HomeMy WebLinkAboutReg 2003-04-21 Item 4D - Turnover - Public Infrastructure from International Sabey Gateway East II / Group Health Development ($158,372 Value)t uu l 1908 CAS Number: 03-053 Agenda Item Title: Accept Turnover of Infrastructure from International Gateway East II- Group Health Original Sponsor: I Timeline: Sponsor's Summary: Recommendations: Sponsor: Committee: Administration: Cost Impact (if known): Fund Source (if known): Meeting Date 4/21/03 Meeting Date 4/21/03 COUNCIL AGENDA SYNOPSIS Meeting Date 4/21/03 Council The International Gateway East II Group Health development is complete and ready for turnover of public infrastructure improvements. Public Works staff inspected the facilities and all permits have been approved. The turnover includes pavement, curb, gutter, and sidewalk, and 12" storm drainage with 13 catch basins and a detention tank for a value of $158,372.00. Accept turnover of public infrastructure. Forward to Regular Council and authorize Mayor to sign acceptance forms. Same as sponsor. N/A Initials Prepared by 1 Mayor's rpiew 1 Council review DM S A. I I ITEM INFORMATION Original Agenda Date: April 21, 2003 Admin. Public Works RECORD OF COUNCIL ACTION Action APPENDICES Attachments Information Memo dated March 25, 2003 with vicinity maps Transportation Committee meeting minutes from April 14, 2003 Turnover documents available at Public Works ITEM No. qd TO: FROM: DATE: SUBJECT: ISSUE BACKGROUND ALTERNATIVES None. RECOMMENDATION INFORMATION MEMO Mayor Mullet Public Works Directo March 25, 2003 International Gateway East II Group Health Permit Nos. D99 -0438 D99 -0439 Site Address 12401 12501 East Marginal Way South, Tukwila Parcel Nos. 734560 -0490, 0430, 0385, 0580 Turnover of Storm Drainage and Street Facilities within S 124th St, S 126th St, and 35th Ave S Accept turnover of storm drainage system and street infrastructure, constructed within right -of- way, as part of the development known as the International Gateway East II Group Health Development. The International Gateway East II Group Health Development is now completed. As a condition of the development, the International Gateway East II Group Health Development included the construction of; 1,400 lineal feet of 12 inch CPEP, 60 lineal feet of 72 inch CMP detention tank, 10 each Type I CBs, 1 each Type II CB 48 -inch, 2 each Type II CB 60 -inch for storm drainage. Along with 114 square yards of concrete driveway, 1,370 lineal feet of 5 feet wide sidewalk, 1,400 lineal feet of curb /gutter, and 4,620 square feet of pavement. The value of the transferred assets, from the Developer to the City of Tukwila, is $158.372.00. Conditions were placed on the development to provide the following turnover documents: 1. Letter from owner requesting turnover 2. Capital Asset Acquisition form 3. List of Materials /Costs (City format) 4. Bill of Sale 5. Two -year maintenance bond 6. As -built plans and CD for proposed public facilities The proposed public facilities have been constructed to City standards and inspected by Public Works staff and are now ready for turnover as public infrastructure. Request Utilities Committee move to consent agenda to authorize Mayor to sign acceptance forms. attachments: Vicinity Map Turnover Documents 1-6' Development File: International Gateway East II Group Health *NOTE: All documents are available at Public Works and will be presented at the meetings. 3. Tukwila Urban Center(TUCI /TOD Transit Plan There is already an ongoing study of the TUC /TOD areas by Freedman, Tung and Bottomley as well as ECONorthwest. Now Public Works has selected a contractor to do the Transit Network study that will be a part of the TUC /TOD study as well as an update to the Transportation Element of the Comp Plan. Staff used a consultant list to rate who would be best to do this work and selected Perteet, who has what is possibly the best transportation planner in the region. They were chosen from a list of three consultants. Perteet will coordinate with the other two consultants. Pam C asked for the tally sheet used to rate consultants. When asked how Metro's transit plan would fit into this, Cyndy said this study will be used to fit Metro's plan into this area. Dennis raised the issue of no residents being included in the stakeholder meetings, and Cyndy said residents could go to any of the meetings if they were interested. Recommend Consultant Agreement with Perteet for 582,795 to Regular Meeting for mayor's sienature. 4. Interurban Bridge Consultant Services Entranco provides consultant services on city projects, and they have agreed to provide construction management services on the Interurban Bridge Widening and Trail. The cost of their services will be $250,000 for the $2 m. project. This will be Supplement 2 to their contract. Recommend Sunplemental Agreement for Entranco services on Interurban Bridge Widening proiect to Regular Meeting. 5. Gateway East II- Group Health Turnovers International Gateway East constructed some public improvements as part of their Group Health development. Those were constructed according to city standards, and are ready for acceptance. They include a storm drain, curb, gutter, sidewalk, paving and driveway. Recommend acceptance of infrastructure and release of retainage to Regular Meeting's consent agenda. G. Committee Chair approval I J L chair approval a *Z, c mzz Vicinity Map Site Allentown Foster International Gateway East 11 Group Health Infrastructure Turnover D99-0439 D99-0438 D99-0439 International Gateway East 11 - Group Health 12401 East Marginal Way South 12501 East Marginal Way South International Gateway East II Group Health Infrastructure Turnover Storm Sidewalk Pavement EXISTING POWER POLE TO BE RELOCATED. CQNIWCtOR.SKALI. .COORDINATE.RELOCABON WITH SEATTLE•QTY DOW AND US •*EST. DC STREET SIGN! TO BE RELOGAIED FIRE HTDFWAT. TO BE RELOCATED O DG.VIATER VAIA TO-8(..ADJUST8D-TO BOLLARDS MD aim (FIRE DEPT. ACCESS ONLY) COSTING TELEPHONE POLE TO BE REIAOVED. COMACTOR.SHALL. CONTRACTOR SHALL•COOREARATE. REMOVAL (PER CRY OF TUKWILA S70. DETAIL RS-9) NOTE eCtOR4CTORS1AIli PROYDE BY. ELECTRICAL: ENGINEER MC: EXISTING TELEPHONE GUY POLE MID GUY WIRE TIT BE. RELOCATED...CONTRACTOR SHALL COORDINATE International Gateway East II Group Health Infrastructure Turnover Storm Sidewalk Pavement 1. NEW 8' WATERTON CONSTRUCTED BY OTHERS. CONTRACTOR SHALL FIELD LOCATE WATERMAN MID COORDINATE MN RELOCATION WEN KUM )125. 2. CONTRACTOR SHALL REPLACE DRIVEWAY TO octstim CONDITIONS OR BETTER FOLLOWING CONSTRUCTION. DEVELOPER SHAU. OBTAIN MY TEMPORARY CONSTRUCTION EASEMENTS MD/OR PERMANENT DRAINAGE EASEMENTS FROM ADJACENT PROPERTY OWNER PRIOR TO CONSTRUCTION. COSTING POWER P CONTRACTOR SHALT WITH SEATTLE COY EXISTING POWER P CONTRACTOR SHALT International Gateway East II Group Health Infrastructure Turnover Storm Sidewalk Pavement NOTE* SEE SHEET R2 FOR 35TH AVE. S. PLUG EXISTING TO EAST ARO WEST. ADJUST RIM TO ANISEED GRADE EL International Gateway East II Group Health Infrastructure Turnover Storm Sidewalk Pavement SAWCUT UNE 1 MIN. MATCH EXISTING GRADE PLAN VIEW 10' STORM o DRAINAGE ESMI. I 0 PUGET SOUND ENERGY International Gateway East II Group Health Infrastructure Turnover Storm Sidewalk Pavement