ITEM INFORMATION
CAS NUMBER: 04-123 I ORIGINAL AGENDA DATE: AUGUST 23, 2004
AGENDA ITEM TITLE Fort Dent Stormwater Pump Station #19 Consultant's Supplement with PACE.
CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other
Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date 8/23/04
SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P&'R Police PTY/
SPONSOR'S Penhallegon Associates Consulting Engineers, Inc. (PACE) entered into Contract No. 03-
SUMMARY 144 for design of the Fort Dent Stormwater Pump Station #19. This supplement will have
PACE perform construction inspection and management for the project.
REVIEWED BY COW Mt CA &P Cmte F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DATE: 8/17/04
RECOMMENDATIONS:
SPONSOR /ADMIN. Authorize Mayor to sign supplement with PACE
COMMITTEE Forward to COW for approval 1
COST IMPACT FUND SOURCE 1
EXPENDITURE REQUIRED AMOUNT B UDGETED APPROPRIATION REQUIRED
$50,078.00
Fund Source: 303 Facilities Fund
Comments:
MTG. DATE I RECORD OF COUNCIL ACTION
8/23/04 1 1
I I
I I
MTG. DATE I ATTACHMENTS
8/23/04 1 Information Memo dated 8/11/04
1 Supplemental Agreement No. 1 to Contract 03 -144 Project No. 03 -DRO4
Committee Meeting Minutes from August 17, 2004
1 Utilities Comm g g
1
1
INFORMATION MEMO
To: Mayor Mullet
From: Public Works Directo~'g~
Date: August 1 I, 2004
Subject: Fort Dent Stormwater Pump Station//19 and Drainage Imorovements
Construction Services Sunolement
Project No. 03-DR04
Contract No. 03-144
.ISSUE
Authorize the Mayor to sign Supplement No. 1 for construction services.
BACKGROUND
Penhallegon Associates Consulting Engineers, Inc. (PACE), and Tukwila entered into
Contract No. 03-144 for design services related to the Fort Dent Stormwater Pump Station
#19. Because in-house staff is busy with the existing construction workload, this contract
supplement was negotiated for construction inspection and management.
ANALYSIS
The proposed supplemental scope of work and fee of $50,078 to cover the 90 calendar day
contract (approx. 65 working days) is approximately 17% of the engineer's estimated cost
and about $770 per working day. The average percentage is about 15% and the average
daily cost is about $2,500 per day.
RECOMMENDATION
Authorize the Mayor to sign Supplemental Agreement No. 1 to Contract No. 03-144 with
PACE in the mount of $50,078.
attachment~: Supplemental Agreement No. 1
SUPPLEMENTAL AGREEMENT NO. 1
to
CONSULTANT AGREEMENT NO. 03-144
THIS SUPPLEMENTAL AGREEMENT is entered into between the City of Tukwila,
Washington, hereinafter referred to as "the City," and Penhallegon Associates Consulting
Engineers, Inc., hereinafter referred to as "the Consultant," in consideration of the mutual
benefits, terms, and conditions hereinafter specified.
The City desires to supplement the agreement entered into with the Consultant and executed on
November 12, 2003, and identified as Agreement No. 03-144. All provisions in the basic
agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
1. Scope of Services is hereby changed to include the attached Exhibit A-1.
2. Payment shall be amended as follows:
Payment for the work provided by the Consultant as part of this supplement shall be
made and the total amount of payment to the Consultant for this work shall not exceed
$50,078.00 without express written modification of the Agreement signed by the City.
The maximum amount payable under this agreement as supplemented inclusive of all
fees and other costs is now $91,820.00.
DATED this day of ,20
CITY OF TUKWILA PENHALLEGON ASSOCIATES
CONSULTING ENGINEERS, INC.
Steven M. Mullet Chris A Rhinehart
Mayor Project Manager
EXHIBIT A-1
CONSULTANT AGREEMENT NO. 03-144
SUPPLEMENTAL AGREEMENT NO. 1
SCOPE OF WORK
Penlaallegon Associates Consulting Engineers, Inc., will perform bidding
assistance and construction observation services for the Fort Dent Stormwater Pump
Station #19 and Drainage Improvements Project.
Bidding assistance will consist of receiving the bids fi.om the City; checking Contractor
references; tabulating and evaluating the bids received; and recommending the contract
award for the City.
Construction observation services will consist of 65 working days (x 8 hours/day = 520
hours), made up of observation by PACE and Follett Engineering (electrical engineer)
staff. Survey services are included, consisting of 4 hours of 2-man crew time, intended to
verify the Contractor's survey work or resolve minor survey issues. On-call engineering
assistance (12 engineering hours) and project management for three additional months (6
hours) are included.
Deliverables will consist of:
Bid Tab
Weekly construction observation reports
August 10, 2004
Mr. Bob Gilbgrson
City of Tukwila
6300 Southcenter Blvd.
Tukwila WA 98188
Subject: Fort Dent Stormwater Pump Station and Drainage Improvements
Additional Services Scope and Fee
Bid and Construction Phases
Dear Bob:
Penhallegon Associates Consulting Engineers, Inc. (PACE) is pleased to submit this proposal for
additional services to provide engineering services during the bidding and construction phases of
this project.
Scope of Additional Service
This proposal includes bidding assistance and construction services during the 90 calendar days
of the construction contract.
Bidding assistance will consist of receiwng the bids f~om the City; checking Contractor
references; tabulating and evaluating the bids received; and recommending the contract award
for the City.
Per your request, construction observation services will consist of 65 working days (x 8
hours/day = 520 hours), made up of observation by PACE and Follett Engineering (electrical
engineer) staff. Assigned staff will vary, based on the relevant work being performed by the
Contractor on any given day. These staff will report directly to you as Construction Manager, or
others designated by you. Survey services are included, consisting of 4 hours of 2-man crew
time, intended to verify the Contractor's survey work or resolve minor survey issues. On-call
engineering assistance (12 engineering hours) and project management for three additional
months (6 hours) are included.
Assumptions
Attendance at construction meetings is assumed to be included in the construction observation
hours. Construction management, shop drawing review, progress payment processing, and
record drawing preparation will be provided by City of Tukwila. Compaction and any other
testing will be provided by others. Construction survey and staking will be provided by the
Contractor, except as noted under Scope of Additional Service.
Penhallegon Associates Consulting Engineers, Inc.
Engineering · Planning · Surveying
Mr. Bob Gilberson, City of Tukwila
Fort Dent Stormwater Pump Station and Drainage Improvements
Additional Services Scope and Fee
· Augast 10, 2004
Page 2
Deliverables
Bid Tab
Weekly construction observation reports
Fee for Additional Service
Fee for the proposed additional service is $1,173 for bid assistance and $48,905 for construction
services, for a total of $50,078. The fee is based on our 2003/2004 rates. A spreadsheet is
attached listing personnel, hours, hourly rates, and extensions.
We have developed this scope of work based on our understanding of the proposed service. If
you have questions or feel that additional items require our attention, please don't hesitate to call.
Sincerely,
PENHALLEGON ASSOCIATES
CONSULTING ENGINEERS, INC.
Chris Rhinehart, P.E.
Project Manager
Fort Dent Stormwater Pump Station
Fort Dent Stormwater Pump Station
Utilities Committee
Augnst 17, 2004
Present: Pam Carter, Chair; Pam Linder, Dennis Robertson
Frank kiarte, Bob Giberson, Gail Labanara, Ryan Larson, Mike Cusick, Pat
Brodin, Lucy Lanterbach
1. Metro King County 2005 Sewer Rate Increase Metro is increasing its 2005 sewer charges
for service and for new connections. They have been charging for new connections since 1990, '
and those rates will go up again next year. Generally people pay the'cost up front or over 15
years. There will be a 9% increase in monthly sewer rates, resulting in an average charge of
$32.60 per single-family house in 2005. The connection fee is increasing from $18 per month to
$34.05. Pam C noted it is City policy to pass on increases from Metro. Recommend ordinance
to COW and Regular Meetings.
2. 2004 Small Drainage Bid Award Dennis Craig, Inc. won the contract for the small drainage
projects for this year. There are seven projects, including the S. 180th Street underpass drainage
repair. There was not a map of where the other six projects were, and staff promised there would
be a map when it went to Council. Dennis asked for a rough cost of each of the projects. Funding
for the projects will come from the street fund, although staff is working to get the S. 180th
project funded separately. The lowest puce was higher than the engineer's estimate.
Recommend bid award to COW and Council for approval.
3. Fort Dent Storm water Pump Station #19 The City tried to repair Pump Station 19, but it
was too far gone to be repaired. Replacement of the pump station was needed, and some
associated drainage improvements were added. Drainage from the parking lot that now goes to
the river will be diverted to the pond, and will be cleaned a little more than currently. The
winning bid from Western Engineering Constructors, Inc. for $221,588.17 was quite a bit lower
than the engineer's estimate. Recommend bid award to COW and Regular Meeting for
approval.
4. Fort Dent .Storm water Construction Services_ Penhallegon Associates Consulting
Engineers, Inc. (PACE) won the contract to design the improvements needed at Fort Dent
drainage. Staff would normally do this, but they are too busy to be able to do that just now. The
$50,078 contract will cover about 65 working days in a 90-day period. Dennis thought it was
expensive, but he realized staff couldn't afford to do it. Recommend bid award to COW and
Regular Meeting for approval.
5. Information Notices Committee members appreciated seeing what the citizens will see in
the Hazelnut. They changed the open house in Allentown from 7-9 to 6-8 October 6th.
Information.
6. Other Pam C raised the issue of dead plantings on S. 51st near Bonsai. Staff said they
thought it was past the time the contractor had to keep them alive, but said they would check.
Information.