Loading...
HomeMy WebLinkAboutReg 2004-12-06 Item 5A - Bid Award - Buckley Nursery Company for Tree Installation on Tukwila International Boulevard Phase I for $90,230.02CAS NUMBER: 04-170 MTG. DATE 12/6/04 COUNCIL AGENDA SYNOPSIS Meeting Date Prepared by 1 Mayor's review 1 o,ntl review 12/06/04 BG I 1 Fund Source: 104.02 Commercial Streets (page 38, 2004 CIP) Comments: Initials ITEM INFORMATION ORIGINAL AGENDA DATE: DECEMBER 6, 2004 AGENDA ITEM TITLE Bid Award for Street Trees on Tukwila Int'I Blvd Phase I CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Heating Other Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date 12 /6/04 Mtg Date Mtg Date SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal Pe .9.R Police PW SPONSOR'S Two bids from the Small Works Roster were received on November 17, 2004. The Tow bid SUMMARY of $90,230.02 was from Buckley Nursery. References indicate that Buckley Nursery has worked on numerous Tukwila capital projects as a landscape subcontractor with very good results. REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte Utilities Cmte Arts Comm. Parks Comm Planning Comm. DATE: 11/22/04 RECOMMENDATIONS: SPONSOR /ADMIN. Award contract to Buckley Nursery Company, Inc. COMMIT"T"EE Recommend award bid and forward to Regular for approval COST IMPACT FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED $90,230.02 $150,000.00 RECORD OF COUNCIL ACTION MTG. DATE 1 ATTACHMENTS 12/6/04 Information Memo dated November 17, 2004 Bid Results 1 Transportation Committee Meeting Minutes from November 22, 2004 1 ITEM NO. 5. o, APPROPRIATION REQUIRED To: Mayor Mullet From: Public Works Director Date: November 17, 2004 Subject: Tukwila International Boulevard Phase 1- Street Trees BID AWARD ISSUE Award the bid for installation of street trees on Tukwila International Boulevard Phase 1 to Buckley Nursery Company, Inc. BACKGROUND Street trees were removed from the primary federally funded Phase 1 bid documents to gain WSDOT approval for clear zone requirements on their former Highway 99. Now that Tukwila has taken over the highway and sufficient funds exist, the street trees will be planted in the tree pits constructed in the Phase 1 construction, including a drip irrigation system. ANALYSIS INFORMATION MEMO Two bids from the Small Works Roster were received. The bids were checked and no errors were found. Buckley Nursery submitted the lowest bid and is within budget with adequate contingency. Buckley Nursery has worked on numerous Tukwila capital projects as a landscape subcontractor with very good results. Bid Results Engineer's Estimate Budget Bid Amount 90,230.02 Contingency (10 9.023.00 Total 99,253.02 $106,046 $150,000 RECOMMENDATION Award the bid for the Tukwila International Boulevard Phase 1 Street Tree project to Buckley Nursery Company, Inc., in the amount of $90,230.02, including sales tax. attachment: Bid Results (P:Projects1A• RW d: RS Projects \9IRWD3 UB11Sumet Trees\Award Info Memo) BID Y;. PRESENT BIDDER NAME DATE /TIME RECEIVED BUCKLEY NURSERY CO., INC. 11 -16 -04 11:40 A.M. A LANDSCAPING AND CONSTRUCTION 11 -16 -04 4:47 P.M. CITY OF TUKWILA OFFICE OF THE CITY CLERK TUKWILA INTERNATIONAL BOULEVARD PHASE I STREET TREES PROJECT NO. 91 -RWO3 BID OPENING November 17, 2004 10:00 a.m. THE FOLLOWING DOES NOT REPRESENT A BID AWARD YES YES TOTAL PROJECT COST APPARENT A DENDUMS INCLUDING RANK OF ACKNOWLEDGED? WSST BID YES 1 YES /s/ Jane E. Cantu, CMC. City Clerk $90,230.02 $97,920.00 The above figures appear as written within bid documents; and as read aloud at bid opening. THEY DO NOT however, REPRESENT ANY BID AWARD; apparent low, or otherwise. DATED this 17 day of November, 2004. 1 2 Robert H. Baker, CMC, Deputy City Clerk Transportation Committee November 22, 2004 Present: Joan Hernandez, Chair; Joe Duffie, Pam Carter Frank Iriarte, Bob Giberson, Gail Labanara, Cyndy Knighton, Lucy Lauterbach 1. Tukwila Urban Center Transportation Plan Additional work is needed on the Tukwila Urban Center (TUC) Plan. Mirai Associates have been working on the Plan since 2002. Staff knew these changes would be needed since 2003. As the Plan was originally going to be done in one year, additional work is needed now. The time elapsed since 2002 as well as the public comments have meant more studies and more project management are needed. Additional funds of $44,533 are requested to pay for additional workshop meetings, and traffic studies of both the TUC and Mall to Pond scenarios. No action and peak hour projections will be included. When the studies are done they will be very useful in several ways. The contract is written to run until December, 2005, but it is likely to be done in the spring of that year. Recommend Contract Supplement and funding request to Regular Meeting. 2. S. l80`" Street Proiect Acceptance The project at S. 180 won several awards including an American Public Works 2004 Project of the Year nomination. The project was originally bid over budget, but Bob Giberson volunteered to act as construction manager, thereby saving substantial funds and bringing the project in slightly under budget. It is now ready for acceptance by the City and release of the retainage. Recommend nroiect acceptance to consent agenda of a Regular Meeting. 3. Tukwila International Boulevard (TIB) Bid Award Street trees were added to this stage of development of TIB because they couldn't be added when the State owned the highway. Now that the City owns that section of TIB we are ready to plant. Two bids on the small works roster were received, with the lower bid being under budget and being won by Buckley Nursery. A drip irrigation system will also be installed. The Committee wanted to be sure the tree leaves wouldn't clog the drains. Norway Maples and incense cedars will be planted in January. Award bid for trees to Buckley Nursery for $99.253.02 at a Regular Meeting. 4. Tukwila International Boulevard Mid Block Crossings Bid Award Two mid block crossings will be added to the Phase I section of TIB. One is by the Bartell's lot and Northfield Car Wash and the other is at S. 150 near the new KFC. The crossings will be activated by pedestrians walking, and the lights will flash in the pavement. This project was bid in the small works roster, and Totem Electric won the bid that came in under budget. This project will be done between January and March, 2005 after the special poles are purchased. Award bid for $126.980.50 to Totem Electric for mid block crossings in Phase 1 at a Regular Meeting. Committee Chair approval