia, WA 98504 -7474, immediately after acceptance of the work done under this contract. NO PAYMENT SHALL BE MADE 1-ROM RETAINED FUNDS until receipt of Department's certificate, and then only in accordance with said certificate. To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753 -3217. Teletype (1TY) users please call (800) 451 -7985. You may also access tax information on our Internet home page at http: /dor.wa.gov. REV 31 0020e (6 -27 -01) Transportation Committee January 24, 2005 Jim Haggerton; Chair Joe Duffie Pam Carter Jim Morrow Bob Giberson Gail Labanara Robin Tischmak * 1. Boeing- Access Road Bridg-e Deck Proiect Acceptance Concrete Barrier, Inc won the contract to reconstruct the bridge deck and overlay the Boeing Access Bridge over the railroad. The work was done last summer, and had one price overrun due to increased depth of bridge deck removal, repair and bridge deck overlay. The project has been approved, and is ready for final acceptance. It is within budget. Recommend contract approval on consent ag-enda of a Regular Meeting. F ran.~ Iri arte Pat Brodin Cyndy Knighton Rhonda Berry Lisa Veruer Lucy Lauterbach Brent Carson David Markley Dave Kautz Bill Arthur Greg Sherlock 2. 2005 Traffic Count Contract Traffic counts are done monthly at 12 locations, and annually in the CBD. Requests for proposals led to a proposal that is even lower than last year's contract. Traffic Data Gathering won the contract with a proposal for S5,275. Committee approval. 3. 2005 Overlav Staff explained that they did not include K.PG, who has done the design for street overlays for many years in Tukwila, to bid, as they are involved in t~o many Tukwila projects already. Three other firms were short-listed, and W &H Pacific was selected. They will design 43'd Ave'-160'h-end; S. 164'h Military-51S'; 49'" Ave. S S.164'h - end; Macadam Road S. S. of 131stPl- N.ofS.128'"; Macadam Road S. S. 150'h-S. 1441h; S. 1151h Interurban to 40th; and tow alternatives: Southcenter Blvd 61s1_66111; and 420d Ave. Interurban- S. 124111. Approve selection ofW&H to deshm 2005 overlav to CO'W and Reg-ular Meetings. 4. Crosswalk ReQuest The School District has asked the City to approved a mid-block crosswalk at Thorndyke ITom the school to across S. 150th. The problem is that the parking lot gets too congested by all the parents who pick their kids up. Some parents wait on the north side ofS. 150th, and with all the traffic, the school thinks it dangerous for kids to be crossing to those waiting parents. Jim H agreed with Jim M's suggestion that it's a children/parent problem. A crossing guard could be used instead of a crosswalk, which provides a false sense off safety. Jim H also noted a better method would be to build the roadway ITorn the parking lot to go around the school, corning out on the east side of the school. The school had looked at that, and asked if the City would build it. Committee support for Public Works decision. 5. Klickitat Design Consultant Selection A report was done after a charette and study on the Klickitat area. A Modified 3-B option would have brought a flyover ramp over 1-5 ITom the southbound 1-5 lanes. When they asked for design proposals ITom three firms, they offered 510,000 if the firms would look at Option 3-B and analyze its feasibility, cost-benefit, and perhaps suggest another alternative. The finn Hl\TTB came up with what staff described as an elegant and simple replacement for the flyover. It is a combination bridge under the northbound