HomeMy WebLinkAboutReg 2003-12-01 Item 4H - Final Acceptance - 2003 Overlay Program by Lakeside Industries for $762,454.501 Meeting Date 12/01/03 Meeting Date 12/01/03 CAS Number: 03-156 Agenda Item Title: Original Sponsor: I Timeline: Sponsor's Summary: COUNCIL AGENDA SYNOPSIS d 3— \6 L Meeting Date Prowled by 12/01/03 Council `:ORD`F COUNC Initials 1 Mayor's review 1 Council review ?ITEMNFORMATTON Original Agenda Date: December 1, 2003 Accept as complete 2003 Overlay Program Construction Contract and release retainage. Admin. Public Works The overlay and repair project was completed by Lakeside Industries on September 24, 2003. Underruns amounted to $36,105.25, due to quantity underruns. The total contract amounted to $762,454.50. Recommendations: Sponsor: Accept project as complete and authorize release of retainage. Committee: Forward to Consent Agenda of Regular Council. Administration: Same as sponsor. Cost Impact (if known): $762,454.50 I Fund Source (if known): 104/02 Commercial Streets Action ITNDIC�$ Attachments Information Memo dated November 20, 2003 Notice of Completion of Public Works Contract 03 -107 Transportation Committee Meeting Minutes from November 24, 2003 ITEMNO. v. ACTION TAKEN RECOMMENDATION INFORMATION MEMO To: Mayor Mullet From: Public Works Director Cam Date: November 20, 2003 Subject: 2003 Overlay Program Protect Completion and Accentance ISSUE Accept construction contract as complete and authorize release of retainage bond. BACKGROUND The Notice to Proceed for Contract No. 03 -107 with Lakeside Industries of Issaquah, Washington, was issued June 24, 2003, for construction of the 2003 Overlay Program. This project provided paving, repairs and overlay of various streets within the City. This contract was totally completed on September 24, 2003. The unit bid price underruns listed below were primarily due to minor quantity underruns. The contract costs are summarized as follows: Actual Contract Award Amount S798,559.75 Change Orders 0.00 Underruns (36,105.25) Sales Tax (N /A Rule 171) 0.00 Total Amount Paid (incl. retainage bond) 5762.454.50 The final payment has been issued, final records are being prepared, and this acceptance will formalize the closeout of this project. It is recommended that this contract be forwarded to Regular Council on the consent agenda for formal acceptance and authorize the release of the retainage bond, subject to the standard claim and lien release procedures. RT:ad attachment: Notice of Completion of Public Works Contract (PRProjeou\M RW RS Projecu \O3RWO1\Aaeptx a Memo) a State of Washington De,._._...... of Revenue E PO Box 47474 Olympia WA 98504 -7474 Contractor's Registration No. (UBI No.) 601 381 635 Date 11/3/03 NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT From: City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Sub -Total 762,454.50 Amount of Sales Tax Paid at 0.0 0.00 (If various rates apply, please send a breakdown.) TOTAL 762,454.50 Comments: Retainage Bond was provided by Lakeside Industries. etc to Signature Type or Print Name Phone Number Assigned To Date Assigned Notice is hereby given relative to the completion of contract or project described below Contract Number 03 -107 Telephone Number 425- 432 -1325 Description of Contract 2003 Overlay Program Project No. 03 -RWO1 Contractor's Name Lakeside Industries Contractor's Address P.O. Box 7016, Issaquah, WA 98027 Date Work Commenced Date Work Completed Date Work Accepted 6/24/03 10/24/03 Surety or Bonding Company Travelers Casualty and Surety Company of America Agent's Address USI Northwest, 20415 72nd Ave South, Suite 300, Kent, WA 98032 Contract Amount 798,559.75 Additions 0.00 Liquidated Damages 0.00 Reductions 36,105.25 Amount Disbursed 762,454.50 Amount Retained 0.00 TOTAL 762,454.50 The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, PO Box 47474, Olympia, WA 98504 -7474, immediately after acceptance of the work done under this contract. NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Department's certificate, and then only in accordance with said certificate. To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753 -3217. Teletype (TTY) users please call (800) 451 -7985. You may also access tax information on our Internet home page at http: /dor.wa.gov. REV 31 0020e (6 -27 -01) Transportation Committee November 24, 2004 DRAFT Present: Richard Simpson, Chair; Dave Fenton, Pam Linder Frank Iriarte, Brian Shelton, Robin Tischmak, Cyndy Knighton, Lucy 1. 2003 Overlay Completion and Acceptance Robin passed out a map showing where the six overlay projects were done this year. Projects were done on 42nd Ave S., S. 153` Baker Boulevard, 40 Ave S., TIB and 51 Ave. S. Lakeside Industries was the contractor, and all work has been done. There was $36,105 in under runs due to quantity under runs. Traffic control and street planning were overruns, but there were no weather delays or bad soils. Recommend contract acceptance and release of retainaoe to Regular Meeting. 2. KFC /Taco Bell Turnover KFC is moving to the old Burger King site on TIB. As part of their development, they are dedicating public right of way off of TIB. This will make things easier for the city right of way projects. Recommend acceptance of turnover documents to Reaular Meetina. 3. Olive Garden Turnover of Improvements As a condition of the Olive Garden's development they built to city specifications and are now ready to turn over some utilities. These include storm pipes, catch basins and their lids, and stormceptors. Their value is $37,048.58. Recommend acceptance of utilities to Reaular Meeting. 4. Transportation Concurrencv and Impact Mitiaation Staff explained that the rush on this is self- imposed both because of the current lawsuit appeal and because of some impending developments it would be good to have it ready for. The information presented tonight is a first draft of what needs to be done. It is more of a quick fix than a very thorough assessment of the whole concurrency and mitigation system. A more complete review and ordinance will be done next year. Cyndy said the department is interested in plugging vulnerabilities with this interim plan. Cyndy passed out a table of mitigation expected for specific sections of streets in the CBD. Some were projects that have already been done, and others were projects that are beyond six years. She then passed out language that would be in the ordinance but it was written in an easy to read format, which showed current and newly proposed language. As she went through the memo and explained some of the changes. Pam suggested she write a memo to guide people through the changes and the tables, and explain some anomalies. The committee suggested she explain Level of Service as well as the difference between concurrency and impact mitigation. She said concurrency is a yes /no issue of whether facilities are adequate now or in the future to handle the new growth. If the answer is "no developers must pay traffic impact fees. They must also do a traffic study to determine how many trips their business is expected to add to the