Loading...
HomeMy WebLinkAboutCOW 2004-06-14 Item 3B - Public Hearing - Resolution Adopting 2005-2010 Transportation Improvement Program COUNCIL AGENDA SYNOPSIS i..................... Initials ..................... ITEMNO. Prepared by Mayor's review Co~.u,,ncil r,evjew 6/14/04 : ITEM INFO TION CAS Number: 04-083 [ Original Agenda Date: June 14, 2004 Agenda Item Title: Six-Year Transportation Improvement Program (2005-2010) Original Sponsor: Council Admin. Public Works Timeline: Sponsor's Summary: The Transportation Improvement Program (TIP) is required by RCW to be updated annually. The TIP is adopted by resolution after a public hearing at the local agency level and incorporated into the Regional and State TIP's. The TIP is primarily a financial planning document for projects competing for grants. Recommendations: Sponsor: Hold a public hearing and adopt resolution for TIP. Committee: Hold Public Hearing at COW and then on to Regular Council for approval. Administration: Same as Sponsor. Cost Impact (if known): N/A Fund Soume (if known): N/A :: : · : Meeting Date Action 6/14/04 Meeting Date Attachments 6/14/04 Information Memo dated June 9, 2004 Draft 2005-2010 TIP Summary Spreadsheet and Transportation Improvement Program Resolution $~u_?_bmitted to Transportation Committee June 14, 2004 (same night)~ INFORMATION MEMO To: Mayor Mullet Public Works Director~Wf) From: Date: June 9, 2004 ~- Subject: Six-Year Transportation Improvement Program (2005 - 2010) ISSUE Annual update of the Six-Year Transportation Improvement Program for the years 2005 - 2010. BACKGROUND The Transportation Improvement Program (TIP) is required by RCW to be updated annually. The TIP is adopted by resolution after a public hearing at the local agency level and incorporated into the Regional and State TIP's. The TIP is primarily a financial planning document for projects competing for grants. Any project submitted for federal grant funding must be included in the local, regional and state adopted TIP's. The TIP is a rolling plan showing various funding sources: grants, developer, local funds. Projects "roll" as funds or stages (design report, final design, construction) occur. Tukwila's TIP and CIP list many of the same transportation related projects. The TIP lists only the next six years, while the CB? lists the next six years and projects scheduled beyond six years. The CIP also includes water, sewer, drainage, and capital facilities. The TIP is required to be adopted by July 1, while the CIP is prepared during summer and fall in conjunction with budget preparation. Differences between the two maybe due to priority changes, funding availability changes, or other factors that normally occur in the time between adoption of the two documents. ACTION TAKEN The "Draft" 2005 - 2010 TIP was created by modifying the 2004- -7 2009 TIP by adding projects, removing projects, adjusting proje& 6osts, and reprioritizing the list &projects. Project # 2 is a sub-project of the CBD Traffic Masterplan on CIP page 49 and is to be re- evaluated as part of that project. Project # 3 (Pedestrian Safety Program) is a sub-project of the CIP project Other Residential Improvements on page 3 to provide pedestrian improvements separate, from a complete residential street improvement project. RECOMMENDATION Hold a public hearing and adopt the annual update. RT:ad attachments: Draf~ TIP Surara~ Spreadsheet Current Adopted Six-Year TIP Washington State Department of Transportation Page 1 Six Year Transportation Improvement Program Aggeency: Tukwila From 2005 to 2010 Co. No.: 17 Co. Name: King Co.. Nearing Date: 6/14/2004 Adoption Date: City No.: 1320 MPO/RTPO: PSRC Amend Date: Resolution No.: Project Identification rroject costs m r nousanos or uoltare Federally Funded A. Federal Aid No. B. Bridge No. s I" Fund Source Information Expenditure Schedul Projects Only c C. Project Title Ea 1 S (Local Agency) n 3 J u i Federal Funding Rm g a .2 E D. Street/Road Name or Number 0.F a o Phase Federal Federal State 4th Required E. a, h z E. Beginning MP or road Ending MP or road E m m Start Fund Cost b Fund State Local Total Envir. Date F. Describe Work to be Done .e tmm/ddyyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd T T ype (A4 '1? 1 2 3 4 1 5 6 7 1 8 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 17 I 18 i 19 1 20 1 21 16 1 07 S c At. 1/1/2005 I I 1 1 1 79501 79501 1250 12501 12501 4200 Overlay and Repair Program G I No Various City Streets 0 from: to: P Repair, nehabhitate, and overlay City streets as needed In an S annual program. T Totals 7950 7950 1250 1250 1250 42001 16 2 21 P T PE I 1/12005 I I I 1 1 101 10 101 1 1 CM Transit Center w l No Central Business District P from: to: S Construct transit center. Totals 10 10 10 19 3 12 S At. 1 1/1f2005 1 I 1 1 4201 4201 7a 1 70 1 701 210 L Pedestrian Safety Program No Various City Streets from: to: Pave and/or stripe shoulder for walkway and other pedestrian safety improvements. Totals 420 420 70 70 70 210 1 14 4 11 S L I 1/12005 1 I 1 1 1 6001 6001 1001 1001 1001 300 L Bridge Program No Various City Streets j from: to: Perform bed ratings and bi- annual inspections as well at construct necessary repairs and maintenance. ITOtals 600 600 100 100 100 300 14 5 08002500 09 P 1,000 Ft T PE 1 1/1/2005 1 I 1 1 1 1001 1001 1001 1 Boeing Access Rd Bridge Replacement p No 0 from: Airport Way to: 1 -5 Reconstruct bridge. Totals 100 100 100 I 14 6 12 S At. I 1/1/2005 1 I 1001 1 1 161 1161 1161 1 I CE Green River Valley Signal Coordination No from: West Valley Corridor to: S 180 St Corridor Design and construct signal coordination improvements, monitoring equipment, and control upgrages. Totals 100 16 116 116 Supersedes previous editions Ink Washington State Department of Transportation Page 2 Six Year Transportation Improvement Program Agency: Tukwila From 2005 to 2010 Co. No.: 17 Co. Name: IGng Co. Hearing Date: 6/14/2004 Adoption Date: City No.: 1320 MPOJRTPO: PSRC Amend Date: Resolution No.: Project Identihcation Protect t:osts in ,nousanas or ud°ars Federally Funded A. Federal Aid No. B. Bridge No. z S I Fund Source lniouTrtatlon Expenditure Schedule Projects Only (Local Agency) c 2 .1 C. Project Title i t a 1 n 2 ding I RAN Federal Fun 4 E D. StreetJRoad Name or Number a a Required o D- 3 Beginning MP or road Ending MP or road y o a 1-, Phase Federal Federal State State Local Total 1st 2nd rd n Envir. D t z 9i g t c Start Fund Cost by Fund Funds Funds Funds 3 Thr Type m ate F. Describe Work to be Done o_ (mn✓ddhyrif Code Phase Code 6th (M *W' l 1 2 3 4 51 6 1 7 1 8 1 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 1 17 1 18 1 19 1 20 1 21 14 7 03 P G CN 1 11172005 1 1 36861 1 42001 14001 92861 43861 49001 I CE Tukwila Intl Blvd (Phase 2) p No P front 3 116 St ta: S 132 St S Construct overlay, curb gutter, sidewalks, Wimbledon, T drainage, landscaping, and utity undergrounding. w Totals 3686 4200 1400 9266 4386 4900 17 6 03 S 1,650 Ft w CM 1 1"1.2°°5 I 1 1 1 10161 9391 1955i 19551 1 1 S 144 St (Phase 1) T No S from Tukwila Intl Blvd to: Mditery Road p Design and construct paving, curb gutter, sidewaks, drainage, G illumination, and utiIty undergrounding• C Totals 1116 939 1955 1955 16 3 12 P PE 111!2005 1!112006 180 1 1 801 26 °1 260 1 W CN I 1177 294 1471 1471 CBD Traffic Signal interconnect T I i 1 1 I 1 I I No CBD Streets G from to: C Design and install hard wire interconnect system between traffic p signets In the CBD. S Totals 1357 374 1731 260 1471 16 10 01 .P 3,000 Ft W CN 1 1/1/2010 1 1 57221 1 1 13741 70961 1 1 1 7096 Southcenter Parkway T No S from: S 180 St to: S City Limits p Design and construct widening to 4 lanes and center turn lane G including curb gutter, sidewalks, drainage, landscaping, and Totals 5722 1374 7096 7096 14 11 03 P 4,500 Ft W CN 1 111/201D 1 1 50101 1 1 7821 57921 1 1 1 5792 Interurban Ave T No S from S 143 St to: Ft Dent Way p Construct paving, curb &gutter, drainage, illumination, sidewalk, i G and landscaping. c 'Totals 5010 782 5792 5792 16 12 12 P 1,000 Ft W PE I 1112 I I 26I 1 1 41 301 1 1 30 S 133 St 1 SR 599 Ramps Intersection I CN t112010 274 1 1 a61 320 1 320 No S from: 500 Ft on each leg to: 500 Ft on each leg G Design and construct intersection improvements Including a new C traffic signal P Totals 300 50 350 350 r Supersedes previous editions Washington State Department ofTransportatioe Paget Six Year Transportation improvement Program Agency: Tukwila From 2005 to 2010 Co. No.: 17 Co. Name: King Co. Hearing Date: 6/14/2004 Adoption Date: City No.: 1320 MPO /RTPO: PSRC Amend Date: Resolution No.: Project Ipentrticatton rroject hosts in rnousanos or uollars Federally Funded A. Federal AId No. B. Bridge No. m c m Expenditure Schedule I Fund Source Information p Projects Only E b 8 H (Local Agency) o m p` C. Project Title o a o v 2 I Fe Funding I RAN a 0 D. StreedRoad Mama ar Number 0 B Q Ph ase Federal Federal State 4th Required e U 0- z E. Beginning MP or road Ending MP or road E g a d Start Fund Cost by Fund Stat Local Total 1st 2nd 3rd Thru Emir' Date F. Describe Work to be Done a (mm/ddNY» Code Phase Code Funds Funds Funds 6th Type (mHVyr) 1 2 3 4 5 6 7) 8 1 9 I 10 1 11 I 12 1 13 I 14 1 15 1 16 1 17 1 18 1 19 I 20 21 14 13 04 P PE I 11112010 1 I I I I 1001 1001 I I I 100 Tukwila !nil Blvd S 116 St No from: SR99 Bridge to: SR599 Design and construct widening on Tukwila Intl Blvd and intersection improvements at T.I.B.1S 116 St. Totals 100 100 100 16 14 03 P 1,500 F1 P PE 1/1/2008 1 1 351 35 351 1 East Marginal Way S CN 1/1/2010 I 16901 1 1 2301 19201 1 1 1 1920 No T from: Boeing Access Rd to: S 112 St W Design and construct widening to 3 lanes including curb gutter, sidewalks, drainage, landscaping, and utility undergrounding. Totals 1690 265 1955 35 1920 16 15 12 P 1,000 Ft AL 1 1 /1/2007 1 I 1 1 1 2001 2001 1 1 200 Andover Park E Minkler Blvd. L No from: 500 Ft each leg to: 500 Ft each leg Design and construct intersection and traffic signal improvements and widening for left turn lanes. Totals 200 200 200 16 16 01 P 2,000 Ft P AL 1 111/2007 1 I 1 1 1 7751 7751 1 1 4251 350 S 168 St T L No W from: Southcenter Pkwy to: Andover Park W S Construct new roadway including curb gutter, sidewalk, drainage, illumination, and landscaping. Totals 775 775 425 350 14 17 12 P 1,500 Ft T LL I 111)2009 1 1 6001 1 1 1251 7251 1 1 1 725 West Valley Hwy S 156 St P No from: Southcenter Blvd to: S 158 St Construct additional northbound left tum lane at S 156 St for northbound HOV to northbound 1 -405. I Totals 600 125 725 725 1 14 18 03 P 2,100 Ft G CN I 1/1/2005 I 1 3945) 1 30001 4481 73931 35331 38601 Tukwila Intl Blvd (Phase 3) C No S from: S 132 St to: S 138 St p Reconstruct roadway including paving, curb gutter, sidewalks, T Illumination, drainage, and utility undergrounding. w Totals 3945 3000 448 7393 3533 3860 Supersedes previous editions 1 Washington State Department of Transportation Page Six Year Transportation Improvement Program A Tukwila From 2005 to 2010 Co. No.: 17 Co. Name: King Co. Heating Date: 6//412004 Adoption Date: City No.: 1320 MPOIRTPO: PSRC Amend Date: Resolution No.: Project laentmcatton 1 Protect t:osts In ,noueands or uolrars 1 Federafy Funded A. Federal Aid No. B. Bridge No. Expenditure Schedule Projects Only o u Fund Source information (Local Agency) o C. Project Title 5 z I Federal Funding R d 8 rn o E Q. Street/Road Name or Number s a Phase Federal Federal State 4th c 0 m a i rn c 6 State Local Total ir• Date LL a. z E. Beginning MP or road Ending MP or road E (2 Fund Cost 1 3rd Thru Start Fost by Fund Funds Funds Funds 1st 2nd 3 Type lyAyyy) F. Describe Work to be Done t (+run/dowYI Code Phase Code 6th 1 1 2 1 3 1 4 5 6 7 1 8 1 9 I 10 1 11 I 12 1 13 1 14 1 15 1 16 1 17 1 18 i 19 1 20 1 21 14 19 05 P 0.580 w u 1 1/1/2010 1 1 5301 1 I 501 5801 1 1 I 580 No West Valley Highway T S from: 1-405 to: StranderBlvd P Design and construct widening to 7 tares Including nab gutter, G sidewalks, illumination, and drainage. Totals 530 50 580 580 16 20 04 P z.00°Ft W LL 1 1n12oos 1 1 1 1 1 4251 4251 1 1 1 425 No Minkler Blvd T S from: Southcenter Pkwy to: Andover Park W p Consruct widening for 3 lanes including curb gutter. sidewalk, drainage, and landscaping. 'Totals 425 425 425 14 21 03 P 3.500Ft P PE 1 u1 /2010 1 1 1 1 1 1001 1001 1 1 1 100 Tukwila Intl Blvd. (Phase 4) S No w from: Boeing Access Rd to: S116 St Design and construct widening including paving, curb gutter, sidewalk, drainage, illumination, landscaping, and utility ITOtals 100 100 100 r L 1/1/2009 1 1 301 2201 1 1 1 220 16 22 12 P 1,o0oFt W L A 1 1 190 1 No Andover Pk E1 Industry Signal T S from: 500 Ft on each leg to: 500 Ft on each leg p Design and construct a traffic signal and intersection G improvements. Totals 190 30 220 220 17 23 03 P 600 Ft AL 1 1/12009 1 1 1 1 1 2001 2001 1 1 1 200 No Nelson Place from: S 156 St to: S 158 st Design and construct paving, curb gutter, sidewalks. drainage, and illumination. Totals 200 200 2001 00 1 24 32 P PE 1 1/1/2009 1 1 1 1 1 301 30` I 1 1 30 CBD Interurban Trail Connector No from: Interurban Tref to: CBD Design and construct trail from Interurban Trail to CBD. RTota's 30 30 30 Supersedes previous editions Aft Washington State Department of Transportation Page Six Year Transportation Improvement Program Agency: Tukwila From 2005 to 2010 Co. No.: 17 Co. Name: King Co. Hearing Date: 8/14/2004 Adoption Date: City No.: 1320 MPO/RTPO: PSRC Amend Date: Resolution No.: 1'roject Faentltacation r•rolect t:osts in r nousanas or Uouars I Federally Funded A. Federal Aid No. B. Bridge No. i m 1 Fund Source Information j Expenditure Schedule Projects Only g1^5 N r (Local Agency) e .a C. Project Tide a m 3 8 r u f0 Federal Funding 1 RAM O E D. Street/Road Name or Number S a Phase Federal' Federal State Required a Z 3 E. E r n i2 5 State Local Total 4th En. a. Beginning MP or road MP or road E 1st 2 nd 3rd Thru Date F. Describe Work to be Done En Start Fund Cost by Fund (mm/ddryyyy) Code Phase Code Funds Funds Funds 6th Type (M t yyy 1 2 3 4 5 6 7 1 8 1 9 1 10 1 11 1 12 1 13 1 14 1 15 I 16 1 17 1 18 1 19 1 20 21 16, 25 05 P 1,500 Ft W PE 1 1/1/2005 1 1 1 I 1 5001 5001 3001 2001 1 Klickitat SC Pkwy /1-5 Access Revision T No 5 from: 1 -5 Off Ramp to: S 168 St p Design and construct safety and capacity improvements. G Totals 500 500 300 200 17 26 03 P 1000 p PEI 111/2006 1 1 1 1501 1001 250 1 2501 S 144 St (Phase 2) Feet T CN 1/1/2007 1 8 401 5 601 1400 I 1 14001 No W from: 42nd Ave S to: Tukwila Intl Blvd S Design and construct paving, curb gutter, sidewalks, drainage, G illumination, and utility undergrounding. C Totals 990 660 1650 250 1400 1 16 27 03 P 1.1 W PE 111/2007 1 I 1501 150 I I 150 Southcenter Blvd. Miles s CN 1 1/1/2008 I I I 1 1 16001 16001 I I 1 1600 No T from: 1-5 to Tukwila Intl Blvd, c Improve roadway to a three -lane urban arterial with medians, turn lanes, curbs, gutters, sidewalks, street lighting, and drainage, G 1750 1750 150 16001 16 28 05 P C PE 1 1/1/2006 1 1 1 1 1 1001 1001 1 1001 1 Andover Park West G No P from: Tukwila Parkway to: Strander Blvd. S Complete widening for center left tum lane. T w Totals 100 100 100 1 14 29 04 P 0.5 C PE 1 1/1/2007 I 11 I I 1 1001 1001 1 1 1001 SC Blvd. 161 Ave S Bridge Widening Miles G No P from: 1 to: 62nd Ave S s Widen Southcenter Blvd. and the 61st Ave S Bridge to add a lane T for future traffic growth. w Totals 100 100 100 17 30 05 P 0.25 C PE 1 1/1/2005 1 1 I I 1 251 251 251 1 1 S 144th St Bridge Sidewalks Miles G N P from: 51st Ave S to: 53rd Ave S S Widen existing sidewalks on bridge over 1.5 between 51st Ave S T and 53rd Ave S. w Totals 25 25 25 1 1 Grand Totals for Supersedes previous editions A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX-YEAR TRANSPORTATION · -~:: IMPROVEMENT PROGRAM, AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION .AND :~ THE TRANSPORTATION IMPROVEMENT BOARD. - ,.~ WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as ~:~ amended, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City stxeet and arterial needs, and based upon these findings has prepared a Six-Year Transportation Improvement Program for the ensuing six (6) calendar years (2005-2010); and WHEREAS, a public hearing was held on the said Six-Year Transportation Improvement Program on June 14, 2004; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. PASSED BY THE CITY COUNCIL OF THE CII'Y O1~ TUKWILA, WASHINGTON, at_ a Regula,r_ Meeting thereof this day of A'ZgEST/AUTHENTICATED: Jim Haggerton, Council President Jane E. Cantu, CMC, City Clerk APPROVED AS TO FORM BY: Filed with the City Clerk: Passed by the City Council: Office of the City Attorney Resolution Number:.