Loading...
HomeMy WebLinkAboutSpecial 2003-06-23 Item 2C - Final Acceptance - Sanitary Sewer Lift Station #12 Pump Upgrade & Generator by Gary Harper Construction for $91,044.44*et, COUNCIL AGENDA SYNOPSIS +t- Initials Meeting Date 1 Prepared by 1 Mayor's review 1 Council review 6/23/03 1 Mc_griti I I I I I I I ITEM INFORMATION Original Agenda Date: June 23, 2003 ITEMNO. *Special Meeting* oZ.G. I CAS Number: 03-087 Agenda Item Title: Accept as complete Sewer Lift Station No. 12 Pump Upgrade and Generator and release retainage. Original Sponsor: Timeline: Sponsor's Summary: Admin. Public Works Meeting Date 6/23/03 Meeting Date 6/23/03 Council The installation of a bypass force main connection in Andover Park West was substantially completed by Gary Harper Construction on March 11, 2003. One change order for traffic loops was $1,971.20 and underruns were $215.65. The total contract amounted to $91,044.44. Recommendations: Sponsor: Accept project as complete and authorize release of retainage. Committee: Forward to Consent Agenda of Special Meeting of Regular Council. Administration: Same as sponsor. Cost Impact (if known): $91,044.44 Fund Source (if known): 403/02 Sewer Construction RECORD OF COUNCIL ACTION Action APPENDICES Attachments Information Memo dated May 29, 2003 Notice of Completion of Public Works Contract 02 -104 Utilities Committee Meeting Minutes from June 17, 2003 TO: FROM: DATE: SUBJECT: ISSUE INFORMATION MEMO Mayor Mullet Public Works Directo? May 29, 2003 VV Sewage Lift Station No. 12 Pump Upgrade and Generator Project No. 97 -SW03, Contract No. 02 -104 Proiect Completion and Acceptance Accept construction contract as complete and authorize release of retainage in the amount of $4,184.02. BACKGROUND On November 19, 2002, the City entered into Contract No. 02 -104 with Gary Harper Construction, Inc., of Redmond, Washington, for construction of Project No. 97 -SW03. This sewer project included the installation of a bypass force main connection in Andover Park West and related work. Construction began on February 19, 2003, and was substantially completed on March 11, 2003. One change order was issued during the contract for the reinstallation of traffic loops encountered during the excavation for the bypass connection to the force main. The final contract cost is summarized as follows: RECOMMENDATION Contract Award Amount $81,925.00 Change Order No. 1 1,971.20 Reduction in Quantities (215.651 Subtotal $83,680.55 Sales Tax 8.8% 7.363.89 Total Amount Paid (incl. 5% retainage) S91.044.44 There has been $4,184.02 in retainage withheld from the progress payments to Gary Harper Construction, Inc., for this contract. All work required under this contract has been completed. It is recommended that this contract be forwarded to the Tukwila City Council on the consent agenda for formal acceptance and authorize the release of retainage, subject to the standard claim and lien release procedures. attachment: Notice of Completion of Public Works Contract (P:ProjecuW- SW ProjeciM97SWOTCloscout Memo Guy Helper Construction) State of Washington Department of Revenue I'S PO Box 47474 REV ENUE Olympia WA 98504 -7474 Contractor's Registration No. (UBI No.) 601 606 620 Date 5/31/03 NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT From: h.1. a&},$°"'3 e= ''�FT9Fa.aF .w f- Y' Y- "?ff`fafi="4S' s {c Name8etlddressof)t'nbhr.Agency m l r �p ePa> rtnle4> �IBea 911:: Assigned To City of Tukwila 6200 Southcenter Blvd. Tukwila, WA 98188 Sub -Total 83,680.55 Amount of Sales Tax Paid at 8.8 7,363.89 (lfvarious rates apply, please send a breakdown.) TOTAL 91,044.44 Comments: Date Assigned Notice Ls hereby given relative to the completion of contract or project described below Description of Contract Contract Number Sewage Lift Station No. 12 Pump Upgrade and Generator 02-104 Contractor's Name Telephone Number Gary Harper Construction, Inc. 425- 883 -3837 Contractor's Address 10621 169th Ave. NE, Redmond, WA 98052 -2745 Date Work Commenced Date Work Completed Date Work Accepted 2/19/02 1 3/11/03 Surety or Bonding Company Colonial American Casualty Surety Company Agent's Address Bratrud Middleton Insurance, P.O. Box 11205, Tacoma, WA 98411 -0205 Contract Amount 81,925.00 Additions 1,971.20 Liquidated Damages Reductions 215.65 Signature Type or Print Name Phone Number Amount Disbursed 86,860.42 Amount Retained 4,184.02 TOTAL 91,044.44 The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, PO Box 47474, Olympia, WA 98504 -7474, immediately after acceptance of the work done under this contract. NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Department's certificate, and then only in accordance with said certificate. To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753 -3217. Teletype (TTY) users please call (800) 451 7985. You may also access tax information on our Internet home page at http: /dor.wa.gov. REV 31 0020e (6- 27-01) Utilities Committee June 17, 2003 Present: Pam Linder, Chair; Joan Hernandez, Richard Simpson Jim Morrow, Brian Shelton, Mike Cusick, Gail Labanara, Frank Iriarte, Pat Brodin, Lucy Lauterbach Sewage Lift Station #12 This project, which is the first phase of a two -phase deal, has been completed and is under budget. There was one change order to add traffic loops that had been removed, but there was also a reduction in quantities of materials used, so the price was good. This phase did the excavation and undergrounding work. The next phase will put in new pumps and motors. Recommend to consent agenda of June 23 meeting, Annual Water Oualitv Report Federal rules dictate an annual water report should go out each year. Pat has some changes in mind for next year's report. He also said he will contact the citizen who complained about water at her house during citizen comments Monday night. Information. 303 Facilities Status Undate Jim and Gail have a long list of all the city work that is being done on buildings around the city. Jim explained what they work on is decided by budget, manager's time, and the priority a project has. The Council/court room information may come back in a month, with costs associated with all the potential features. The committee said they'd like quarterly 303 Facilities Status updates. Starfire Variance As land near the river is on a floodplain and the City follows federal rules regarding such, any developments near the river must also generally follow the FEMA standards. Though there are fields in his building, the Starfire has put offices and restrooms above the floodplain. Still, their building will require a variance. Pam was reassured when Jim said they must show an official request for a variance; their insurance must cover them for flooding; and they will hold the city harmless in case of a flood. Information. Solid Waste Interoocal The County is raising garbage rates to pay for their Cedar Hills dump. Tukwila is one of a number of cities that are requesting negotiations on their interlocal agreements with King County for garbage. There is a short window when the interlocal can be opened; it must be opened by month's end. The City has sent a letter requesting the opening. Information. ?s Li Committee chair approval