HomeMy WebLinkAboutReg 2003-10-06 Item 4C - Final Acceptance - Minkler Shops Traffic Signal Cabinet Room by Paasche Construction for $58,924.40I Original Sponsor: Timeline: Sponsor's Summary: CAS Number: 03-121 tfri Meeting Date I I K 10/6/03 I COUNCIL AGENDA SYNOPSIS Meeting Date 10/6/03 Agenda Item Title: Accept as complete Minkler Shops Traffic Signal Cabinet Room Contract and release retainage. Council Initials ITEM NO. Prepared by I Mayor's review I Council review TP f I I I I ITEM ?INECI ATION r Original Agenda Date: October 6, 2003 Admin. Public Works The construction of the traffic signal cabinet room project was substantially completed by Paasche Construction on April 24, 2003. One change order for $4,536.46 was issued for roof repair and inspector required electrical work. The total contract amounted to $58,924.40. Recommendations: Sponsor: Accept project as complete and authorize release of retainage. Committee: Forward to Consent Agenda of Regular Council. Administration: Same as sponsor. I Cost Impact (if known): $58,924.40 I Fund Source (if known): 303 Facilities "k v r s s PRNDI- 'USiCIL ICTIO Action Meeting Date I Attachments 10/6/03 Information Memo dated September 11, 2003 Notice of Completion of Public Works Contract 03 -052 Utilities Committee Meeting Minutes from September 16, 2003. To: Mayor Mullet From: Public Works D recto Date: September 11, 2003 V Subject: Minkler Shops Traffic Signal Cabinet Room Project Completion and Acceptance ISSUE Accept construction contract as complete and authorize release of retainage in the amount of $2,707.92. BACKGROUND The Notice to Proceed for Contract No. 03 -052 with Paasche Construction, Inc., of Roy, Washington, was issued February 18, 2003, for the construction of Project No. 01 -BG03 Minkler Shops Traffic Signal Cabinet Room. This contract was substantially completed on April 24, 2003. One change order was issued during the contract for roof repair and inspector- required electrical protection devices. The contract cost is summarized as follows: ACTION TAKEN The final payment has been issued, final records are being prepared, and this acceptance will formalize the close -out of this project. RECOMMENDATION All work required under this contract has been completed. It is recommended that this contract be forwarded to the Tukwila City Council on the consent agenda for formal acceptance and authorize the release of retainage, subject to the standard claim and lien release procedures. INFORMATION MEMO Contract Award Amount $49,622.00 Change Order No. 1 4.536.46 Subtotal $54,158.46 Sales Tax Paid (8.8 4,765.94 Total Amount Paid (incl. retainage) S58.924.40 attachment: Preliminary Notice of Completion a:A. be),maemMcbsoot Mme) %Olym State of Washington Department of Revenue pia PO Box 47474 WA 98504 -7474 Contractor's Registration No. I No. 8i No.) 601 703 589 From: City of Tukwila 6200 Southcenter Blvd. Tukwila, WA 98188 Notice is hereby given relative to the completion of contract or project described below Description of Contract Contract Number Minkler Shops Traffic Signal Cabinet Room (No. 01 -BG03) 03 -052 Contractor's Name Telephone Number 253- 843 -2999 Paasche Construction, Inc. Contractor's Address 30105 14th Ave. South, Roy, WA 98580 -8630 Date Work Commenced Date Work Completed Date Work Accepted 2/18/03 4/24/03 Surety or Bonding Company Gulf Insurance Company Agent's Address 130 Nickerson Street, Suite 311, Seattle, WA 98109 Contract Amount 49,622.00 Additions 4,536.46 Liquidated Damages 0.00 Reductions Sub -Total 54,158.46 Amount of Sales Tax Paid at 8.8 4,765.94 (If various rates apply, please send a breakdown.) TOTAL 58,924.40 Comments: Date NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT Signature Type or Print Name Phone Number Assigned To Date Assigned Amount Disbursed Amount Retained 56,216.49 2,707.91 TOTAL 58,924.40 The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, PO Box 47474, Olympia, WA 98504 -7474, immediately after acceptance of the work done under this contract. NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Department's certificate, and then only in accordance with said certificate. To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753 -3217. Teletype (TTY) users please call (800) 451 -7985. You may also access tax information on our Internet home page at http: /dor.wa.gov. REV 31 0020e (6.27 -01) syssv, es L Committee chair approval Utilities Committee September 16, 2003 Present: Pam Linder, Joan Hernandez, Dave Fenton Jim Morrow, Gail Labanara, Pat Brodin, Frank Inane, Lucy Lauterbach; Keri Stockstead 1. Puget Sound Access Update Keri updated the committee on the six South King County cities that joined together to build a public access studio. Comcast owed the cities funds that were pooled together to build a state of the art public access station. It is one block off of West Valley and 5.228` at 22412 72nd Ave in Kent. A non -profit company will be formed to shield cities from liability from wild first amendment TV appearances. There are 7 camcorders that can be checked out, and there are also three bays for camera work. The studio is opening part time October 1, and programming can be seen from 5 pm —5 am. Regular program hours and the studio being open 24 hours a day 7 days a week will begin November 1 Information, 2. VoiceStream Franchise The City's first wireless high -speed data transmission company, VoiceStream, wants a franchise to install a wireless system here. The wireless system will offer digital voice, messaging, and data services. Typically, such a company would add an antenna to existing poles or put up their own pole, and run wire down it to a box, which could be located in the right of way or on private property. Cities cannot tax franchises, though Tukwila's right of way ordinance allows the City to collect the cost of setting up this franchise. Jim said the height of the antenna will not be above the 35' pole near the Bonsai Company on S. 144 and 51'`. The franchise will be for three. The years rather than the ten years they wanted. This change is due to the rapid changes in the telecommunication field City may need to deal with what happens if a company does go out of business with equipment in the City's rights of way. The committee asked that this issue be brought back to a future meeting. Jim M talked of something other cities have done, which is to require a special laminate pole for new wireless poles. These special poles have notches to string the wire down the pole, which is not possible on exiting poles. This issue will also be brought back to another meeting. Forward franchise agreement to COW. 3. Minkler Shoos Room Acceptance The shops needed a special space at the shops to put in a traffic signal repair room, as the City now takes care of all the city's traffic signals. There was one change order for roof repair and electric changes required by the L &I inspector. The project is now complete, and ready to be accepted. Recommend project acceptance and release of retainage to consent agenda.