HomeMy WebLinkAboutCOW 2004-04-26 Item 3D - Contract Supplement #1 - 2004 Overlay and Repair Program Design with KPG for $108,112.60 Meeting Date Prepared b~l Mayor's revicw C?uncil review
4/26/04
·
CAS Number: 04-059 ] 'g' g : p '
Agenda Item Title: 2004 Over lay amd Repair Program Consultant's Supplement
Original Sponsor: Council Admin. Public Works
Timeline:
Sponsor's Summary: In December 2003, KPG began design of the 2004 Overlay and Repair Program. Final design
is complete and the bid award for construction is underway. This supplement is for KPG to
perform construction management services for the overlay program for a fee not to exceed
$108,112.60.
Recommendations:
Sponsor: Authorize the Mayor to sign supplement with KPG, Inc.
Committee: Authorize Mayor to sign supplement and forward to COW for information only.
As a supplement to an existing contract, no formal action is needed by Council.
Administration: Same as Sponsor.
Cost Impact (if known): $108,112.60 for a new contract amount of $176,636.39
Fund Source (if known): 104.02 Commercial Streets (pg. 42 2004 CIP)
Meeting Date Action
4/26/04
Meeting Date Attachtnents
4/26/04 Information Memo dated April 5, 2004
Supplemental Agreement No. 1 to Contract 03-141 Project No. 04-RWO1
Transportation Committee Meeting Minutes from April 12, 2004
INFORMATION MEMO
To: Mayor Mullet
From: Public Works Directot~~
Date: April 5, 2004
Subject: 2004 Overlay Program - Construction Services Sunnlement
Project No. 04-RW01
Contract No. 03-141
ISSUE
Authorize the Mayor to sign a contract supplement for construction services on the 2004
Overlay Program.
.BACKGROUND
KPG, Inc., and Tukwila entered into Contract No. 03-141 for design services related to the
2004 Overlay Program. KPG now has the capabilities in-house to perform construction
services.
ANALYSIS
A contract supplement fOr construction services has been negotiated for a fixed fee not to
exceed $108,112.60.
Supplement No. 1 Bud~,et
Construction Services $108,112.60 $150,000.00
RECOMMENDATION
Authorize the Mayor to sign Supplemental Agreement No. 1 to Contract No. 03-141 with
KPG, Inc., in the amount of $108,112.60.
attachments: Supplemental Agreement No. 1
SUPPLEMENTAL AGREEMENT NO. 1
CONTRACT NO. 03-141
PROJECT NO. 04-RW01
City of Tukwila KPG, Inc.
Public Works Department 753 - 9th Avenue N.
6300 Southcenter Boulevard #100 Seattle, WA 98109
Tukwila, WA 98199
PROJECT: 2004 OVERLAY AND REPAIR PROGRAM -- CONSTRUCTION SERVICES
This SUPPLEMENTAL AGREEMENT NO. 1 is to supplement the agre .epaent entered into with
KPG, Inc. and the Ci/y of Tukwila, which was executed on the 29th day of December, 2003.
All provisions in the basic agreement remain in effect, except as expressly modified as follows:
Article 2, Scope of 8erviees, shall be modified as follows:
The Consultant agrees to provide construction services as requested by the City in accordance
with the scope of work included as Exhibit A.
Article 4, Payment, shall be modified as follows:
Payment for work provided by Consultant shall be made as provided on Exhibit B, attached
hereto, provided that the total amount of payment to the Consultant for this work not exceed
$108,112.60 without express written modification of the Agreement signed by the City. The new
tOtal contract shall not exceed $176,636.39 without express written modification of the
Agreement signed by the City.
IN WITNES~ WHEREOF, the parties hereto have set their hands and seals this __ day
of ,2004.
APPROVED: APPROVED:
CITY OF TUKWILA KPG, INC.
Steve Mullet Nelson Davis, P.E.
Mayor Principal
Attested:
Jane Cantu, City Clerk
Exhibit A
City of Tukwila
2004 Overlay and Repair Program
Supplement Number 1
Contract Number 03-141
Construction Services
Scope of Work
Mamh 29, 2004
The Consultant shall provide Construction Management and Field Observation services
for the 2004 Oveday Program as outlined below:
A. 3'he Consultant shall provide continuous project management throughout the
construction duration. This includes management of staff and testing
subconsultant and preparation of monthly invoices and progress reports. The
estimated proje(~t duration is 4 months.
B. Prepare for and attend pro-construction conference with the City, Contractor, and
affected utilities. The Consultant shall prepare notice of pre-construction
meeting, agenda, and minutes for distribution to all attendees. -
C. The Consultant shall keep records and prepare correspondence as required for
the duration of construction. Certified payroll and other required documentation
obtained from th~ Contractor will be provided to the City.
D. The Consultant shall provide one set of preconstruction photographs and any
photographs taken during the coume bf construction. Photographs will be
labeled with the date taken and subject matter.
E. The Consultant shall provide the services of one full-time inspector and
supplemental assistants, as needed, on the project site who will observe the
technical content of the construction, including providing day to day contact with
the Contractor and the City. By providing such assistance, the Consultant shall
assume no responsibility for proper construction techniques and job site safety.
The prasen(~:e of the Consultant's personnel at the construction site is for the
purpose of providing to the City a greater degree of confidence that the
completed work will conform generally to the Contract Documents. The
Consultant will endeavor to protect all parties against defects and deficiencies in
the work of the Contractor, but cannot guarantee the Contractor's performance
and shall not be responsible for construction means, methods, techniques,
sequences of procedures, or for safety precautions and programs in connection
with the work performed by the construction contractor and any subcontractor.
F. The Consultant shall contract with an independent testing lab for material testing
services such as field sampling, sieve analysis, in place density tests, extraction,
and rice density. A $10,000 allowance has been included for testing services
from an independent lab.
G. The Consultant shall review traffic control, schedule, and materials submittals
provided by the Contractor.
H. The Consultant shall provide weekly, informal site visits with the field observer
and Contractor to addres§ concerns, make clarifications, and assure compliance
with Contract Documents.
I. The Consultant shall review change conditions as they arise and make
recommendation to the City for field changes/change orders.
J. The Consultant shall track quantities, prepare pay estimates, and review with
City and Contractor for approval. Four (4) pay estimates are anticipated for this
project.
K. The Consultant shall provide field inspection for substantial completion and final
completion.
L. The Consultant shall prepare and review a comprehensive punchlist based on
the above field inspections.
M. The Consultant shall revise the original drawings and submit to the City, upon
completion of the work, using available information supplied by the Contractor
and field personnel. The Consultant shall provide one set of original red-ink on
mylar record drawings and one set of bond copies.
N. The Consultant shall prepare field survey and record drawings for the South 134th
Street project completed in 2003. Field survey will include roadway centerline
profile grades at 50-foot intervals and horizontal and vertical locations of all catch
basins and pipes. The surveyed information will be used to update the original
design plans using AutoCAD. One mylar copy and one bond copy of the
completed record drawings will be provided to the City.
The construction duration is anticipated to be 70 working days with a construction start
date of approximately May 10, 2004.
Deliverables:
Items to be provided by the Consultant:
· Preconstruction notice and minutes
· Daily field inspection reports
· Field testing reports
· Preconstruction and construction photos
· Documentation from site meetings, change conditions, and field directives.
· Copy of all correspondence and payroll information received.
· Change orders, if required.
· Partial and Final pay requests
· Punchlist.
· Record Drawings (ink on City provided mylar and one bbnd copy), 2004 Overlay
· Record Drawings (mylar and bond ~;opy) for South 134~ Place.
Items to be provided by the City:
· Contract award
· Contract closeout
Hour and Estimate
2004 Overlay and Repair Program
Contract # 03-141
Transportatmn Committee
4/12/04
4. 2004 Overlay Construction Services KPG has a contract with the City to do both design for
the overlay projects, and construction management. A contract supplement is all that is needed.
Pam confirmed that another firm had done construction management for many years in the 90's.
The contract will be within budget. Move supplement to COW for approval.
Committee chair approval