Loading...
HomeMy WebLinkAboutSpecial 2004-08-23 Item 3A - Bid Award - Dennis R. Craig Inc for 2004 Small Drainage Program for $429,869.34 COUNCIL AGENDA SYNOPSIS eir Initials ITEM NO. O 1 g 1 Meeting Date 1 Prepared J( Mayor's review 1 Coaycil review 1 t!fii 1 I 8/23/04 1 RC t 1 .}'A/ 1.J /.n I e'� I I 1 1 I 1908 1 I 1 1 1 I 1 1 I ITEM INFORMATION CAS NUMBER: 04-121 I ORIGINAL AGENDA DATE: AUGUST 23, 2004 AGENDA ITEM TITLE Bid Award for the 2004 Small Drainage Projects CATEGORY Discussion Motion Resolution Ordinance Bid Award ['Public Hearing Other Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date 8/23/04 Mtg Date Mtg Date I SPONSOR El Council Mayor Adm Svcs DCD Finance Fire Legal PeoR Police Pr I SPONSOR'S The project was advertised on July 27 and August 3, 2004. Four bids were received and SUMMARY opened on August 11, 2004. The low bid of $429,869.34 was from Dennis R. Craig, Inc. References indicate that Dennis R. Craig, Inc. has performed well on similar type projects with Tukwila and other agencies. REVIEWED BY COW Mt CA &P Cmte F &S Cmte Transportation Cmte Utilities Cmte Arts Comm. Parks Comm. Planning Comm. DATE: 8/17/04 RECOMMENDATIONS: SPONSOR /ADMIN. Award contract to Dennis R. Craig, Inc. COMMITTEE Forward to COW for approval COST IMPACT FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $472,856.27 $670,000.00 Fund Source: 412 Surface Water Fund and 104.02 Commercial Streets Comments: The additive alternate bid for the S. 180th St Drainage Repair will be budgeted under the Annual Overlay Repair Fund. MTG. DATE RECORD OF COUNCIL ACTION 8/23/04 MTG. DATE ATTACHMENTS 8/23/04 Information Memo dated 8/11/04 Map of Site Locations Bid Tabulation Utilities Committee Meeting Minutes from August 17, 2004 INFORMATION MEMO To: Mayor Mullet From: Public Works Director Date: August 11, 2004 Subject: 2004 Small Drainage Program Project No. 04-DR01 Bid Award ISSUE Award the bid for the 2004 Small Dra'mage Program to Dennis R. Craig, Inc., of Redmond, Wash'mgton, in the amount of $429,869.34. BACKGROUND The 2004 Small Drainage Program includes six project sites in the base bid and one alternate site designed by KPG, Inc.: Site No. I - S 146t~ St (west of 51s~ Ave S) Site No. 2 - "The Loop" Phase 3 (S 15 8z/47~) Site No. 3 - 40~ Ave S (Southcenter Blvd vicinity) Site No. 4 - S 180~" St at West Valley Hwy Site No. 5 - S 14P' St (42~ A ye S vicinity) Site No. 6 - S 130th St (35~ to 37~ Ave S) Site No. 7 - S 180th St Grade Separa6on Drainage Repair (Additive Item A) ANALYSIS This project was advertised on July 27 and August 3, 2004. Four bids were received and opened on August 11, 2004. The bids were checked and tabulated. Only minor math errors were found and corrected. Dennis R. Craig has worked successfully with Tukwila on past projects. Reference checks also indicated that Dennis R. Craig has performed well on similar type projects with other agencies. BUDGET AND BID SIYMMARY Bid Results Engineer's Estimate Budget Base Bid Amount $ 313,562.14 $ 278,968.64 $ 550,000.00 Additive Item A 116,307.20 142,364.80 120,000.00 Contingency (10%) 42,986.93 42,133.34 Total $ 472,g56.27 $ 463,466.78 .$ 670,000.00 All amounts include sales tax Additive A is budgeted under Annual Overlay & Repair at $120,000.00. RECOMMENDATION Award the construction bid to Dennis R. Craig, Inc., in the amount of $429,869.34 for the base bid and additive item A. attachment: Bid Tabulation 2004 SMALL DRAINAGE PROGRAM Utilities Committee Au§asr 17, 2004 Present: Pam Carter, Chair; Pam Linder, Dennis Robertson Frank Iriart¢, Bob Giberson, Gui1 Labanara, Ryan Larson, Mike Cusick, Pat Brodin, Lucy Lauterbach 1. Metro King Count~ 2005 Sewer Rate Increase Metro is increasing its 2005 sewer charges for service and for new connections. They have been charging for new connections since 1990, and those rates will go up again next year. Generally people pay the Cost up front or over 15 years. There will be a 9% increase in monthly sewer rates, resulting in an average charge of $32.60 per single-family house in 2005. The connection fee is increasing fi:om $18 per month to $34.05. Pam C noted it is City policy to pass on increases from Metro. Recommend ordinance to COW and Regular Meetings.  2. 2004 Small Drainage Bid Award Dennis Craig, Inc. won the contract for the small drainage projects for this year. There are seven projects, including the S. 180th Street underpass drainage repair. There was not a map of where the other six projects were, and staff promised there would be a map when it went to Council. Dennis asked for a rough cost of each of the projects. Funding for the projects will come from the street fund, although staffis working to get the S. 180th project funded separately. The lowest price was higher than the engineer's estimate. Recommend bid award to COW and Council for approval. 3. Fort Dent Storm water Pump Station #19 The City tried to repair Pump Station 19, but it was too far gone to be repaired. Replacement of the pump station was needed, and some associated drainage improvements were added. Drainage fi:om the parking lot that now goes to the river will be diverted to the pond, and will be cleaned a little more than currently. The winning bid from Western Engineering Constructors, Inc. for $221,588.17 was quite a bit lower than the engineer's estimate. Recommend bid award to COW and Regular Meeting for approval. 4. Fort Dent Storm water Construction Services Penhallegon Associates Consuliing Engineers, Inc. (PACE) won the contract to design the improvements needed at Fort Dent drainage. Staff would normally do this, but they are too busy to be able to do that just now. The $50,078 contract will cover about 65 working days in a 90-day period. Dennis thought it was expensive, but he realized staff couldn't afford to do it. Recommend bid award to COW and Regular Meeting for approval. 5. Information Notices Committee members appreciated seeing what the citizens will see in the Hazelnut. They changed the open house in Allentown from 7-9 to 6-8 October 6th. Information. 6. Other Pam C raised the issue of dead plantings on S. 51st near Bonsai. Staff said they thought it was past the time the contractor had to keep them alive, but said they would check. Information. ,.~)(~ommittee Chair approval