Loading...
HomeMy WebLinkAboutReg 2004-06-21 Item 7B - Contract Supplement #1 - Boeing Access Road Briddge Deck Rehabilitation Management with Sargent Engineers for $72,024OCoci,,rCIL'AGENDA SE.'OPSIS ...... ~ ................. Init. isis ......................... ITEM NO. Meeting Date Prepared by Mayor's review Cou~cil re, vjew 6/14/04. RT ~t~'~ / '/1/~{''( ~'-1' ITEM INFORMATION CAS Number: 04-087 ] Original Agenda Date: June 14, 2004 Agenda Item Title: Boeing Access Rd Bridge Deck Rehabilitation Project Consultant's Supplement Original Sponsor: Council Admin. Public Works Timeline: Sponsor's Summary: In 2003, sargent Engineers began design of the Boeing Access Road Bridge Deck Rehabilitation Project: Final design is complete and the bid award for construction is underway. This supplement is for Sargent to perform construction management services for the bridge overlay project for a fee not to exceed $72,024.00. Recommendations: Sponsor: Authorize the Mayor to sign supplement with Sargent Engineers, Inc. Committee: Authorize Mayor to sign supplement and forward to COW" Administration: Same as Sponsor. Cost Impact (if known): $72,024.00 for a new contract amount of $97,719.00 ~und Source (if known): 104.01 Bridges (pg. 33 2004 CIP) CO CIL ACTION Meeting Date Action 6/14/04 Discussed at C.O.W.; forwar~dd to 6/21/04 Regular Meeting for approval. Meeting Date Attachments 6/14/04 Information Memo dated June 9, 2004 Supplemental Agreement No. 1 to Contract 03-079 with Exhibits Submitted to Transportation Committee June 14, 2004 (same n 6/21/04 Transportation Cmte Minutes dated 6/~4/04 Transportation Committee June 14, 2004 Present: Joan Hernandez, Chair; Para Carter, Joe Duffle Bob Giberson, Gail Labanara, Robin Tischmak, Lucy Lauterbach 1. Six Year TIP Program. As is done every year, a TIP that lists all the projects that could be available for grants, was proposed. A spreadsheet showed that this year's projects are very ar's thou some new projects have been added and others have been split into similar to last ye , gh . '" i two projects or otherwise changed. Bob explained the new Southcenter Parkway (S. 180 -S. C ty Limits) includes the pr,o!aect called S 17St~ Street. ,T~he new projects include the Klickitat project, S. 144t~ from TIB to 42 (formerly part of the 144 project); Southcenter B1vd (T.LB. - I-$); Andover Park West (Tukw la Parkway-Strander); Southcenter Boulevard 61st Street bridge Widening; and widening the sidewalks on the bridge on S. 144t~ over I-5. The Committee members said they appreciated all the information in the spreadsheet. Recommend to COW and Re_.~q.l ar Meetin..n..q~ 2. Boeing Access Road Bridge Deck Improvement The bridge deck on BAR is badly worn, and in places it's almost down to the rebar. The entire bridge needs to be replaced, but that is unlikely to happen for several years. Because this project is not removing the sub-base, but only the top layer of roadway, it will not move the project lower on the priority list it's on for grants. The project will be done mosfly nights and weekends from early July-Labor Day. Joan asked why there was only one bid. Bob said this is specialized work that few companies do. The City of Sumner did not get any bids on its similar project. Bob said that Concrete Barfiir has worked with Tukwila before, and is a very good company. The bid with contingency is very close to the mount in the City budget. Recommend contract award to COW and Regular Meeting.  In past years the City used 3. BAR Bridge Deck Improvement Construction Management one company to do all of its construction management, but in the last few years we've had staff do it, or relied on the design company to do it. Such is the case with this project. The design team, Sargent, is getting a sub, KBA, and together they will provide construction, se~ces for $72,024. The committee questioned what was needed to approve this company. The City already had a contract with Sargent, and the construction management would be a supplement to the conjunct. The Committee members feli it should get Council approval because it is much bigger than the original $25,700 Sargent contract. Recommend Mayor sign contract supplement wlth Sargent for construction management services on BAR... 4. Wes~ Valley HighwayIStrander Intersection ~.mprovements 'The project to put an extra turn lane on West Valley to Strander was completed by R.W. Scott Construction. There was one change order, part of which involved replacing the traffic loops in the road. They were scraped up when the resurfacing was being done, and had to be replaced. There were overruns due to more roadway fili and asphalt, and to avoid some utility conflicts. The City also got a credit because the company was allowed to put in PVC rather than steel conduit pipes. Recommend contract acceptance and release of ret.inage to consent agenda of a Regular Meeting: ~-~)~ Committee chair approval