Loading...
HomeMy WebLinkAboutCOW 2004-02-23 Item 3L - Bid Award - Ballard Sheet Metal Works for Tukwila Community Center Rotunda Gutter Replacement for $31,203.84Meeting Date 2/23/04 Original Sponsor: Timeline: Sponsor's Summary: Recommendations: Sponsor: Committee: Administration: I Cost Impact (if known): I Fund Source (if known): COUNCIL AGENDA SYNOPSIS Meeting Date 2/23/04 Council Initials Prepared by Mayor's review I Council review TP. frl U I: 7 1.-H v I I I I I I CAS Number: 04-033 Original Agenda Date: February 23, 2004 Agenda Item Title: Bid Award for Tukwila Community Center Rotunda Gutter Replacement Project Admin. Award contract to Ballard Sheet Metal Works, Inc. Recommend to COW and then Regular Council Same as Sponsor $31,203.84 (with WSST) 303 Facilities Public Works ITEM NO. 31 This project will provide a new stainless steel replacement gutter and downspout system to the Tukwila Community Center rotunda. The project was solicited for bids on January 8 and five bids were received and opened on January 30, 2004. The low bid of $28,680.00 was from Ballard Sheet Metal Works, Inc. Action 2/23/04 I Information Memo dated February 6, 2004 Bid Tabulation Transportation Committee Meeting Minutes from February 9, 2004 ANALYSIS/ WORK PLAN ACTION TAKEN INFORMATION MEMO To: Mayor Mullet From: Public Works Director'{) Date: February 6, 2004 ttJJ Subject: Tukwila Community Center Rotunda Gutter Replacement City Project No. 03 -BG07 Bid Award ISSUE Award the bid for the Tukwila Community Center Rotunda Gutter Replacement. BACKGROUND This facility was built and occupied in late 1996. The existing gutter was fabricated from paintable mild steel sheet metal with a light zinc coating. The system includes only four down leaders and no expansion joints. Whether by design detailing or by construction, the support brackets are allowing the gutter to pull off the building fascia. This loss of profile, accumulation of debris, and resulting water ponding has rusted out the gutter in several locations and needs to be replaced. In 2003, we retained the sheet metal consulting services of Herb Johnson to assist in the detailing and specifying of a stainless steel replacement gutter and downspouts system. The choice of replacement material, the addition of expansion joints, development of carefully detailed support brackets, and the addition of one new downspout reflects the need to install an assembly which needs little to no maintenance. The gutter is very difficult to access from the north side given the inability to reach over the north entry. The project was solicited for bid on January 8. Five (5) bids were received on January 30, 2004, with the apparent low bid of $28,680.00 submitted by Ballard Sheet Metal Works, Inc. See attached bid tabulation. We have reviewed the bids, notified the apparent low bidder of their opportunity to claim error within 24 hours which they have declined, and checked the low bidder's references. The estimated cost of $31,203.84 including WSSTX is within the project budget of $33,000 with an adequate contingency for construction. Mayor Mullet Page 2 February 6, 2004 Bid Results Engineer's Estimate Budget Bid Amount $28,680.00 $26,000.00 WSSTX (8.8 2.523.84 2.288.00 Subtotal $31,203.84 $28,288.00 Contingency (5 1.434.00 1.300.00 Total $32.637.84 $29.588.00 $33.000.00 RECOMMENDATION Award the contract to Ballard Sheet Metal Works, Inc., in the amount of $28,680.00 (not including WSSTX). attachment: v.M B id Tabulation (rnojmtA-00 Prats103•f -•1- +Mad Info Mn) m BUDGET AND BID SUMMARY Bidders Kollmar Northwest Sheet Metal McKinstry Northshore Sheet Metal Engineer's Estimate Tukwila Community Center Rotunda Gutter Replacement Bid Tabulation Project 03 -BG07 Base Bid 8.8% Sales Tax Bid Total 76,550.00 62,546.00 51,432.00 41,000.00 6,736.40 5,504.05 4,526.02 3,608.00 24,000.00 2,112.00 83,286.40 68,050.05 68,050.00 55,958.02 55,958.00 44,608.00 26,112.00 I Bold figures represent bid. 4. Federally Funded Right of Wav Acauisitions It is very complex to comply with federal requirements if federal funds are used to buy rights of way. Jim explained that is in the City's best interest to buy rights of way with City money as a match to other parts of any project funded by federal funds. By using City funds, Public Works can start projects sooner, and do them faster and better than if federal funds were used. Pam asked if there was a downside to the City's buying right of way, and Jim said there was not. Jim said they need more coordination with WSDOT, but that was fine. Other cities have done this. Information. )75. TCC Round Gutter Replacement Bid Award The Community Center which was built in 1996 1 has always had gutters on the middle rotunda that have been problematic. They are made of tin metal, and had no expansion joints. The gutters have pulled off the building and are not misshapen and don't do their job. After a study of the situation, bids were called for, and five bids were received. Ballard Sheet Metal Works, Inc. was the low bidder at $31,203.84. This is within budget. Recommend to COW for bid award. 6. WSDOT Letter WSDOT wrote a letter to Senator Hom asking for turnback of Highway 99. The City wanted WSDOT to include a request for the funding to help improve the northern section. They did not, so the City will write Senator Horn separately requesting the appropriation. Information. Committee chair approval TRANSPORTATION COMMITTEE, 2/9/04, Page 2