HomeMy WebLinkAboutCOW 2004-08-23 Item 4D - Bid Award - Western Engineering Constructors for Fort Dent Stormwater Pump Station #19 and Drainage Improvements for $221,588.17 COUNCIL AGENDA SYNOPSIS try Initialr `ry ITEM NO. o t 1 MeetingDate 1 Pretaredby L Mayors review 1 Council review 1 4t 47 1 t i 8/23/04 1 RL .,o 1 1 C r l l l tsos 1 1 1 1 1 1 I I ITEM INFORMATION I CAS NUMBER: 04-122 I ORIGINAL AGENDA DATE: AUGUST 23, 2004 AGENDA ITEM TITLE Bid Award for Fort Dent Stormwater Pump Station #19 CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date 8/23/04 Mtg Date Mtg Date 'SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal PoR Police PW/ SPONSOR'S The project was advertised on July 20 and 27, 2004. Two bids were received and opened SUMMARY on August 11, 2004. The low bid of $221,588.17 was from Western Engineering Constructors, Inc. References indicate that Western Engineering has performed well on similar type projects with other agencies. REVIEWED BY COW Mt CA &P Cmte F &S Cmte Transportation Cmte Utilities Cmte Arts Comm. Parks Comm. Planning Comm. DATE: 8/17/04 RECOMMENDATIONS: SPONSOR /ADMIN. Award contract to Western Engineering Constructors, Inc. CoMMITrEE Forward to COW for approval COST IMPACT FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED 1 $243,746.99 Fund Source: 303 Facilities Fund Comments: 1 MTG. DATE I RECORD OF COUNCIL ACTION 8/23/04 1 1 MTG. DATE ATTACHMENTS 8/23/04 1 Information Memo dated 8/11/04 Recommendation Memo from Penhallegon Associates 1 Bid Tabulation 1 1 303 Project Listing 1 Utilities Committee Meeting Minutes from August 17, 2004 1 INFORMATION MEMO To: Mayor Mullet From: Public Works Director Date: August 11, 2004 Subject: Fort Dent Stormwater Pump Station #19 and Drainage Improvements Project No. 03-DR04 Bid Award ISSUE Award the bid for the Fort Dent Stormwater Pump Station #19 and Drainage Improvements project to Western Engineering Constructors, Inc. BACKGROUND The stormwater pump station at Fort Dent was discovered to be in disrepair and without sufficient capacity. In 2003, the City contracted with PACE to design an upgrade to the pump station and related storm drain facilities. The project was advertised for bids July 20 and 27 and bids were opened August 11, 2004. ANALYSIS Two bids were received and have been checked and tabulated. A minor error in addition was found and corrected. Changes have been made. Western Engineering Constructors, Inc., has not worked for Tukwila on any past projects; however, reference checks show that they have performed well on similar type projects with other agencies. BUDGET AND BID SUMMARY Bid Results En__n_gineer's Estimate_ Budget Bid Amount $ 221,588.17 $ 291,618.82 see 303 Fund Contingency (10%) 22,158.82 29,161.88 Listing attached Total $ 243,746.99 $ 320,780.70 RECOMMENDATION Award the construction bid to Western Engineering Consm~ctors, Inc., in the amount of $221,588.17. Attachments: Consultant Recommendation Bid Tabulation 303 Fund Listing MEMORANDUM Date~ 12 August 2004 Bob Giberson To-' City of Tukwila FAX 206 431 3665 From: ' Chris Rhinehart Fort Dent Stormwater Pump Station #19 and Drainage Improvements Subject: Project No. 03-DR04 Bid Award Recommendation We have reviewed the bids received by the City and opened On August 10, 2004, for this project. We recommend the project contract be awarded to Western Engineering Constructors, Inc., based on their low bid amount and industry recommendations of contractor reputation and quality of workmanship. The Western Engineering Constructors, Inc., bid documents show a Total Bid Price of $221,587.52. This amount includes an error in addition; the corrected sum is $221,588.17, which is shown in the attached bid tabulation. Penhallegon Associates Consulting Engineers, Inc. 1601 - 2n" Ave., Suite 1000 Seattle, WA 98101 Phone: (206) 44t-t855 Fax: (206) 448-7167 Bid Tabulation Fort Dent Stormwater Pump Station and Drainage Improvements 2004 Project Listing 303 Fund 2004 Capital Improvement Program CIP 2004 Project Listing 303 Fund 2004 Capital Improvement Program CIP 2004 Project Listing 303 Fund 2004 Capital Improvement Program CIP Utilities Committee August 17, 2004 Present: Pam Carter, Chair; Para Linder, Dennis Robertson Frank Iriarte, Bob Giberson, Gail Labanara, Ryan Larson, Mike Cusick, Pat Brodin, Lucy Lauterbach 1. Metro King County 2005 Sewer Rate Increase Metro is increasing its 2005 sewer charges for service and for new connections. They have been charging for new connections since 1990, ' and those rates will go up again next year. Generally people pay the'cost up front or over 15 years. There will be a 9% increase in monthly sewer rates, resulting in an average charge of $32.60 per single-family house in 2005. The connection fee is increasing from $18 per month to $34.05. Para C noted it is City policy to pass on increases from Metro. Recommend ordinance to COW and Regular Meetings. 2. 2004 Small Drainage Bid Award Dennis Craig, Inc. won the contract for the small drainage projects for this year. There are seven projects, including the S. 180th Street underpass drainage repair. There was not a map of where the other six projects were, and staffpromised there would be a map when it went to Council. Dennis asked for a rough cost of each of the projects. Funding for the projects will come from the street fund, although staffis working to get the S. 180th project funded separately. The lowest price was higher than the engineer's estimate. Recommend bid award to COW and Council for approval. ~.~3. Fort Dent Storm water Pump Station//19 The City tried to repair Pump Station 19, but it was too far gone to be repaired. Replacement of the pump station was needed, and some associated drainage improvements were added. Drainage from the parking lot that now goes to the river will be diverted to the pond, and will be cleaned a little more than currently. The winning bid from Western Engineering Constructors, Inc. for $221,588.17 was quite a bit lower than the engineer's estimate. Recommend bid award to COW and Regular Meetin~ for approval. 4. Fort Dent Storm water Construction Services Penhallegon Associates Consulting Engineers, Inc. (PACE) won the contract to design the improvements needed at Fort Dent drainage. Staff would normally do this, but they are too busy to be able to do that just now. The $50,078 contract will cover about 65 working days in a 90-day period. Dennis thought it was expensive, but he realized staffcouldn't afford to do it. Recommend bid award to COW and Re!~ular Meetin~ for aooroval. 5. Information Notices Committee members appreciated seeing what the citizens will see in the Hazelnut. They changed the open house in Allentown from 7-9 to 6-8 October 6th. Information. 6. Other Pam C raised the issue of dead plantings on S. 51st near Bonsai. Staff said they thought it was past the time the contractor had to keep them alive, but said they would check. Information.