HomeMy WebLinkAboutCOW 2004-04-12 Item 4A - Budget - Additional Staffing Needs for Tukwila Valley South Annexation for $270,000 Meeting Date Prepared by Mayor's review Council review
04/12/04 JM~ ~ ~7~/r' ~ , (~.
CAS Number: Ref. 04-046 ] Original Agenda Date: April 12, 2004
Agenda Item Title: Contract Assistance for Tukwila Valley South Annexation
Original Sponsor: Council Adrnin. Public Works
Timeline:
Sponsor's Summary: The Segale family has proposed annexation of approximately 250 acres within the
Tukwila Valley South (TVS) area. Neither DCD nor Public Works have the resources
to adequately manage such a significant endeavor. Propose additional staff to meet the
requirements.
Recommendations:
Sponsor: Approve staffing outlined.
Committee: Forward to COW and then on to Regular for approval of staffing.
Administration: Same as Sponsor.
Cost Impact (if known): $270,000.00
Fund Source (if known): General Fund $175,000 and CIP Funds $95,000
Meeting .Date Action
04-05-04 Council discussion. Consensus existed to forward the item to 4/12/04
for additional information from staff. If all questions are addressed
dd~ing the C.O.W. meeting, Council agreed to forward the item to the
Special meeting which will immediately follow the C.O.W.
Meeting Date Attachments
04/12/04 Mere, o from Mayor dated.gpr±l 8, 2004
Finance and Safety Committee Meeting Minutes from April 5, 2004
CITY OF TUKWILA
INTER-OFFICE MEMO
TO: Mayor Mullet
Finance & Safety Committee
FROM: Steve Lancaster
Jim Morrow
SUBJECT: Contract Assistance for TVS Annexation
DATE: April 8, 2004
SUMMARY
We have previously spoken about the need for additional staff resources within DCD and Public
Works related to the proposed Tukwila Valley South annexation. Our specific proposal for
meeting this need is to:
1. Retain a Project Manager on a one-year contract (with the possibility of extension) to
coordinate the DCD workload.
2. Assign Ryan Larson on a half-time basis to coordinate the PW workload.
3. Transfer Ryan's remaining project management workload (Cascade View Drainage
Project, Small Drainage Projects) to Mike Ronda (currently a contract employee).
4. Retain an additional Project Inspector to assist Mike Ronda with the increased
construction inspection workload.
5. Retain the services of an engineering firm to address the transportation, water and sewer
issues association with the infrastructure needed to support the annexation.
Funding Sources
General Fund
Annual 2004 Costs 2005 Ending Fund CIP Project
Costs (May to Dec.) Costs Balance Funds
1. DCD Project Manager $100,000 $ 60,000 $100,000 $160,000
3. PW Mike Ronda 30,000 20,000 30,000 $ 50,000
4. Add'l Project Inspector 65,000 38,000 65,000 103,000
5. Engineering Firm.* 75,000 10,000 75,000 85,000
~ Total $ 270,000 $128,000 $ 270,000 $ 245,000 $153,000
$ 398,000 $ 398,000
No. 5 - Engineering Firm will be on an "on-call" basis and only pay for requested tasks.
Costs are a worst case scenario. These costs are not budgeted for 2004, and so would come
out of the ending fund balance.
Page I of 4
BACKGROUND
The Segale family has proposed annexation of approximately 250 acres within the Tukwila
Valley South (TVS) area. Associated with the annexation, they have also proposed:
· Adoption of a "pre-annexation agreement."
· Adoption of a "Master Plan" for the TVS area.
· Preparation of an Environmental Impact Statement.
· Amendments to the Comprehensive Plan and development regulations.
· Adoption of a "development agreement."
These documents and agreements will guide the long-term development of approximately 500
acres. They will have significant implications for land use, environmental protection,
infrastructure development and the City's fmancial health. It is imperative that they accurately
reflect the needs of the property owner as will as those of the community at large.
As we discussed during the 2003 budget process, neither DCD nor Public Works have the
resources to adequately manage such a significant endeavor, in light of other important priorities
(Mall expansion, GMA update, TUC Plan, Link unclassified use permit, transportation plan, CIP
execution, etc.)
PROPOSAL
1. Retain a Proiect Manager on a one-year contract (with possibilit3, of extension if needed) to
coordinate the DCD workload.
The Project Manager would coordinate the City's review and consideration of the TVS
annexation. S/he would provide support to a Project Team comprising the City
Administrator, Community Development Director, City Attorney, Public Works Director and
Finance Director.
The Project Manager would oversee the preparation of the Master Plan, the Environmental
Impact Statement, Development Regulations, and a Development Agreement. The Project
Manager would advise the Project Team concerning land use, environmental, infrastructure,
financial and other issues, highlighting and evaluating policy issues requiring City Council
decisions.
Depending upon qualifications and experience, the Project Manager would:
· Serve ~s the primary staff liaison to the property owner's consultant team.
· Monitor work of consultants to ensure the development of objective, accurate, complete
and well-written information for decision-makers.
· Review proposals relating to land use policy, development regulations, infrastructure
financing and related issues, and advises decision-makers.
· Coordinate inter-departmental review of project-related information and
recommendations.
Page 2 of 4
· Coordinate the City's project-related activities and decisions with other governmental
ageneias.
· Identify and evaluate policy and implementation options, and draft issue papers, staff
reports and recommendations for consideration by decision-makers.
· Make presentations to decision-makers and other groups.
It is estimated that it will cost approximately $100,000 per year to hire an experienced project
manager.
2. Assign Ryan Larson on a half-time basis to coordinate the Public Works workload.
Ryan Larson is knowledgeable of the annexation proposal and would be able to provide
immediate value to the project. Because surface water issues will be a major component of
the annexation plan, Ryan will be able to effectively provide input and advice. In order to
assign Ryan to the project, his project management workload (Cascade View Drainage
Project Design and Construction, Surface Water Small Drainage Design and Construction)
will have to be reassigned.
3. Transfer Ryan's remaining project management workload to Mike Ronda (currently a
contract employee).
Mike Ronda has proven to be an invaluable asset. He provided engineering and construction
management services for the S. 180th Street Grade Separation Project. He currently is
supervising the Interurban Bridge Widening and Trail Bridge Project. His engineering skill
and management capability, as well as being a registered professional engineer, has been
tested and proven many times. His talent would transfer well to the Cascade View Drainage
Project (Design and Construction) and the City's Small Drainage Project. It is recommended
that Mike's salary and benefits be increased to the same level as that paid to the Golf
Clubhouse Project Manager because Mike's role and responsibilities are being significantly
increased.
The additional costs would be approximately $30,000 per year and would be paid by the
Cascade View Drainage Project. That project currently has budgeted $620,000 for
construction management and construction engineering services. Expanding Mike's
workload will decrease the services and associated costs required of the construction
management consultant. Because there is a 68% mark-up placed on salary, material, and
service costs, it has been estimated that the City can reduce the expected construction
management budget by $50,000 because the consultant will not need to provide a full-time
construction manager. It should be noted that the need for an outside construction
management consultant will still be required, but at a reduced scope of work.
4. Retain an additional Project Inspector to assist Mike Ronda with the increased construction
inspection workload.
A portion of each major CIP project's budget includes the cost of an outside fn'm to perform
construction management functions, including construction inspection. These services come
at a premium because of consultant mark ups and company overhead expenses. The Cascade
View Drainage Project budget (funded by a Public Works Trust Fund Loan) includes
Page 3 of 4
construction management services because the Public Works Department does not have
sufficient staff to perform these fuhctions. If an additional contract construction inspector
were to be hired, at an added expense of $65,000 per year, and placed under Mike Ronda's
supervision, then the City could reduce the number of inspectors needed by the consultant. It
should be noted that the need for an outside construction management consultant will still be
required, but at a reduced scope of work. The need for an additional inspector would not be
required until construction of the Cascade View Drainage Project begins in late 2004 or early
2005.
Summary of PW Cost & Savings
Cascade View Drainage has budgeted $620,000 for construction management services,
which is approximately 8% of the total project budget.
Costs of CIP Consultant Cascade View
Project Funding Const Mgmt Total Construction Savings
Proposal Services Costs Mgmt Budget
Cascade View Drainage $153,000 $367,000 $520,000 $620,000 $100,000
This savings of $100,000 is money that does not have to be borrowed from the Trust Fund
Loan.
5. Retain the services of an angineering firm to address the transportation, water and sewer
issues associated with the infrastructure needed to support the annexation.
Public Works' current workload prevents the staff from addressing the engineering issues
that will arise becanse of the proposed annexation. In order to address these issues in a
timely manner, it is proposed that an outside consultant fn'm be retained to provide Ryan
Larson with the needed engineering support. The contract would be structured as a task
order contract - no costs would be incurred unless the City issues a specific scope of work.
It is estimated that the consultant costs could be as high as $75,000 per year.
OPTIONS
1. Authorize the Mayor to implement the proposal described by this memo.
2. Continue to staffthe proposed annexation and associated work with existing resources. This
would result in significant delays to virtually all major initiatives, including the CIP Program
and the annexation proposal. (Please note, howeTger, that most of these initiatives have
legally or contractually mandated timeframes).
3. Request that the proponent fund the additional resource needs described by this memo.
4. Decline to process the annexation proposal at this time.
RECOMMENDATION
Authorize the Mayor to implement the proposal described by this memo.
Page 4 of 4
Fina..nce and Safety Committee
April 5, 2004
Present: Dave Fenton, Chair; Joan Hernandez, Dennis Robertson
Keith Haines, Jim Morrow, Steve Lancaster, Alan Doerschel, P, honda
Berry, Lucy Lauterbach
1. Military Benefits Clarification Resolution 1529 provides medical insurance for the
families of people who are serving in the military. The resolution was unclear whether
the twelve month coverage was for a contiguous period, or if it could cover people who
served overseas for six or eight months, came home, and then left again for another six
month tour. Jim Morrow made a plea for the military families, saying it would remove
one worry from those who have a head of a household in active service. Dennis asked
how much it cost last year, and Alan said it was a.minimal cost to the City. The
Committee unanimously recommended that the twelve-month limit (and possible
extension) start over with each activation for service. Report clarification to Council.
2. Position Reclassification Jim Morrow said he had planned to do a reclassification
during the budget review process last fall. In the draft budget he had put a Business
Manager in the organizational chart and planned for Frank to fill it, but then found it was
no such position existing in the City's position classification system. Administrative
Services recommended either devising a new classification of service, or finding one
that would work for the "new" position. The Classification Description for Assistant
Director worked for the newly named position of Deputy Director for Business Services.
In the list of additional duties, Joan asked for a clarification of why the Deputy Director
would oversee the Emergency Operation Center (ECG). Jim said he was not giving up
being co-chief (with Nick Olivas) of the EOC, but that in an emergency the Deputy
Director would oversee the Public Works Department-specific duties while Jim oversaw
the overall EOC operations. The position is funded, and it will acknowledge the
additional Workload Frank has assumed over time, including some engineering contract
management. Dennis said the Classification was very general, but others said it is
necessarily so, as it can apply to a variety of positions and is not a job description.
RecOmmend to COW and Regular Meeting.
3. TVS Staffin,,q Needs, Steve L explained that DCD has been limited in the amount of
work that can be done on the Tukwila Valley South (TVS) annexation because of the
other pressing issues such as TUC, TOD, Sound Transit, the Mall expansion, and the
Comp Plan. Steve said he could have spent' 30 hours on the TVS proposal last week,
but he was'~on[y able to spare 3 hours. Public Works is also Very busy with projects and
Cannot spare staff to work on TVS. As the TVS proposal is starting to gain momentum,
staff will be needed to work on it. Steve wants to hire a contract employee as a project.
manager for the DCD portion on the workload required to adopt a pre-annexation
agreement, a master plan, an ElS, Comp Plan amendments, and a development
agreement. All of these will be needed before annexation. Public Works plans to assign
Ryan Larson work on TVS half time, and to hire a current contract employee, Mike
Finance and Safety
4/5/04
Ronda, to backfill Ryan's work on surface water. Mike will retain some inspection, and
another inspector will be hired on a contract basis to help Mike. Costs are estimated to be from
$60,000-$120,000 for the rest of 2004. Funds will come from savings in project budgets of other
Public Works projects, as well as from Ending Fund Balance. The Mayor strongly recommended
against allowing Segale to fund the positions, as the contracted persons would spend most of
their time outside of City Hall working with Segale in meetings. The Mayor wants to avoid an
appearance of fairness issue that could result from the positions being developer-funded. One
issue Steve L raised is that because of all the pre-annexation items Segale wants before he will
annex, the City could spend a lot of money working through all the items. The City may want to
include something in the Pre-annexation agreement that, in the event the property owner decided
against annexation, would require the City be reimbursed for work completed up to the point of
the decision not to annex. There won't be any permit fees incurred until about 2006. If the
project were successful, development would then continue for an estimated ten years. Joan said
she was uneasy about the funds coming from the ending fund balance. She thought it was
confusing to read about the Cascade surface water budget going to the contract employee, Mike
Ronda, and she wanted to be clear about where all the funding was coming from. Staff was
interested in moving ahead quickly with this proposal, but they agreed not to push for its
approval that evening, but to reschedule it for next week's COW and Special Meeting.
Recommend mayor's proposal to 4/5 meeting~ 4/12 COW and Special Meeting.
4. Crime Update for Tukwila International Boulevard Keith said criminal activity has
picked up on TIB in recent months. Prestitutes are more in evidence there, and there
has been loitering that might indicate drug activity. The cameras are broken, which
seems to encourage illegal activity. Police are responding with hire patrols and plain-
clothes police officers. They have already arrested some prostitutes. Committee
members asked about the Highway 99 Citizens Patrol, and were told they have largely
lost interest as crime had dropped off. Litter is a real preblem around the intersection of
TIB and S. 144t". The Stop By corner grocery is selling marijuana pipes and has
pomogrephic magazines in clear view of any kids who walk into the store. As neither of
these things is clearly illegal, police walk a fine line trying to convince the store owner it
is not in the community's interest to have these things. ,loan asked how much crime is
the result of the cameras being down. Keith said he didn't know, but he's eager to get
the new cameras. In the meantime, a new controller that will work with the old cameras
and the new ones has been installed. The olfl cameras should be able to be used in a
limited fashion soon. The new cameras have to wait for City Light to pull their wires and
the new lights'to go up, so it could be some time before they're installed. Information;
reschedule'in one month.
5. Memorandum of Understandin.q (MOU) Law Enforcement Info Exchan.qe (LinX)
The last time this issue was discussed at Committee, Dennis had suggested several
changes to the MOU. However, when Keith took those recommendations to the next
LinX meeting he found several cities and agencies had already approved the agreement