Loading...
HomeMy WebLinkAboutReg 2003-03-17 Item 8D - Contract - 2003 Overlay Program with KPG Inc for $59,500.86Original Sponsor: Timeline: Sponsor's Summary: 1 Meeting Date 3/17/03 COUNCIL AGENDA SYNOPSIS Meeting Date 3/17/03 Council Initials Prepared by 1 Mayor's review 1 Council review RT„('t)I ,edvA I 1 J 1 �Q +M O,� CAS Number: 03-034 I Original Agenda Date: March 17, 2003 Agenda Item Title: 2003 Repair and Overlay Program Consultant's Agreement with KPG Inc. Admin. ciacgerPMAt Action Recommendations: Sponsor: Authorize the Mayor to sign the agreement with KPG, Inc. Committee: Forward to Regular Administration: Same as Sponsor Cost Impact (if known): $59,500.86 Fund Source (if known): 104/02 Commercial Streets The contract is for the design of the 2003 Repair and Overlay Program. The street improvements include overlay for 42n Ave S, S 153` St, Baker Blvd, 40 Ave S, Tuk Int'l Blvd (BAR -New Bridge), Olympic Ave, 51 Ave S and Norfolk (EMW- Seattle City limits). Meeting Dale 1 Attachments 3/17/03 Information Memo dated March 5, 2003 Consultant's Exhibits A B and Project Location Map Transportation Committee Meeting Minutes from March 10, 2003 Public Works ITEMNO. To: Mayor Mullet From: Public Works Direct Date: March 5, 2003 Subject: P.S. E. Contract 2003 Overlay Program ISSUE Authorize the Mayor to sign a design contract with KPG, Inc., to provide P.S. E. for the 2003 Overlay Program. BACKGROUND The City has budgeted to construct necessary street overlays and repairs on an annual basis. KPG, Inc., is the consultant selected to provide Plans, Specifications, and an Engineer's Estimate for bidding and construction. The budget and estimated cost breakdown by phase is: Actual Budget Preliminary Eng. (2003) 59,500.86 70,000 Preliminary Eng. (2004) 92,000 Construction 1,273,000 Construction Engineering 160.000 Total 5 1.595.000 The streets included for overlay are: 1. 42 Ave S (154` 1601 2. S 153`d St (65`" —Dead End) 3. Baker Blvd (APW— Christensen Rd) 4. 40`" Ave S (139`" 1331 ANALYSIS INFORMATION MEMO 5. Tukwila Int'I Blvd (BAR —New Bridge) 6. Olympic Ave (Riverside Dr —S Glacier St) 7. 51 Ave S (139`" —Dead End) 8. Norfolk (EMW— Seattle City Limits) A contract with KPG, Inc., for preparation of P.S. E. has been negotiated in the amount of $59,500.86. This contract is within budget and will provide design for the 2003 Overlay Program to be constructed this year. Design for the 2004 Overlay Program is included in this year's budget to be advertised for bids in early 2004. RECOMMENDATION Authorize the Mayor to sign the contract with KPG, Inc., in the amount of $59,500.86. attachments: Scope of Work, Fee Estimate, Map Exhibit A City of Tukwila 2003 Overlay Program Scope of work March 4, 2003 TASK 1 2003 OVERLAY PROGRAM The Consultant shall prepare final Plans, Specifications and Estimates for the following overlay projects: o 42 Avenue South S The Street to S 160 Street o South 153 Street 65 Avenue S to dead end Baker Boulevard Andover Park West to Christensen Road 40 Avenue South South 139 Street to East Marginal Way Tukwila International Bridge to East Marginal Way Olympic Avenue South S Glacier to S Riverside o 51 Avenue South South 139 Street to dead end Norfolk East Marginal Way to Seattle City Limit The Consultant shall provide all necessary field reviews, base mapping, and utility notification required to complete final bid documents. 40 copies of the final bid documents will be provided to the City for bid advertisement. Interim review submittals (10 copies each) will be prepared at the 50% and 90% stages of plan completion. The Consultant shall also prepare the bid tabulation, check low bidder(s) references, and provide a recommendation for award to the City. Permitting, environmental documentation, or stormwater detention and water quality have not been included in this scope and estimate. Norfolk improvements will not be included in the bid set, but will be issued separately by the City as a restoration requirement for an upcoming Metro sewer project. HOUR AND FEE ESTIMATE EXHIBIT B Project: City of Tukwila 2003 Overlay Program Labor Hour Estimate Total Fee Senior Project Task Description Engineer Engineer Technician Clerical 136.87 86.46 64.82 57.63 Fee Task1 -2003 Overlay Program 1.1 Coordination meetings 1.2 Utility coordination 1.3 Prepare base maps 42nd Avenue South S 153rd Street Baker Boulevard 40th Avenue South Tukwila International Boulevard Olympic Avenue South 51st Avenue South Norfolk 1.4 Field Reviews 1.5 Prepare overlay plans (estimate 20 sheets) 1.6 Quantities estimates 1.7 Prepare specifications 1.8 Prepare review submittals Reimbursable expenses see breakdown for details Task Totals 03/05/2003 KPG Architecture Landscape Architecture Civil Engineering it 4 8 1 0 4 1,469.68 0 8 l 4 4 1,181.48 0 2 0 0 172.92 0 2 0 0 172.92 0 8 16 0 1,728.80 0 8 16 0 1,728.80 0 8 16 0 1,728.80 0 8 16 0 1728.80 0 4 8 0 864.40 2 2 4 0 705.94 16 32 40 0 7,549.44 16 140 220 0 28,554.72 8 16 12 0 3,256.16 4 16 8 8 2,910.44 4 16 24 8 3,947.56 1,800.00 54 278 384 I 24 S 59,500.86 Total Estimated Fee: 59,500.86 Reimbursable Breakdown Cost Task1 2003 Overlay Program Mileage 300.00 Reproduction 1,500.00 Task 1 Total 1,800.00 City of Tukwila 2003 Overlay Project Locations 2003 Overlay Program Project Sites March 6, 2003 Vicinity Map Present: Pam Linder, Joan Hernandez, Joe Duffle Jim Morrow, Brian Shelton, Gail Labanara, Robin Tischmak, Lucy Lauterbach; Dennis Robertson 1. 2003 Overlay Program The City negotiated with KPG to do the design of the 2003 overlay projects. By combining the 2004 projects that were to be designed in 2004 with the 2003 projects, the City will get the best value. Some of the 8 projects will be designed this year and be put out to bid in 2004, while some will be constructed this year. Staffwas asked how streets were chosen for overlays, and Jim said they use pavement management to determine which streets are worst in the City. They also overlay projects where they are working on something else in conjunction, such as water or sewer projects. The contract with KPG was negotiated at $59, 500.86. Recommend contract to Regular Meeting. 2. Level of Service Standards For highways of statewide significance (HSS), DOT sets the level of service (LOS). For other highways and roads, PSRC sets the LOS. LOS ranges from A (no congestion) to F (most congested). PSRC is interested in changing LOS standards to be less strict, which would mean what is now an "F" LOS could become an `B" LOS. That could have a negative effect on Tukwila if we can't charge because a business would meet the new concurrency standards. The issue is being discussed and is in the Legislature now. Information. 3. WSDOT Lane Closures The ramp from southbound I -405 to SR 167 will be closed the weekend of Friday 10 p.m. March 28 to early Monday morning, March 31 Jim said it is very helpful to contractors to be able to totally close lanes for a short time. Information only. 4. Grand Central Casino The casino has been finished, and is now ready to turn over to the City the curb, gutter, sidewalk and storm drainage system they've installed: Pam said since the facilities meet City standards, and there is no alternative to accepting them, they should be accepted. Recommend acceptance to consent agenda of a Regular Meeting. e LS v Committee chair approval Transportation Committee March 10, 2003