HomeMy WebLinkAbout13-205 - Architectural Murals in Brick - Artwork Replacement (South 148th Street/Tukwila International Boulevard)City of Tukwila
6200 Southcenter Boulevard, Tukwila WA 98188
Contract Number: 13 -205
Council Approval N/A
CONTRACT FOR SERVICES
This Agreement is entered into by and between the City of Tukwila, Washington, a non - charter
optional municipal code city hereinafter referred to as "the City," and Mara Smith / Architectural
Murals in Brick , hereinafter referred to as "the Contractor," whose principal office is located at
339 NW 82, Seattle Washington 98117.
WHEREAS, the City has determined the need to have certain services performed for its citizens
but does not have the manpower or expertise to perform such services; and
WHEREAS, the City desires to have the Contractor perform such services pursuant to certain
terms and conditions; now, therefore,
IN CONSIDERATION OF the mutual benefits and conditions hereinafter contained, the parties
hereto agree as follows:
1. Scope and Schedule of Services to be Performed by Contractor. The Contractor shall perform
those services described on Exhibit A attached hereto and incorporated herein by this reference as if
fully set forth. In performing such services, the Contractor shall at all times comply with all Federal,
State, and local statutes, rules and ordinances applicable to the performance of such services and the
handling of any funds used in connection therewith. The Contractor shall request and obtain prior
written approval from the City if the scope or schedule is to be modified in any way.
2. Compensation and Method of Payment. The City shall pay the Contractor for services rendered
according to the rate and method set forth on Exhibit B attached hereto and incorporated herein by
this reference. The total amount to be paid is $5,102.70 (+ shipping charges). $2,551.35 is due
immediately, and the remaining $2,551.35 is due 30 days after completion.
3. Contractor Budget. The Contractor shall apply the funds received under this Agreement within the
maximum limits set forth in this Agreement. The Contractor shall request prior approval from the
City whenever the Contractor desires to amend its budget in any way.
4. Duration of Agreement. This Agreement shall be in full force and effect for a period commencing
October 16, 2013, and ending February 14, 2014, unless sooner terminated under the provisions
hereinafter specified.
5. Independent Contractor. Contractor and City agree that Contractor is an independent contractor
with respect to the services provided pursuant to this Agreement. Nothing in this Agreement shall be
considered to create the relationship of employer and employee between the parties hereto. Neither
Contractor nor any employee of Contractor shall be entitled to any benefits accorded City employees
by virtue of the services provided under this Agreement. The City shall not be responsible for
withholding or otherwise deducting federal income tax or social security or contributing to the State
Industrial Insurance Program, or otherwise assuming the duties of an employer with respect to the
Contractor, or any employee of the Contractor.
/ S1-
d /' c2-- c7/6-/A7/9-e_3
CA Revised 2012 Page 1 of 4
6. Indemnification. The Contractor shall defend, indemnify and hold the City, its officers, agents,
officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits
including attorney fees, arising out of or in connection with the performance of this Agreement, except for
injuries and damages caused by the sole negligence of the City. Should a court of competent jurisdiction
determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages
arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent
negligence of the Contractor and the City, its officers, officials, employees, and volunteers, the
Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. It is further
specifically and expressly understood that the indemnification provided herein constitutes the
Contractor's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this
indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section
shall survive the expiration or termination of this Agreement.
7. Insurance. The Contractor shall procure and maintain for the duration of the Agreement, insurance
against claims for injuries to persons or damage to property which may arise from or in connection
with the performance of the work hereunder by the Contractor, their agents, representatives,
employees or subcontractors. Contractor's maintenance of insurance, its scope of coverage and limits
as required herein shall not be construed to limit the liability of the Contractor to the coverage
provided by such insurance, or otherwise limit the City's recourse to any remedy available at law or in
equity.
A. Minimum Scope of Insurance. Contractor shall obtain insurance of the types and with the limits
described below:
1. Automobile Liability insurance with a minimum combined single limit for bodily injury and
property damage of $1,000,000 per accident. Automobile liability insurance shall cover all
owned, non - owned, hired and leased vehicles. Coverage shall be written on Insurance Services
Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If
necessary, the policy shall be endorsed to provide contractual liability coverage.
2. Commercial General Liability insurance with limits no less than $1,000,000 each occurrence,
$2,000,000 general aggregate and $2,000,000 products - completed operations aggregate limit
Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01
and shall cover liability arising from premises, operations, independent contractors, products -
completed operations, stop gap liability, personal injury and advertising injury, and liability
assumed under an insured contract. The Commercial General Liability insurance shall be
endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85 or an
equivalent endorsement. There shall be no endorsement or modification of the Commercial
General Liability Insurance for liability arising from explosion, collapse or underground
property damage. The City shall be named as an insured under the Contractor's Commercial
General Liability insurance policy with respect to the work performed for the City using ISO
Additional Insured endorsement CG 20 10 10 01 and Additional Insured- Completed
Operations endorsement CG 20 37 10 01 or substitute endorsements providing equivalent
coverage.
3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of
Washington.
CA Revised 1 -2013 Page 2 of 4
B. Other Insurance Provision. The Contractor's Automobile Liability and Commercial General
Liability insurance policies are to contain, or be endorsed to contain that they shall be primary
insurance with respect to the City. Any insurance, self - insurance, or insurance pool coverage
maintained by the City shall be excess of the Contractor's insurance and shall not contribute with
it.
C. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best rating
of not less than A: VII.
D. Verification of Coverage. Contractor shall furnish the City with original certificates and a copy
of the amendatory endorsements, including but not necessarily limited to the additional insured
endorsement, evidencing the insurance requirements of the Contractor before commencement of
the work.
E. Subcontractors. The Contractor shall have sole responsibility for determining the insurance
coverage and limits required, if any, to be obtained by subcontractors, which determination shall
be made in accordance with reasonable and prudent business practices.
F. Notice of Cancellation. The Contractor shall provide the City and all Additional Insureds for this
work with written notice of any policy cancellation, within two business days of their receipt of
such notice.
G. Failure to Maintain Insurance. Failure on the part of the Contractor to maintain the insurance as
required shall constitute a material breach of contract, upon which the City may, after giving five
business days notice to the Contractor to correct the breach, immediately terminate the contract or,
at its discretion, procure or renew such insurance and pay any and all premiums in connection
therewith, with any sums so expended to be repaid to the City on demand, or at the sole discretion
of the City, offset against funds due the Contractor from the City.
8. Record Keeping and Reporting.
A. The Contractor shall maintain accounts and records, including personnel, property, financial and
programmatic records which sufficiently and properly reflect all direct and indirect costs of any
nature expended and services performed in the performance of this Agreement and other such
records as may be deemed necessary by the City to ensure the performance of this Agreement.
B. These records shall be maintained for a period of seven (7) years after termination hereof unless
permission to destroy them is granted by the office of the archivist in accordance with RCW
Chapter 40.14 and by the City.
9. Audits and Inspections. The records and documents with respect to all matters covered by this
Agreement shall be subject at all times to inspection, review or audit by law during the performance
of this Agreement.
10. Termination. This Agreement may at any time be terminated by the City giving to the Contractor
thirty (30) days written notice of the City's intention to terminate the same. Failure to provide
products on schedule may result in contract termination. If the Contractor's insurance coverage is
canceled for any reason, the City shall have the right to terminate this Agreement immediately.
11. Discrimination Prohibited. The Consultant, with regard to the work performed by it under this
Agreement, will not discriminate on the grounds of race, religion, creed, color, national origin, age,
veteran status, sex, sexual orientation, gender identity, marital status, political affiliation or the presence
of any disability in the selection and retention of employees or procurement of materials or supplies.
CA Revised 1 -2013 Page 3 of 4
12. Assignment and Subcontract. The Contractor shall not assign or subcontract any portion of the
services contemplated by this Agreement without the written consent of the City.
13. Entire Agreement; Modification. This Agreement, together with attachments or addenda,
represents the entire and integrated Agreement between the City and the Contractor and supersedes
all prior negotiations, representations, or agreements written or oral. No amendment or modification
of this Agreement shall be of any force or effect unless it is in writing and signed by the parties.
14. Severability and Survival. If any term, condition or provision of this Agreement is declared void or
unenforceable or limited in its application or effect, such event shall not affect any other provisions
hereof and all other provisions shall remain fully enforceable. The provisions of this Agreement,
which by their sense and context are reasonably intended to survive the completion, expiration or
cancellation of this Agreement, shall survive termination of this Agreement.
15. Notices. Notices to the City of Tukwila shall be sent to the following address:
City Clerk, City of Tukwila
6200 Southcenter Blvd.
Tukwila, Washington 98188
Notices to the Contractor shall be sent to the address provided by the Contractor upon the
signature line below.
16. Applicable Law; Venue; Attorney's Fees. This Agreement shall be governed by and construed in
accordance with the laws of the State of Washington. In the event any suit, arbitration, or other
proceeding is instituted to enforce any term of this Agreement, the parties specifically understand
and agree that venue shall be properly laid in King County, Washington. The prevailing party in any
such action shall be entitled to its attorney's fees and costs of suit.
DATED this , 3 day of t CO "b- T , 20 ..
CITY OF TUKWILA
City Clerk, C risty O'Flaherty
APPROVED AS TO FORM:
(KU.ONL (111,4N
Office of the City Attorney
CA Revised 1 -2013
CONTRACTOR
By:
Printed Name and Title:A/4( 4 S, 4 /1 41407,sr
Address: -3.3 y /04/ S2
PITA777---/, 7g//
Page 4 of 4
Mara Smith, Artist, will carve one "Eagle" brick mural 2' 8" x 6' (16.8 sq. ft.) in Mutual
Materials' Inca Red Economy brick (nominal size 4" x 4" x 12 ") solids @ $200.00 per
sq,ft. (price includes the sculpture brick @ $20.00 sq. ft., design, carving, firing of
mural).
Additional fees include:
• Shipping (approx 600 Ibs). To be arranged once mural is fired. Tukwila will only be
charged actual shipping fees.
• $1000 Travel expense for 1 week carving time in Spokane (hotel /car /meals).
One brick mural 2' 8" x 6' (16.8 sq.ft. @ 200 /sq ft) = $3360.00
One day installation supervision = $300.00
Travel Expenses = $1000.00
WA Sales tax @ 9.5% = $442.70
Total ® $5102.70
50% $2551.35 due upon acceptance of the Contract.
Please send payment to:
Mara Smith / Architectural Murals in Brick
339. NW 82 ST, Seattle, WA 98117
206 963 2506
Much thanks.
From: Mara 5 f mailto:astarsmithCc gmaii.coml
Sent: Friday, October 18, 2013 9:43 AM
To: Stan Anderson
Cc: Kris King; Kris King
Subject: Tukwila Brick Mural Replacement
Exhibit A & B
Tukwila Eagle Brick Mural Invoice
RE: Quote for cost of replacing brick artwork at S. 148th & International Blvd, Tukwila.
ATTN: Stan
Anderson
2013
Street Maintenance Superintendent
206- 571 -6299
Fax 2Q6- 575 -3404
600 Minkler Blvd.
Tukwila, WA 98188
15 October
Dear Stan;
Here's the quote to replace only the "Eagle" brick mural artwork for the City of Tukwila,
WA, at S. 148th and Tukwila International Blvd. Arndt Masonry, the contractor, will need
to provide you a separate quote for the footing, back -up wall, and mural installation,
and any other costs associated with the installation of the Mural.
Mutual Materials' Mica Plant, In Spokane, WA, is making Economy size Inca Red brick
next week. I would like to use the larger brick since it would require less mortar
and create less distortion. Its also readily available so you won't have to wait until
Spring to do this.
The mural would also look good with a brick frame around it. Would only involve
allowing space for it and the frame will really help to define the artwork.
I can begin carving as soon as we have a signed agreement and I receive the down
payment of 50 %. The other 50% will be due upon shipment from the Mica Plant to
Tukwila.
Our Contract:
0t !6 _viz got) 3 / a/
°"-11 ` v pAp � 2. S"�f- /. 3i
jsr or z
late 4 � it'.