HomeMy WebLinkAboutReg 2003-03-17 Item 6C - Turnover - Public Infrastructure from Grand Central CasinoCAS Number: 03-030
Agenda Item Title:
Original Sponsor:
Timeline:
Sponsor's Summary:
Recommendations:
Sponsor:
Committee:
Administration:
Cost Impact (if known):
Fund Source (if known):
D3 —O3
Meeting Date
3/17/03
COUNCIL AGENDA SYNOPSIS
Initials
Meeting Date Prepared by 1 Mayor 's review 1 Council review I
3/17/03 DM tri TA". 1 .0)C. I
Ls
MOWORMA; We"
I 1 I
I I I
i I I
Original Agenda Date: March 17, 2003
Accept Turnover of Infrastructure from Grand Central Casino
Council Admin. Public Works
The Grand Central Casino development is complete and ready for tumover of public
infrastructure improvements. Public Works staff inspected the facilities and all
permits have been approved. The turnover includes curb, gutter, and sidewalk, and
12" storm drainage with 4 catch basins for a value of $13,689.50.
Accept tumover of public infrastructure.
Forward to Council Consent Agenda and authorize Mayor to sign acceptance forms.
Same as sponsor.
N/A
Action
MR E IDTCEg
Meeting Date 1 Attachments
3/17/03 I Information Memo dated March 4, 2003 with vicinity maps
Transportation Committee meeting minutes from March 10, 2003
(Turnover documents available at Public Works)
ITEMNO.
TO: Mayor Mullet
FROM: Public Works Director
DATE: March 4, 2003 VV
ISSUE
BACKGROUND
ALTERNATIVES
None.
RECOMMENDATION
INFORMATION MEMO
SUBJECT: Grand Central Casino
Permit No. D01 -180
Site Location —14040 Interurban Avenue South, Tukwila
Parcel Nos. 336690- 1025,1026, 1035
Turnover of curb, gutter, and sidewalk, and 12" storm drainage facilities
Accept tumover of curb, gutter, and sidewalk, and 12" storm drainage system as part of the
development of Grand Central Casino.
The development of the Grand Central Casino is now completed. As a condition of the
development, the Grand Central Casino facilities included the construction of 67 lineal feet of
12 -inch storm pipe, 3 each Type I catch basins, 1 each Type II —48-inch catch basin, 351
lineal feet of curb gutter, 93 lineal feet of 5 -foot wide sidewalk, and all appurtenances. The
value of the transferred assets from the Developer to the City of Tukwila is $13,689.50.
Conditions were placed on the development to provide the following tumover documents:
1. Letter from owner requesting turnover
2. Capital Asset Acquisition form
3. List of Materials /Costs (City format)
4. BiII of Sale
5. Bond for two -year maintenance period
6. As -built plans for proposed public facilities
The proposed public facilities have been constructed to City standards and inspected by Public
Works staff and are now ready for tumover as public infrastructure.
Request Transportation Committee to move to consent agenda to authorize Mayor to sign
acceptance forms.
attachments: Vicinity Map
Tumover documents 1-8•
Development file: Grand Central Casino
'NOTE: All documents are available at Public Works and will he presented at tha meetines.
Vicinity Map
Site
grand Central Casino
Infrastructure Turnover
D01-180
D01-180
Grand Central Casino
14040 International Avenue South
INSTALL "SIDEWALK/ TRAIL CLOSED
SIGNS WHEN UNDER CONSTRUCTION.
EXTEND NEW PAVED
SIDEWALK TO NEW CURB
CUTTER (TYP.)
DEPRESS CURB IN THIS AREA
FOR H/C ACCESS TO SIDEWALK
RELOCATE EX. STOP AND STREET SIGN.
END CONC. CURB
AND GUTTER
FRAME AND GRATE.
PER CITY OF TUKWILA
SOUTH 141ST STREET IMPROVEMENT PLAN
CHANNELIZATION STRIPE
PER CITY OF TUKYALA
RELOCATE DISPLACED EXISTING
LANDSCAPING TO THIS AREA
AT THE CITY'S DIRECTION.
MLINUHE NT ri 1 7--
51i49.66- 0.1281
P.O.T.
MATCH EX. CONC.
CURB GUTTER
NEW CONC. SIDEWALK.
MATCH EXISTING.
SAWCUT LINE
DEPRESS CURB IN THIS AREA
FOR H/C ACCESS TO SIDEWALK
CROSSWALK/ STOP BAR CHANNEUZATION
PER CITY OF TUKWILA STD. DTL. RS -19.
RELOCATE EX. STREET LIGHT CONTROL CABINET
GROUND RODS TO NORTH SIDE OF 140TH ST.
(PLAN AND DETAILS TO BE PROVIDED BY OTHERS)
100 (S inulll 51REE1)
:I1 S„ r on Cori
i.(NIERLIN1 -:r INTERURBAN AVENUE:
I
Q
1%P Q 0
i Q
REPLACE EXISTING 0-CAItH BASIN I
HERRING BONE Rim t7 W
GRATE WITH VANED c• plr(' NE
9
.6)
71 RCE1 LIGHT
IUIJC IION BOX
(ADJUST TO NEW
FINISHED GRADE)
DEPRESS CURB IN THIS
AREA FOR H/C ACCESS
TO SIDEWALK
GRATE.
CENTERLINE OF INTERURBAN
AVE. SO. PER SURVEY FOR
CITY OF TUKWILA RECORDED
UNDER NO. 8401059003.
SINGLE, SOLID YELLOW I
CHANNELIZATION STRIPE
PER CITY OF TUKWILA
EX. ASPHALT NE TO BE UP -SIZED
SIDEWALK TO A 12" LINE.15LF A.B
DRIVEWAY
REMOVE/ REPLACE E:
GBP. (TYPE II -48 '0)
FRAME AND GRATE
INSTALL CONCRETE
DRIVEWAY APRON PER
CITY OF TUKVALA STD.
STREET SIGN,
(SEE SHEET
MATCH EX. CONC.
CURB GUTTER
EX. CURB
GUTTER
GUTTER
SAWCUT LINE
NEW CONC. CURB i
Grand Central Casino
Infrastructure Turnover
Present: Pam Linder, Joan Hernandez, Joe Duffle
Jim Morrow, Brian Shelton, Gail Labanara, Robin Tischmak, Lucy
Lauterbach; Dennis Robertson
1. 2003 Overlay Program The City negotiated with KPG to do the design of the 2003 overlay
projects. By combining the 2004 projects that were to be designed in 2004 with the 2003
projects, the City will get the best value. Some of the 8 projects will be designed this year and be
put out to bid in 2004, while some will be constructed this year. Staff was asked how streets
were chosen for overlays, and Jim said they use pavement management to determine which
streets are worst in the City. They also overlay projects where they are working on something
else in conjunction, such as water or sewer projects. The contract with KPG was negotiated at
$59, 500.86. Recommend contract to Regular Meeting.
2. Level of Service Standards For highways of statewide significance (HSS), DOT sets the
level of service (LOS). For other highways and roads, PSRC sets the LOS. LOS ranges from A
(no congestion) to F (most congested). PSRC is interested in changing LOS standards to be less
strict, which would mean what is now an "F" LOS could become an "E" LOS. That could have a
negative effect on Tukwila if we can't charge because a business would meet the new
concurrency standards. The issue is being discussed and is in the Legislature now. Information.
3. WSDOT Lane Closures The ramp from southbound 1 -405 to SR 167 will be closed the
weekend of Friday 10 p.m. March 28 to early Monday morning, March 31 Jim said it is very
helpful to contractors to be able to totally close lanes for a short time. Information only.
4. Grand Central Casino The casino has been finished, and is now ready to turn over to the
City the curb, gutter, sidewalk and storm drainage system they've installed. Pam said since the
facilities meet City standards, and there is no alternative to accepting them, they should be
accepted. Recommend acceptance to consent agenda of a Regular Meeting.
1 is U Committee chair approval
Transportation Committee
March 10, 2003