COUNCIL AGENDA SYNOPSIS
Meeting Date
3/22/04
4,.ara ITEM INFORMATION;
Initials
Prepared b 1 Mayor's review 1 Councjl review
MC el I 1 I <I /AA tti
0 4 r 0 1/4i o I Original Agenda Date: March 22, 2004
Bid Award for Andover Park West Overflow Project
Council
This project will provide a bypass sewer line at Lift Station No. 2 (located in Andover Park
West at Minkler). The project was advertised on February 2 and 8 and eleven bids were
received and opened on February 27, 2004. The low bid of $247,574.40 is from Construct
Company and references show satisfactory work.
Award contract to Construct Company.
Forward to COW and then Regular Council.
Same as Sponsor.
$247,574.40
403/02 Sewer Fund (pg. 98 2004 CIP)
Action
Information memo dated March 4, 2004
Bid tabulation
Utilities Committee Minutes from March 16, 2004
Admin. Public Works
ITEM NO.
4 e
To: Mayor Mullet
From: Public Works DirectoofTn
Date: March 4, 2004
Subject: Andover Park West Overflow
Project No. 86 -SW03
Bid Award
ISSUE
INFORMATION MEMO
Award the bid for the gravity overflow at Sewer Lift Station No. 2 at the intersection of
Minkler Blvd. and Andover Park West.
BACKGROUND
This project will provide a gravity overflow for Lift Station No. 2 in the event of a power
outage in combination with generator failure. The original budget for the project is
$300,000.00 for engineering and construction in the 2004 C.I.P.
ANALYSIS
All bids were checked and tabulated. The apparent low bidder is Construct Co. LLC from
Sumner, Washington. City staff checked the provided references for jobs of similar size and
experience. The references checked indicate the contractor has done satisfactory work.
Funds for the Andover Park West Overflow are available in the current C.I.P. The funding
provides the project a 10% contingency.
Expenses Budget
To Date (surveying copies of plans) 5,000.00
Construct Co. to Install Overflow 247,574.40
Contingency 10% for Overflow 24157.44
Total Expenses $277.231.84 $300.000.00
RECOMMENDATION
Award the construction bid to Construct Co. LLC for $247,574.40 to install the overflow at
Lift Station No. 2.
MC:1W
(P:Projeru%A -SW P.gsblS6SWO3Viid Award Info Memo)
Utilities Committee
March 16, 2004
Present: Pam Carter, Chair; Pam Linder, Dave Fenton
Jim Morrow, Frank Iriarte, Bob Giberson, Pat Brodin, Mike Cusick, Alan
Doerschel, Rebecca Fox, Lucy Lauterbach; Steve Caputo Rabanco
DRAFT
1. Water Sewer Comn Plans Consultant Agreement The Water and Sewer Plan updates are
planned for this year. The chosen firm from a list of short- listed consultants is Economic and
Engineering Services, Inc. Pam Carter noted that the consultant contract came in under budget with
the 9.5% contingency included. Mike indicated that the study will incorporate the portion of Water
District 125's water distribution system that serves Foster Point since the City plans to take over that
system. Pam commented on SewerCAD and Mike explained that the City will purchase the
SewerCAD software if there is sufficient money left in the contingency. If additional modeling is
required, consultant will provide the service. The consensus was to move the issue to COW and then
to Regular Council. Refer Agreement with EES for S189.873 to COW.
2. Andover Park West Overflow This project will build a gravity flow system for Lift Station 2 at
Minkler /Andover Park West. This is needed in case of a generator failure. The lowest bid came in under
budget with the 10% contingency included. Pam asked if the low bidder, Construct Co. LLC had done
work for the City. Mike indicated that Construct Co had never worked on a project for the City but
reiterated that references were checked and that feedback was very positive. A question was asked if the
low bidder was a company that performed poorly on previous projects what would we do? Jim
indicated that more than likely, staff would recommend the next lowest bidder and forward to Council
for approval. Jim stated that part of the contract process is to determine both contractor responsiveness
(did contractor fully meet all the terms stated in the invitation for bids) and contractor responsibility (is
the contractor trustworthy and does he have the ability to satisfactorily perform the proposed work).
The Committee recommended moving this issue to COW and Regular Council for approval.
Recommend bid award to Construct Co. LLC for S247.674.40 including WSST to COW and
Council.
3. Solid Waste Contract Extension The City currently has a garbage and recycling contract with
Rabanco. The contract will expire in March, 2005. Staff presented two options to the Committee: to wait
until the contract expires next year and then look for a provider; or to extend the current contract for two
years, which is possible because of an extension clause in the current contract. The Committee
recommended this second option. Jim M said Public Works staff is too busy to negotiate a new contract
with possible a new contractor next year, and that an extension was their favored option. Pam L asked
about performance, which staff reported as excellent. Regarding rates, Frank said Tukwila's rates
compare favorably to other cities around us. Pam C asked about Bellevue's new contract, which is very
complicated but probably has lower rates than Tukwila. Steve's answer was that Tukwila's rates are the
best in the whole South Sound. Jim M noted the time to be able to extend the contract expires at the end
of March. Pam C asked whether there were any reasons not to extend, and Frank said there weren't any
other than denying other providers the right to compete for our business. Dave said as a commercial
customer he's had very good support from Rabanco.