ITEM INFORMATION
I CAS NUMBER: 04-122 I ORIGINAL AGENDA DATE: AUGUST 23, 2004
AGENDA ITEM TITLE Bid Award for Fort Dent Stormwater Pump Station #19
CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other
Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date 8/23/04 Mtg Date Mtg Date
'SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal PoR Police PW/
SPONSOR'S The project was advertised on July 20 and 27, 2004. Two bids were received and opened
SUMMARY on August 11, 2004. The low bid of $221,588.17 was from Western Engineering
Constructors, Inc. References indicate that Western Engineering has performed well on
similar type projects with other agencies.
REVIEWED BY COW Mt CA &P Cmte F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DATE: 8/17/04
RECOMMENDATIONS:
SPONSOR /ADMIN. Award contract to Western Engineering Constructors, Inc.
CoMMITrEE Forward to COW for approval
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED 1
$243,746.99
Fund Source: 303 Facilities Fund
Comments:
1 MTG. DATE I RECORD OF COUNCIL ACTION
8/23/04 1
1
MTG. DATE ATTACHMENTS
8/23/04 1 Information Memo dated 8/11/04
Recommendation Memo from Penhallegon Associates 1
Bid Tabulation 1
1 303 Project Listing
1 Utilities Committee Meeting Minutes from August 17, 2004
1
INFORMATION MEMO
To: Mayor Mullet
From: Public Works Director
Date: August 11, 2004
Subject: Fort Dent Stormwater Pump Station #19 and Drainage Improvements
Project No. 03-DR04
Bid Award
ISSUE
Award the bid for the Fort Dent Stormwater Pump Station #19 and Drainage Improvements
project to Western Engineering Constructors, Inc.
BACKGROUND
The stormwater pump station at Fort Dent was discovered to be in disrepair and without
sufficient capacity. In 2003, the City contracted with PACE to design an upgrade to the pump
station and related storm drain facilities. The project was advertised for bids July 20 and 27
and bids were opened August 11, 2004.
ANALYSIS
Two bids were received and have been checked and tabulated. A minor error in addition was
found and corrected. Changes have been made. Western Engineering Constructors, Inc., has
not worked for Tukwila on any past projects; however, reference checks show that they have
performed well on similar type projects with other agencies.
BUDGET AND BID SUMMARY
Bid Results En__n_gineer's Estimate_ Budget
Bid Amount $ 221,588.17 $ 291,618.82 see 303 Fund
Contingency (10%) 22,158.82 29,161.88 Listing attached
Total $ 243,746.99 $ 320,780.70
RECOMMENDATION
Award the construction bid to Western Engineering Consm~ctors, Inc., in the amount of
$221,588.17.
Attachments: Consultant Recommendation
Bid Tabulation
303 Fund Listing
MEMORANDUM
Date~ 12 August 2004
Bob Giberson
To-' City of Tukwila
FAX 206 431 3665
From: ' Chris Rhinehart
Fort Dent Stormwater Pump Station #19 and Drainage Improvements
Subject: Project No. 03-DR04
Bid Award Recommendation
We have reviewed the bids received by the City and opened On August 10, 2004, for this project. We
recommend the project contract be awarded to Western Engineering Constructors, Inc., based on their
low bid amount and industry recommendations of contractor reputation and quality of workmanship.
The Western Engineering Constructors, Inc., bid documents show a Total Bid Price of $221,587.52.
This amount includes an error in addition; the corrected sum is $221,588.17, which is shown in the
attached bid tabulation.
Penhallegon Associates Consulting Engineers, Inc.
1601 - 2n" Ave., Suite 1000 Seattle, WA 98101
Phone: (206) 44t-t855 Fax: (206) 448-7167
Bid Tabulation
Fort Dent Stormwater Pump Station and Drainage Improvements
2004 Project Listing 303 Fund
2004 Capital Improvement Program CIP
2004 Project Listing 303 Fund
2004 Capital Improvement Program CIP
2004 Project Listing 303 Fund
2004 Capital Improvement Program CIP
Utilities Committee
August 17, 2004
Present: Pam Carter, Chair; Para Linder, Dennis Robertson
Frank Iriarte, Bob Giberson, Gail Labanara, Ryan Larson, Mike Cusick, Pat
Brodin, Lucy Lauterbach
1. Metro King County 2005 Sewer Rate Increase Metro is increasing its 2005 sewer charges
for service and for new connections. They have been charging for new connections since 1990, '
and those rates will go up again next year. Generally people pay the'cost up front or over 15
years. There will be a 9% increase in monthly sewer rates, resulting in an average charge of
$32.60 per single-family house in 2005. The connection fee is increasing from $18 per month to
$34.05. Para C noted it is City policy to pass on increases from Metro. Recommend ordinance
to COW and Regular Meetings.
2. 2004 Small Drainage Bid Award Dennis Craig, Inc. won the contract for the small drainage
projects for this year. There are seven projects, including the S. 180th Street underpass drainage
repair. There was not a map of where the other six projects were, and staffpromised there would
be a map when it went to Council. Dennis asked for a rough cost of each of the projects. Funding
for the projects will come from the street fund, although staffis working to get the S. 180th
project funded separately. The lowest price was higher than the engineer's estimate.
Recommend bid award to COW and Council for approval.
~.~3. Fort Dent Storm water Pump Station//19 The City tried to repair Pump Station 19, but it
was too far gone to be repaired. Replacement of the pump station was needed, and some
associated drainage improvements were added. Drainage from the parking lot that now goes to
the river will be diverted to the pond, and will be cleaned a little more than currently. The
winning bid from Western Engineering Constructors, Inc. for $221,588.17 was quite a bit lower
than the engineer's estimate. Recommend bid award to COW and Regular Meetin~ for
approval.
4. Fort Dent Storm water Construction Services Penhallegon Associates Consulting
Engineers, Inc. (PACE) won the contract to design the improvements needed at Fort Dent
drainage. Staff would normally do this, but they are too busy to be able to do that just now. The
$50,078 contract will cover about 65 working days in a 90-day period. Dennis thought it was
expensive, but he realized staffcouldn't afford to do it. Recommend bid award to COW and
Re!~ular Meetin~ for aooroval.
5. Information Notices Committee members appreciated seeing what the citizens will see in
the Hazelnut. They changed the open house in Allentown from 7-9 to 6-8 October 6th.
Information.