Loading...
HomeMy WebLinkAboutReg 2004-06-21 Item 7C - Resolution - 2005-2010 Transportation Improvement Program CO qCIL'A GENDA OPSIS ~ ............. ' ...... Initials ....................... ITEM NO. Prepared b? Mayor's review Co~j~cil r,evjew MeetingDate RT~ /. ~tlm ~ 6/14/04 ~ . /~ ~/~ 14' i~M :~O~TION CAS Number: ~ ~ ~ ~ ~ ~ Original Agenda Date: J~e 14, 2004 Agenda Item Title: Six-Year Transpo~ation I~prove~ent Program (2005-2010) Original Sponsor: Council Admin. Public Wor~ Timeline: Sponsor's Summa~: The Tr~spo~tion Improvement Proem (T~) is required by RCW to be updated annually. The T~ is adopted by resolution ~er a public he~g at the local agency level ~d inco~o~ted in~ the Regional ~d S~te T~'s. The ~ is prim~ily a fin~cial plying document for projects competing for ~ts. Recommendations: Sponsor: Hold a public he~ing ~d adopt resolution for 'l'W. Commi~ee: Hold Public Hear~g at COW ~d ~en on to Re~l~ Council for approval. A~is~ation: Sine as Sponsor. Cost ~pact (if ~om): N/A Fund 8o~ce (if~om): N/A AcHon 6114104 D~s~ss~ ae ~.O.~.~ fo~d~ to ~12~10~ ~ ~me~n~ for approval. Meeting Date Attachments 6/14/04 Information Memo dated June 9, 2004 Draft 2005-2010 TIP Summary Spreadsheet and Transportation Improvement Program Resolution Su.~_bmitted to Transportation Committee June 14, 2004 (same nig 6/21/04 Memo frc~n Jim Morrow dated 6~9/04 Resolution (final format) and exhibit Transportation Cmte Minutes dated 6/14/04 INFORMATION MEMO To: Mayor Mullet From: Public Works Directo~'i''t3 Date: June 9, 2004 Subject: Six-Year Transportation Improvement Program (2005 - 20 10) ISSUE Annual update of the Six-Year Transportation Improvement Program for the years 2005 - 2010. BACKGROUND The Transportation Improvement Program (TIP) is updated annually as required by RCW. The TIP is adopted by resolution after a public hearing at the local agency level and incorporated into the Regional and State TIP's. The TIP is primarily a financial planning document for projects competing for grants. Any project submitted for federal grant funding must be included in the local, regional and state adopted TIP's. The TIP is a rolling plan showing various funding sources: grants, developer, local funds. Projects "roll" as funds or stages (design report, final design, construction) occur. Tukwila's TIP and CIP list many of the same transportation related projects. The TIP lists only the next six years, while the CIP lists the next six years and projects scheduled beyond six years. The CIP also includes water, sewer, drainage, and capital facilities. The TIP is required to be adopted by Snly 1, while the CIP is prepared during summer and fall in conjunction with budget preparation. Differences between the two may be due to priority changes, funding availability changes, or other factors that normally occur in the time between adoption of the two documents. ACTION TAKEN .............. The "Draft" 2005 - 2010 TIP was created by modifying the 2004 - 2009 TIP by adding projects, removing projects, adjusting project costs, and reprioritizing the list of projects. Project g2, CBD Transit Center, is a sub-project of the Tukwila Urban Center (TUC) Masterplan on CIP page 49 and is to be re-evaluated as part of that project. Project #3 (Pedestrian Safety Program) is a sub-project of the CIP project Neighborhood Traffic and Pedestrian Safety Improvements on page 3 to provide pedestrian improvements separate from a complete residential street improvement project. RECOMMENDATION Hold a public hearing and adopt the annual update. RT:ad attachments: Draft TIP Summary Spreadsheet Current Adopted Six-Year TIP City of Tulcwila Washington Resolulion No. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM, AND DIRECTING THE SAME TO BE FILED WI'I'PI THE STATE SECRETARY OF TRANSPORTATION .AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Coundl of the City of Tulcwila has previously adopted a Transportation Improvement Program and thereafter periodic'ally modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs, and based upon these findings has prepared a Six-Year Transportation Improvement Program for the ensuing six (6) calendar years (2005-2010); and WHEREAS, a public hearing was held on the said Six-Year Transportation - Improvement Program on June 14, 2004; ' ~! ' .'- NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Filing of Program, The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. · PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of - ~ 2004 ..... . . ATTEST/A~NTICATED: Jim Haggerton, Council President ' '- ~,~: Jane E. Cantu, CMC, City Clerk ~ ·: APPROVED AS TO FORM BY: Filed with the City Clerk: Passed by the City Council: ; " Office of the City Attorney Resolution Number: Washington State Department of Transportation Page 1 Six Year Transportation Improvement Program -en Agency: Tukwila From 2005 to 2010 Co. No.: 17 Co. Name: King Co, Nearing Date: 6/14/2004 Adoption Date: City No.: 1320 MPO/RTPO: PSRC Amend Date: Resolution No.: Project laentlhcatton project goats rn i nousanas or uouars 1 Federally Funded Fund Source information Projects Only 4 A Federal Aid No. B. Bridge No. a o e (Local Agency) ule 8 a .a�r C. Project Title i g 3 r I Federal Funding R v .t5 D. StreetlRoad Name or Humber sr= 3 t" o Phas Federal Federal State 4th Required a o- Z E. Beginning MP or road Ending MP or road E m Sta Fund Cost by Fund State Local Total 1 5t 2 nd 3rd T Envir. Date F. Describe Work to be Done ti (mrn/dd/riyy) Code Phase Code Funds Funds Funds 6th Type 1 2 3 1 4 1 5 1 6 7 1 8 1 9 1 10 1 11 1 12 13 •I 14 1 15 1 16 1 17 1 18 I 19 1 20 21 16 1 07 S C AL 1 1/1/2005 I 1 I 7950 79501 1250 12501 1250! 4200 Overlay and Repair Program G L No Various City Streets 0 from: to: P Repair, rehabilitate, and overlay City streets as needed in an S annual program. T Totals 795D 7950 1250 1250 1250 4200 16 2 21 P T PEI 1/112005 I I 1 I 1 101 101 101 CBD Transit Center W No Central Business District P from: to: S Construct transit center. Totals 10 101 10 19 3 12 S AL 1 1/1/2005 1 1 I 1 1 4201 4201 701 701 701 210 L Pedestrian Safety Program No Various City Streets from: to: Pave and/or stripe shoulder for walkway and other pedestrian safety improvements. Totals 420 420 70 70 70 210 14 4 11 S AL 1 1/1/2005 1 1 1 1 1 5001 6001 1001 1001 1001 300 Bridge Program No Various City Streets from: to: Perform load ratings and bl-annual Inspections as well as construct necessary repatrs and maintenance. ITota(S 600 600 100 100 100 3001 14 5 08002500 09 P Loco Ft T PEI 1/1 /2005 I 1 I 1 1 1001 1001 1001 1 1 Boeing Access Rd Bridge Replacement p No 0 from: Airport Way to: 1 5 Reconstruct bridge. Totals 100 100 100 14 6 12 S AL 1 1/1/2005 1 1 1001 I 1 161 1161 1161 I CE Green River Valley Signal Coordination L No from: West Valley Corridor to: S 180 St Corridor Design and construct signal coordination Improvements, monitoring equipment, and control upgrages. [Totals 100 16 116 116 I Supersedes previous editions nom► Page 2 Six Year Transportation improvement Program �T Washington State Department of Transportation p P 9 Ill Agency: Tukwila From 2005 to 2010 Co. No.: 17 Co. Name: King Co. Hearing Date: 6/14/2004 Adoption Date: City No.: 1320 MPOIRTPO: PSRC Amend Date: Resolution No.: Project identification n+rolect t:osca m t nousanas of Nonars iederaJy Funded A. Federal Aid No. B. Bridge No. V .c Fund Source information Expenditure Schedule Projects Only s? Z C Project Title n 4 3 i o t Federal Funding 1 (Loea! Agency) R�AI e v 3 E D. StreeURoad Name or Number a fi P a Phase Federal Federal State State Local Total ath Ertv Required 2 ti Z E. Beginning MP or road Ending MP or road E o m Start Fund Cost by Fund 1st 2nd 3rd Thai Date F. Describe Work to be Done E (m 4m) Code Phase Code Funds Funds Funds 6th Type (M tyyyl 1 2 3 1 4 1 5 1 6 7 1 8 1 9 1 10 1 11 1 12 1 13 .1 14 I 15 1 16 1 17 I 18 I 19 1 20 21 14 7 03 P G ow f 1/t0005 i i 36861 1 42001 14001 92864 43861 49001 1 CE Tukwila WI Blvd (Phase 2) 0 No P from: S 116 St to: S 132 St S Construct overlay, curb gutter, sidewalks. illumination, T drainage, bndscaping, and utity undergrounding. W 'Totals 3686 4200 1400 9286 4386 4900 17 8 03 S 1,650 Ft W Cad 1 "1 /2005 I 1 1 1 10161 9391 19551 19551 1 S 144 St (Phase 1) T No s from: Tukwila Intl Blvd to: Mlttary Road p Design and construct paving, curb gutter, sidewalks, drainage, G Illumination, And utility undergrounding. C Totals 1016 939 1955 1955 16 9 12 P W PE V12005 180 I 1 801 2601 2601 1 CB0 Traffic signal Interconnect T CN 1 1/1/20D6 1 11771 I 1 zea I 1471 1 14711 J No CBD Streets G from to: C Design and install hard wire interconnect system between traffic p signals in the CBD. S 'Totals 1357 374 1731 260 1471 16 10 01 .P 3.000 Ft w Chi 1 1/12010 1 1 57221 1 1 13741 70961 1 1 1 7096 Southoenter Parkway T No S from S 180 St to: S City Limits p Design and construct widening to 4 lanes and center tum lane G Including curb gutter. sidewalks, drainage, landscaping, and Totals 5722 1374 7096 7096 14 11 'hWy utadaM1lroundinit_ CN 2010 1 1 7821 57921 1 5792 03 P a,sa� Ft W 1 1/1 1 1 5010 1 782 1 1 Interurban Ave T No S from: S 143 St to: Ft Dent Way p Construct paving, curb gutter, drainage, illumination, sidewalk, G and landscaping. C Totals 5010 782 5792 5792 16 1 2 12 P 1,000 Ft W PE 1 /12009 26 1 1 4) 30 1 1 30 S 133 St 1 SR 599 Ramps intersection T CN 1/12010 2741 1 1 461 3201 1 1 f 320 No 5 from: 500 Ft on each leg to: 500 Ft on each leg G Design and construct intersection improvements including a new traffic signal p Totals 300 50 350 3501 Supersedes previous editions Page 3 Six Year Transportation improvement Program AWL -3- Washington State Department of Transportation Age From 2005 to 2010 Agency: Tukwila Co. No.: 17 Co. Name: King Co. Hearing Date: 6/14/2004 Adoption Date: City N0.: 1320 MPOIRTPO: PSRC Amend Date: Resolution No.: Protect toentincation 1 r rotect'. :oats in r nousanos or 'Jotters Federally Funded n Fund Source Information Expenditure Schedule Projects Only A. Federal Aid No. B. Bridge N m (Local Agency) g w 8. I Federal Funding I R/W e m C. Project Title g Required c a o E D. Street/Road Name or Number 8P a o Phase Federal Federal State St ate Local Total 4th Enwr. Date r z E. Beginning MP or roa Ending MP or road r Start Fund Cost by Fu Funds Funds Funds 1 st 2nd 3rd T Type af Date 6th F. Describe Work to be Done i E (mm/dd/YYYY) Code Phase Code o. 1 2 3 4 51 C 7 1, 8 1 9 1 10 1 11 1 12 1 13 .1 14 1 15 1 16 1 17 1 18 1 19 20 1 21 1 1 1 P PE 1 111/2010 I 100 100 I 1 1 100 14 13 No Tukwila Intl Blvd S116 St from: SR99 Bridge to: SR599 Design and construct widening on Tukwila Intl Blvd and 100 100 100 intersection Improvements at T.I.BJS 116 St. Totals 16 14 03 P 1,500 Ft P PE l 1/1/2006 I 1 1 2301 19201 35 1 1 I 1920 N o S CN I 1/1/2010 1690 East Marginal Way T from: Boeing Access Rd to: S 112 St W Design and construct widening to 3 lanes Including curb gutter, 1690 265 1955 35 1920 sidewalks, drainage, landscaping, and utility undergrounding. Totals 16 15 12 P 1,000 Ft AL 1 1/1/2007 1 I 1 1 1 2001 2001 1 1 2001 L No Andover Park E 1 Minlder Blvd. from: 500 Ft each leg to: 500 Ft each leg Design and construct Intersection and traffic signal improvements 200 200 200 1 and widening for left turn lanes. Totals 16 16 01 P 2,000 Ft P 1 1/12007 1 1 1 1 1 7751 7751 1 1 4251 350 No S 168 St T W from: Southcenter Pkwy to: Andover Park W S Construct new roadway including curb gutter, sidewalk, 775 775 425 350 drainage, Illumination, and landscaping. Totals 14 17 12 P 1,50DFt T AL 1 1/1/2009 1 1 6001 1 1 1251 7251 1 1 725 No West Valley Hwy S 156 St P from: Southcenter Blvd to: S 158 St Construct additional northbound ten turn lane at S 156 St for 125 725 725 northbound HOV to northbound 1-405. Totals 600 14 18 03 P 2,100 Ft G CN 1 1/1/2005 1 1 39451 1 30001 4481 73931 35331 38601 1 No Tukwila Intl Blvd (Phase 3) C S from: S 132 St to: S 138 St P Reconstruct roadway including paving, curb gutter, sidewalks, T Illumination, drainage, and utility undergrounding. w Totals 3945 3000 448 7393 3533 3860 1 Supersedes previous editions Washington Stater Department of Transportation Page 4 Six Year Transportation Improvement Program Agency: Tuk1a From 2005 to 2010 Co. No.: 17 Co. Name: king Co. Hearing Date: 6/14/2004 Adoption Date: City No.: 1320 MPOIRTPO: PSRC Amend Date: Resolution No.: Project i0entntcatton rrolect t:osts in t nousanas of uonars F Funded A. Federal Aid No. B. Bridge No. c o I Fund Source information Expenditure Schedule Projects Only 2 .c p C. Project Title c i r I Federal Funding I (focal Agency) RAN C E D. Street/Road Name or Number S J is It 4th Required c v a E to Phase Federal Federal State Stale Local Total Erwin Date w a Z E. Beginning MP or road Ending MP or road E r Start Fund Cost by Fund F. Describe Work to be Done o.. (ma✓ddyoyyj Code Phase Code Funds Funds Funds 1st 2nd 3rd Type (MAV111 1 2 3 1 4 51 6 7 1 8 1 9 I 10 1 11 1 12 1 13 1 14 I 15 I 16 1 17 1 18 19 120 1 21 14 19 05 P 0.5 Mi w Al. 1 1/112010 I 1 5301 1, 1 501 S9oi 1 1 I Sao West Valley Highway T L No S from: 1-405 to Strander Blvd P Design and construct widening to 7 lanes including curb gutter. G sidewalks, illumination, and drainage. Totals 530 50 580 580 16 20 04 P 2,000 Ft W AL 1 1/112009 I I I I 1 4251 4251 I I I 425 Minkler Blvd T No S from Southcenter Pkwy to: Andover Park W p Consr uat widening for 3 lanes inlcudag curb gutter. sidewalk, drainage, and landscaping. Totals 425 425 425 14 21 03 P 3.500 Ft P PEI 1/112010 I 1 1 I 1 tool 1001 I I 1 10o Tukwila Intl Slvd. (Phase 4) S No W from: Boeing Access Rd to: S 116 St Design and construct widening Including paving. curb gutter, sidewalk, drainage, illumination, landscaping, and utility Totals 100 100 100 16 22 �adsrgronndknl AL 11112009 190 3 229 12 P t,000 Ft W 1 1 I I 1 1 1 l 1 1 1 220 Andover Pk E Industry Signal T No S from: 500 Ft on each leg to: 500 Ft on each leg p Design and construct a traffic signal and intersection G improvements. [Totals 190 30 220 220 17 1 23 03 P 600 Ft AL 1 1/1)2009 1 1 1 1 1 2001 2001 1 1 200 Nelson Place 1 No from: S 156 St to: S 158 st I Design and construct paving, curb gutter, sidewalks, drainage. 1 and illumination. Totals 200 200 200 00 24 32 P PEI 1/1/2009 1 I 1 1 1 301 301 1 1 1 30 CBD interurban Trail Connector No from: Interurban Trail to: CBD Design and construct Ira8 from Interurban Trag to CBD. Totals 30 30 30 Supersedes previous editions T Washington State Department of Transportation Pages Six Year Transportation Improvement Program Agge Tukwila From 2005 to 2010 Co. No.: 17 Co. Name: King Co. Hearing Date: 6/14/2004 Adoption Date: City No.: 1320 MPOIRTPO: PSRC Amend Date: Resolution No.: Yroiect identification 1 project t:osts in rnousanos or uouars Federally Funded A. Federal Aid No, B. Bridge No. o w t 11 m 1 Fund Source information Expenditure Schedule Projects Only (Local Agency) A a z p C. Project Title o g J u m I Federal Funding R/1N g 1 7 .8 g D. Street/Road Name or Number ai� se .1 s Phase Federal Federal State 4th Required L. 0_ z E. B Phase Local Total Envir. Date Beginning MP or road Ending MP or road E e a m Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type F. Describe Work to be Done a (m ddh7YY) Code Phase Code 6th tM MN>7 1 2 3 41 5 6 7 1 6 1 9 1 10 1 11 1 12 1 13 .1 14 1 15 16 1 17 18 1 19 20 1 21 16 25 05 P 1,500 Ft W PE 1 1/112005 1 1 1 1 1 5001 5001 300 j 2001 Klickitat SC Pkwy /1-6 Access Revision T No S from: I -5 Off Ramp to: S 168 St p Design and construct safety and capacity improvements. G Totals 500 500 300 200 17 26 03 P loon P PE 1 11112006 1 1 1 1501 1001 2501 1 2501 S 144 St (Phase 2) Feet T CN 1/112007 1 8401 5601 14001 1 1 1400 No W from: 42nd Ave S to: Tukwila Int'I Blvd S Design and construct paving, curb gutter, sidewalks, drainage, G illumination, and utility undergrounding. c Totals 99D 660 1650 250 1400 16 27 03 P 1.1 W PE rz007 1501 1501 1 1 150 Southcenter Blvd. Miles S CN 111!2008 1/s I 1 1 fi 16001 1600 1 1 1600 No T from: 1 -5 1o: Tukwila Intl Blvd. C Improve roadway to a three -lane urban arterial with medians, rum G lanes, curbs, gutters, sidewalks, street lighting, and drainage. P Totals 1750 1750 150 1600) 16 28 05 p c PE 1 1/1/2006 1 I I 1 I 1001 1001 1 1001 1 Andover Park West G No p from: Tukwila Parkway to: Strander Blvd. S Complete widening for center left tum lane W Totals 100 100 100 I 14 29 04 P 0.5 C PE 1 1/1/2007 1 1 1 1 1 1001 1001 1 1 1001 SC Blvd. 61st Ave S Bridge Widening Miles G No P from: 1 -5 to: 62nd Ave S S Widen Soulhcenter Blvd. and the 61st Ave S Bridge to add a lane T for future traffic growth. W Totals 100 100 100 17 30 05 P 0.25 C PE 1 1/1/2005 1 1 1 1 1 251 251 251 1 1 S 144th St Bridge Sidewalks Miles G No P from: 51s1 Ave S to: 53rd Ave S S Widen existing sidewalks on bridge over 1 5 between 51st Ave S T and 53rd Ave S. W Totals 25 25 25 k Grand Totals for I Supersedes previous editions Transportation Committee June 14, 2004 Present: Joan Hernandez, Chair; Para Carter, Joe Duffle Bob Giberson, Go. il Labanara, Robin Tisehmak, Lucy Lantcrbach 1. Six Year TIP Pro,ram As is done every year, a TIP that lists all the projects that could be available for grants, was proposed. A spreadsheet showed that this year's projects are very similar to last year's, though some new projects have been added and others have been split into two projects o~otherwise changed. Bob explained the new Southeenter Parkway (S. 180th-s. City ~,~ ~,~lnd~ the nroiect called S 178~ Street. The new projects include the Klickitat project, · 1---~(h fr--~-'~B to~42~a (formerly part of the 144~h project); Southcenter Blvd (T.I.B. - 1-5); Andover Park West (Tukwila Parkway-Strander); Southcenter Boulevard 61st Street bridge Widening; and widening the sidewalks on the bridge on S. 144th over 1-5. The Committee members said they appreciated all the information in the spreadsheet. Recommend to COW and Regular Meeting; 2. Boeing Access RoadBrid~e Deck Improvement The bridge deck on BAR. is badly worn, and in places it's almost down to the rebar. The entire bridge needs to be replaced, but that is vnli~ely to happen for several years. Because this project is not removing the sub-base, but only the top layer of roadway, it will not move the project lower on the.priority list it's on for grants. The project will be done mostly nights and weekends from early ~nly-Labor Day. ~oan asked why there was only one bid. Bob said th]s is specialized work that few companies do. The City of Snrancr did not get any bids on its similar project. Bob said that Concrete Barrie~ has worked with Tukwila before, and is a very good company. The bid with contingency is very close to the amount in the City budget. Recommend contract award to COW and Re~lar Meeting. 3. BAR Bridge Deck Improvement Construction Management In past years the City used one company to do all of its construction management, but in the last few years we've had staff do it, or relied on the design company to do it. Such is the case with this project. The design team, Sargent, is getting a sub, KBS, mad tpgether they will provide construction services for $72,024. The committee questioned what was needed to approve this company. The City akeady had a contract with Sargent, and the construction management would be a supplement to the contract. The Committee members felt it should get Council approval because it is much bigger than the original $25,700 Sargent contract. Recommend Mayor sign contract supplement with Sargent for construction m~n~ement services on BAR. 4. Wes~ Valley l~io~hwa¥/Strander Intersection ~mprovements-The project to put an extra tam lane on West Valley to Strandar was completed by R.W. Scott Construction. There was one change order, part of which involved replacing the traffic loops in the mad. They were scraped up when the resurfacing was being done, and had to be replaced. There were overruns due to more roadway fill and asphalt, and to avoid some utility conflicts. The City also got a credit because the company was allowed to put in PVC rather than steel conduit pipes. Recommend contract acceptance and release of retainage to consent agenda of a Regular Meeting. Committee chair approval