Loading...
HomeMy WebLinkAboutReg 2003-12-01 Item 4F - Turnover - Kentucky Fried Chicken / Taco Bell Sidewalks (15036 Tukwila International Boulevard)ITE M,MTFOR C4411ON 0 16 I Original Agenda Date: December 1, 2003 Agenda Item Title: Accept Right -of -Way for Sidewalks (KFC/Taco Bell) CAS Number: 03-154 I Original Sponsor: Timeline: Sponsor's Summary: Recommendations: Sponsor: Accept turnover of right -of -way for sidewalks. Committee: Forward to Regular Council and authorize Mayor to sign acceptance form. Administration: Same as sponsor. Cost Impact (if known): N/A Fund Source (if known): .a '1 w RECOD OMP AG Action Meeting Date COUNCIL AGENDA SYNOPSIS Meeting Date 12/1/03 1 Council Admin. Public Works As part of the development for the KFC/Taco Bell, the owners are dedicating public right -of way adjacent to Tukwila International Blvd. This dedication is needed for the sidewalk to be within public right -of -way at 15036 Tukwila International Blvd. x7 S1/4 t r aPPEN ie Initials 1 Pr ed by 1 Mayor's review 1 Council review 1 dM 1 I 1 1 I 1 1 1 I 1 1 I axt:? 1 Meeting Date 1 Attachments 12/1/03 I Information memo dated November 14, 2003 with vicinity maps Transportation Committee meeting minutes from November 24, 2003 [Turnover documents available at Public Works) ITEMNO. 4.f TO: Mayor Mullet FROM: Public Works Director�fl DATE: November 14, 2003 (J SUBJECT: KFC/Taco Bell Dedication of Riaht- of -Wav /Turnover) ISSUE BACKGROUND INFORMATION MEMO Accept right -of -way dedication, adjacent to Tukwila International Blvd., as part of the KFC/Taco Bell development. Permit No. D03 -201 Site Location —15036 Tukwila International Blvd., Tukwila Parcel No. 004100 -0525 As part of the development for the KFC/Taco Bell, the owners are dedicating public right -of -way adjacent to Tukwila Intemational Blvd. This dedication is needed for the sidewalk to be within public right -of -way. Conditions were placed on the development to provide the following tumover documents: 1. Dedication of Right -of -Way 2. Excise Tax Affidavit Form RECOMMENDATION Authorize Mayor to sign acceptance forms. attachments: vicinity map Development file: KFC/Taco Bell Development NOTE: All documents are available at Public Works and will be presented at the meetinas. KFC / Taco bell D03-201 Dedication of Right-of-way Turnover Vicinity Map 5 0 5 3 LG Q ry. 2306905 0485 17TUkW •an.. 3_32 ..1.v 0 305 KFC /Taco Bell D03 -201 Dedication of Right -of -Way Turnover 211430s 0494 fl 254045, o se ;05E 29 4628#s 0 0 0 a: e 15.7 31515 +5 ,W 329198 c' h 0517 mm 29 ry 97 le 00020416003153 1686.2TOCETROFSEC. 6 RO ,0 0 "AP s. Iszna KC SP 3770169 7707 0812rPP O X0 0 LOf A l.Qf B N 1 0 0 0� ps( 1461405 $470A e 0098 0095 153.891SM 71, Parcel Map .0 28 27 1: b x D z G 1979905 89 23325*$ x r C636 L 506960 0680 144 n 0 31355.5 1 0520 323180 0525 0530 0 0 0 0 6 0 6000 +s 0670 1 n I>0 l Jae 0 0 0 1476045 0v6 4025E 08 File: P:\ 10000A10750\ staves\ 10750EXH03.dwa Scale: Horizontal 1 30' Vertical Desianed 18215 72ND AVENUE SOUTH KENT, WA 98032 (425)251 -6222 (425)251 -8782 FAX CIVIL ENGINEERING, LAND PLANNING, SURVEYING, ENVIRONMENTAL SERVICES 1 Drawn CAD 30' L_ 1 r1 i N i i -14101'54 1 16 W o 11.94' C:11 NO0'00'19 "E ,e''`o 8.50 Checked NWG Aooroved ADDITIONAL RIGHT -OF -WAY DEDICATION CITY OF TUKWILA Title: RIGHT -OF -WAY DEDICATION Exhibit `B' 1 /'c T L_V I L� Date/Eme: 09/05/2003 10:48 Scale: 1 =30 owallace Xrels: For: Job Number 10750 Sheet 1 of 1 RWG 1 Date_9/05/03 Transportation Committee November 24, 2004 DRAFT Present: Richard Simpson, Chair; Dave Fenton, Pam Linder Frank Iriarte, Brian Shelton, Robin Tischmak, Cyndy Knighton, Lucy 1. 2003 Overlay Completion and Acceptance Robin passed out a map showing where the six overlay projects were done this year. Projects were done on 42nd Ave S., S. 153 Baker Boulevard, 40 Ave S., TIB and 51 Ave. S. Lakeside Industries was the contractor, and all work has been done. There was $36,105 in under runs due to quantity under runs. Traffic control and street planning were overruns, but there were no weather delays or bad soils. Recommend contract acceptance and release of retainaae to Reaular Meeting. 2. KFC /Taco Bell Turnover KFC is moving to the old Burger King site on TIB. As part of their development, they are dedicating public right of way off of TIB. This will 'make things easier for the city right of way projects. Recommend acceptance of turnover dncuments to Regular Meeting_ 3. Olive Garden Turnover of Improvements As a condition of the Olive Garden's development they built to city specifications and are now ready to turn over some utilities. These include storm pipes, catch basins and their lids, and stormceptors. Their value is $37,048.58. Recommend acceptance of utilities to Regular Meetina. 4. Transportation Concurrencv and Impact Mitigation Staff explained that the rush on this is self imposed both because of the current lawsuit appeal and because of some impending developments it would be good to have it ready for. The information presented tonight is a first draft of what needs to be done. It is more of a quick fix than a very thorough assessment of the whole concurrency and mitigation system. A more complete review and ordinance will be done next year. Cyndy said the department is interested in plugging vulnerabilities with this interim plan. Cyndy passed out a table of mitigation expected for specific sections of streets in the CBD. Some were projects that have already been done, and others were projects that are beyond six years. She then passed out language that would be in the ordinance but it was written in an easy to read format, which showed current and newly proposed language. As she went through the memo and explained some of the changes. Pam suggested she write a memo to guide people through the changes and the tables, and explain some anomalies. The committee suggested she explain Level of Service as well as the difference between concurrency and impact mitigation. She said concurrency is a yes /no issue of whether facilities are adequate now or in the future to handle the new growth. If the answer is "no developers must pay traffic impact fees. They must also do a traffic study to determine how many trips their business is expected to add to the