Loading...
HomeMy WebLinkAboutReg 2003-12-01 Item 4E - Agreement - Addendum #1 for Foster Point Revitalization Design with AHBL Inc for $19,727CAS Number: 03-150 Original Sponsor: Timeline: Sponsor's Summary: Meeting Date 11/24/03 Meeting Date 11/24/03 12/1/03 COL TOIL AGENDA Sx DPSIS 03 Meeting Date 11/24/03 12/1/03 Initials Prepared by 1 Mayor's review 1 Council review Mcgg'rti h wv-- 1 V I I I 0 Original Agenda Date: November 24, 2003 Agenda Item Title: Allentown Phase II Foster Point Sewer Consultant's Agreement Supplement Council Admin. Public Works The consultant's agreement for design of the Foster Point area of Allentown Phase II was 90% completed and put on hold until funding was obtained through the Public Works Trust Fund. This supplement will complete the design of Foster Point and bring it to current city standards. It will also include additional storm sewer facilities and the design of the relocated lift station. Recommendations: Sponsor: Authorize the Mayor to sign the supplement with AHBL, Inc. Committee: Forward to Committee of the Whole. Administration: Same as Sponsor. I Cost Impact (if known): $19,727.00 I Fund Source (if known): 403/02 Sewer (pg. 95, 2004 Proposed CIP) Action Consensus existed to forward item to the December 1 Regular Meeting. 1 Attachments Information Memo dated October 27, 2003 Consultant's Supplement Utilities Committee Meeting Minutes from November 18, 2003 No attachments (see 11/24/03 C.O.W. packet). 1 3 ITEMNO. 1