HomeMy WebLinkAboutReg 2003-12-01 Item 5B - Agreement - Strander Boulevard Pipe Replacement Design with PACE for $192,745Agenda Item Title:
I Original Sponsor:
Timeline:
Sponsor's Summary:
Meeting Date
11/24/03
Meeting Date
11/24/03
Co L ICIL AGENDA Sr TOPSIS
Meeting Date
11/24/03
I CAS Number: 03-148
Recommendations:
Sponsor:
Committee:
Administration:
Cost Impact (if known):
Fund Source (if known):
Council
Initials
Prepared by 1 Mayor 's review I Councjlreview
R kg7MI Sswm- I kd.
'I
INFORMAT
Original Agenda Date: November 24, 2003
Strander Blvd Pipe Replacement Consultant's Agreement
Admin. Public Works
The consultant's agreement is for design of the new stormwater conveyance system and
pump station along Strander Blvd between Andover Park E and the river. The current system
is undersized and causes flooding at the intersection. Two firms submitted proposals and
Penhallegon Associates (PACE) was chosen as having the best project understanding and staff
availability to meet the project needs.
Authorize the Mayor to sign the agreement with PACE.
Forward to Committee of the Whole.
Same as Sponsor.
$192,745.00
412 Storm Drainage (pg. 112 2004 Proposed CIP)
Action
Consensus existed to f....wa..0 item to the December 1 Regular Meeting.
7
�APcES.
Attachments
Information Memo dated November 12, 2003
Consultant's Agreement
Picture offlooding at Strander Blvd. and Andover Park E. intersection
Utilities Committee Meeting Minutes from November 18, 2003
12/1 /03 No attachments (see 11/24/03 C.O.W. Racket).
(Pipeline drawing will be available for viewing.
ITEMNO.