HomeMy WebLinkAboutReg 2004-10-04 Item 7B - Contract - Boeing Access Road Bridge Replacement with Sargent Engineers for $74,252 W: COUNCIL AGENDn SYNOPSIS
a• 2'S, Initials ITEM NO.
-a 9.4 Meeting Date 1 Prepared by 1 Mayor's review 1 Council review
u���'4° 0 9/27/04 I RTC I
lr 4
10/4/04 1 B. Baker t 4cvvv'. L /i.. Fi
rsoe I I I b
1 1
ITEM INFORMATION
CAS NUMBER: 04-135 ORIGINAL AGENDA DATE: SEPTEMBER 27, 2004
AGENDA ITEM TITLE Boeing Access Rd Bridge Replacement (over BNRR)
Consultant Contract for Preliminary Design Report with Sargent Engineers
CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other
Mtg Date Mtg Datel 0/ 4/0i Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date 9 /20/04
SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P&R Police PW/
SPONSOR'S Boeing Access Rd Bridge was constructed in 1945 and is approaching the end of its
SUMMARY functional life. Recent inspections have found that the bridge now qualifies for federal
replacement funds. In order to apply for funds, a type, size and location study is needed
for preliminary design information and costs. Sargent Engineers specializes in bridge
design and has successfully completed many bridge projects for the City.
REVIEWED BY COW Mtg. CA&P Cmte F &S Cmte Transportation Crete
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DATE: 9/13/04
RECOMMENDATIONS:
SPONSOR /ADMIN. Authorize the Mayor to sign the agreement with Sargent Engineers
CoMMU t E Forward to Council for approval
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$74,252.00 $100,00.00
Fund Source: 104.01 Bridges (page 35, 2004 CB?)
Comments:
MTG. DATE RECORD OF COUNCIL ACTION
9/27/04 Discussed at COW; consensus existed to forward item to 10/4/04 mtg. for action
MTG. DATE ATTACHMENTS
9/27/04 Information Memo dated September 9, 2004
Consultant Agreement for Engineering Services
1 Transportation Committee Meeting Minutes from September 13, 2004
10/4/04 1 No attachments.
1 1
1 I