Loading...
HomeMy WebLinkAboutCOW 2003-09-22 Item 4B - Loan Application - Public Works Trust Fund for Allentown Phase II / Foster Point Sewer and Cascade View Drainage ProjectsOriginal Sponsor: I Timeline: Sponsor's Summary: ITEM INFORMATION CAS Number: 03-120 I Original Agenda Date: September 22, 2003 Agenda Item Title: Public Works Trust Fund Loans Recommendations: Sponsor: Committee: Administration: Cost Impact (if known): Fund Source (if known): Meeting Date 9/22/03 Council Meeting Date 9/22/03 Meeting Date 9/22/03 COUNCIL AGENDA SYNOPSIS Prepared by BS Initials 1 Mayor's review 1 Council review I I 1 Admin. Public Works Public Works Trust Fund (PWTF) Loan applications for the Allentown Phase II/Foster Point Sewer and Cascade View Drainage Projects were recommended to the 2004 Legislature for approval. Funding becomes available when the Governor signs the bill, which is anticipated to occur in April 2004. Information. Forward to Committee of the Whole. Same as Sponsor. City matching funds are Sewer $300,000 Surface Water $464,000, remainder over 20 yrs. See above RECORD OF COUNCIL ACTION` Action APPENDICES' Attachments Information Memo dated September 15, 2003 Two Letters from the Washington State Public Works Board Utilities Committee Meeting Minutes from September3, 2003 ITEMNO. b. To: Mayor Mullet From: Public Works Director,�rr Date: September 15, 2003 ��J tt Subject: Public Works Trust Fund Loans ISSUE INFORMATION MEMO Information regarding Public Works Trust Fund Loans received by the City for Allentown Phase II/Foster Point Sewer and Water Project and the Cascade View Drainage Project. BACKGROUND The City received notification that the loan applications submitted for the Allentown Phase II /Foster Point and Cascade View Projects will be recommended to the 2004 Legislature for approval. Funding becomes available when the Governor signs the bill approved by the Legislature, which is anticipated to occur in April 2004. ANALYSIS Following is the financing for the respective projects: Allentown Phase II /Foster Point Sewer Project PWTF Loan Construction $5,700,000 City Sewer Water Fund 300.000 Total Project Cost $6.000.000 Cascade View Drainage Proiect CDBG Grant Design 305,000 PWTF Loan Design 100,000 PWTF Loan Construction 4,200,000 City Surface Water Fund 464.000 Total Project Cost $5.069.000 RECOMMENDATION Information only. p:/brian/pwtf 2004 info memo August 20, 2003 MR. JAMES MORROW CITY OF TUKWILA 6300 SOUTHCENTER BLVD STE 100 TUKWILA, WA 98188 Dear MR. MORROW: Sincerely, John LaRocque Executive Director JL:cag Enclosure Washington State Public Works Board Post Office Box 48319 Olympia, Washington 98504 -8319 Regarding: 2004 Public Works Trust Fund Construction Loan Application for NEIGHBORHOOD REVITALIZATION Administrative services provided by the Department of Community, Trade and Economic Development (360) 725 -5000 Fax (360) 664 -3029 Web site: www.pwb.wa.gov I am pleased to inform you that your application for a 2004 PWTF Construction loan for the project cited above is included among the projects the Public Works Board (Board) will recommend to the 2004 Legislature for financing. The loan list will be submitted to the Legislature on or before November 1, 2003. Approval of the list usually occurs late in the legislative session and must be signed by the Governor before the Board can execute contracts. ISAAC HUANG, your Client Service Representative, will contact you with more information as the list works its way through the process. If you have any questions, please contact your Client Service Representative at (360) 725 -5009 or by e-mail at: Isaac.Huang@pwb.wa.gov. Additional information can be found at our website: www.owb.wa.eov. We look forward to working with you on this project. Also, please find enclosed an information and registration packet regarding the Infrastructure Assistance Coordinating Council (IACC) 2003 Conference to be held on October 28 -30, 2003, in Wenatchee, Washington. The Conference will include technical assistance, planning and financial experts, software information, federal and state program overviews, and training sessions. We hope you can join us. G uG c c ♦V Pro �c:S� G, (L 7 k ou C e r( 304 000. August 20, 2003 MR. JAMES MORROW CITY OF TUKWILA 6300 SOUTHCENTER VOULEVARD, SUITE 100 TUKWILA, WA 98188 -2544 Regarding: 2004 Public Works Trust Fund Construction Loan Application for CASCADE VIEW DRAINAGE IMPROVEMENTS Dear MR. MORROW: 1 am pleased to inform you that your application for a 2004 PWTF Construction loan for the project cited above is included among the projects the Public Works Board (Board) will recommend to the 2004 Legislature for financing. The loan list will be submitted to the Legislature on or before November 1, 2003. Approval of the list usually occurs late in the legislative session and must be signed by the Governor before the Board can execute contracts. ISAAC HUANG, your Client Service Representative, will contact you with more information as the list works its way through the process. If you have any questions, please contact your Client Service Representative at (360) 725 -5009 or by e-mail at: Isaac.Huang @pwb.wa.gov. Additional information can be found at our website: www.owb.wa.cov. We look forward to working with you on this project. Also, please find enclosed an information and registration packet regarding the Infrastructure Assistance Coordinating Council (IACC) 2003 Conference to be held on October 28 -30, 2003, in Wenatchee, Washington. The Conference will include technical assistance, planning and financial experts, software information, federal and state program overviews, and training sessions. We hope you can join us. Sincerely, John LaRocque Executive Director JL:cag Enclosure Washington State Public Works Board Post Office Box 48319 Olympia, Washington 98504 -8319 Administrative services provided by the Department of Community, Trade and Economic Development (360) 725-5000 Fax (360) 664-3029 CWa 0 ki COO 6 it 1" t; ,h 6 er'se. Web site: www.pwb.wa.gov 6 06 060 Gr. CGC. 1S ooO. 42e- Utilities Committee September 3, 2003 Present: Joan Hernandez, Dave Fenton, Richard Simpson Jim Morrow, Brian Shelton, Gail Labanara, Mick Cusick, Lucy Lauterbach 1. Lift Station 12 Generator The lift station on the southeast corner of the Mall is in need of upgrades. Mike got a $32,000 bid for two generators from the State bid list. Thinking he could improve that, he put out a bid himself and got two bids. The lower bid was from NC Power Systems for $29,800 plus tax. Joan asked if the supplier and equipment were both reputable and acceptable, and was told they were. After this purchase is made, Mike will ask for bids for new pumps, plus electric wiring and equipment. Once all the equipment is ready, the project will be put out to bid for installation. This project is in both the CIP and budget for this year. Information. 2. Public Works Trust Fund (PWTFI Loans Staff had gotten permission from Council to apply for two PWTF Loans. They have received tentative approval of both their loan requests. The first loan of $5.7 million plus $300,000 of sewer funds will be enough to put sewers, water and sidewalks into the rest of Allentown and Foster Point. Another loan of $4.2 million and $464,000 of surface water funding will be used to improve the surface water problems in Cascade View. Both of these will become 2004 projects when the formal award of the loans is made. The committee wanted to be sure the City had enough funds in the enterprise funds to support these two projects. Refer funding and loan renavment schedules to Council for information. Committee approval