Loading...
HomeMy WebLinkAboutCOW 2004-11-22 Item 4G - Contract Supplement #1 - Southcenter Parkway Extension Design with David Evans & Associates for $79,615 COUNCIL AGENDA SYNOPSIS 4 w ky Initials ITEM NO. 0 1 iZ 1S-1 Meeting Date 1 Prepared by 1 Mayor review 1 Council review 0 N �o� 11/22/04 1 RT 131M lf L" ITEM INFORMATION CAS NUMBER: 04-168 I ORIGINAL AGENDA DATE: NOVEMBER 22, 2004 AGENDA ITEM TITLE Southcenter Pkwy Extension Consultant's Supplement CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date 11 /22/04 SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P &R. Police PW SPONSOR'S David Evans Associates' contract No. 04 -025 was for design of the roadway SUMMARY improvements on Southcenter Parkway Extension. Additional design work is necessary for the sewer from Minkler Blvd to S 200 St as well as an additional 1,400 feet of roadway to reach the southern -most City Limit. REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte Utilities Cmte Arts Comm. Parks Comm. Planning Comm. DATE: 11/8/04 RECOMMENDATIONS: SPONSOR /ADMIN. Authorize Mayor to sign Supplement with David Evans Associates COMMITTEE Approve supplement and forward to COW and then Regular Council COST IMPACT FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED CITY FUNDS REQUIRED $430,192.00 $461,000.00 $111,000 Fund Source: 104.02 Commercial Streets (page 40, 2005 Proposed CIP) Comments: Supplement No. 1 for $79, 615 bringing the total contract to $430,192,00. Federal Hwy Surface Transp. Program grant of $200, 000 and State Arterial Program grant of $150, 000. MTG. DATE RECORD OF COUNCIL ACTION 11/22/04 MTG. DATE ATTACHMENTS 11/22/04 Information Memo dated November 3, 2004 Consultant's Supplement No. 1 Transportation Committee Meeting Minutes from November 8, 2004 INFORMATION MEMO To: From: Date: Subject: Mayor Mullet Public Works Director November 3, 2004 Southcenter Parkway Extension - S 180th St to South City Limit~ P .S. &E. Contract- Supplement #1 ISSUE Authorize the Mayor to sign Contract Supplement #1 with David Evans & Associates, Inc., to provide additional roadway design and sanitary sewer P.S. & E. for the Southcenter Parkway Extension project. BACKGROUND The City has contracted with David Evans & Associates, Inc., to provide P.S. & E. for the extension of South center Parkway from S 180th St to the South City Limits. The project design is being coordiIiated with the proposed Segale development and annexation. Additional design work is necessary for design of the sanitary sewer from Minkler Blvd to S 200th St as well as an additional 1,400 feet of roadway design to reach the City's southern-most City Limit. Preliminary 'design work on the sanitary sewer was prepared by the Segale design team. This supplement will allow David Evans & Associates to prepare, fmal plans and the specification manual for bidding and construction. The current contract, Supplement #1, and budget amounts are: Contract Budaet Existing Preliminary Engineering Contract Supplement #1 Total $ 350,577 79.615 $ 430,192 $ 461,000 ANALYSIS A contractsupplementforpreparationofP.S. & E. has been negotiated in the amount of $79,615.00. This contract is within budget and will provide design services for the sanitary sewer line from S 180th St to S 200th St and approximately 1,400 feet of additional roadway design including. advertisement for construction bids. RECOMMENDATION Authorize the Mayor to sign Contract Supplement #1 with David Evans & Associates, Inc., in the amount of $79,615.00. attachment: Consultant Agreement (P:ProjectsIA- RW & RS Projectsl84RW37 57 Ave ExtlTCMEMO-Sup 1) . ~. .... "II Washington State Department of Transportation Organization and Address Supplemental Agreement David Evans & aSSOcLates, Inc. 4l~ llHth Ave SE Bellevue, WA 98005 Attn: Catherine Mirkin, PE Agreement Number 04-025 Project Number Phone (425) 519-6582 Project Title Southcenter Parkway Extension Project New Maximum Amount Payable $ 430,192.00 Description of Work The supplemental scope of services includes preparation of plans, specifications and estimates (PS&E).for 7000 If of sanitary sewer main and 1400 If of roadway widening onSouthcenter Parkway. The Local Agency of City of Tukwila desires to supplement the agreement entered into with David Evans & Associates, Inc. and executed on April 5, 2004 and identified as Agreement No. 04-025' All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1 , SCOPE OF WORK, is hereby changedto read: Additional work is described in Exhibit B-2 II .. Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: Completion Date: July 1, 2005 III Section V, PAYMENT, shall be amended as follows: Additional payment in the amount of $79,615 shall be added to the contract (see Exhi.bi.t D-:lJ as set forth in the attached Exhibit A,and by this reference made a part of this supplement. If you concur with this supplement and agree to tt,e changes as stated above. please sign in the appropriate spaces below and return to this office for final action. By: (afhi'\"in't' e. t'tlr/t.:". D_JJe-vu", I AJ,ft r; By: (JHAA~ ,;:7h~ L.-~ Consultant Signature Approving Authority Signature DOT Form 140-063 EF Revised 10/97 Exhibit "A" Summary of Payments Total Basic Agreement Supplement #1 Total $108,162.00 $2b,088.00 $134,250.00 $183,833.00 $44,340.00 $228,173.00 $ 26,133.00 $ 1,360.00 $ 27,493.00 $ J2,449.00 $ 7,827.00 $ 4O~276.00 $350,577.00 $79,615.00 $430,192.00 Direct Salary Cost Overhead (Including Payroll Additives) Direct Non-Salary Costs Fixed Fee DOT Form 140-063 EF Revised 10/97 CITY OF TUKWILAENGINEERING DESIGN SERVICES SOUTHCENTERP ARKW AY EXTENSION PROJECT SCOPE OF SERVICES SUPPLEMENT #1 SECTION 1.00 PROJECT DESCRIPTION AND DELIVERABLES PROJECT DESCRIPTION This supplemental scope ,of services includes preparation of plans, specifications and estimates (PS&E) 'for the sanitary sewermainJrom South 200th Street to Minkler Boulevard (roughly 10,20010 and 1400 If of roadway widening on Southcenter Parkway from the existing south city limit to the future south city limit. The roadway section will include a five-lane roadway (two lanes in each direction with a center two-way left turn lane) with curb, gutter and six-foot sidewalks onthe both sidesofthe road., Other improvements include an enclosed storm drainage system, illumination,. utility relocations, channelization and signing. Construction documents for the sanitary sewer main and the additional'1400 If of roadway widening will be incorporated into the PS&E documents being prepared under the basic scope of services for the Southcenter Parkway Extension Project. It is assumed the sanitary sewer main will be a gravity flow system. If a pump station is required instead ofa gravity main system it will be considered an extra service to provide that design. 1.02 PROJECT DELIVERABLES FURNISHED BY THE CONSULT ANT The Consultant shall maintain a project file for pertinent work items. These files win be delivered to the City at the conclusion of the project. In addition to the project files, the Consultant shall ,deliver the following documents and products to the City as part of this agreement: . PS&E contract plans for review at 60% and 90% submittals (25 sets of half-size plans and 25 specs) and one final set of signed reproducible contract documents (10 full size plans and 50 half-size final plans and specs 1.03 ITEMS FURNISHED BY THE CITY . All available "As-Built" information; . Any applicable preliminary design, geotechnical or environmental documentation; . CityofTukwilaComprehensive Plan (sanitary sewer section only);and DAVID EVANS AND ASSOCIATES, INC. c:\windows\temp\southcenter - supplemental services #1.doc, Scope of Services SECTION 2.00 PROJECT MANAGEMENT AND QUALITY CONTROL 2.01 PROJECT MANAGEMENT Direction of the Consultant staff and review of their work over the course of the Project shall be provided. This work element includes preparing the monthly progress reports, invoices, attending progress meetings, and planning work items for the following month. Periodic monitoring of the Consultant's design budget will occur over the course of the Proj ect. Current status, as, well as budget projections, will be developed. This work element is intended to help monitor costs and budgets and to,propose corrective actions. These actions could include fonnal requests for scope modifications and respective budget adjustments. Drawings and documents received and generated over the course of the Project will require review, coordination and file management to be completed by the Consultant. 2.02 COORDINATION MEETINGS No additional coordination meetings are anticipated for the roadway widening work. Coordination meetings for the sanitary sewer design is cover under Section 6. 2.03 QUALITY CONTROL/QUALITY ASSURANCE REVIEW This task is for QC/QA review of the Consultant's deliverables by a designated QC/QA staff member. The review shall cover documents, reports, plans, specifications, cost estimates and pertinent infonnation on an ongoing basis. The QC/QA program entails the periodic review of study criteria, design, assumptions,.concepts and presentation of product fonnat and assures that the overall Project objectives are being fulfilled. The City will provide additional quality review. This will be coordinated with the Consultant Project Manager and pertinent staff members. Support groups within the City will review and provide direction of pertinent work items and will coordinate with the Consultant Project Manager and pertinent staffmernbers. DAVID EVANS AND ASSOCIATES, INC. 2 c:\windows\templsouthcenter - supplemental services # \.doc Scope of Services 3.01 BASEMAPPING The basemapping for the. 1400 lfofroadway widening has been completed by Segale Business Park (SBP) and shall be made available to the Consultant. The Consultant shall prepare the base map for the sanitary sewer design from South 180th Street to Minkler Blvd usingtheSBP, survey, info and City of Tukwila GIS info. If additional topographic survey is necessary, to complete the, sanitary sewer design, the survey work will be covered under Section 3.0l of the basic services agreement for the Southcenter Parkway Extension Project. DAVID EVANS AND ASSOCIATES, INC. 3 c:lwindowsltemplsouthcenter - supplemental services #\.doc. Scope of Services SECTION 4.00 DESIGN The Consultant shall design and prepare roadway plan/profiles from the existing south city limit an additional 1400 ,If to the'so':!thand sanitary sewer main plans from South 200th Street to Minkler Boulevard. 4.01 REVIEW EXISTING DATA AND ESTABLISH DESIGN STANDARDS The Consultant shall review the following documents for relevant geometric design criteria and establish applicable design standards for: the project. . SouthcenterParkwayExtension Design 'Report; . City of Tukwila Engineering Design and Development Standards; . AASHTO Policy on Geometric Design of highways and Streets (1994); . WSDOT Design Manual; . WSDOT Local Agency Guidelines, and . Manual of Uniform Traffic Control Devices. Particular emphasis shall be, placed ,on identifying those elements that may be subject to interpretation, engineering judgment or modification due to adverse field conditions. All elements shall be reviewed with City staff prior to the start of detailed design. In preparation of the sanitary , sewer main design the Consultant shall review the following documents: . CityofTukwilaComprehensive Plan (Sanitary Sewer Service) . Department of Ecology Design Criteria for Sewerage Works . City of Kent Comprehensive Plan (Sanitary Sewer Service) . SegaleProperty EIS (for sanitary sewer loadings) The Consultant shall prepare all drawings using AutoCAD R2000 in conformance with City standards. Project schedules shall be prepared using Microsoft Project, spreadsheets in Microsoft Excel and text documents in Microsoft Word. 4.02 PROJECT SITE VISITS (2 TOTAL) The Consultant shall conduct one site visit with City maintenance, design, and construction staff to review and discuss design considerations. Where appropriate, elements identified by these site visits will be incorporated into design. The Consultant shall. conduct one additional site visit with City staff to resolve design questions and issues. DAVID EVANS AND ASSOCIATES, INC. 4 c:lwindowsllemplsouthcenler. supplemental services #I.doc. Scope of Services , ,...'" 4.03 INTERMEDIATEUESIGN (60% COMPLETION) The Consultant shalLdevelop the design to a 60% completion level, and participate in a review coordination meeting to respond to City staff questions and comments (covered under the basic services). The City will provide one consolidated set of review comments. Review comments will be responded to and incorporated as applicable into the design. The 60% design will include the following elements, as a minimum, prepared by the Consultant: . Roadway plans and profiles (4 sheets); . Miscellaneous details(l sheet); . Channelization and signing plans (2 sheets); . Illumination plans (2 sheets); . Temporary erosion/sedimentation control plans (4 sheets); . Sanitary sewerrmiinplanandprofiles (20 sheets); . Sanitarysewer main details (1 sheet); . Construction Cost Estimate; ,and . Specifications 4.04 FINAL DESIGN (90% COMPLETION) The Consultant shall prepare a complete'design for review by the City and participate in a review coordination' meeting to respond to 'City, staff questions and comments (covered under the basic services). The City will provide one consolidated set of review comments. Review comments will be responded to and incorporated as applicable into the design. The 90% design shall include the following elements,' asa minimum, prepared by the Consultant: . Roadwayplans and profiles (4 sheets); . Miscellaneousdetails (I sheet); . Channelization and signing plans (2 sheets); . Illumination plans (2 sheets); . Temporary erosion/sedimentation control plans (4 sheets); . Sanitary sewer ma.in plan and profiles (20 sheets); . Sanitary sewer main details (I sheet); . Construction Cost Estimate; and . Specifications The Consultant shall calculate quantities and prepare a detailed construction cost estimate. 4.05 PREPARE FINAL CONTRACT DOCUMENTS (100% COMPLETION) The Consultant shall prepare final contract documents in accordance with City's review comments from the final design coordination meeting and in accordance with regulatory agency pennit conditions. The following work shall be completed as part of the final contract document preparation: . Plan modifications and/or revisions in response to City review comments from the final design coordination meeting; . Final design ofproject elements; DAVID EV ANSAND ASSOCIATES, INC. 5 c:lwindowsltemplsouthcenter - supplemental services #\.doc, Scope of Services . SpeciaF>provisionsand listing of City standard specifications, with fill-ins, to be iIlcorporated.in the construction contract documents, and . Prepare a final (100% Completion) list of bid items, quantities, and a construction cost,estimate for a set of signed and reproducible construction contract documents. The Consultant shall assemble all plan sheets, general and special provisions, cost estimate, and associated documentation ,for" submittal as an Ad Ready PS&E package. The Consultant shall prepare the advertisement ,'for ,bid and reproduce the construction documents. The City will distribute plans and specifications to prospective bidders. DAVID EVANS AND ASSOCIATES, INC. 6 c;lwindowsltemplsouthcenter - supplemental services #\.doc, Scope of Services SECTIONS.OO UTILITY COORDINATION It is assumed the utility coordination work for the 1400 lf of roadway widening can be completed under the basic sc:opeofservices. The Consultant shall provide additional coordination and participate in meetings as required to identify, existing utilities, determine and resolve utility conflicts with the proposed sanitary sewer design. 5.01 NOTIFICATION.oF UTILITIES The Consultant shall notify the City and franchise utility companies of the sanitary sewer design and arrange to have, the utility locations surface marked and request utility as-builts. The City and Consultarit shall collaborativelydevelopa list of utility companies within the existing City right-of-way. The Consultant shall contactthe utility companies. 5.02 COORDINATION MEETINGS It is assumed that no additional coordination meetings will be required for the 1400 lf of roadway widening, and any coordination ' for the sanitary sewer,main design will be consolidated into the roadway coordination meetings identified in the basic scope of services. 5.03 UTILITY COORDINATION The Consultant shall. prepare the, roadway widening and sanitary sewer main design to avoid known utility conflicts if practical. The Consultant and the City shall identify utilities that need to be potholed.Potholingwill be completed by an AirN ac System. The Consultant shall meet with each affected utility company one (1) time in the office and one (1) time in the field. The City will pothole city-owned , utilities if necessary~ Franchise utilities will pothole their own utilities if necessary at their own expense. All utility conflicts shall be identified and potholed prior to submittal of 60% plans. The Consultantshall provide hard copies and electronic files of proposed plans to the utility companies. Plan will be provided at the 60% and 90% submittals. DAVID EVANS AND ASSOCIATES, INC. 7 c:lwindowsllemplsouthcenler - supplemental services 1# \.doc Scope of Services SECTION 6.00, AGENCY COORDINATION The Consultant shall' provide"agency coordination and participate in meetings as required to ensure full coordination with local agencies. 6.01 COORDINATION WITH CITY OF TUKWILA UTIL TIES The basic scope of servicesinc1udedConsultant participation in up to two (2) meetings with the City, of Tukwila Utilities Department to provide coordination for the horizontal and vertical aligmnent of the proposed sanitary sewer line proposed along the Southcenter Parkway Extension. It is anticipated an additional two (2) meetings will be required with the City Utilities Department to complete the design work. 6.02 COORDINATION WITH CITY OF KENT/KING COUNTY The basic scope of services included Consultant participation in up to two (2) meetings with the City of Kent and King County regarding potential improvements south of the City of Tukwila City limits. It is anticipated these two meetings will be sufficient to coordinate the complete sanitary sewerdesigh. DAVID EVANS AND ASSOCIATES, INe. 8 c:lwindowsltemplsouthcenter - supplemental services # l.doc, Scope of Services ~"- SECTION 7.00 PRIVATE PROPERTY OWNER COORDINATION The Consultant shall coordinate, the design of the sanitary sewer main with the private property improvements adjacent to the SouthcenterParkway Extension project. 7.01 COORDINATION WITH LOCAL DEVELOPMENT The Consultant shall participate in up to two (2) meetings with SBP to coordinate potential developmenfwith the sanitary sewer main design. The Consultant shall prepare meeting minutes and distribute them to theCitywithin five (5) days of the meeting. The Consultant shall also work withiexisting developments between South 180th Street and Minkler Boulevard that are impacted by the sanitary sewer main design. 7.02 DESIGN ISSUES WITH LOCAL DEVELOPMENT The Consultant shall address and coordinate design issues that arise between the potential private developmenLand the SouthcenterParkwayExtension project. The Consultant shall work with the private' property ownertoprovide sanitary sewer service stub locations and inverts. The Consultant shall also work with the private property owner to coordinate frontage improvements along the 1400 If or roadway widening. DAVID EVANS AND ASSOCIATES, INC. 9 c:lwindowsllemplsoulhcenler - supplemental services #1.doc. Scope of Services Southcenter Parkway Extension Project Supplemental Services #1 Estimated Pension Hours Summary , , ('I 1\ ~i"" co 0' cO) <'"'<'"' ~ ~\ ~ ifI ~fi1 0 0 -'=- 0 r ..'r , :I i, if "" "" "t:: ::t:: go> ~~ I ! a. ~ , ::J th.~ 0'<:: (j) (j) r ~ > " ,. OtJ:> >S ifI ", ? G) j;.~ -'=- I." J-,0 0 " r ~ G) , '-' ~t- _ifI ? \i: ~~ ::> tIt~ , (j) 0 r ,', , Ii; \ g> I.OlO row ? <0 j;.~ g:~ " ::> ~ (j) ~ -5 ~ 1.0 Sf/) G) .... ~-'=- III r tit .... \ <II .; co"'" ~ ~' C ',," <I) ~.... 0 '0 r I ", (j) "(j; c ~ 1.0 (") ro<ll " , W <I) ~ .... 'O.G '0 r (j) ~ C S(/) I (") '" ' . III .i!! j;. .... ::.':C cA 0.. I. I -d -5 1.0 %~ / c ~ 0> ~ .':? I- ~ 'ci I <0 ~eD -a~ ,', \ ;::. ~ tit 0'<:: I- t;j ''6 I ;::. 0 ~ w , ~ -<I" t- -'=- , cA tit 0 I- -<I" eD ~" ~ ~ ~ iO <II lO :c () 0 tit 0 I- 2 ~ ~~ ".1'" tJ:>1.O () ~ , in 0 0 I- ...,. lO ,fi,'6 0"," cae ~ &~ ~ -0'<:: , I- eo co tJ:>eD .'6 ~(") iO~ W ~ -0.<:' , tit ' ' I- ~ "" "" '" ~ ~('I iO <II 0.. tit -0 :c \ I- g g.... _w ~:c tit ::.' l I' ,,' , " ifI f.I) c: Q) <I) 0 c: '% ~ ~ ::;I c ~ ~ <I) > _ 0 , L:>'-'- 0"'0 -'" ::;I <I) () (j; 0- ~ ' ':._ 'i~'<:: l- . coo co;':: 0,;:> -0 OJ () \~ <I) 0 " <I) '5 c.<::;::: 0.0,;:> <I) :a;'::"': 0 ~ E ...3o~ <1)\'0'- c OC %_-0 o 8.9. ...~o I ~ . I;' "to 0.. I ~ '-' .<; <.),<;. Sc: 'B~ c:'B OJ'.;:o. o a i~ g g t 16 8:5 ~(){) p..~ ~~ o~ ('1\ 0 ....'" 00 0 C< c<C< ..0..0 <6<6 <6 t- ~'" i:5 Q) 'C:' 'e: ~ 0.. ~ ~* E ''jj) ~,~ ('I ~ .~(/) ."X~;5 OW(\)0 .... (f).c:. ~ ~ro C. .-;: ~ 'C ~ )( ... (\) ,... UJ~~&. .... - "0 ~ %.~ c ':) ~ t\ (f) .g :S(/) -g W (f) '< ('I N ~ ..... <'"' ('I <I> en '" (l. - EXHIBIT D-2 SOllthcenter Parkway Extension Project.. Estimated Person-hours/Costs Summary Supplemental Services #1 Summary Classification Hrs. x Rate = Cost 1 PrincipallQuality Control 6 $50.00 $300 2 Project Manager 116 $46.00 $5,336 3 Sr; Engineer 142 $36.00 $5,112 4 Design Engineer 242 $30.00 $7,260 5 Sr CADD Drafter 8 $28.00 $224 6 CAPD Drafter 276 $22.00 $6,072 7 Sr. Traffic Engineer 4 $40.00 $160 8 Traffic Engineer 16 $29.00 $464 9 Landscape Architect 16 $35.00 $560 12 Senior Environmental Planner 0 $43.00 $0 13 Senior Scientist 0 $35.00 $0 14 Scientist 0 $29.00 $0 15 Environmental Tech 0 $26.00 $0 16 Survey Manager 0 $45.00 $0 17 Survey Office 0 $29.00 $0 18 Survey Crew 0 $40.00 $0 19 Support I Clerical 30 $20.00 $600 Total Hrs. 856 Overhead Cost' @ Net Fee .@ Subtotal 169.96% of Direct Labor 30.00% of Direct Labor $26,088 $44,340 $7,827 $78,255 Direct Salary Cost Direct Non..salary Cost a) Reproduction, Plans Reports b) Deliveriesl Mail c) Travel (Personal Miles) d) Utility locate (APS) e) Potholing (APS) Subtotal 800 Sheets @ $0.75 ISheet $600 o Each @ $45.00 lEach $0 2 Each @ $15.00 lEach $30 100 Miles @ $0.30 IMile $30 2 holes @ $350.00 hole $700 $1,360 Hrs. $79,615 Total Updatad 1/8/99 Printed 11/12/2004 " Transportation Committee November 8, 2004 Present: Joan Hernandez, Chair; Pam Carter, Joe Duffie Pat Brodin, RobinTischmak, Jim Morrow, Kevin Fuhrer, Alan Doerschel, Frank lriarte,Oail Labanara, Lucy Lauterbach 1. Interurban Avenue South Desi!!nThe cityhas received a $396,000 federal grant for funding the design of road improvements on Interurban Avenue S. from 143rd to Fort Dent Way. After interviewingfiveofthe fourteenfirmsthat were interested, staff chose KPO by a wide margin. Theyscored higher than other companies on every rating criterion. The design and engineering costs of $434,710.24 are withintheproject budget, although Joan noticed that in the CJP there is notmoneyfor construction until after201O. She asked if the design work being done now would still be useful ifconstruction didn't occur until that many years ahead, and Jim assured her it would. The Committee approved the scope of work that was included.. Authorize mayor to shm contractwithKPG fordeshm services for Interurban. 2.' SouthcenterParkwavExtension SuoplementDavid Evans already has a $351,000 contract to design theextensionof~outhcenter Parkway to the south city limits. Additional design work is needed for the sewer line from Minkler to S.200th and the additional 1 ,400 feet of roadway to reach the city's southern boundary, so a supplement to the contract has been prepared. Segale did some preliminarydesignworkonthe sewer, but the majority of design still remains to be done. A supplement has been negotiated inthe amount of $70,615, and is within budget. Advertising for construction is included in the work. Jim said the City cannot afford to build the road or sewer without bonds, and wecouldn't pay the bond payments without assistance from the TVS project. Pam pointed outthat the only reasonfor the sewer project is to serve the TVS project. The sewer money is within the S.180th Street project in the CJP. Recommend authorizint!; mavor tosi!!n supolement for extension., 3. Tukwila International Boulevard (TIB} Phases 2 and 3 of the TIB project were previously discussed in late 2003 and early 2004, but there was not enough money to do both phases, so the southern section that would continue the previous improvements north, had been chosen. Since the first of the year the City has received more funding, and is now able to do both phases, if some savings are found.' The Committee considered the $16.5 m and $l6.15m versions and recommended the $16.15 million dollar version, and also considered other savings that could be made if necessary., Move discussion to COW" 4. Cascade View Park Cascade View Community ,Park construction is complete, and the city is ready to release theretainage of the contractor. Though the contract was largely done in 2003, there were a number of landscape issues that have remained open. Those are now resolved, and the project canbe closed out Joan a.skedwhat the $8,571.20 cost overruns were for and \vas informed they were partly for gravel, asphalt and the sidewalk extension. Recommend Droiect acceDtance and release of retaina!!eto consent a!!enda of a Re!!ular Meetin2, ,'~