HomeMy WebLinkAboutReg 2003-04-07 Item 8 - Contract - Boeing Access Road Bridge Inspections / Design with Sargent Engineers for $25,695CAS Number: 03-045
Agenda Item Title:
I Original Sponsor:
I Timeline:
Sponsor's Summary:
Recommendations:
Sponsor:
Committee:
Administration:
Cost Impact (if known):
I Fund Source (if known):
COUNCIL AGENDA SYNOPSIS
Initials
Meeting Date Prepared by 1 Mayor's review 1 Council review
4/7/03 RTV 5`M 1 bee.
7 I I
r ®l C 1
STEM
o L\ I Original Agenda Date: April 7, 2003
2003 Bridge Inspections Consultant's Agreement with Sargent Engineers.
Council
Admin.
The contract is for the routine inspection of six bridges designated in the 2003 Bridge
Inspection Program. We will also include the design services for the overlay and bridge deck
repairs on the Boeing Access Road bridge over the railroad. Sargent has satisfactorily
provided services in the past for the City's Bridge Program.
Authorize the Mayor to sign the agreement with Sargent Engineers, Inc.
Forward to Regular Council
Same as Sponsor
$25,695.00
104/01 Bridges
Meeting bate
4/7/03
1 Meeting Date
1 4/7/03
Action
'P,�l�IDICES'
Attachments
Information Memo dated March 19, 2003
Consultant's Proposal
Transportation Committee Meeting Minutes from March 24, 2003
Public Works
ITEM NO.
z.
J
INFORMATION MEMO
TO: Mayor Mullet
FROM: Public Works Director
DATE: March 19, 2003
SUBJECT: 2003 Bridge Inspections Consultant Selection Contract
Annual Bridge Inspections Repairs
ISSUE
Approve consultant selection and authorize the Mayor to execute a contract with Sargent Engineers
for bridge inspections and design of a bridge deck overlay for the Boeing Access Road bridge.
BACKGROUND
Three (3) consulting firms were rated on their experience and ability to provide routine bridge
inspections and to provide design services for overlay of the Boeing Access Road bridge. The rating
sheet is attached. Sargent Engineers scored the best and has satisfactorily provided services in the
past for the City's Bridge Program.
Six (6) of the City's bridges are required to have routine inspections performed in 2003. The Boeing
Access Road bridge over the railroads is in need of significant bridge deck repairs. Sargent
Engineers prepared the attached scope of work and estimate to provide the engineering expertise to
accomplish both tasks.
Additional work anticipated in 2003 includes scour evaluations for two (2) bridges. This expertise
was included in the consultant rating process, but Sargent Engineers does not perform the diving
necessary for the evaluations. CES, Inc., rated a very close second and does provide diving services
for scour evaluations. Staff recommends using CES, Inc., to provide scour analysis later this year.
ANALYSIS
Sargent Engineers, Inc., has prepared a contract to provide design and bidding documents for the
repairs to the deck of the Boeing Access Road bridge over the railroads. The scope also includes
inspection of the six (6) bridges due in 2003.
2003 Buda et Proposed Contract
Engineering 48,000 25,695
Right -of -Way -0-
Construction 641.000
Total 689,000
RECOMMENDATION
Approve consultant selection and authorize Mayor to execute a contract with Sargent Engineers in
the amount of 25,695.
attachments: Consultant Selection, Scope of Work, Estimate
CONSULTANT SELECTION
2003 BRIDGE PROGRAM
Staff Expertise 1 1.5 1
Bridge Deck Repair /Rehab. 1 2 1
Experience
Bridge Inspection
Program Management
Tukwila Bridge 2 2 1
Program Knowledge
Scour Analysis
Expertise
CES, Inc. I CH2M Hill 1 Sargent Eng.
1
1.5 1
2 1.5
Totals 6 9 5.5
Score consultant 1 to 3 with 1 being highest and 3 being lowest.
Lowest score is consultant ranked highest.
SARGENT
Sargent Engineers, Inc.
320 Ronlee Lane NW
Olympia, Washington 98502
Tel 360 867-9284
Fax 360 867 -9318
M w.sargentengineers.com
Mr. Robin Tischmak
City of Tukwila Public Works Department
6300 Southcenter Boulevard
Tukwila, WA 98188 -2544
RE: Bridge Inspections and Maintenance
Project No.: A03100.00
RECEIVED
MAR 1 1 2003
TUKWILA
Ai WORKS
March 10, 2003
Dear Mr. Tischmak:
Thank you for calling me to discuss your bridge inspection and maintenance needs. You
have identified six bridges that need inspections and one bridge that needs maintenance. Based
on our discussions, I have prepared the following scope of work.
Bridge Inspections
All inspections for the bridges shall be routine inspections and shall conform to the State
of Washington standards for routine inspections and the reporting of routine inspections.
Macadam Road Bridge
This is a concrete slab bridge that requires a routine inspection. The bridge will be
inspected from the ground below the bridge. We will not need any access equipment for the
inspection.
51 Avenue Bridge
This is a two span concrete box girder bridge. The center pier is a vee shaped pier with a
small deck section between the vee. We will inspect this bridge from the ground and will not
require any special lift equipment.
South Grady Way Bridge
This is a multiple span structure that crosses the railroad tracks. It located between
Tukwila and Renton. We will inspect this bridge from the ground and will not require any
special lift equipment.
ENT
Mr. Robin Tischmak
Page 2
March 10, 2003
Boeing Access Bridge over Airport Way
This is a four span concrete tee girder structure. We will perform the inspection from the
ground under the bridge. No climbing or lift vehicles will be required.
South 118th Street Pedestrian Bridge
This is a glued laminated timber bridge that has three spans. We will use climbing
methods to access and inspect this bridge.
Green River Pedestrian Bridge
This is a glued laminated timber tied arch bridge with a single span over the river. We
will use climbing methods to access and inspect this bridge.
Boeing Access Bridge Deck Repair
The deck of the Boeing Access Road over the railroad tracks is deteriorating. You wish
to repair the deck of the bridge. We see this happening in a two stage approach. In the first
stage, we will survey the deck and get it tested if necessary. We will then prepare options for the
repair of the deck. These options along with cost estimates will be presented to you for your
evaluation. If you select an alternative, the next phase will prepare the contract documents for
the repair. Our scope of work includes:
Survey the deck for delaminations, bad concrete, rock pockets, and other deterioration.
If needed, test samples of the deck for compressive strength, chloride content, and overall
chemical composition.
Prepare concepts and cost estimates for the repair of the deck.
Prepare a report for the City to evaluate the repair options.
If the City selects a repair option, prepare the plans, specifications, and estimate for the
repair of the deck.
The City will perform permitting and traffic control, if any is required.
Cost Estimate
In preparing our cost estimate, we assumed that we would inspect the bridges to the best
of our ability using ladders and climbing techniques. Our estimate for completing the above
items is:
EM'
Bridge Inspections
1 Meetings
ITUK 1- Macadam Road
I Prepare State documentation
ITUK 7 51st Avenue South Bridge
Prepare State documentation
TUK 8 S Grady Way
Prepare State documentation
TUK 11 Boeing Access Road
Prepare State documentation
TUK 16 S 118th Street
I Prepare State documentation
I TUK 29 Green River Pedestrian
Prepare State documentation
'Boeing Access Road Deck Repair
(Inspect condition of deck
!Prepare repair options
Prepare plan for requested options
Prepare specifications
Prepare cost estimate
Check of plans specifications and estimate
Meetings
ITotal Direct Salary Cost
Direct Costs
Mileage
Subconsultants
Total Direct Costs
'Total
MJS
Rate:I
I
6
6
I $400.00
I $1,500.00
Principa
$125.00
Senior Project
Engineer Engineer
$105.00 1 $76.00
1
31
21
1
2
1
4
1
2
1
5.5
1
5.5
1
8
48
24
6
116
Monte Smith
Principal
40
16
4
60
Sincerely,
Sargent Engineers, Inc.
Mr. Robin Tischmak
Page 3
March 10, 2003
Design
Engineer
$65.00
2
2
4
2
5.5
5.5
8
29
If you should have any questions regarding this proposal, please give me a call.
Drafter III Task Cost
$65.00
$315
$340
$105
$340
$105
$680
$105
$340
$105
$935
$105
$935 1
$105
$1,360 1
16 $6,080
48 $6,160
$1,216
4 $5641
$2,520 1
$1,380
68 $23,795 1
$1,900
1
$25,695 1
Transportation Committee
March 24, 2003
Present: Richard Simpson, Chair; Dave Fenton, Pam Linder
Robin Tischmak, Jim morrow, Frank Iriarte, Gail Labanara, Brian Shelton, Mike
Cusick, Lucy Lauterbach
1. 2003 Bridge Insuections Agreement Staff has chosen Sargent Engineers to do this years'
bridge inspections. Three firms were rated for this project. Six bridges will be inspected, and the
bridge deck of Boeing Access Road will be surveyed and options will be prepared for repairs.
The budget for engineering is $48,000. The proposed contract is $25,695. Money from this
budget will also be needed later to analyze the scouring on the Boeing Access Bridge.
Recommend agreement with Sargent Engineers for $25.695 to a Regular Meeting.
2. Interurban Bridge Widening This project was bid last year, but all the bids were over the
city's budget. Some project items were reduced, and the project was re -bid this year. One of the
eight bids received was low enough to be able to move ahead with the project. The bridge will be
widened to allow two left turns to I -405, and the Interurban Bridge trail design is included in this
bid. The low bidder was C.A. Carey, whose references checked out. Award Interurban Bridges
nroiect to C.A. Carey at a Regular Meeting.
3. Duwamish Parking Pam L brought up the issue of the street parking shortage in Duwamish
which results when residences have many people over for a family gathering or a party. There
were a couple of issues: whether private parking was allowed on a side street, and how to resolve
the disagreement between neighbors about parking. Some apparently like the smaller streets with
no parking. Others would like to be able to park when they have extra cars visiting their homes.
Jim M suggested those with gatherings at their homes get a "D" type permit that allows parking
on the streets. Jim suggested saying that the city built the street as the citizens had asked, and if
they now want to change that, they need to petition the city or otherwise request the change. Pam
thought a reasonable option would be to allow parking on one side of the street only, with no
overnight parking. Pam thought if someone got a petition to allow parking it could appear to be
a majority opinion, but could be the result of skewing the wording to make the alternative look
unreasonable. She thought people should have both a parking and a no- parking petition to get
both sides involved. Information.
/155 Committee chair approval