HomeMy WebLinkAboutReg 2004-12-06 Item 8E - Contract Supplement #4 - Tukwila Urban Center Transportation Plan with Mirai Associates for $44,533CAS NUMBER: 04-178 MTG. DATE 12/06/04 MTG. DATE 12/06/04 COUNCIL AGENDA SYNOPSIS Meeting Date 12/06/04 Prepared by CK Initials Mayor's review ITEM INFORMATION review ORIGINAL AGENDA DATE: DECEMBER 6, 2004 AGENDA ITEM TITLE Tukwila Urban Center Master Plan Consultant's Supplement CATEGORY Discussion El Motion Resolution Ordinance Bid Award Public Hearing Other Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date 12/06/04 SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P&R Police PW SPONSOR'S Mirai Associates contract No. 02 -014 was to conduct transportation planning and modeling SUMMARY services in conjunction with the Urban Center Sub -Area Plan Update, updates to the Transportation Element of the Comprehensive Plan, and revise the City's Concurrency Ordinance and Impact Fee Schedule. Additional work is needed for contract administration beyond the timeframe and public outreach. REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte Utilities Cmte Arts Comm Parks Comm. Planning Comm. DATE: 11/22/04 RECOMMENDATIONS: SPONSOR /ADMIN. Authorize Mayor to sign Supplement with Mirai Associates COMMITTEE Approve supplement and forward to Regular Council COST IMPACT FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED CITY FUNDS REQUIRED $270,793.00 $313,000.00 $313,000.00 Fund Source: 104.02 Commercial Streets (page 53, 2005 Proposed CIP) Comments: RECORD OF COUNCIL ACTION ATTACHMENTS Information Memo dated November 16, 2004 Consultant's Supplement Transportation Committee Meeting Minutes from November 22, 2004 ITEM NO. e To: Mayor Mullet From: Public Works Directo cri)T Date: November 16, 2004 ((__JJ'"" Subject: Tukwila Urban Center Transportation: Additional Modeling, FEIS, and Budget Needs Project No. 01 -RWO6 Contract No. 02 -014 SunDiement No. 4 Mirai Associates ISSUE Additional work is necessary for the TUC Plan, and additional budget is necessary for the new work as well as to cover the expense of the extended project time from the existing contract with Mirai Associates. BACKGROUND INFORMATION MEMO In February 2002, Consultant Agreement No. 02 -014 was signed with Mirai Associates to conduct transportation planning and modeling services in conjunction with the Urban Center Sub -Area Plan update, updates to the Transportation Element of the Comprehensive Plan, and revise the City's Concurrency Ordinance and Impact Fee Schedule. Three supplements to the original contract have been issued: a time extension, the "Klickitat Area" report, and an analysis of impacts surrounding the future I-405 work under design by WSDOT. ANALYSIS During the TUC work process, several issues have combined that have created a need for both additional scope and budget. Originally, this work was contracted to be completed by December 31, 2002. Delays in the planning process have extended the timeframe by over two years at this point. Additional budget is necessary for the contract administration. Further, some of the delays were due to an extended public outreach process. Additional budget and time is necessary to account for the workload and staffing impacts. And finally, during the TUC process, the need for additional work arose to complete the study in a logical, effective manner. Budget needs to be increased to accommodate the additional work. RECOMMENDATION Approve and execute Supplement No. 4 with Mirai Associates. h:\pubworks \cyndy \tuc \information memo mirai supplement #4 -feis and additional scope &budget.doc SUPPLEMENTAL AGREEMENT NO. 4 to CONSULTANT AGREEMENT NO. 02 -014 THIS SUPPLEMENTAL AGREEMENT is entered into between the City of Tukwila, Washington, herein -after referred to as "the City," and Mirai Associates, hereinafter referred to as "the Consultant," in consideration of the mutual benefits, terms, and conditions hereinafter specified. The City desires to supplement the agreement entered into with the Consultant and executed on, February 8, 2002, and identified as Agreement No. 02 -014. All provisions in the basic agreement remain in effect except as modified by this supplement. The changes to the agreement are described as follows: 1. Scope of Services, is hereby changed to include performance of the services, identified on Exhibit "A" attached hereto, including the provision of all labor materials, equipment and supplies. 2. Payment, shall be amended as follows: DATED this Payment for the work provided by the Consultant as part of this supplement shall be made as provided on Exhibit "B" attached hereto, provided that the total amount of payment to the Consultant for Supplement No. 4 shall not exceed $44,533 without express written modification of the Agreement signed by the City. The maximum amount payable under this agreement as supplemented inclusive of all fees and other costs is now $270,793. 3. Time for Performance, is amended to change the number of calendar days for completion of the work to read: Work under this contract shall commence upon the giving or written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product required pursuant to this Agreement by December 3L 2005, unless an extension of such time is granted in writing by the City. day of 20 CITY OF TUKWILA MIRAI ASSOCIATES Steven M. Mullet, Mayor By: Print Name: Title: Exhibit "A" Tukwila Urban Center Subarea Plan /Supplemental EIS (Tukwila Urban Center /CBD Master Plan) Scope of Work for Transportation Amendment #4 (Supplement No. 4) The Scope of Work for Transportation (Exhibit A), attached to the Consultant Agreement between the City of Tukwila and Mirai Associates, for Urban Center Subarea Plan/Supplemental EIS, executed on February 8, 2002, as amended, will be amended as follows: Phase 0. Project Management The following paragraphs will be added to Project 0, Project Management section: The time for performance in the Consultant Agreement between the City and the Consultant will be extended from December 31, 2002 to December 31, 2005. Mirai project manager will continue to carry out the task for coordinating with city's project manager, Public Works staff and Community Development staff for all aspects of Mirai tasks, including producing high quality products and meeting the agreed schedule. Mirai project manager and his support staff will prepare materials necessary for presentations to staff/consultant team workshops, coordination meetings, and community /public workshops as instructed by the City project manager. The consultant will attend 14 additional coordination/workshop meetings. Budget Amendment: Project management: (36 month x 4 hours per month of Project Manager x $139.59 per hour $21,100.96) Additional coordination/workshops (4 hours of Project Manager per workshop x 14 times x $139.59 per hour=$7,817.04) Subtotal: $28,918.00 ($21,100.96+$7,817.04) Phase 1. Existing Conditions, Issues and Opportunities Task lc. Develop Travel Demand Forecasting Model The third paragraph in Task 1 c will be replaced with the following: Page 1 The Consultant will develop an initial 2020 No- Action Traffic Model based on the land use forecasts provided by Community Development staff and the roadway network that reflects the committed road facility improvements for the entire City. This initial 2020 No- Action model will be used to formulate needed traffic mitigations that will support Tukwila Urban Center (TUC) land use concepts. Mirai will focus on the development of the model for the PM peak hour. The Consultant will refine the initial 2020 TUC No Action Model and create the 2020 No Action Model that can be used for the Tukwila Urban Center EIS. The Consultant will develop the 2020 No Action Model based on revised land use forecasts provided by the Community Development staff. The City project manager will provide clear direction related to the 2020 No Action roadway network. The Consultant will process the revised 2020 No Action traffic volumes from the model for level of service (LOS) calculations. Applying the post processed 2020 No Action volumes, the consultant will calculate intersection levels of service for the TUC area, using Synchro software. The Consultant will update the 2020 TUC Mall to Pond Alternative Traffic Model. This model is referred to as the revised 2020 TUC preferred alternative model. The Community Development staff will provide a set of revised 2020 land use for the preferred alternative. Budget Amendment: Revised No- Action Model and refined Preferred Alternative Model: $7,935.00 (75 hours of Senior Modeler x $105.80 per hour) Revised No Action LOS calculations: $3,840.00 (64 hours of Engineer x $60.00 per hour) Subtotal: $11,775.00 ($7,935.00 +$3,840.00) Phase 2. Alternatives Analysis Task 3a Conduct Impact Analysis Preferred Alternative —2 Analysis will be replaced with the following: 2. Analysis The consultant will identify the magnitude of 2020 transportation problems with No Action and evaluate transportation facility needs for two TUC development alternatives. The consultant will identify impacts to arterial intersections and roadways within the TUC area and develop a list of recommended improvements to support TUC alternatives. The consultant will assist the land use consultant to select a preferred alternative based on the transportation facility needs. For the impact analysis on the roadway system, Mirai will use the Tukwila model developed in Task lc. Page 2 The consultant will calculate PM peak hour levels of service and simulate the existing and future conditions with a traffic operational model, using Synchro software. The operational model will be developed for arterial corridors. The consultant will carry out five sets of levels of service calculations: 1) Initial No Action Alternative, 2) Mall -to -Pond Alternative, 3) Mall -to Station Alternative (Preferred Alternative), 4) Revised No- Action Alternative, and 5) Revised Preferred Alternative. Budget Amendment: Revised Preferred Alternative LOS calculations: $3,840.00 (64 hours of Engineer x $60.00 per hour) Total Added Budget Amount: Project management: Revised No- Action Model: Revised Preferred Alternative LOS calculations: Total $28,918.00 $11,775.00 $3.840.00 $44,533.00 Page 3 Title Project Manager Task Management Project Manager Phase O. Project M Issues 1 Existing Conditions Phase and Oppor tunities P hase 2. Alternatives Analysis E "B" ntat EIS Ian�Supp Urban Center Subarea M Plan) 'Tukwila Urb Center (Tukwila Urban F Amen dment #4 (Supplement No. 4) Eng ineer Enginee Hours 200 hours 75 hours 64 hours 64 hours Rate $139. $139. $60.0 $60.00 TOTAL Amount $28,918. $7 ,935. $3,840.0 $3,840.0 $44,533.0 Page 4 Transportation Committee November 22, 2004 Present: Joan Hernandez, Chair; Joe Duffle, Pam Carter Frank Iriarte, Bob Giberson, Gail Labanara, Cyndy Knighton, Lucy Lauterbach 1. Tukwila Urban Center Transportation Plan Additional work is needed on the Tukwila Urban Center (TUC) Plan. Mirai Associates have been working on the Plan since 2002. Staff knew these changes would be needed since 2003. As the Plan was originally going to be done in one year, additional work is needed now. The time elapsed since 2002 as well as the public comments have meant more studies and more project management are needed. Additional funds of $44,533 are requested to pay for additional workshop meetings, and traffic studies of both the TUC and Mall to Pond scenarios. No action and peak hour projections will be included. When the studies are done they will be very useful in several ways. The contract is written to run until December, 2005, but it is likely to be done in the spring of that year. Recommend Contract Supplement and funding request to Regular Meeting. 2. S. 180 Street Project Acceptance The project at S. 180` won several awards including an American Public Works 2004 Project of the Year nomination. The project was originally bid over budget, but Bob Giberson volunteered to act as construction manager, thereby saving substantial funds and bringing the project in slightly under budget. It is now ready for acceptance by the City and release of the retainage. Recommend project acceptance to consent agenda of a Regular Meeting. 3. Tukwila International Boulevard (TIB) Bid Award Street trees were added to this stage of development of TIB because they couldn't be added when the State owned the highway. Now that the City owns that section of TIB we are ready to plant. Two bids on the small works roster were received, with the lower bid being under budget and being won by Buckley Nursery. A drip irrigation system will also be installed. The Committee wanted to be sure the tree leaves wouldn't clog the drains. Norway Maples and incense cedars will be planted in January. Award bid for trees to Buckley Nursery for $99.253,02 at a Regular Meeting. 4. Tukwila International Boulevard Mid Block Crossings Bid Award Two mid block crossings will be added to the Phase I section of TIB. One is by the Bartell's lot and Northfield Car Wash and the other is at S. 150 near the new KFC. The crossings will be activated by pedestrians walking, and the lights will flash in the pavement. This project was bid in the small works roster, and Totem Electric won the bid that came in under budget. This project will be done between January and March, 2005 after the special poles are purchased. Award bid for $126,980.50 to Totem Electric for mid block crossings in Phase 1 at a Regular Meeting. Committee Chair approval