Loading...
HomeMy WebLinkAboutReg 2003-12-01 Item 5B - Agreement - Strander Boulevard Pipe Replacement Design with PACE for $192,745Agenda Item Title: I Original Sponsor: Timeline: Sponsor's Summary: Meeting Date 11/24/03 Meeting Date 11/24/03 Co L ICIL AGENDA Sr TOPSIS Meeting Date 11/24/03 I CAS Number: 03-148 Recommendations: Sponsor: Committee: Administration: Cost Impact (if known): Fund Source (if known): Council Initials Prepared by 1 Mayor 's review I Councjlreview R kg7MI Sswm- I kd. 'I INFORMAT Original Agenda Date: November 24, 2003 Strander Blvd Pipe Replacement Consultant's Agreement Admin. Public Works The consultant's agreement is for design of the new stormwater conveyance system and pump station along Strander Blvd between Andover Park E and the river. The current system is undersized and causes flooding at the intersection. Two firms submitted proposals and Penhallegon Associates (PACE) was chosen as having the best project understanding and staff availability to meet the project needs. Authorize the Mayor to sign the agreement with PACE. Forward to Committee of the Whole. Same as Sponsor. $192,745.00 412 Storm Drainage (pg. 112 2004 Proposed CIP) Action Consensus existed to f....wa..0 item to the December 1 Regular Meeting. 7 �APcES. Attachments Information Memo dated November 12, 2003 Consultant's Agreement Picture offlooding at Strander Blvd. and Andover Park E. intersection Utilities Committee Meeting Minutes from November 18, 2003 12/1 /03 No attachments (see 11/24/03 C.O.W. Racket). (Pipeline drawing will be available for viewing. ITEMNO.