Loading...
HomeMy WebLinkAboutReg 2003-07-21 Item 4C - Final Acceptance - South 150th Street / 42nd Avenue South Signal by TransTech Electric for $123,914.67J a*MA, 6 oat* tr i r 1908 CAS Number: 03-096 Agenda Item Title: Original Sponsor: Timeline: Sponsor's Summary: Recommendations: Sponsor: Committee: Administration: Cost Impact (if known): Fund Source (if known): Meeting Date 7/21/03 Meeting Date 7/21/03 COUNCIL AGENDA SYNOPSIS Meeting Date 7/21/03 o3 O96 Accept as complete Contract No. 02 -069 with TransTech Electric, Inc. of Kent for the South 150 Street and 42 Ave South Traffic Signal Project and release retainage. Council Admin. Public Works The contract with TransTech Electric is complete for the S. 150' St.42 Ave S. Traffic Signal Project. Construction began July 10, 2002 and was completed on April 4, 2003. There were additional quantities of concrete needed for $6,111.00 and underruns amounted to $2,171.28. The total contract to install the traffic signal was $123,914.67. Accept the contract as complete and authorize release of retainage. Move to Regular Consent Agenda. Same as Sponsor. $123,914.67 104 Streets Initials Prepared by 1 Mayor's review 1 Council review 1 CK 1 ✓ts-e` 1 (e.r—L CA I I I i I I I I I TEM;INFORIVITION ._r r`' Original Agenda Date: July 21, 2003 C OM Action Attachments I Information memo dated June 26, 2003 I Notice of Completion of Public Works Contract 02 -069 I Transportation Committee Meeting Minutes from July 14, 2003 ITEMNO. INFORMATION MEMO To: Mayor Mullet From: Public Works Director*' Date: June 26, 2003 l Subject: S 150 St /42 1 d Ave S Signal Proiect Comuletion and Acceptance ISSUE Accept construction contract as complete and authorize release of retainage in the amount of $6,195.73. BACKGROUND The Notice to Proceed for Contract No. 02-069 with TransTech Electric, Inc., of Kent, Washington, was issued July 10, 2002, for construction of Project No. 99 -RS01. This project constructed a new traffic signal at the intersection of S 150' St and 42° Ave S. This contract was totally completed on April 4, 2003. The bid documents had an error in concrete quantities that were paid on a unit price basis for the additional amount necessary. The contract costs are summarized below: ACTION TAKEN Contract Award Amount (with sales tax) $119,974.95 Additional cost for concrete 6,111.00 Underruns <2 171.28> Total Amount Paid (incl. retainage bond) $123,914.67 The final payment has been issued, final records are being prepared, and this acceptance will formalize the close -out of this project. RECOMMENDATION It is recommended that this contract be forwarded to the Tukwila City Council on the consent agenda for formal acceptance and authorize the release of the retainage bond, subject to the standard claim and lien release procedures. (Ptnolw.W ■W a as imlmM99R fln.r& Sipolaramech coum Maw) State of Washington Department of Revenue fa PO Box 47474 REVENUE Olympia WA 96504 -7474 Contractor's Registration No. (UBI No.) 601617500 From: City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Description of Contract S 150th St/42nd Ave S Traffic Signal Contractor's Name Transtech Electric, Inc. Contractor's Address Date 5/7/03 NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT Notice is hereby given relative to the completion of contract or project described below (99 -RS01) 23639 129th Ave. SE, Kent, WA 98031 Date Work Commenced Date Work Completed Date Work Accepted 7/10/02 4/4/03 Surety or Bonding Company Hentschell Associates, Inc. Agent's Address One Pacific Bldg., 621 Pacific Ave. South, Suite 400, Tacoma, WA 98402 Contract Amount 119,974.95 Additions 6,111.00 Reductions 2,171.28 Sub Total 123,914.67 Amount of Sales Tax Paid at 0.00 (/j various rates apply, please send a breakdown.) TOTAL 123,914.67 Comments: Signature Type or Print Name Phone Number Assigned To Date Assigned Contract Number 02 -069 Telephone Number 253- 639 -1330 Liquidated Damages 0.00 Amount Disbursed 117,718.94 Amount Retained 6,19533 TOTAL 123,914.67 The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, PO Box 47474, Olympia, WA 98504 -7474, immediately after acceptance of the work done under this contract. NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Department's certificate, and then only in accordance with said certificate. To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753 -3217. Teletype (TTY) users please call (800) 451 -7985. You may also access tax information on our Internet home page at http: /dor.wa.gov. REV 31 0020e (6 -27-01) i'Committee chair approval Transportation Committee July 14, 2003 Present: Richard Simpson, Chair; Dave Fenton, Pam Linder Jim Morrow, Frank Iriarte, Brian Shelton, Lucy Lauterbach S. I50 /42 Signal Light Proiect Acceptance The signal light at S l50` was started Last summer, and is now complete. Additional concrete was needed on the project, but underruns in other materials reduced that overrun. Recommend project completion accentance to consent agenda of a Regular Meeting.