HomeMy WebLinkAbout05-071 - HNTB - Klickitat / Southcenter Parkway Access Improvement (Supplements I-M)05-071(m)
Council Approval N/A
Washington State
WI Department of Transportation
Supplemental Agreement
Number 13
Organization and Address Phone:
City of Tukwila
Public Works Department
6300 Southcenter Blvd., Suite #100
Tukwila, WA 98188
206-431-3665
Original Agreement Number
05-071 (M)
Project Number
84-RW19
Execution Date
Completion Date
March 31, 2012
Project Title
Klickitat/Southcenter Parkway Access
Improvement Project
New Maximum Amount Payable
$4,271,261
Description of Work
Additional On -Call Engineering Services During Construction
The Local Agency of Tukwila desires to supplement the agreement entered into with HNTB Corporation and
executed on April 6, 2005 and identified as Agreement No. 05-071. All provisions in the Agreement remain in
effect except as expressly modified by this supplement. The changes to the Agreement are described as follows:
Section II, SCOPE OF WORK, shall be amended as follows:
The scope of work for this project is supplemented as detailed in the attached Exhibit A, and by
this reference made part of the Agreement.
II
Section IV, TIME FOR BEGINNING AND COMPLETION, shall be amended as follows:
All work under this Agreement shall be completed by the date shown in the heading of this
Supplemental Agreement Number 13 under Completion Date.
III
Section V, PAYMENT, shall be amended as follows:
Compensation due to Consultant for work performed or services rendered for this project is
supplemented as detailed in the attached Exhibit B, and by this reference made part of this
Agreement. Supplemental Agreement Number 13 Services shall be compensated on a Negotiated
Hourly Rates basis.
Page 1 of 2
Contract Document
Amount Management Maximum Amount
Authorized Reserve Fund Payable
Original Agreement $1,168,322 $50,000 $1,218,322
Supplement No. 1 $1,956,680 $0 $3,175,002
Supplement No. 2 $17,200 $0 $3,192,202
Supplement No. 3 $0 $0 $3,192,202
Supplement No. 4 $14,759 $0 $3,206,961
Supplement No. 5 $63,350 $0 $3,270,311
Supplement No. 6 $4,500 $0 $3,274,811
Supplement No. 7 $4,200 $0 $3,279,011
Supplement No. 8 $147,387 $0 $3,426,398
Supplement No. 9 $533,816 $0 $3,960,214
Supplement No. 10 $0 $0 $3,960,214
Supplement No. 11 $107,764 $0 $4,067,978
Supplement No. 12 $171,062 $0 $4,239,040
Supplement No. 13 $32,221 $0 $4,271,261
TOTAL $4,221,261 $50,000 $4,271,261
If you concur with this Supplemental Agreement Number 13 and agree to the changes as stated above, please
sign in the appropriate spaces below and return to this office for final action.
By: HNTB Corporation
By: City of Tukwila
rake, AIA, Vic resident App
DOT Form 140-063 EF
Revised 9/2005
Page 2 of 2
Exhibit A
Scope of Services
Contract 05-071
Klickitat/Southcenter Parkway
Urban Access Improvement Project
Supplemental Agreement No. 13
Additional On -Call Engineering Services During
Construction
August 2011
INTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 13 Page i
TABLE OF CONTENTS
I. INTRODUCTION 1
II. PROJECT SCHEDULE 1
III. WORK TASKS 1
TASK 24 ON-CALL ENGINEERING SERVICES DURING CONSTRUCTION 1
Task 24.1 Project Administration 1
Task 24.2 On -Call Engineering Services During Construction 2
j:\41113\I_red book\contract\pha se_2\hntb\su ppl ement_ 13\exhibit_a_scope_of_work_su pp_13v3.docx
Printed 8/12/2011
CINTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 13 Page 1
I. INTRODUCTION
This supplemental agreement includes additional services related to continuing On -Call Engineering
Services During Construction as herein defined and necessary to accomplish work by the Agency.
I1. PROJECT SCHEDULE
The notice -to -proceed date assumed for Services detailed below is August 1, 2011. It is anticipated that
all Services shall be complete by March 31, 2012.
III. WORK TASKS
TASK 24 ON-CALL ENGINEERING SERVICES DURING
CONSTRUCTION
Task 24.1 Project Administration
Subconsultant Management
• Consultant shall prepare and execute subconsultant supplemental agreements.
• Consultant shall provide direction to Subconsultants, including conducting project coordination
meetings as required with appropriate task leaders.
Budget Management & Invoicing
• Consultant shall actively manage, update, and control budget.
• Consultant shall complete monthly Job Progress Input reports.
• Consultant shall produce monthly invoices.
Communicate Progress
• Consultant shall conduct ongoing, proactive, and responsive communications with Agency staff
involved in the direction and execution of the Project.
• Consultant shall produce a monthly progress report to be submitted with the monthly invoices.
Quality Management
• Consultant shall conduct monthly quality assurance review meetings ("Project Review
Meetings"), which shall include a review of the project status with the principal -in -charge, project
manager, project administrator, and other key staff as required.
• Consultant shall be responsible for checking and coordinating all design revisions and
computations, specifications, estimates, and other deliverables identified in this Scope of
Services.
j:\41113\1 redbook\contract\phase_2\hntb\supplernent_13\exhibit_a_scope_of_work_supp_13v3.docx
Printed 8/12/2011
a1NTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 13 Page 2
Task 24.2 On -Call Engineering Services During Construction
The work under this task shall consist of performing additional on-call engineering services during
construction as herein defined and necessary to accomplish work by the Agency. Specific items of work
that the Agency may require the Consultant to perform include the following:
1. Conduct shop drawing review.
2. Construction / material products equivalency review.
3. Consult with the Agency on plan clarifications and provide revisions when requested by Agency.
4. Design and provide PE stamped change order plan sheets, when needed.
5. Provide design concurrence on change orders provided by the Agency. This would not be a
"verbal approval", it would simply reflect that the Consultant has reviewed the change and
acknowledges that it is consistent with the original design parameters or intent.
6. Attend construction meetings and field reviews when requested by the Agency to assist with
solutions to problems.
7. Support the Agency in preparation for Disputes Review Board meetings, as needed.
8. Support the Agency in CPM review and updates, as needed.
9. Support the Agency in public outreach, as needed.
10. Other services, as needed, to support the Agency with construction of Project.
The level of effort for On -Call Engineering Services During Construction is limited to the amount of
labor and expenses indicated in Exhibit B. Additional services beyond the level of effort indicated in
Exhibit C shall be considered Extra Work requiring a supplemental agreement.
Assumptions:
• Agency will determine which submittals are to be reviewed by Consultant.
• Agency will make every effort to respond to each submittal before seeking Consultant support.
• Agency will receive and distribute submittals to Consultant in electronic or hardcopy format for
review and response.
• Consultant will respond to RFI submittals no later than five (5) working days after receipt by
Consultant.
• Consultant will respond to Shop Drawing submittals no later than fifteen (15) working days after
receipt by the Consultant.
• Consultant shall not be responsible for (1) construction means, methods, techniques, sequences,
procedures, or safety precautions and programs in connection with the Contractor's construction
activity; (2) the failure of any contractor, subcontractor, vendor, or other Project participant, not
under contract to Consultant, to fulfill contractual responsibilities to Agency or to comply with
federal, state, or local laws, regulations, and codes; or (3) procuring permits, certificates, and
licenses required for any construction unless such procurement responsibilities are specifically
assigned to Consultant in the Scope of Services.
• Consultant will not be responsible for maintaining a submittal tracking list.
Deliverables:
• Electronic responses to submittals (electronic .pdf file format)
j:\41113\I redbook\contract\phase_2\hntb\supplement_13\exhibit_a_scope_of_work_supp_13v3.docx
Printed 8/12/2011
aINTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 13 Page 3
Reimbursement for Premium Overtime
If the Agency deems it in its interest for the Consultant's non-exempt staff to perform work on an
overtime basis, it may authorize such action in writing to the Consultant. The premium portion of the
overtime hours shall not be burdened with overhead and profit, and shall be shown separately on the
invoices.
Meeting Notice Requirements
The Consultant shall attend various Project related meetings for this task, such as coordination and
progress meetings. For these meetings, a minimum of four (4) hours advance notice of such meetings
shall be required to be given to the Consultant by the Agency.
The Consultant may be requested to attend construction meetings and field reviews as needed for the
project. For construction and field reviews, the Consultant would be expected to be on site within four (4)
hours.
j:\41113\I_redbook\contract\phase_2\hntb\supplement_13\exhibit_a_scope_of_work_su pp_13v3.docx
Printed 8/12/2011
a1NTB
EXHIBIT B
HNTB Corporation
Consultant Fee Determination
Summary Sheet (Negotiated Hourly Rates)
Tukwila Urban Center Access Project: Klickitat/Southcenter Parkway
Supplement No. 13, Additional On -Call Engineering Services During Construction
LABOR COSTS
Staff Classification
All
Direct Overhead Profit Inclusive
Hours Salary @ 148.24%* @ 30% Rate
Total Cost
Principal
Project Manager/Sr. Project Engineer
Sr. Structural Engineer
Project Engineer/Structural Engineer
Engineer/Traffic Engineer
Landscape Architect
Jr. Landscape Architect
Sr. CAD Technician
Sr. Project Administrator
3 $ 97.44
57 $62.40
6 $ 75.84
39 $49.60
28 $ 36.08
13 $41.04
4 $34.16
17 $40.96
25 $43.20
$ 144.45
$ 92.50
$ 112.43
$ 73.53
$ 53.48
$ 60.84
$ 50.64
$ 60.72
$ 64.04
$ 29.23
$ 18.72
$ 22.75
$ 14.88
$ 10.82
$ 12.31
$ 10.25
$ 12.29
$ 12.96
$ 271.12
$ 173.62
$ 211.02
$ 138.01
$ 100.39
$ 114.19
$ 95.05
$ 113.97
$ 120.20
$ 813.35
$ 9,896.44
$ 1,266.10
$ 5,382.27
$ 2,810.89
$ 1,484.47
$ 380.19
$ 1,937.44
$ 3,004.99
1
TOTAL LABOR COSTS
192
$ 26,976I
*Audited 2009 FAR Design Office Overhead Rate
REIMBURSEABLE COSTS
Local Travel (Mileage/Parking):
Reproduction:
Courier/Express Mail:
Other:
$ 100.00
$ 100.00
$ 45.00
$ -
TOTAL REIMBURSEABLE COSTS
$ 245
SUBCONSULTANT COSTS
HDR Engineering, Inc. (Roadway Design)
PACE Engineers, Inc. (Utility Coordination)
GeoEngineers, Inc. (Geotechnical Support)
5,000
TOTAL FEE
$ 32,221
05-071, Supplement No. 13
HNTB Corporation
J:\41113\L_Redbook\Contract\Phase_2\HNTB\Supplement_13\Supp_13_Fee_Est_v2.xlsx Page 1 of 2
HNTB Corporation
Labor Hours Estimate
Tukwila Urban Center Access Project: Klickitat/Southcenter Parkway
Supplement No. 13, Additional On -Call Engineering Services During Construction
Staff Cassifications
05-071, Supplement No. 13
HNTB Corporation
Page 2 of 2
Principal
Proj.
Mgr./
Sr.
Proj.
Eng.
Sr.
Struct.
Eng.
Proj.
Eng./
Struct.
Eng.
Eng./
Traffic
Eng.
Landscp
Arch.
Jr.
Landscp
Arch.
Sr.
CAD
Tech.
Sr.
Proj.
Admin.
TOTAL
24Ojai,
r r...' D:10, Y Cs
...: 1
6
„8
4
;:
9'
Shop Drawing Reviews
-
1
2
2
10
5
-
-
-
-
19
Plan Clarifications & Revisions
-
10
4
10
14
6
4
10
-
58
Design & Provide Stamped Change Orders
-
2-
2
2
2
-
7
-
15
Design Concurrence on Change Orders
-
10
-
15
5
3-
-
-
33
Construction Meetings & Field Reviews
-
8-
2
2
2
-
-
-
14
Support for DRB Meetings
-
-
-
-
-
-
-
-
-
-
CPM Review & Updates
-
-
-
-
-
-
-
-
-
-
Public Outreach
-
-
-
-
-
-
-
-
-
-
Project Mgmt./Administration
3
25
-
-
-
-
-
-
25
53
Total Hours by Classifications 3
57
6
39
28
13
4
17
25
1 192
05-071, Supplement No. 13
HNTB Corporation
Page 2 of 2
GeoEngineers, Inc.
Sub -Consultant Fee Determination
Summary Sheet (Negotiated Hourly Rates)
Tukwila Urban Center Access Project: KlickitatlSouthcenter Parkway
Supplement No. 13, Additional On -Call Engineering Services During Construction
LABOR COSTS
Staff Classification
All
Direct Overhead Profit Inclusive
Hours Salary @ 211.80% @ 30% Rate Total Cost
Principal
Project Engineer/Scientist
Engineer/Scientist
Administrator 3
Administrator 2
19 $ 56.01 $ 118.63 $16.80 $ 191.44 $ 3,637.40
8 $ 38.47 $ 81.48 $11.54 $ 131.49 $1,051.92
0 $ 30.00 $ 63.54 $ 9.00 $ 102.54 $ -
2 $21.16 $ 44.82 $ 6.35 $ 72.32 $ 144.65
2 $15.00 $ 31.77 $ 4.50 $ 51.27 $ 102.54
Total Hours 31
1
TOTAL LABOR COSTS
$ 4,937
REIMBURSEABLE COSTS
Local Travel (Mileage/Parking):
Reproduction:
Courier/Express Mail:
Other:
TOTAL REIMBURSEABLE COSTS
63
1
TOTAL FEE
$ 5,000
05-071, Supplement No. 13
GeoEngineers, Inc.
Page 1 of 2
GeoEngineers, Inc.
Labor Hours Estimate
Tukwila Urban Center Access Project: Klickitat/Southcenter Parkway
Supplement No. 13, Additional On -Call Engineering Services During Construction
Staff Cassifications
05-071, Supplement No. 13
GeoEngineers, Inc.
Page 2 of 2
Principal
Project
Engineer/
Scientist
Engineer/
Scientist
Admin 3
Admin 2
TOTAL
t ,1 ,C :; ifu
I_`..
:; 1
-
Attend Preconstruction Meeting
Shop Drawing Reviews
-
Plan Clarifications & Revisions
10
3
13
Design & Provide Stamped Change Orders
-
Design Concurrence on Change Orders
9
1
10
Construction Meetings & Field Reviews
4
4
Support for DRB Meetings
-
CPM Review & Updates
-
Public Outreach
-
Other Miscellaneous Support
2
2
4
Total Hours by Classification
19
8
-
2
2
31
05-071, Supplement No. 13
GeoEngineers, Inc.
Page 2 of 2
Washington State
Department of Transportation
05-071(1)
Council Approva112/13/10
Supplemental Agreement
Number 12
Organization and Address Phone
City of Tukwila
Public Works Department
6300 Southcenter Blvd., Suite #100
Tukwila, WA 98188
206-431-3665
Original Agreement Number
05-071 (L)
Project Number
84-RW19
Execution Date
Completion Date
December 31, 2011
Project Title
Klickitat/Southcenter Parkway Access
Improvement Project
New Maximum Amount Payable
$4,239,040
Description of Work
On -Call Engineering Services During Construction
The Local Agency of Tukwila desires to supplement the agreement entered into with HNTB Corporation and
executed on April 6, 2005 and identified as Agreement No 05-071 All provisions in the Agreement remain in
effect except as expressly modified by this supplement. The changes to the Agreement are described as follows.
Section II, SCOPE OF WORK, shall be amended as follows.
The scope of work for this project is supplemented as detailed in the attached Exhibit A, and by
this reference made part of the Agreement.
II
Section IV, TIME FOR BEGINNING AND COMPLETION, shall be amended as follows.
All work under this Agreement shall be completed by the date shown in the heading of this
Supplemental Agreement Number 12 under Completion Date.
III
Section V, PAYMENT, shall be amended as follows
Compensation due to Consultant for work performed or services rendered for this project is
supplemented as detailed in the attached Exhibit B, and by this reference made part of this
Agreement. Supplemental Agreement Number 12 Services shall be compensated on a Negotiated
Hourly Rates basis.
Page 1 of 2
Contract Document
Amount Management Maximum Amount
Authorized Reserve Fund Payable
Original Agreement $1,168,322 $50,000 $1,218,322
Supplement No. 1 $1,956,680 $0 $3,175,002
Supplement No. 2 $17,200 $0 $3,192,202
Supplement No. 3 $0 $0 $3,192,202
Supplement No. 4 $14,759 $0 $3,206,961
Supplement No. 5 $63,350 $0 $3,270,311
Supplement No. 6 $4,500 $0 $3,274,811
Supplement No. 7 $4,200 $0 $3,279,011
Supplement No. 8 $147,387 $0 $3,426,398
Supplement No. 9 $533,816 $0 $3,960,214
Supplement No. 10 $0 $0 $3,960,214
Supplement No. 11 $107,764 $0 $4,067,978
Supplement No. 12 $171,062 $0 $4,239,040
TOTAL $4,189,040 $50,000 $4,239,040
If you concur with this Supplemental Agreement Number 12 and agree to the changes as stated above, please
sign in the appropriate spaces below and return to this office for final action
By: HNTB Corporation
L v
V4
a A Drake, , Vice President Approving Authority Signature
By. City of Tukwila
044A0
Date Date
betit kz_z .7 14 00 ID
DOT Form 140-063 EF
Revised 9/2005
Page 2 of 2
Exhibit A
Scope of Services
Contract 05-071
Klickitat/Southcenter Parkway
Urban Access Improvement Project
Supplemental Agreement No. 12
On -Call Engineering Services During Construction
December 2010
INTB
Tukwila Urban Access Improvement Project
05-071, Supplement No 12 Page i
TABLE OF CONTENTS
I. INTRODUCTION 1
II. PROJECT SCHEDULE 1
III. WORK TASKS 1
TASK 24 ON-CALL ENGINEERING SERVICES DURING CONSTRUCTION 1
Task 24.1 Project Administration 1
Task 24.2 On -Call Engineering Services During Construction 2
c:\docume-1\peter--1.tuk\locals-1\temp\xpgrpwise\exhibit_a_scope_of work_supp_12_v1_final.docx
Printed 12/10/2010
a1NTB
Tukwila Urban Access Improvement Project
05-071, Supplement No 12 Page 1
I. INTRODUCTION
This supplemental agreement includes services related to On -Call Engineering Services During
Construction as herein defined and necessary to accomplish work by the Agency.
II. PROJECT SCHEDULE
The notice -to -proceed date assumed for Services detailed below is January 1, 2011. It is anticipated that
all Services shall be complete by December 31, 2011.
III. WORK TASKS
TASK 24 ON-CALL ENGINEERING SERVICES DURING
CONSTRUCTION
Task 24.1 Project Administration
Subconsultant Management
• Consultant shall prepare and execute subconsultant supplemental agreements.
• Consultant shall provide direction to Subconsultants, including conducting project coordination
meetings as required with appropriate task leaders.
Budget Management & Invoicing
• Consultant shall actively manage, update, and control budget.
• Consultant shall complete monthly Job Progress Input reports.
• Consultant shall produce monthly invoices.
Communicate Progress
• Consultant shall conduct ongoing, proactive, and responsive communications with Agency staff
involved in the direction and execution of the Project.
• Consultant shall produce a monthly progress report to be submitted with the monthly invoices.
Quality Management
• Consultant shall conduct monthly quality assurance review meetings ("Project Review
Meetings"), which shall include a review of the project status with the principal -in -charge, project
manager, project administrator, and other key staff as required.
• Consultant shall be responsible for checking and coordinating all design revisions and
computations, specifications, estimates, and other deliverables identified in this Scope of
Services.
c:\docume-1\peter--1.tuk\locals-1\temp\xpgrpwise\exhibit_a_scope_of work_supp_12_v1_final.docx
Printed 12/10/2010
INTB
Tukwila Urban Access Improvement Project
05-071, Supplement No 12 Page 2
Task 24.2 On -Call Engineering Services During Construction
The work under this task shall consist of performing on-call engineering services during construction as
herein defined and necessary to accomplish work by the Agency. Specific items of work that the Agency
may require the Consultant to perform include the following:
1. Attend Preconstruction meeting.
2. Conduct shop drawing review.
3. Construction / material products equivalency review.
4. Consult with the Agency on plan clarifications and provide revisions when requested by Agency.
5. Design and provide PE stamped change order plan sheets, when needed.
6. Provide design concurrence on change orders provided by the Agency. This would not be a
"verbal approval", it would simply reflect that the Consultant has reviewed the change and
acknowledges that it is consistent with the original design parameters or intent.
7. Attend construction meetings and field reviews when requested by the Agency to assist with
solutions to problems.
8. Support the Agency in preparation for Disputes Review Board meetings, as needed.
9. Support the Agency in CPM review and updates, as needed.
10. Support the Agency in public outreach, as needed.
11. Other services, as needed, to support the Agency with construction of Project.
The level of effort for On -Call Engineering Services During Construction is limited to the amount of
labor and expenses indicated in Exhibit B. Additional services beyond the level of effort indicated in
Exhibit C shall be considered Extra Work requiring a supplemental agreement.
Assumptions:
• Agency will determine which submittals are to be reviewed by Consultant.
• Agency will make every effort to respond to each submittal before seeking Consultant support.
• Agency will receive and distribute submittals to Consultant in electronic or hardcopy format for
review and response.
• Consultant will respond to RFI submittals no later than five (5) working days after receipt by
Consultant.
• Consultant will respond to Shop Drawing submittals no later than twenty (20) working days after
receipt by the Consultant.
• Consultant shall not be responsible for (1) construction means, methods, techniques, sequences,
procedures, or safety precautions and programs in connection with the Contractor's construction
activity; (2) the failure of any contractor, subcontractor, vendor, or other Project participant, not
under contract to Consultant, to fulfill contractual responsibilities to Agency or to comply with
federal, state, or local laws, regulations, and codes; or (3) procuring permits, certificates, and
licenses required for any construction unless such procurement responsibilities are specifically
assigned to Consultant in the Scope of Services.
• Consultant will not be responsible for maintaining a submittal tracking list.
Deliverables:
• Electronic responses to submittals (electronic .pdf file format)
t:\41113\I_redbook\contract\phase_2\hntb\supplement_12\exhibit_a_scope_of_work_supp_12_v1_final docx
Printed 12/8/2010
NNTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 12 Page 3
Reimbursement for Premium Overtime
If the Agency deems it in its interest for the Consultant's non-exempt staff to perform work on an
overtime basis, it may authorize such action in writing to the Consultant. The premium portion of the
overtime hours shall not be burdened with overhead and profit, and shall be shown separately on the
invoices.
Meeting Notice Requirements
The Consultant shall attend various Project related meetings for this task, such as coordination and
progress meetings. For these meetings, a minimum of four (4) hours advance notice of such meetings
shall be required to be given to the Consultant by the Agency.
The Consultant may be requested to attend construction meetings and field reviews as needed for the
project. For construction and field reviews, the Consultant would be expected to be on site within four (4)
hours.
j\41113\I redbook\contract\phase_2\hntb\supplement_12\exhibit_a_scope_of work_supp_12_vl_final.docx
Printed 12/8/2010
I NTB
EXHIBIT B
HNTB Corporation
Consultant Fee Determination
Summary Sheet (Negotiated Hourly Rates)
Tukwila Urban Center Access Project: Klickitat/Southcenter Parkway
Supplement No. 12, On -Call Engineering Services During Construction
LABOR COSTS
Staff Classification
Hours All Inclusive Rate Total Cost
Principal
Project Manager
Sr. Structural Engineer
Sr. Architectural Manager
Senior Project Engineer
Project Engineer/Structural Engineer
Design Engineer/Traffic Engineer
Landscape Architect
Jr Engineer/Jr. Landscape Architect
Sr. CAD Technician
CAD Technician
Sr Project Administrator
Sr Administrative Assistant
20 $
170 $
16 $
14 $
113 $
273 $
90 $
56 $
18 $
54 $
55 $
115 $
30 $
264 44 $ 5,288.79
215 69 $ 36,667 58
182.75 $ 2,923 97
174.73 $ 2,446.29
162.56 $ 18,36916
13114 $ 35,801.24
96 83 $ 8,714 48
103 73 $ 5,808 76
70 56 $ 1,270 11
112 19 $ 6,058 06
97 05 $ 5,337 76
113 74 $ 13,080 62
67.22 $ 2,016 68
TOTAL LABOR COSTS
1024
$ 143,783I
*Audited 2009 FAR Design Office Overhead Rate
REIMBURSEABLE COSTS
Local Travel (Mileage/Parking)
Reproduction
Courier/Express Mail:
Other
$ 600 00
$ 500 00
$ 500 00
$ 250 00
TOTAL REIMBURSEABLE COSTS
$ 1,850
SUBCONSULTANT COSTS
HDR Engineering, Inc. (Roadway Design)
$ 16,650 I
PACE Engineers, Inc. (Utility Coordination)
$ 8,779I
TOTAL FEE
$ 171,062 I
05-071, Supplement No 12
J.\41113\L_Redbook\Contract\Phase_2\HNTB\Supplement_12\Supp_12_Fee_Est_v1b.xlsx Page 1 of 2
HNTB Corporation
Labor Hours Estimate
J
Q
0
1-
,
fix
O
N
co
M
O
O
O
N
co
'�
O
N
N
CO
CO
O
K)
O
co
N-
O
O
O
co
N
co
O
CO
O
N
v
O
o
CO
c°
O
N
N
N
N
CO
N
0
C
E •y
D O
Cn Q
1
1
1
,
1
1
1
,
i
1
1
1
,
1
1
1
,
1
1
O
M
0
M
c,—
.0 E+k-
L L p
cnaQ:
,
,
!
1
,
1
1
1
,
1
1
,
1
1
,
1
i
1Lo
rr
Lc)
o €io
0)-
,0.,m.
N
'.
a)
CO
t
1
O
N
(2,,
C\'
1
1
t
,
,
1
1
,
1
1
1
en
t()
Q V
CTU 1-:L
1
1
1
1
$
O1
co
c,
ch
1
N
1
co
<-..to
Ice,
1
ii
1
,
1
1
1
Q
U
P .0
O 0
L CU 1-
to
'6"'
z,
l/
,
,
$
1
1
0
r
1
1
C°
N
1
1
N
1
,
1
$
1
,
1
1
1
18
0.
C U
N 0
tib
:3
.
CO
'
'
N'
'
C‘'
Nr
1
1
'.
1
1
.
v.
O
1
1
Cb
56
C
O - U
N Q)O
a) C R C
CI W F- W
1
1
1
1
.0
LO
1
1
0
N
'
N
1
1
,
$
1
1
0
N
1
N
1
0
0)
U
O0) i a)
>` c �. c
aWcnW
NI-
77
rz
1
1
Nr
42
t
1
M
M
1
t
(0
1
1
c
i
1
273
•
0)
co o- w
#r#
.r..
°"
1-
N'
1
N
"
O
v
�--
`q
'
O
M
o
e�
v
'
`o
•-
O'
N
0
N
1
co,
N
c°
N
,
c',
U `
CM
a0
'
°D
$
N$
$
N,
1
1
1
,
1
,
1
1
et
0 .
i a)
,_ a c
cn cn W
Ni-
Nr"4"'1
1
co
1
,
1
1
i
,
1
1
1
,
t
i
1
CO
L
N
CV
N
0
0
0
n
T
.0
c
.1
a
20 1
1
1
1
1
1
,
$
1
,
1
1
1
1
,
1
1
1
,
1
$
1
20
0
N
1
1
Attend Preconstruction Meeting
Shop Drawing Reviews
Structural (49 Drawings @ 2 hrs/drwg)
Landscape Architecture (4 Reviews)
Traffic (3 Reviews)
Plan Clarifications & Revisions
Structural (12 months @ 6 hrs/month)
Civil (20 RFIs)
Landscape Architecture (6 RFIs)
Design & Provide Stamped Change Orders
Structural (10 months @ 6 hrs/month)
Civil (5 Change Orders)
Landscape Architecture (2 Change Orders)
Traffic (1 Change Order)
Design Concurrence on Change Orders
Structural (10 months @ 6 hrs/month)
Civil (5 Change Orders)
Landscape Architecture (2 Change Orders)
Construction Meetings & Field Reviews
Structural (10 months @ 6 hrs/month) A
{ Civil (8 Mtgs/Field Reviews)
Landscape Architecture (4 Mtgs/Field Reviews)
Support for DRB Meetings
CPM Review & Updates
Public Outreach
`Project Mgmt./Administration
Total Hours by Classification
*Level -of -Effort Assumptions are noted in ( )
N
05-071, Supplement No
HDR Engineering, Inc.
Sub -Consultant Fee Determination
Summary Sheet (Negotiated Hourly Rates)
Tukwila Urban Center Access Project: KlickitatlSouthcenter Parkway
Supplement No. 12, On -Call Engineering Services During Construction
LABOR COSTS
Staff Classification
Hours Hourly Rate Total Cost
Principal/QC
Project Manager/Lead Designer
Sr Civil Engineer
Project Controller
4 $194 91 $780
46 $129 68 $5,965
49 $119 00 $5,831
32 $107 93 $3,454
Total Hours
131
1
TOTAL LABOR COSTS
$16,0301
REIMBURSEABLE COSTS
Local Travel (Mileage/Parking)
Reproduction.
Courier/Express Mair
Other
$120
$500
$0
$0
TOTAL REIMBURSEABLE COSTS
$620
TOTAL FEE
$16,6501
HDR Engineering, Inc
05-071, Supplement No. 12 Page 1 of 2
HDR Engineering, Inc.
Labor Hours Estimate
Tukwila Urban Center Access Project: Klickitat/Southcenter Parkway
Supplement No. 12, On -Call Engineering Services During Construction
Staff Cassifications
HDR Engineering, Inc
05-071, Supplement No. 12 Page 2 of 2
Principal/
QC
PM/Lead
Designer
Sr Civil
Engineer
Project
Controller
TOTAL
24
> l II Sery During t onon
4
46
49
32
131
Attend Preconstruction Meeting
-
4
-
-
4
Shop Drawing Reviews
-
8
16
-
24
Plan Clarifications & Revisions
-
6
9
-
15
Design & Provide Stamped Change Orders
-
4
8
-
12
Design Concurrence on Change Orders
-
4
8
-
12
Construction Meetings & Field Reviews
-
4
8
-
12
Support for DRB Meetings
-
-
-
-
-
CPM Review & Updates
-
-
-
-
-
Public Outreach
-
-
-
-
-
Other Miscellaneous Support
-
-
-
-
-
Project Mgmt./Administration
4
16
-
32
52
Total Hours by Classifications 4
46
49
32
1 131
HDR Engineering, Inc
05-071, Supplement No. 12 Page 2 of 2
PACE Engineers, Inc.
Sub -Consultant Fee Determination
Summary Sheet (Negotiated Hourly Rates)
Tukwila Urban Center Access Project: Klickitat/Southcenter Parkway
Supplement No. 12, On -Call Engineering Services During Construction
LABOR COSTS
Staff Classification
Hours Hourly Rate Total Cost
Principal Engineer
Sr Project Manager
Civil Engineer
CAD
Administration
1 $185.40 $185
56 $149.35 $8,364
0 $108.15 $0
0 $108.15 $0
0 $87.55 $0
Total Hours
57
TOTAL LABOR COSTS
$8,549
REIMBURSEABLE COSTS
Local Travel (Mileage/Parking)
Reproduction*
Courier/Express Mail:
Other
$30
(Included)
$200
$0
TOTAL REIMBURSEABLE COSTS
$230
TOTAL FEE
$8,779
PACE Engineers, Inc.
05-071, Supplement No 12 Page 1 of 2
PACE Engineers, Inc.
Labor Hours Estimate
Tukwila Urban Center Access Project: Klickitat/Southcenter Parkway
Supplement No. 12, On -Call Engineering Services During Construction
Staff Cassifications
PACE Engineers, Inc.
05-071, Supplement No. 12 Page 2 of 2
Principal
Engineers
Sr. Project
Manager
Civil
Engineer
CAD
Administration
TOTAL
2
On - Cali Rei Du iri C ert
#
56
-
-
57
Attend Preconstruction Meeting
4
4
Shop Drawing Reviews
16
16
Plan Clarifications & Revisions
8
8
Design & Provide Stamped Change Orders
-
Design Concurrence on Change Orders
-
Construction Meetings & Field Reviews
12
12
Support for DRB Meetings
-
CPM Review & Updates
-
Public Outreach
-
Other Miscellaneous Support
1
16
17
Total Hours by Classifications 1
56
-
-
-
( 57
PACE Engineers, Inc.
05-071, Supplement No. 12 Page 2 of 2
Aft
Washington State
Department of Transportation
05-071(k)
Council Approval 12/6/10
Supplemental Agreement
Number 11
Organization and Address Phone
City of Tukwila
Public Works Department
6300 Southcenter Blvd., Suite #100
Tukwila, WA 98188
206-431-3665
Original Agreement Number
05-071 ( K)
Project Number
84-RW19
Execution Date
Completion Date
March 31, 2011
Project Title
Klickitat/Southcenter Parkway Access
Improvement Project
New Maximum Amount Payable
$4,067,978
Description of Work
Change Order Design Services
The Local Agency of Tukwila desires to supplement the agreement entered into with HNTB Corporation and
executed on April 6, 2005 and identified as Agreement No. 05-071. All provisions in the Agreement remain in
effect except as expressly modified by this supplement. The changes to the Agreement are described as follows'
Section II, SCOPE OF WORK, shall be amended as follows
The scope of work for this project is supplemented as detailed in the attached Exhibit A, and by
this reference made part of the Agreement.
11
Section IV, TIME FOR BEGINNING AND COMPLETION, shall be amended as follows
All work under this Agreement shall be completed by the date shown in the heading of this
Supplemental Agreement Number 11 under Completion Date.
111
Section V, PAYMENT, shall be amended as follows.
Compensation due to Consultant for work performed or services rendered for this project is
supplemented as detailed in the attached Exhibit B, and by this reference made part of this
Agreement.
Contract Document
Amount Management Maximum Amount
Authorized Reserve Fund Payable
Original Agreement $1,168,322 $50,000 $1,218,322
Supplement No. 1 $1,956,680 $0 $3,175,002
Supplement No. 2 $17,200 $0 $3,192,202
Supplement No. 3 $0 $0 $3,192,202
Supplement No. 4 $14,759 $0 $3,206,961
Supplement No. 5 $63,350 $0 $3,270,311
Supplement No. 6 $4,500 $0 $3,274,811
Supplement No. 7 $4,200 $0 $3,279,011
Supplement No. 8 $147,387 $0 $3,426,398
Supplement No. 9 $533,816 $0 $3,960,214
Supplement No. 11 $107,764 $0 $4,067,978
TOTAL $4,017,978 $50,000 $4,067,978
/51U/dt24/6/A -C3
Page 1 of 2
If you concur with this Supplemental Agreement Number 11 and agree to the changes as stated above, please
sign in the appropriate spaces below and return to this office for final action
By: HNTB Corporation
lI/1(v ('o
Date
DOT Form 140-063 EF
Revised 9/2005
By: City of Tukwila
Ap. o ng Authori ture
.wtir-Ur -1, X10
Date
Page 2 of 2
Exhibit A
Scope of Work
Contract 05-071
Klickitat/Southcenter Parkway
Urban Access Improvement Project
Supplemental Agreement No. 11
Change Order Design/Proprietary Item
Memorandums
September 2010
'}INTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 11 Page i
TABLE OF CONTENTS
I. INTRODUCTION 1
II. PROJECT SCHEDULE 1
III. WORK TASKS 1
TASK 22 SIGN BRIDGE 1
Task 22.1 Project Administration 1
Task 22.2 Illumination PS&E Revisions 2
Task 22.3 Sign Bridge PS&E 2
Task 22.4 Ductbank Preservation PS&E Revisions 3
Task 22.5 Miscellaneous PS&E Revisions 4
Task 22.6 Supplemental Geotechnical Memorandum 4
TASK 23 PROPRIETARY ITEM MEMOS 5
j \41113\I_redbook\contract\phase_2\hntb\supplement_11\submitted_to_client\exhibit_a_scope_of_work_supp_11_v13 docx
Printed 11/16/2010
ITB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 11 Page 1
I. INTRODUCTION
This supplemental agreement includes the following services: 1) determination of type, size and
location of a new sign bridge on Southcenter Parkway at the north button hook off ramp, 2)
redesign elements of the project to avoid conflict with the existing PSE and Qwest duct banks, 3)
preparation of revised drawings and specifications to the PS&E suitable for use as a change order
for the new sign bridge and duct bank redesign, and 4) preparation of Public Interest Findings/
Proprietary Item memos for Sole Source Items.
II. PROJECT SCHEDULE
The Project is on Advertisement as of September 30, 2010. Consultant shall begin services
included in this supplemental agreement upon notice -to -proceed from Agency. Consultant shall
submit the draft deliverables identified in tasks 22.2, 22.3, 22.4, 22.5, and 22.6 within three (3)
weeks after the notice to proceed is issued. It is anticipated that all services shall be complete by
January 10, 2010. If the schedule is extended due to reasons beyond the Consultant's control
(such as WSDOT reviews), it shall be considered Extra Work.
III. WORK TASKS
TASK 22 SIGN BRIDGE
Task 22.1 Project Administration
Subconsultant Management
• Consultant shall prepare and execute subconsultant supplemental agreements.
• Consultant shall provide direction to Subconsultants, including conducting project
coordination meetings as required with appropriate task leaders.
Budget Management & Invoicing
• Consultant shall actively manage, update, and control budget.
• Consultant shall complete monthly Job Progress Input reports.
• Consultant shall produce monthly invoices.
Communicate Progress
• Consultant shall conduct ongoing, proactive, and responsive communications with
Agency staff involved in the direction and execution of the Project.
• Consultant shall produce a monthly progress report to be submitted with the monthly
invoices.
Quality Management
• Consultant shall conduct monthly quality assurance review meetings ("Project Review
Meetings"), which shall include a review of the project status with the principal -in -
charge, project manager, project administrator, and other key staff as required.
• Consultant shall be responsible for checking and coordinating all design revisions and
computations, specifications, estimates, and other deliverables identified in this Scope of
Work.
j.\41113\I_redbook\contract\phase_2\hntb\supplement_11 \submitted_to_client\exhibit_a_scope_of_work_supp_11 _v13. docx
Printed 11/16/2010
:•INTB
Tukwila Urban Access Improvement Project
05-071, Supplement No 11 Page 2
Task 22.2 Illumination PS&E Revisions
Consultant shall revise the illumination PS&E to accommodate a new sign bridge at the north
button hook ramp. This task will include the following:
• Relocate Pole 30.
• Relocate power for lighting, sign lighting and ITS elements.
• Coordination with Puget Sound Energy for revised loads if necessary.
• Review lighting calculations with the AGI32 program to determine if continuous lighting
is maintained after modifying location of Pole 30.
• Review and revise voltage drop and load calculations as required.
• Design will be prepared to meet WSDOT standards as modified by the City of Tukwila,
NEC, IES standards.
Deliverables:
• Revised Illumination Plans, Specifications and Estimate (electronic .pdf file format and
one (1) original stamped/signed 11" x 17" hard copy).
Task 22.3 Sign Bridge PS&E
Consultant shall prepare the PS&E for a new sign bridge that crosses over Southcenter Parkway
at approximate Station 19+50.
At 90% design completion, Consultant shall submit the plans, specifications and structural
calculations to the Agency and WSDOT for review. Consultant shall address and incorporate the
review comments into the final Sign Bridge package. Consultant shall conduct one site visit and
identify potential utility conflicts and notify the Agency of findings.
The following new plan sheets will be prepared:
• Sign Bridge Layout (Elevation, Camber Diagram, General Notes)
• Sign Bridge Details 1 (Structural steel)
• Sign Bridge Details 2 (Structural steel)
• Sign Bridge Foundation Details I(Shaft)
• Sign Bridge Foundations Details 2 (Miscellaneous shaft and details)
Assumptions:
• The new sign bridge will span the entire width of southbound Southcenter Parkway and
will have two foundations, on the west side of Southcenter Parkway and another in the
proposed median of Southcenter Parkway.
• The sign bridge will be mounted on a separate foundation and will not be mounted on
barrier. Sign bridge foundations will be drilled shafts "behind" traffic barriers and
guardrail such that integral foundation -and -traffic barrier details are not used
• No additional field investigation shall be required
• The sign bridge will be a WSDOT standard structural steel monotube sign structure
j \41113\I_redbook\contract\phase_2\hntb\supplement_11 \submitted_to_ciient\exhibit_a_scope_of_work_supp_11 _v13.docx
Printed 11/16/2010
LINTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 11 Page 3
• Sign bridge posts will be less than 30 feet tall
• One round of review comments on 90% plans, specifications, and structural calculations
will be addressed to complete the final Change Order package
• The sign bridge will be designed per the WSDOT Bridge Design Manual (March 2010),
which uses the AASHTO Standard Specifications for the Design of Structural Supports
for Highway Signs, Luminaires and Traffic Signals. Fourth Edition dated 2001, with
Interims through 2006. Construction will be in accordance with the WSDOT Standard
Specifications for Road, Bridge and Municipal Construction (2010) and associated
WSDOT Special Provisions.
Deliverables:
• 90% Sign Bridge Plans, Specifications, and Estimate (electronic .pdf file format)
• Breakdown of Lump Sum Quantities for sign structure (electronic .pdf file format)
• Sign structural calculations (electronic .pdf file format)
• Final Sign Bridge Plans, Specifications, and Estimate (electronic .pdf file format and one
(1) original stamped/signed 11" x 17" hard copy)
Task 22.4 Ductbank Preservation PS&E Revisions
Consultant shall revise the PS&E to avoid conflict with the PSE and Qwest duct banks and the
City -owned fiber optic line on Southcenter Parkway (Sta. 5+00 to 8+00). The Consultant shall
revise the PS&E to avoid the PSE duct bank at Strander Boulevard (Sta. 31+90 to 33+00). This
includes coordinating with the private utility companies, potholing and surveying at conflict
locations, updating the basemap, identifying the feasibility of redesigning elements to avoid
conflict with the duct banks, and revising the following design elements: drainage, roadway
grading, retaining wall, and associated specifications and estimate.
Once pothole data has been collected and analyzed, the Consultant shall analyze the PS&E
revisions assumed below for feasibility and cost effectiveness. Should the assumed PS&E
revisions not adequately address the utility conflicts, not be feasible or cost effective, work on
this scope item (22.4) will be stopped until the matter can be further discussed with the Agency.
Assumptions:
• Potholing and survey at up to five (5) areas.
• The base map survey will be revised to show the actual PSE and Qwest duct bank width.
• The feasibility analysis is limited to identifying the most cost effective approach to avoid
conflict with the PSE duct banks and make recommendations to the City.
• Coordination will continue with PSE and Qwest.
• Design revisions are limited to the following:
o Roadway grading — revise roadway profile of Doubletree entrance to relocate low
point of curb returns to allow for moving drainage structures 38 and 39a.
o Drainage — move drainage structures 38 and 39a, add shallow inlets at structures
35 and 35a and relocate the CB Types 2's, move underdrain from Wall 4, move
structures 86, 87, 88 (stormwater vault), and 89.
j:\41113\I_redbook\contract\phase_2\hntb\supplement_11 \submitted_to_client\exhibit_a_scope_of_work_supp_11 _v13. docx
Printed 11/16/2010
I NTB
Tukwila Urban Access Improvement Project
05-071, Supplement No 11 Page 4
o Retaining Wall 6 — review and modify shoring specifications, if needed, for
construction of Wall 6 adjacent to the proposed stormwater vault and existing
PSE duct bank.
o Retaining Wall 5c footing will be revised to avoid conflict with the Qwest duct
bank.
Deliverables:
Drainage, Roadway Grading, and Wall Revised Plans, Specifications, and Estimate (electronic
.pdf file format and one (1) original stamped/signed 11" x 17" hard copy)
Task 22.5 Miscellaneous PS&E Revisions
Consultant shall revise the associated PS&E as needed to accommodate the effects of the
illumination and sign bridge design changes. This includes revising the following design
elements: realignment of median curb, roadway sections, signal conduit, drainage, temporary
erosion and sediment control, site preparation, landscaping, architectural treatments, and
associated specifications and estimate.
Assumptions:
• Design revisions outside of the construction limits of the new sign bridge and associated
revised illumination is not included in this scope of work.
Deliverables:
• Sign Bridge Miscellaneous Revised Plans, Specifications, and Estimate (electronic .pdf
file format and one (1) original stamped/signed 11" x 17" hard copy)
Task 22.6 Supplemental Geotechnical Memorandum
Consultant shall review the project geotechnical data and report, and prepare geotechnical
recommendations for the design of the new sign bridge foundations. This scope of work includes
the following tasks:
• Review boring logs previously completed near the new sign bridge foundation locations
(GeoEngineers borings B-9 and B-10).
• Based on the existing data, evaluate subsurface conditions and develop soil design
parameters for the sign bridge foundations.
• Present recommendations in a supplemental memorandum.
Assumptions:
• Geotechnical recommendations will be in accordance with Chapter 17 of the WSDOT
Geotechnical Design Manual (GDM issued January 2010)
Deliverables:
• Supplemental Geotechnical Memorandum (electronic .pdf file format)
j:\41113\I_redbook\contract\phase_2\hntb\supplement_11 \submitted_to_client\exhibit_a_scope_of_work_supp_11 _v13.docx
Printed 11/16/2010
NNTB
Tukwila Urban Access Improvement Project
05-071, Supplement No 11 Page 5
TASK 23 PROPRIETARY ITEM MEMOS
CONSULTANT shall prepare up to ten (10) Proprietary Item Memos to address the Public
Interest Finding (PIF) as required in the WSDOT Local City Guidelines (LAG) Manual Section
44.55. Consultant shall prepare Proprietary Item Memos for the items listed below; any
additional memos will be considered extra work and shall require a supplemental agreement.
• Proprietary Item Memos will be prepared to address the following items:
o Clow Medallion hydrants
o Sherwin Williams Chrome Yellow Paint
o Electronic Ball Markers
o Bio -Barrier by Fiberweb
o PROSPECT Tree grates by Urban Accessories
o EAS -60 two part epoxy
o Pelco Spectra IV Television Cameras
o Iteris Video Detection System
o RZ-4 Advanced Video Detection Cameras
o Vantage LAM (Lens Adjustment Module)
Assumptions:
• The Proprietary Item Memos will not require review and/or approval by WSDOT.
• The Proprietary Item Memos will require one review by the Agency. Consultant shall
address one (1) round of consolidated review comments and shall submit a final memo
for inclusion in the Agency's Project file.
• Each Proprietary Item Memo will be limited to two pages in length.
Deliverables:
• One (1) draft and one (1) final Proprietary Item Memo for each of the following items
(electronic MS Word format):
o Clow Medallion hydrants
o Sherwin Williams Chrome Yellow Paint
o Electronic Ball Markers
o Bio -Barrier by Fiberweb
o PROSPECT Tree grates by Urban Accessories
o EAS -60 two part epoxy
o Pelco Spectra IV Television Cameras
o Iteris Video Detection System
o RZ-4 Advanced Video Detection Cameras
o Vantage LAM (Lens Adjustment Module)
j \41113\I_redbook\contract\phase_2\hntb\supplement_11\submitted_to_client\exhibit_a_scope_of_work_supp_11_v13 docx
Printed 11/16/2010
INTB
HNTB Corporation
Consultant Fee Determination
Summary Sheet (Lump Sum)
Tukwila Urban Center Access Project: KlickitatlSouthcenter Parkway
Supplement No. 11 - Change Order Design/Proprietary Item Memos
LABOR COSTS
Staff Classification
Hours Rate Total Cost
Principal
Project Manager
Sr. Structural Engineer
Sr. Architectural Manager
Senior Project Engineer
Project Engineer
Design Engineer/Traffic Engineer
Landscape Architect
Jr. Engineer/Jr. Landscape Architect
Sr. CAD Technician
CAD Technician
Sr. Project Administrator
Sr. Administrative Assistant
2 $277 52 $555
40 $226.36 $9,054
2 $191.79 $384
2 $183.38 $367
100 $170.60 $17,060
28 $137.63 $3,854
110 $101.62 $11,178
4 $108.86 $435
0 $73 54 $0
2 $116 93 $234
42 $101 85 $4,278
38 $119 37 $4,536
9 $70 55 $635
Total Hours
379
1
TOTAL LABOR COSTS
$52,5691
REIMBURSEABLE COSTS
Local Travel (Mileage/Parking):
Reproduction:
Courier/Express Mail:
Other:
$50
$200
$50
$50
TOTAL REIMBURSEABLE COSTS
$350
SUBCONSULTANT COSTS
1
HDR Engineering, Inc.
$31,3881
1
PACE Engineers, Inc.
$21,2151
1
GeoEngineers, Inc.
$2,2421
1
TOTAL FEE
$107,7641
05-071, Supplement No. 11 HNTB Corporation
J:\41113\L_Redbook\Contract\Phase_2\HNTB\Supplement_11\Submitted_to_client\Supp_11_Fee_Est_v8.xlsx Page 1 of 2
HNTB Corporation
Labor Hours Estimate
Tukwila Urban Center Access Project: Klickitat/Southcenter Parkway
Supplement No. 11 - Change Order Design/Proprietary Item Memos
Staff Cassifications
To
a
'5
c
a
Proj. Mgr
1Sr Structural
1Sr Arch. Mgr I
Sr Proj Eng.
Proj. Eng
Design Eng./
Traffic Eng.
Landscp Arch
Jr Landscp
Arch
Sr CAD Tech.
CAD Tech
Proj Admin
Admin. Assist/
Clerical
TOTAL
2
AO-
t
"42.'"'-'
16
1,10
„
: ‘;
T 2'4238
ir
i.,358,
.:
Budget Performance
2
8
10
Schedule Conformance
2
2
Communicate Progress
6
6
12
Consultant Team
24
20
44
Manage Quality
2
2
-
4
Manage Change
4
4
8
.16
' ;-
=
:‘,'
-
, 4 =
2
' 62 :
Illumination Design
4
40
4
2
50
Specifications
4
4
Estimate
4
4
Quality Control Review
4
4
Quality Control Control Review
4
2
6
2
22
' is.:
.
-,i" 2
106 -
Analyze Existing fi ity ocates Provided/
Determine Available Space Constraints &
Acceptable Types of Shallow Inlets
2
10
2
14
Design New Stormdrain Layout, Grades, &
Structure Types (Assumes 7 Structures)
14
14
Update Sub -Basins & Hydraulic Calculations,
Backcheck
2
4
6
Revise Drainage Plan, Profile, and Detail (Vault
& StormFilter) Sheets (Assumes 6 Sheets)
6
12
18
Update Drainage Quantities & Cost Estimate,
Backcheck
2
4
6
Design New CIP Standard Plan Wall in Front of
Relocated Vault, Backcheck
2
8
10
Revise MSE Wall Plans/Add CIP Wall Plans &
Specifications
8
12
20
Attend Collaboration Meeting with Stakeholders
4
4
Quality Control Review
12
2
14
.
-32
.
4
=
-
14' -,k,;
'2
14:12
Roadway and Channelization Design
2
2
4
Signals and Interconnect
2
8
10
Drainage Plans & Details
8
16
6
30
TESC Plans & Details
2
4
4
10
Site Preparation
2
4
2
8
Landscape Design & Architectural Treatments
2
4
2
8
Specifications
12
12
Estimate
8
8
Quality Control Review
12
12
21.-C.
SlipTikkrientarGeoter.lth ' :.,,-,„,:tW:
-
, '‘O -
-
„ -
•"
-
Geotechnical Memorandum
-
2
2
Wt.1
P 2 - ' - -M? IThM 2111riai,r
''
8‘,
12
-
-,,t
-' 21
iPetttmMimos
-L.
''-,
4f.'::'''''
:
-
-
-
'.
-
1
21
Preparation of Proprietary Item Memos
-
4
12
-
1
17
Quality Control Review
4
4
IatTIWAPurgt'
,j,.p4i Hours by Classification' 2
40
2
2
100
28
110
4
-
2
2 .
?9
HDR Engineering, Inc.
Sub -Consultant Fee Determination
Summary Sheet (Lump Sum)
Tukwila Urban Center Access Project: Klickitat/Southcenter Parkway
Supplement No. 11 - Change Order Design/Proprietary Item Memos
LABOR COSTS
Staff Classification
Hours Rate Total Cost
Principal/QC
Project Manager/Lead Designer
Sr. Civil Engineer
Sr Structural Designer/QC
Structural Designer
CADD Technician
Project Controller
1 $194 91 $195
19 $129 68 $2,464
24 $119 00 $2,856
35 $188 41 $6,594
94 $101 97 $9,585
78 $99 52 $7,763
14 $107.93 $1,511
Total Hours
265
TOTAL LABOR COSTS
$30,9681
REIMBURSEABLE COSTS
Local Travel (Mileage/Parking):
Reproduction:
Courier/Express Mail:
Other:
$120
$300
$0
$0
TOTAL REIMBURSEABLE COSTS
$420
TOTAL FEE
$31,3881
HDR Engineering, Inc.
05-071, Supplement No 11 Page 1 of 2
HDR Engineering, Inc.
Labor Hours Estimate
Tukwila Urban Center Access Project: Klickitat/Southcenter Parkway
Supplement No. 11 - Change Order Design/Proprietary Item Memos
Staff Cassifications
05-071, Supplement No. 11
HDR Engineering, Inc.
Page 2 of 2
Principal/
QC
PM/Lead
Designer
Sr Civil
Eng.
Sr.
Structural
Designer/
QC
Structural
Designer
CADD
Tech.
Project
Controller
TOTAL
24
36..:,-,
,
„„„94
78
!
„ -,
14
268
' '‘.•;141111:irt t*''''''N '', \ tZt ,
'Ci't
11
-
-
-
„,
14
28
Budget Performance
4
4
8
Schedule Conformance
2
2
4
Communicate Progress
4
8
12
Consultant Team
-
Manage Quality
-
Manage Change
1
1
2
• '
-v!4,:af-.1'i :', -,,z, r„i-,
-!::
4
;:e, 8-
::
_35
74:
s,
-
Signing Plan & Specifications
4
8
2
2
16
Sign Bridge Layout
4
8
14
26
Sign Bridge Details
2
10
30
42
Sign Bridge Foundation
2
10
30
42
Structural Calculations
16
55
71
Specifications
4
4
Quantities & Cost Estimate
5
9
14
Roadway & Channelization Design
-
2
8,
.
4
-
14
Adjust Curb Return Grading at Strander
1
8
4
13
Quality Control Review
1
1
22$-
-
-
„
10
Roadway and Channelization Design
2
8
10
Signals and Interconnect
-
Drainage Plans & Details
-
TESC Plans & Details
-
Site Preparation
-
Landscape Design & Architectural Treatments
-
Specifications
-
Estimate
-
Quality Control Review
-
Total Hours by Classification
1
19
24
35
94
78
14
265
05-071, Supplement No. 11
HDR Engineering, Inc.
Page 2 of 2
PACE Engineers, Inc.
Sub -Consultant Fee Determination
Summary Sheet (Lump Sum)
Tukwila Urban Center Access Project: Klickitat/Southcenter Parkway
Supplement No. 11 - Change Order Design/Proprietary Item Memos
LABOR COSTS
Staff Classification
Hours Rate Total Cost
Sr Principal
Project Manager
Engineer II
CAD Drafter III
Principal Surveyor
Project Surveyor
Survey Tech II
2 -Man Survey Crew
Project Administrator
3 $180 00 $540
47 $145 00 $6,815
13 $105 00 $1,365
6 $105.00 $630
10 $145 00 $1,450
4 $115.00 $460
12 $105.00 $1,260
24 $180.00 $4,320
5 $85 00 $425
Total Hours
124
1
TOTAL LABOR COSTS
$17,2651
REIMBURSEABLE COSTS
Utility Locate:
APS
Mileage/Parking.
Courier/Express Mail.
Other•
$450
$3,200
$50
$100
$150
TOTAL REIMBURSEABLE COSTS
$3,950
1
TOTAL FEE
$21,2151
PACE Engineers, Inc.
05-071, Supplement No 11 Page 1 of 2
PACE Engineers, Inc.
Labor Hours Estimate
Tukwila Urban Center Access Project: Klickitat/Southcenter Parkway
Supplement No. 11 - Change Order Design/Proprietary Item Memos
Staff Cassifications
05-071, Supplement No. 11
PACE Engineers, Inc.
Page 2 of 2
Sr
Principal
Project
Manager
Engineer
II
CAD
Drafter
III
Principal
Surveyor
Project
Surveyor
Survey
Tech II
2 -Man
Survey
Crew
Project
Admin.
TOTAL
3,
- M.4r
13'
"
6
10'
Fiz::1',- ,41:
i -, „i1 ',
24-
, ' ,
6
, 124,
Manage Change
1
1
1
3
sIqBqePS&E-. , j,,,,R. ,, „: ,--
.
,i,ur,
.k:
.
Utility Design Coord. w/ Sign Bridge
4
4
2
-21
13
6
10
:: ,41!
f:;::42
24
4
117
Engineering (Permit Documents)*
2
42
13
-
-
-
-
-
4
61
Meetings w/ PS&E, APS, & Qwest for
Pothole Data (3 Mtgs. Each.)
2
16
4
22
Mark Pothole Locations w/ APS On -Site
(Assume 5 Each)
5
5
On -Site During Potholing
8
8
Review Pothole Data & Basemap
Changes, Coord. w/ Surveyors
6
6
Meet w/ Storm Drain Engineers re:
Options
6
6
Meet w/ City/Recommendations to City
6
6
Unidentified Fiber Optic Coordination
3
5
8
(*Budget Assumes No Design Changes)
-
Surveying
-
-
-
6
10
4
12
24
-
56
Coordinate w/ APS for Potholes (5 Each)
2
4
6
Stake 7 Stormdrain CB's & 1 Detention
Vault
2
8
10
Survey Potholes & Existing Utilities Not
Shown
2
8
10
Establish Field Control on SCP South of
Stander & On Strander
2
8
10
Revise Basemap
6
2
12
20
Total Hours by Classification
3
47
13
6
10
4
12
24
5
124
05-071, Supplement No. 11
PACE Engineers, Inc.
Page 2 of 2
GeoEngineers, Inc.
Sub -Consultant Fee Determination
Summary Sheet (Lump Sum)
Tukwila Urban Center Access Project: Klickitat/Southcenter Parkway
Supplement No. 11 - Change Order Design/Proprietary Item Memos
LABOR COSTS
Staff Classification
Hours Direct Rate Total Cost
Principal
Project Engineer
Word Processor
Administrative Services
4 $60 00 $207 93 $832
8 $40.00 $138 62 $1,109
2 $20 00 $69 31 $139
2 $23 50 $81 44 $163
Total Hours
16
TOTAL LABOR COSTS
$2,2421
REIMBURSEABLE COSTS
Local Travel (Mileage/Parking)
Reproduction
Courier/Express Mail:
Other:
$0
$0
$0
$0
TOTAL REIMBURSEABLE COSTS
$0
TOTAL FEE
$2,2421
GeoEngineers, Inc.
05-071, Supplement No. 11 Page 1 of 2
Ink
Washington State
Department of Transportation
05-071(j)
Council Approval N/A
Supplemental Agreement
Number 10
Organization and Address Phone
City of Tukwila
Public Works Department
6300 Southcenter Blvd., Suite #100
Tukwila, WA 98188
206-431-3665
Original Agreement Number
05-071 (j)
Project Number
84-RW19
Execution Date
Completion Date
December 31, 2010
Project Title
Klickitat/Southcenter Parkway Access
Improvement Project
New Maximum Amount Payable
$3,960,214
Description of Work
Final Design Services
The Local Agency of Tukwila desires to supplement the agreement entered into with HNTB Corporation and
executed on April 6, 2005 and identified as Agreement No. 05-071. All provisions in the basic agreement remain in
effect except as expressly modified by this supplement. The changes to the agreement are described as follows'
Section IV, TIME FOR BEGINNING AND COMPLETION, shall be amended as follows:
All work under this AGREEMENT shall be completed by the date shown in the heading of this
SUPPLEMENTAL AGREEMENT.
If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces
below and return to this office for final action.
y. HNTB Corporation -
Drake, AIA' - President
Date
Z`Z1i`Gu
DOT Form 140-063 EF
Revised 9/2005
By' City of Tukwila
Approvi ► . ' uthority
Date V�J
dojo
re
/ 5/, +-(c //L LS
Alft
Washington State
Department of Transportation
05-071(i)
Council Approval 3/22/10
Supplemental Agreement
Number 9
Organization and Address Phone:
City of Tukwila
Public Works Department
6300 Southcenter Blvd., Suite #100
Tukwila, WA 98188
206-431-3665
Original Agreement Numberl
05-071 6Jt-1
Project Number
84-RW19
Execution Date
CJ . pi, l9 /O
Completion Date
June 30, 2010
Project Title
Klickitat/Southcenter Parkway Access
Improvement Project
New Maximum Amount Payable
$3,960,214
Description of Work
Final Design Services
The Local Agency of Tukwila desires to supplement the agreement entered into with HNTB Corporation and
executed on April 6, 2005 and identified as Agreement No. 05-071. All provisions in the Agreement remain in
effect except as expressly modified by this supplement. The changes to the Agreement are described as follows:
11
Section II, SCOPE OF WORK, shall be amended as follows:
The scope of work for this project is supplemented as detailed in the attached Exhibit A, and by
this reference made part of the Agreement.
II
Section IV, TIME FOR BEGINNING AND COMPLETION, shall be amended as follows:
All work under this Agreement shall be completed by the date shown in the heading of this
Supplemental Agreement Number 8 under Completion Date.
III
Section V, PAYMENT, shall be amended as follows:
Compensation due to Consultant for work performed or services rendered for this project is
supplemented as detailed in the attached Exhibit B, and by this reference made part of this
Agreement.
Contract Document
Amount Management Maximum Amount
Authorized Reserve Fund Payable
Original Agreement $1,168,322 $50,000 $1,218,322
Supplement No. 1 $1,956,680 $0 $3,175,002
Supplement No. 2 $17,200 $0 $3,192,202
Supplement No. 3 $0 $0 $3,192,202
Supplement No. 4 $14,759 $0 $3,206,961
Supplement No. 5 $63,350 $0 $3,270,311
Supplement No. 6 $4,500 $0 $3,274,811
Supplement No. 7 $4,200 $0 $3,279,011
Supplement No. 8 $147,387 $0 $3,426,398
Supplement No. 9 $533,816 $0 $3,960,214
TOTAL $3,910,214 $50,000 $3,960,214
/sed a (6f/c//9
Page 1 of 2
If you concur with this Supplemental Agreement Number 9 and agree to the changes as stated above, please
sign in the appropriate spaces below and return to this office for final action.
By: HNTB Corporation
��,G(lCGll7�
Daniel H. Dixo , Vice Pr sident
/
Date
41,44 1/0
DOT Form 140-063 EF
Revised 9/2005
By: City of Tukwila
App g Authori
Date
ature
cV, Q7.0/v
Page 2 of 2
Scope of Work
Final Design/PS&E
Tukwila Urban Access Improvement Project
Contract 05-071
Supplement 9
February 2010
INTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page i
TABLE OF CONTENTS
I. SUPPLEMENT PURPOSE 1
II. DESIGN CRITERIA 2
III. PROJECT SCHEDULE 3
IV. ITEMS AND SERVICES TO BE FURNISHED BY THE CITY 3
V. ABBREVIATIONS 4
VI. PROJECT DOCUMENTATION 5
VII. WORK TASKS 5
TASK 21.1 PROJECT MANAGEMENT 6
Task 21.1.1 Issues Resolution 6
Task 21.1.2 Measure Project Requirements 6
Task 21.1.3 Measure Budget Conformance 7
Task 21.1.4 Develop Schedule and Measure Conformance 7
Task 21.1.5 Communicate Progress 7
Task 21.1.6 Lead the Project CONSULTANT Team 7
Task 21.1.7 Manage Quality 7
Task 21.1.8 Manage Change 8
TASK 21.2 RIGHT OF WAY 9
Task 21.2.1 Right of Way Legal Descriptions and Easements 9
Task 21.2.2 Right of Way Plans 9
TASK 21.3 PERMITTING
TASK 21.4
Task 21.4.1
Task 21.4.2
Task 21.4.3
Task 21.4.4
Task 21.4.5
Task 21.4.6
Task 21.4.7
Task 21.4.8
10
ROADWAY 10
Roadway and Channelization Design 10
Signals and Interconnect 11
Illumination 12
Site Preparation 12
Traffic Control Plans 12
Detour Plans 13
Signing 14
Landscape Design and Architectural Treatments 14
TASK 21.5 DRAINAGE AND TESC 16
Task 21.5.1 Hydraulic Report Supplement 17
Task 21.5.2 Drainage Plans and Details 18
j \411131I_redbook\contract\phase_2\hntb\supplement_9\exhibit_a_scope_of_work_supp_9_v12_f nal.docx
Printed 3/18/2010
NINTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page ii
Task 21.5.3 TESC Plans and Details 19
TASK 21.6 STRUCTURES (BRIDGES/WALLS) 20
Task 21.6.1 Bridges and Walls 20
TASK 21.7 SURVEYING 21
Task 21.7.1 Field Survey for Design 21
TASK 21.8 UTILITIES 22
Task 21.8.1 Coordination with utilities 22
Task 21.8.2 Utility Design 22
TASK 21.9 SPECIAL PROVISIONS 24
TASK 21.10 DEVELOPMENT OF QUANTITIES AND COST ESTIMATE 24
TASK 21.11 100% AND AD -READY CONTRACT PLAN SHEETS 25
TASK 21.12 CONSTRUCTION SCHEDULE 25
TASK 21.13 ASSISTANCE DURING BID PERIOD 25
j.\41113\I_redbook\ contract \phase_2\hntb\supplement_9\exhibit_a_scope_ot_work_supp_9_v12_final docx
Printed 3/18/2010
MNTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 1
During the term of this Agreement, the engineering CONSULTANT (CONSULTANT) shall
perform professional services for the CITYfinal design and assistance during bid period in
connection with the:
Tukwila Urban Access Improvement:
Klickitat Drive/Southcenter Parkway Area Project
This document shall be used to plan, conduct and complete the work on the project.
I. SUPPLEMENT PURPOSE
The design and PS&E of the Tukwila Urban Access Improvement Project was shelved at the
100% design in May of 2007. The purpose of this supplement is to finalize the project
specifically: 1) complete the work not completed at the time the project was shelved; 2) update
the shelved design to reflect changes in standards and specifications, and 3) design and
incorporate revisions required to meet WSDOT design approval requirements. Specific items to
be addressed in finalizing the design and PS&E from May 2007 include:
• Design work at McDonald's entrance and parking.
• Design work on Doubletree and Legacy properties.
• Address the removal and re -setting of private business monument signs on the project.
(These are located on the Doubletree and Legacy properties)
• Confirm final paving limits between disciplines.
• Updates to project specifications and cost estimates.
• Structural analysis and design of overhead sign supports
• Maintenance of Traffic and Construction Phasing and Staging plans.
• Design updates to reflect changed conditions in project area.
• Coordination with property owners adjacent to the project to convey the current design
which has new curb, gutter, sidewalk, driveway and storm sewer reconstruction on the
west side of the project.
• WSDOT Design Documentation with the exception of Channelization Plans for approval
and Deviations.
• WSDOT review and approval of all work to take place within limited access or WSDOT
right of way (ROW).
• WSDOT review and approval of signing plans.
• Design changes at the south buttonhook ramp to accommodate a WB -67 design vehicle
and related potential impacts to, drainage design, plans, grading, removals, erosion
control and site preparation plans for project.
• Revisions to Stormwater Report as a result of WSDOT changes and changes in criteria.
In addition, at the time this scope was developed for the City of Tukwila, WSDOT and the HNTB
design team coordinated to develop design modifications to accommodate a WB -67 design
vehicle. The WB -67 design vehicle is a change over the original project assumption of a WB -50
design vehicle. This change in design vehicle has resulted in changes to the shelved project
design which are used as the basis of redesign. These changes reflect modifications resulting
from meetings between the City, WSDOT and the CONSULTANT on November 3rd, 2009 and
December 2nd, 2009. Any subsequent changes will require this scope of work to be revised.
041113\I_redbook\ contract \phase_2\hntb\supplement_9\exhibit_a_scope_of_work_supp_9_v12_final docx
Printed 3/18/2010
MNTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 2
• Elimination and reduction of landscape islands at the intersection of Klickitat Drive and
Southcenter Parkway.
• Widening of the southwest quadrant of the Klickitat Drive and Southcenter Parkway
intersection resulting in additional impervious area, modifications to the intersection curb
radius, ADA ramp modifications, relocation of existing traffic signal, controller cabinet,
conduit, pavement markings, additional grading, changes to site preparation plans.
• Traffic signal timing/synchronization modifications.
• Relocation of traffic signal pole Type III at Sta. 16+08.
• Crosswalk modifications.
• Modifications to traffic island at the north buttonhook reduce island size and associated
landscaping.
• Addition of a fillet on the north bridge abutment providing a cantilever to accommodate
wider truck turning movements.
• Extension of c -curb on Southcenter Parkway.
• South buttonhook ramp work.
• North buttonhook ramp work.
• Adjustments to the northbound lanes of Southcenter Parkway between Strander Blvd and
Klickitat Drive.
II. DESIGN CRITERIA
Documents developed as part of this scope of work will be in accordance with the latest edition
and amendments to the following documents, as of the date the AGREEMENT is signed.
Changes in any design standards or requirements after work has begun may result in the need for
Extra Work.
City of Tukwila Publications:
a. Year 2004 Comprehensive Plan
b. City of Tukwila Development Guidelines and Design and Construction Standards, 2003
WSDOT Publications:
a. Standard Specifications for Road, Bridge and Municipal Construction, English edition
(2010) (M41-10)
b. Standard Plans for Road, Bridge and Municipal Construction, English edition (M21-01)
c. Design Manual, (M22-01)
d. Hydraulic Manual, (M23-03)
e. Plans Preparation Manual, (M22-31)
f. Bridge Design Manual, (M23-50)
g. Amendments and General Special Provisions
h. Standard Item Table
i. Traffic Manual, (M51-02)
j. Highway Runoff Manual, (M31-16)
j:\41113\I_redbook\contract\phase_2\hntb\supplement_9\exhibit_a_scope_of_work_supp_9_v12_finaldocx
Printed 3/18/2010
ITB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 3
k. Utilities Manual, (M22-87)
1. Local Agency Guidelines, (M36-63(PA))
m. Environmental Procedures Manual, (M31-11)
American Association of State Highway and Transportation Officials (AASHTO) Publications:
a. A Policy on Geometric Design of Highways and Streets, 5th Edition (2004)
b. Standard Specifications for Highway Bridges, Seventeenth Edition, (2002)
c. Highway Design and Operational Practices Related to Highway Safety, (1997)
U.S. Department of Transportation (USDOT) Publications:
a. Manual of Uniform Traffic Control Devices for Streets and Highways, 2003
b. Highway Capacity Manual
Other Publications/Design Guides:
a. National Electrical Code
b. Standards of the American Waterworks Association
c. Book of American Society for Testing and Materials Standards
d. American Public Works Association standards
e. Americans With Disabilities Act (ADA)
f. General Electric's ALADAN program (Illumination design)
III. PROJECT SCHEDULE
The preliminary project schedule will be developed upon notice to proceed.
The duration of the reviews by the CITY, and by others, will be given in the project schedule.
Mutually agreeable changes to the project schedule, whether initiated by the CITY or
CONSULTANT, may be the basis for adjustments in the project budget.
IV. ITEMS AND SERVICES TO BE FURNISHED BY THE CITY
The CITY will provide the following items and services to the CONSULTANT that will facilitate
the preparation of the documents for work within the limits of the PROJECT. The
CONSULTANT is entitled to rely on the accuracy and completeness of this and other data
furnished and represented by the CITY and others, including but not limited to, survey and traffic
data.
• The City will be responsible for leading WSDOT coordination, permitting, preparation of
agreements and private property coordination.
• Reviews of CONSULTANT submittals at the mutually agreed upon times set forth in the
project schedule and the consolidation of all review comments by others onto one review
set prior to return to the CONSULTANT.
• Lighting requirements and design criteria per City of Tukwila Department of Community
Development (DCD) requirements, if available.
j:\41113\I_redbook\contract\phase_2\hntb\supplement_9\exhibit_a_scope_of_work_supp_9_v12_final. docx
Printed 3/18/2010
HNTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 4
• CITY will prepare and provide documents for rights -of -entry upon all lands necessary for
the performance of the design work including official notices to property owners and
agencies.
• Arrangements for the public meetings, including meeting place, announcements, etc.
• The CITY will be responsible for public involvement and information for the PROJECT.
• Payment of all review and/or permit fees.
• Computer generated files supplied by the CITY will be in AutoCAD, and in a format
compatible with the CONSULTANT's hardware/software. Any reformatting or
reconfiguration or hardware/software purchase necessary to make the supplied files
compatible will be considered Extra Work.
V. ABBREVIATIONS
The following abbreviations are referred to throughout this scope of work:
AASHTO American Association of State Highway and Transportation Officials
BDM WSDOT Bridge Design Manual
DCE Documented Categorical Exemption
DFW Washington State Department of Fish and Wildlife
DNR Washington State Department of Natural Resources
DOE Washington State Department of Ecology
ESA Endangered Species Act
FEMA Federal Emergency Management Agency
FHWA Federal Highway Administration
LOS Level of service
NEPA National Environmental Projection Act
NMFS National Marine Fisheries Service
NPDES National Pollutant Discharge Elimination System
NRHP National Register of Historic Places
ROW Right-of-way
PS&E Plans, specifications, and estimates
SEPA State Environmental Protection Act
TDM Transportation Demand Management
TS&L Type, Size and Location
WSDOT Washington State Department of Transportation
USFWS United States Fish and Wildlife Service
j:\41113\I_redbook\contract\phase_2\hntb\supplement_9\exhibit_a_scope_of work_supp_9_v12_f nal.docx
Printed 3/18/2010
'I NTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 5
VI. PROJECT DOCUMENTATION
The documents listed as "Deliverables" in the Work Tasks, Section IX of this scope of work, and
other exhibits or presentations for the work covered by this AGREEMENT and associated
supplements, if necessary, will be furnished by the CONSULTANT to the CITY upon completion
of the various tasks of work. Whether the documents are submitted in electronic media or in hard
copy, any use of the materials on another project or on extensions of this project beyond the use
for which they were intended, or any modification of the materials or conversion of the materials
to an alternate system or format will be without liability or legal exposure to CONSULTANT.
The CITY will assume all risks associated with such use, modifications, or conversions. The
CONSULTANT may remove from the electronic materials delivered to the CITY, all references
to the CONSULTANT involvement and will retain a tangible copy of the materials delivered to
the CITY which will govern the interpretation of the materials and the information recorded.
Electronic files are considered working files only; the CONSULTANT is not required to maintain
electronic files beyond 90 days after the project final billing, and makes no warranty as to the
viability of electronic files beyond 90 days from date of transmittal.
VII. WORK TASKS
General Assumptions:
• The level of effort for each phase and task of work is limited to the amount of labor and
expenses indicated in Exhibit C. These costs are itemized in Exhibit C to aid in project
tracking purposes only. The budget may be transferred between tasks, provided the total
contracted amount is not exceeded. Additional services beyond these limits will be
considered Extra Work.
• Subsurface investigation and remedial action associated with hazardous wastes located within
the project limits are not within this scope of services. No hazardous, dangerous, or
contaminated soil/ground water is anticipated on or within the project limits. Should any of
these materials be encountered, it will be considered Extra Work.
• The analyses, design, plans, specifications, and estimate performed or prepared as part of the
PROJECT will be in English units. Metric units will not be used on this PROJECT.
• The plans will be prepared in accordance with City of Tukwila drafting standards, with
WSDOT/APWA standards being the default standards to follow.
• The project contract documents will be reviewed once by WSDOT and once by the City of
Tukwila. The review will be of the revised 100% PS&E.
• Electronic files of PS&E contract documents will be delivered to the CITY in AutoCAD
format (latest version) at the conclusion of Supplement 9. Preparation of the record drawings
(as-builts) will be the responsibility of the CITY.
j.\41113\I_redbook\ contract \phase_2\hntb\supplement_9\exhibit_a_scope_of_work_supp_9_v12_final docx
Printed 3/18/2010
ITB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 6
TASK 21.1 PROJECT MANAGEMENT
In this task are described those services necessary to plan, perform, and control the various
elements of the project so that the needs and expectations of the CITY and other project
stakeholders will be met or exceeded.
Assumptions:
To accurately establish and manage the total project budget, the CITY will provide to the
CONSULTANT their anticipated administrative costs through construction. The
CONSULTANT shall generate the estimated right-of-way acquisition costs.
The CONSULTANT's Project Manager and/or deputy Project Manager will meet with the
CITY's Project Manager on a weekly basis throughout the completion of the project.
The CONSULTANT shall submit monthly invoices with a written summary of project progress
to -date and activities expected for the next month.
The workplan components developed in Phase 1 of the project will be used as the guidelines for
performing the work in this supplement. Issues may arise that are beyond the provisions of this
scope of work. Flexibility will be maintained in the workplan to address these urgent project
issues; however, the reallocation of resources may result in justification for Extra Work.
Internal project team coordination meetings will be held weekly between NTP and completion of
final PS&E. These meetings will be in addition to the coordination meetings held with the CITY,
but budgeted as part of the specific work tasks, separate from Task 1 - Project Management.
Task 21.1.1 Issues Resolution
In accordance with the Change Management Plan, this task may involve:
• Identifying and assessing a given issue relative to schedule, budget, resources,
and risk.
• Initiating the appropriate action(s) by assigning the issue to specific team
member(s) for resolution using the Communication Plan provisions as a
guideline.
• Monitors the issue resolution progress.
• Providing assurance for the timely resolution of issues.
• Adjusting the project work plan components as required.
The level of effort associated with each individual issue is contained within the appropriate
task(s) available to the team member(s) responsible for its resolution.
Task 21.1.2 Measure Project Requirements
Maintain the focus of the team members on satisfying the project purpose, objectives, and scope
of work. Monitor and confirm that the technical aspects of the project are being performed and
prepared in compliance with the CITY's expectations. Verify that the information generated on
the project is being filed.
j \41113\I_redbook\contract\phase_2\hntb\supplement_9\exhibit_a_scope_of_work_supp_9_v12_final docx
Printed 3/18/2010
MNTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 7
Task 21.1.3 Measure Budget Conformance
On a weekly basis, monitor the budget. Monitor the planned versus actual rate of expenditure for
each element, and identify trends, taking corrective actions if necessary by implementing the
applicable provisions of the Change Management Plan.
Task 21.1.4 Develop Schedule and Measure Conformance
This task will begin with the development of a project schedule. The schedule will incorporate
all tasks documented in this scope of work. The task shall also include monitoring and updating
the Project Schedule on a monthly basis or as needed to determine potential impacts of proposed
changes. Adjust the durations, predecessor relationships, constraints, linkages, deliverable
descriptions and dates, reviews, percent completes, milestones, critical path, and task completion
dates to reflect the current status of the project and the revisions made to the work breakdown
structure.
Task 21.1.5 Communicate Progress
Conduct ongoing, proactive, responsive communications with the CITY staff involved in the
direction and execution of the project. Coordinate the schedule of the reviews to be performed by
the CITY. Prepare and submit a monthly progress report that will include identification of work
performed in the previous month's schedule, measures for mitigating schedule slippage and
identification and discussion of potential problems that may arise. Prepare meeting minutes if
necessary and distribute to attendees.
Task 21.1.6 Lead the Project CONSULTANT Team
Provide direction to the project CONSULTANT team. Conduct project coordination meetings as
required with appropriate task leaders. Monitor the planned versus actual rate of expenditure for
each task and take corrective actions if necessary. Collect from each task leader, the percent
complete as measured by how much work is left to be accomplished on a task by task basis.
Maintain a high exposure to the project team of the issues to be resolved and their potential
impacts to the measures of success for the project.
Task 21.1.7 Manage Quality
The Quality Assurance manager shall implement the processes described in the Quality
Management Plan to meet the project objectives established by the stakeholders. Perform
continual Quality Planning to reaffirm which quality standards are relevant and how they are to
be satisfied. Verify that Quality Control has been provided for each technical specialty to
evaluate the overall project performance on a regular basis and to build confidence that the
project will satisfy the current quality standards for the design, drawings, specifications, and cost
estimates. Confirm that specific project results are being monitored by each technical specialty
through Quality Control activities to determine if they are in compliance with the quality
standards and, if not, that potential solutions to eliminate the cause(s) of unsatisfactory
performance have been identified and implemented. Facilitate the identification and assignment
of appropriate senior reviewers for each technical specialty. Confirm that the current Quality
Control activities are clearly indicated in the Project Schedule.
j 141113\I_redbook\contract\phase_2\hntb\su pp I ement_9\exhibit_a_scope_of_wo rk_supp_9_v 12_final. docx
Printed 3/18/2010
�INTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 8
Task 21.1.8 Manage Change
The CONSULTANT's Project Manager will monitor scope adherence to identify potential
changes. The Project Manager will work with CONSULTANT team technical specialty staff to
track and document potential changes and, if necessary, complete Project Change Records for
endorsement from the City of Tukwila. Following are the specific efforts included in this task:
1. Identify, Analyze & Develop Change Strategies. Orchestrate the Change Management
Plan by logging and tracking potential changes identified from any source (Step 1);
facilitating the analysis of the change and determination of its impacts (Step 2), and
facilitating the development of a response strategy (Step 3). The specific activities
associated with completing Steps 2 & 3 on a given potential change will be largely the
responsibility of each technical specialty staff.
2. Identify & Analyze Risk of Change. Identify and analyze the likelihood of the potential
change introducing risk into the project. Characterize the risk to the extent possible and
outline control measures for minimizing its negative effects.
3. Change Authorization. Communicate the proposed strategy(s) to resolve the change and
make appropriate revisions as necessary to gain endorsement for the change (Step 4).
Obtain a written change authorization from the CITY, by the City Public Works Director,
and from the CONSULTANT, by its Project Manager, as representatives of the project
stakeholders.
4. Workplan Revisions. Prior to undertaking the work as a result of the change, revise the
project workplan (Step 5) to avoid misunderstandings, discontent, and poor project
performance. Monitor the implementation of the change using the standard project tools
and techniques.
j:\41113\I_redbook\contract\phase_2\hntb\supplement_9\exhibit_a_scope_of_work_supp_9_v12_finaldocx
Printed 3/18/2010
ITB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 9
TASK 21.2 RIGHT OF WAY
Task 21.2.1 Right of Way Legal Descriptions and Easements
The CONSULTANT shall review right of way and easements by referring to the public record
and drawings to ensure that any changes that have taken place since the project was shelved have
been properly recorded. In addition, the CONSULTANT shall ensure that easements previously
prepared have been recorded and are shown on the right of way plans.
Assumptions:
• The CONSULTANT assumes there will be recent recorded easements and right of way
legal descriptions encumbering adjoining private property that may affect the project.
• The CONSULTANT shall review any record documents found and add the changes to
the right of way plans.
• The CONSULTANT anticipates there to be a need for new descriptions to be written for
additional acquisitions. The CONSULTANT shall prepare up to six legal descriptions as
directed.
• The Limited Access line will be moved east, to the back of the proposed curb and gutter
along Southcenter Parkway and the north and south limits of the Limited Access will not
change.
• A Turnback agreement will be prepared between the City of Tukwila and WSDOT to
turn existing ROW and maintenance activities from WSDOT to the City of Tukwila. The
limits of this Turnback will be from new the Limited Access line located at the east curb
and gutter line along Southcenter Parkway to the west side of Walls 1 and Wall 3.
Deliverables:
The CONSULTANT shall provide an AutoCAD file depicting legal descriptions, in the project
coordinates showing the calculated locations.
Task 21.2.2 Right of Way Plans
Assumptions:
• The CONSULTANT shall prepare ROW plans compliant with WSDOT format and
criteria depicting the centerline, right of way lines, easement lines, parcels, owner
information and acquisition areas.
Deliverables:
• Submittal of revised 100% Right of Way Plans
• Written to response to revised 100% submittal comments.
• Ad -ready submittal of Right of Way Plans.
j.\41113\I_redbook\ contract \phase_2\hntb\supplement_9\exhibit_a_scope_of_work_supp_9_v12_fnal docx
Printed 3/18/2010
NNTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 10
TASK 21.3 PERMITTING
Assumptions:
• The City will be responsible for all permitting efforts. No work by the CONSULTANT will
be performed.
TASK 21.4 ROADWAY
Task 21.4.1 Roadway and Channelization Design
The CONSULTANT shall update and complete channelization, sidewalk and curb areas impacted
by redevelopment or design criteria changes since the project was put on the shelf in May 2007.
These areas include but are not limited to: The northern curb line and amenities on Strander
Blvd, McDonalds frontage, Doubletree Hotel and adjacent office building property, and any areas
impacted by new proposed storm sewer changes. The CONSULTANT's efforts will include the
following:
• Definition of the limits of excavation versus pavement removals and update of
quantity calculations if necessary.
• Addition of pay items as required for Removal of Extruded Curb, Type C Curb
Channelization, Concrete Barriers, and Adjustment of Storm Drainage
Structures.
• Design for temporary access for Mc Donald's entrance that allows use of parking
lot and drive thru factilities.
• The proposed Impact Attenuators need to be re-evaluated against new AASHTO
design guidance. Review of standard item names and standard plan references
and make necessary adjustments to PS&E for these changes.
• Ensure project connects properly with adjacent developments since project was
shelved. Verify that contract documents cover the removal and re -setting of the
private business monument signs on the project. These are located at the
Doubletree and Southcenter Place properties. Meet with other design disciplines
to finalize and adjust final revised paving limits.
• Impacts associated with revisions agreed to during the WSDOT coordination
meetings on November 3`d, 2009 and December 2nd, 2009
• As part of this task the CONSULTANT shall complete the buttonhook ramp
design that was previously developed to approximately 30% design level along
with all other changes as a result of WSDOT coordination. The
CONSULTANT's work will include completing the horizontal and vertical
layout design, channelization, paving design and signing design.
• Design deviations, evaluate upgrades and design justifications as described in the
memo from the CONSULTANT to CITY dated January 7, 2010 will be approved
by WSDOT. If not approved, additional related work required by the
CONSULTANT will be considered Extra Work.
Assumptions:
j:\41113\I_redbook\contract\phase_2\hntb\supplement_9\exhibit_a_scope_of_work_supp_9_v12_final docx
Printed 3/18/2010
ITB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 11
• Design revisions to accommodate development activity not listed above will be
considered extra work.
• The buttonhook ramp design and other changes brought about by meetings with WSDOT
will be prepared to a 100% PS&E design level and submitted with the revised 100%
PS&E submittal and final ad -ready PS&E submittal; no other submittals will be made.
Deliverables:
• Submittal of revised 100% roadway and channelization Plans, Specifications and
Estimate.
• Written response to revised 100% submittal comments.
• Ad -ready submittal of roadway and channelization Plans, Specifications and Estimate.
Task 21.4.2 Signals and Interconnect
The CONSULTANT shall update the final design and plans, specifications, and estimates for
traffic signal installations since the project was put on the shelf in May 2007 along with changes
resulting from WSDOT coordination. This task will include the design of signal interconnect
between the new or modified signalized intersections listed below.
• Southcenter Parkway and Doubletree/McDonald's entrance
• Southcenter Parkway and Strander Blvd
• Southcenter Parkway and Klickitat Drive
• Southcenter Parkway and Nordstrom entrance
Assumptions:
• Signal interconnect to be designed and constructed as part of this project will terminate at
project limits on Southcenter Parkway.
• Video surveillance cameras will not be included in this project.
• Vehicle detection will be carried out using the Vantage video image vehicle detection
system systems.
• Communication to support signal coordination will not extend beyond the limits of the
project.
• The City of Tukwila will provide coordination of design activities, permits, and any other
projects that may affect the traffic signal systems design and installation.
Deliverables:
• Submittal of revised 100% Signals and ITS Plans, Specifications and Estimate.
• Written to response to revised 100% submittal comments.
• Ad -ready submittal of Signals and ITS Plans, Specifications and Estimate.
j \41113\I_redbook\contract\phase_2\hntb\supplement_9\exhibit_a_sco pe_of_work_supp_9_v 12_f i nal. docx
Printed 3/18/2010
'ITB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 12
Task 21.4.3 Illumination
The CONSULTANT shall update the illumination design including lighting calculations based on
changes since the project was shelved in May 2007. The following will be updated:
• Review location of power vaults at north end of project and relocate if necessary
• Relocate power for lighting, sign lighting and ITS elements.
• Review changes to channelization and illumination calculations
• Coordination with Puget Sound Energy for revised Toads if necessary.
• Review and revise voltage drop and load calculations as required.
• Design will be prepared to meet WSDOT standards as modified by the City of Tukwila,
NEC, IES standards.
Assumptions:
• Lighting calculations will use the AGI32 program to determine if additional lighting is
required in areas of roadway widening.
• Luminaires will be relocated where required
• Wiring and conduit will be installed underground.
Deliverables:
• Submittal of revised 100% Illumination Plans, Specifications and Estimate.
• Written to response to the revised 100% submittal comments.
• Ad -ready submittal of Illumination Plans, Specifications and Estimate.
Task 21.4.4 Site Preparation
The CONSULTANT shall develop updated design and PS&E (location, limits, type, details,
construction notes, calculations, and quantities) of the site preparation elements for the project to
a 100% review and Ad Ready level of completion based on any changes to design criteria or
standards resulting from shelving of the 100% submittal or from known changes resulting from
WSDOT coordination.
Deliverables:
• Submittal of revised 100% site preparation Plans, Specifications and Estimate.
• Written to response to revised 100% submittal comments.
• Ad -ready submittal of site preparation Plans, Specifications and Estimate.
Task 21.4.5 Traffic Control Plans
The CONSULTANT shall provide a specification for the contractor's use of CITY streets during
construction including the time periods during which construction work can occur.
j:\41113\I_redbook\contract\phase_2\hntb\supplement_9\exhibit_a_scope_of_work_supp_9_v12_final docx
Printed 3/18/2010
MNTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 13
Assumptions:
• The CONTRACTOR shall develop traffic control plans to provide for the movement of
traffic between and through each work area during the course of construction, including
work zones, areas open to traffic, sequencing of work to required maintain traffic, and any
detours.
• Traffic control plans developed for the 100% shelf submittal, May 2007 will be provided to
the contractor for information only.
Deliverables:
• Submittal of revised 100% Specifications and Estimate.
• Written to response to revised 100% submittal comments.
• Ad -ready submittal of Specifications and Estimate.
Task 21.4.6 Detour Plans
The CONSULTANT shall update existing traffic detour plans based on the full closure
construction phasing. The purpose of the traffic detour plans is to establish detour routes to
minimize disruption to traffic on adjacent facilities during the closure of Southcenter Parkway.
The CONSULTANT team will conduct a single workshop to coordinate with various stakeholder
groups to develop the detour plans and strategies. Groups shall include:
• Westfield Mall;
• Tukwila Traffic Management Center staff.
• King County Metro Transit & Sewer
• Emergency Services
• Utilities
• United State Postal Service (USPS) & Regional Distributions, Freight Mobility
• WSDOT
Detour plans developed will consider and include:
• Traffic operations through the proposed detour routes
• Identification of impacts to transit operations, and emergency service providers, and
mitigation of those impacts, if any.
• Temporary signing and delineation
Assumptions:
• The project will be constructed under a full road closure as depicted in the 30% Design
Report. The road will be opened to traffic during the seven week 2010-2011 construction
moratorium period.
• CONSULTANT shall coordinate the detour plan and ramp closures with WSDOT, City
of Tukwila, property owners and other associated stakeholders.
t:\41113\I_redbook\contract\phase_2\hntb\supplement_9\exhibit_a_scope_of_work_supp_9_v12_final docx
Printed 3/18/2010
''INTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 14
Deliverables:
• Submittal of revised 100% Detour Plans, Specifications and Estimate.
• Written to response to revised 100% submittal comments.
• Ad -ready submittal of Detour Plans, Specifications and Estimate.
Task 21.4.7 Signing
The CONSULTANT shall finalize and update the design of overhead and street signs since the
project was shelved in May 2007. Design changes will have to be made to address addition of
the Buttonhook Ramp, development activity that has occurred in the area since project plans were
put on the shelf and other changes brought about through WSDOT coordination. Key elements of
work include:
• Redesign of overhead signs and street signs
• Perform structural analysis and design for overhead sign supports
Assumptions:
• Work will incorporate changes to MUTCD requirements and design criteria as adopted,
as well as WSDOT std. plans and specs for signing that have occurred since the 2007
project shelf date.
• Design and structural analysis will be required for 2 signs mounted to overpass structures.
• Coordination with WSDOT will be necessary to complete the PS&E documents
• WSDOT Bridge and Structures office will review signing structure design for signs
within WSDOT ROW.
Deliverables:
• Submittal of revised 100% signing Plans, Specifications and Estimate.
• Written to response to revised 100% submittal comments.
• Ad -ready submittal of signing Plans, Specifications and Estimate.
Task 21.4.8 Landscape Design and Architectural Treatments
The CONSULTANT shall update and complete the 100% shelf submittal urban design elements
including: pedestrian paving, wall finishes, barriers, pedestrian railings, street trees, slope and
accent plantings, irrigation, pedestrian street lighting, fencing and site furnishings based on
changes in criteria, changes in project area and design changes resulting from coordination with
WSDOT. This work also includes coordination with civil, structural, environmental and storm -
water plan development.
Assumptions:
• Artwork or coordination with artist is not included in the scope at this time
t:\41113\I_redbook\contract\phase_2\hntb\supplement_9\exhibit_a_scope_of_work_supp_9_v12_final docx
Printed 3/18/2010
'ITB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 15
Deliverables:
• Submittal of revised 100% Landscape and Architectural Plans, Specifications and
Estimate.
• Written to response to revised 100% submittal comments.
• Ad -ready submittal of Landscape and Architectural Plans, Specifications and Estimate.
041113 u pp_9_v 12_fi n a I. docx
Printed 3/18/2010
INTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 16
TASK 21.5 DRAINAGE AND TESC
The CONSULTANT shall finalize and update the design for the drainage conveyance, detention,
water quality and Hydraulic Report since the project was shelved in May 2007. Design changes
will have to be made to address the addition of the Buttonhook Ramp, WSDOT coordination, and
other development activity that has occurred in the area since project plans were put on the shelf
as well as to comply with current Washington State Department of Ecology (DOE) Stormwater
Management Manual for Western Washington design criteria. A drainage design review was
performed for the drainage system to identify possible opportunities to:
1) Modify the design to meet current standards.
2) Improvement constructability and reduce construction duration.
3) Incorporate project changes including those that have been requested through
WSDOT review and development activity.
The following Scope utilizes the concept identified in the February 2010 Drainage Design
Review and discussions with the City:
Assumptions:
The following drainage and TESC assumptions apply:
• As much as practical the drainage design and calculations will comply with the 2008
WSDOT Highway Runoff Manual within WSDOT ROW or Limited Access and the
2009 King County Surface Water Design Manual in the City of Tukwila.
• The supplemental report will not follow the WSDOT Stormwater Report template.
• This scope of work assumes changes to the roadway impervious areas for the additional
widening of the south"buttonhook" exit ramp and modifications resulting from WSDOT
channelization changes to accommodate WB -67 truck turning movements at Klickitat
Drive/Southcenter Parkway, which include, elimination of landscape islands,
rechannelization, added impervious area at southwest quadrant of the
Klickitat/Southcenter Parkway intersection.
• Drainage updates will be based on the Drainage Design Review memorandum prepared
for the City of Tukwila in February 2010.
• WSDOT will review and approve design elements within WSDOT Limited Access
and/or ROW.
The drainage design approach for performing these revisions involves the following steps:
• Meet with WSDOT and the City to discuss the drainage revision approach as a result of
changes in criteria and WSDOT revisions, submittal requirements, drainage report
format, and other WSDOT expectations.
• Revise Threshold Discharge Areas to the updated roadway design.
• Revise the drainage design criteria according to current King County Surface Water
Manual and the WSDOT Hydraulics Manual 2010, and Highway Runoff Manual 2008.
041113\ book\contract\phase_2\hntb\supplement_9\exhibit_a_scope_of_work_sup p_9_v 12_fi nal. docx
Printed 3/18/2010
HNTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 17
• Revise the flow control detention vault design and water quality treatment based on the
Drainage Design Review memorandum prepared for the City of Tukwila in February
2010.
• Revise the conveyance system tributary areas, inlet spacing calculations, gutter spread
calculations, and pipe capacity and conveyance calculations as needed to update the
design.
• Revise the vault details.
• Revise the control structure details.
• Provide emergency bypass conveyance around the vaults.
• Update the drainage and TESC plans, profiles, details, quantities, and specifications.
• Remove the structure notes from the plans and include the approximate drainage and
TESC quantities in the contract bid proposal form.
• Prepare a supplement to the Hydraulic Report that will address TESC design updates.
• Submit the supplemental Hydraulics Report along with the revised plans and "original"
responses to WSDOT comments. Responses to the original WSDOT comments will be
revised to reflect the updated design.
This Scope assumes WSDOT will review the plans for and the consultant will provide
response to comments and attend one comment resolution meeting with the City and
WSDOT. Following the response to comments meeting, the Consultant will update the design
according to comment responses, submit for final review and request drainage design
approval.
This Scope assumes a final review meeting will be held with WSDOT and the City to discuss
minor design elements and responses and revisions to be incorporated into the Ad Ready
PS&E submittal.
Task 21.5.1 Hydraulic Report Supplement
This report will address changes in criteria since shelving of project, unresolved issues prior to
shelving, and modifications to impervious areas as a result of changes made during WSDOT
coordination of channelization plans in addition to updates agreed upon by the City as
documented in the Drainage Design Review Memorandum, February 2010. The report will
update the stormwater system design including analyses for modification to drainage basin
impervious areas, inlet spacing/locations, sag inlet capacity analysis, pipe sizing, and detention
and water quality treatment vault sizing.
The CONSULTANT shall update and submit one draft and one final Type A Hydraulic Report
Supplement with TESC narrative for approval to the City of Tukwila for review and approval by
WSDOT. It is assumed that the City and WSDOT will perform concurrent reviews of the
Hydraulic Report Supplement.
041113\I_redbook\contract\phase_2\hntb\supplement_9\exhibit_a_scope_of_work_supp_9_v12_final docx
Printed 3/18/2010
''INTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 18
This report shall include the following:
• A 3-5 page executive summary including:
o Figure showing updated TDA limits and project catchment areas
o Summary of drainage and TESC design criteria applied to the updated design
o Description of both pre and post -developed conditions
o Table identifying and summarixing new and replaced impervious surface
• Calculations for both the collection/conveyance systems, flow control and quality control
systems
• Preliminary drainage plan including location and size of detention and water quality
treatment facilities.
Deliverables:
• 151 Draft Hydraulic Report Supplement submitted with updated plans and calculations
(electronic PDF and 3 hard copies) to the City of Tukwila for concurrent review by the
City and WSDOT.
• Responses to WSDOT and City of Tukwila comments on 1St draft Hyrdaulic Report
Supplement (comment form electronic PDF)
• Final Hyrdaulic Report Supplement submitted with updated plans and calculations
(electronic PDF and 3 hard copies)
Task 21.5.2 Drainage Plans and Details
This element of work includes updating the storm drainage plans according to City of Tukwila
Public Works Department Development Guidelines and Design Construction Standards Revision
1 (2005) and the WSDOT 2008 HRM.
• Update catch basin types, sizes, and locations
• Update pipe sizes, callouts, and water quality facility locations
• Update control structure details
• Update detention and treatment vault details
• Update profiles
• Update utility crossings and checking for water and sewer conflicts
• Updating wall conflicts
• Update oil water separator details
• Evaluate and update discharges into WSDOT right-of-way for method of construction
(i.e. bore and jacking).
• Evaluate the existing WSDOT pond system for flow control and treatment capacity.
j:\41113\I_redbook\contract\phase_2\hntb\supplement_9\exhibit_a_scope_of_work_supp_9_v 12_fi nal. docx
Printed 3/18/2010
'INTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 19
Deliverables:
• Submittal of revised 100% Drainage Plans, Specifications and Estimate.
• Written to response to revised 100% submittal comments.
• Ad -ready submittal of Drainage Plans, Specifications and Estimate
Task 21.5.3 TESC Plans and Details
The purpose of this task is to update TESC Plans and Details. This element of work includes
updating the TESC plans according to City of Tukwila Public Works Department Development
Guidelines and Design Construction Standards Revision 1 (2005) and the WSDOT 2008 HRM.
Deliverables:
• Submittal of revised 100% TESC Plans, Specifications and Estimate.
• Written response to revised 100% submittal comments.
• Ad -ready submittal of TESC Plans, Specifications and Estimate
1:\41113\I_red book\contract\phase_2\hntb\supplement_9\exhibit_a_scope_of_work_supp_9_v 12_fi nal. docx
Printed 3/18/2010
rINTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 20
TASK 21.6 STRUCTURES (BRIDGES/WALLS)
Task 21.6.1 Bridges and Walls
The CONSULANT shall update and complete the project structural design since the project was
shelved in 2007. The structures include the single span cast -in-place slab bridge and foundations,
soldier pile retaining walls, structural earth retaining walls, cast -in-place retaining walls, moment
slabs, traffic barriers, light pole foundations, sign supports and stairs. Specific tasks to be carried
out include:
• Review 100% shelf submittal and update plans.
• Review 100% shelf specifications and update to current WSDOT Specifications and
Special Provisions.
• Design changes for accommodation of WB -67 design vehicle
o Re -design of north end of CIP bridge and abutment
o Design of drilled shaft and column for signal pole foundation.
o Wall at SW corner of Klickitat Drive and Southcenter Parkway
• Review and update the structural cost estimate quantities. Update unit prices and estimate
backup data for the current construction year.
• Conduct interdisciplinary review and update PS&E.
• Perform design checks and quality control on all revisions to the 100% shelf submittal.
• Assemble 100% PS&E package for delivery to client.
• Review, respond to and incorporate as appropriate review comments made on the
revised 100% Submittal.
• Perform QC on the Ad -Ready PS&E Submittal
• Assemble Final Ad -Ready package for delivery to client.
• Project Closeout.
Assumptions:
• 6-1 hour design team coordination meetings
• 6-1 hour design meetings
Deliverables:
• Submittal of revised 100% structures Plans, Specifications and Estimate.
• Written response to revised 100% submittal comments.
• Ad -ready submittal of structures Plans, Specifications and Estimate
j:\41113\I_redbook\contract\phase_2\hntb\supplement_9\exhibit_a_scope_of_work_supp_9_v12_final. docx
Printed 3/18/2010
MNTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 21
TASK 21.7 SURVEYING
Task 21.7.1 Field Survey for Design
Assumptions:
The Consultant shall provide supplemental field survey for the following areas: 1) the north end
where the City of Seattle/City of Tukwila water intertie is located; 2) the changes to the north side
of Strander Blvd.: 3) the McDonalds parking lot and frontage to Southcenter Pkwy.; 4) The
bridge and abutment structure of Klickitat Dr.
In these areas:
• The surface features will be resurveyed and incorporated into the existing base map.
• Utilities will be located only in the intertie area.
Deliverables:
• The CONSULTANT shall provide a complete revised base drawing where the old
features have been removed and the current features added.
j. \41113\I_redbook\contract\phase_2\hntb\supplement_9\exhibit_a_scope_of_work_su pp_9_v 12_fi nal. docx
Printed 3/18/2010
HNTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 22
TASK 21.8 UTILITIES
Task 21.8.1 Coordination with utilities
In the previous phases the CONSULTANT coordinated with the utility agencies/private
companies and for this work will continue to do so. The utility companies that the
CONSULTANT included time to coordinate with are as follows:
• Olympic Pipe Line
• Qwest
• King County Metro
• City of Tukwila Water Dept.
• PSE (gas & power)
Assumptions:
The CONSULTANT shall continue to coordinate and meet with the private utility companies and
utility agencies listed above to let them know how their facilities will be impacted. This will
include sharing project design drawings and survey base map data and information.
• The CONSULTANT shall share design drawings with the utility companies and agencies
as needed to assist the utility companies with their planning and design.
• The design of the private utility relocation such as PSE and Qwest facilities will be done
by those companies. The CONSULTANT will review the private utility design and
provide comments to the private utility.
• Interpretation of any franchise agreements, up -dating, modifying or negotiating
agreements will be done by the City.
• If the existing utilities (water & sanitary sewer) are shown on the survey and are located
in the right of way have to be relocated and the CONSULTANT has included design for
that relocation to be done in kind. The CONSULTANT has not included any time to
coordinate with any local businesses or private companies as far as up -grading existing
utilities.
• The CONSULTANT has not included any time to coordinate with utilities that have been
installed within the last 2 years or since the May 2007 100% Shelf submittal other than
improvements to the utilities owned by the companies listed above such as PSE.
Deliverables:
• The CONSULTANT shall document meetings with utility companies.
Task 21.8.2 Utility Design
The CONSULTANT shall complete and update the utility design to reflect changes since the
project was shelved in 2007.
041113\ docx
Printed 3/18/2010
MNTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 23
Assumptions:
• For the new water system the CONSULTANT has coordinated with the City of Tukwila
Fire Dept. for the water system fire protection requirements. It is assumed that the design
is still valid and meets the Fire Dept. requirements.
• The water system design as last submitted still meets the City requirements as far as
alignment and sizing. The CONSULTANT has not included time for any new alignments
and either up sizing or down sizing the system.
• The previous survey limits did not include SPU and City of Tukwila facilities at the north
end of the project in the vicinity opposite Bahama Breeze Restaurant. This proposed
scope of work will include survey for those items so the new water connection in that
area will be coordinated with the existing facilities.
• The CONSULTANT shall include coordination with the other proposed new utilities
such as storm drain and signals if those designs are revised.
• The CONSULTANT shall include coordination with the new utilities and improvements
from the mall new construction and new businesses and improvements along Strander
Blvd. This work includes time to adjust the existing new water main alignment due to
new utilities serving the mall or businesses based upon as -built data from the
developers/property owners, as available.
Deliverables:
• Submittal of revised 100% utility Plans, Specifications and Estimate.
• Written to response to revised 100% submittal comments.
• Ad -ready submittal of utility Plans, Specifications and Estimate
j.\41113\I_redbook\ contract \phase_2\hntb\supplement_9\exhibit_a_scope_of_work_supp_9_v12_final docx
Printed 3/18/2010
INTB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 24
TASK 21.9 SPECIAL PROVISIONS
The CONSULTANT shall update and complete project Special Provisions and assemble the
contract provisions for reviews and advertisement based on changes in criteria resulting from the
project being shelved and changes resulting from WSDOT coordination. The CONSULTANT
shall review the WSDOT Local Agency and APWA General Special Provisions, GSP's and
update those that are applicable.
Assumptions:
• The development of Special Provisions specific to the proposed project elements that
supplement or revise Tukwila's Standard Specifications and General Special Provisions
are addressed in Tasks 2, 4, 5 6 and 8.
Deliverables:
• Deliverables are addressed in Tasks 2, 4, 5, 6 and 8.
TASK 21.10 DEVELOPMENT OF QUANTITIES AND COST
ESTIMATE
The CONSULTANT shall update and complete the Engineer's Estimate of Probable Construction
Cost, with an itemized list in tabular form describing specification section, item, and quantity,
estimated unit costs and estimated total. This estimate will be based on the 100% PS&E shelf
copy estimate developed for the May 2007 submittal and the update of the cost estimate
developed for Supplement 8.
The costs shown in the estimate represent an estimate of probable costs prepared in good faith
with reasonable care. HNTB has no control over the costs of construction labor, materials or
equipment, nor over competitive bidding or negotiating methods and does not make any
commitment or assume any duty to assure that bids or negotiated prices will not vary from this
estimate.
Deliverables:
• 100% and Ad -ready submittals of Engineer's Estimate of Probable Construction Cost.
j /41113/1_redbook\contract\phase_2\hntb\supplement_9\exhibit_a_scope_of_work_supp_9_v12_final.docx
Printed 3/18/2010
ITB
Tukwila Urban Access Improvement Project
05-071, Supplement No. 9 Page 25
TASK 21.11 100% AND AD -READY CONTRACT PLAN SHEETS
Consultant shall prepare ad -ready plans with supporting design calculations. Format for plans
will be ink or equivalent, on City of Tukwila title/border, 22 -inch x 34 -inch size sheets. The
scales to be used, the lettering and the general delineation of the plans will be such as will provide
legible reproduction at full scale or when reproduced at one-quarter the original area (50 percent
reduction). The Consultant shall also provide electronic files of the ad -ready plans. This task
shall include the update of the following sheets as needed for the 100% and Ad ready submittals:
• Title and vicinity
• Index
• Legend
• General Notes
Deliverables:
• 100% and Ad -ready submittal of contract plan sheets.
TASK 21.12 CONSTRUCTION SCHEDULE
The CONSULTANT shall update the construction schedule prepared in Supplement 8.
Assumptions:
• It is assumed that construction will be completed in two construction seasons.
• The Construction schedule will be consistent with the City's construction moratorium.
Deliverables:
• Draft and Final Construction schedules using Microsoft Projects software.
TASK 21.13 ASSISTANCE DURING BID PERIOD
The CONSULTANT shall attend a pre-bid meeting for the project. Attendance at the Pre -Bid
Meeting shall include up to two (2) CONSULTANT attendees to present information and provide
clarification. No information provided at the Pre -Bid Meeting shall supersede the contract
documents. Bidder questions raised during the Pre -Bid Meeting will be documented. The
CONSULTANT will tabulate bids using a template to be provided by the CITY.
Effort by the CONSULTANT under this task will be complete at the date of bid opening.
j:\41113\I_redbook\contract\phase_2\hntb\supplement_9\exhibit_a_scope_of_work_supp_9_v12_final docx
Printed 3/18/2010
HNTB
Exhibit B-1
HNTB Corporation
Consultant Fee Determination
Summary Sheet (Lump Sum)
Tukwila Urban Center Access Project: KlickitatlSouthcenter Parkway
Supplement No. 9 - Final Design
LABOR COSTS
Staff Classification
Hours Rate Total Cost
Principal
Project Manager
Sr. Engineering Manager
Sr. Architectural Manager
Senior Project Engineer
Project Engineer
Design Engineer/Traffic Engineer
Landscape Architect
Sr. Technician
Project Administrator
Admin. Asst./Clerical
12 $269.34 $3,232
274 $186.65 $51,141
16 $158.38 $2,534
32 $175.43 $5,614
666 $150.67 $100,348
60 $137.12 $8,227
827 $90.87 $75,150
160 $92.97 $14,876
453 $96.48 $43,704
68 $113.06 $7,688
14 $67.74 $948
Total Hours
2582
1
TOTAL LABOR COSTS
$313,4621
REIMBURSEABLE COSTS
Local Travel (Mileage/Parking):
Reproduction:
Other:
$500
$2,500
$250
TOTAL REIMBURSEABLE COSTS
$3,250
SUBCONSULTANT COSTS
HDR Engineering, Inc.
$132,8491
PACE Engineers, Inc.
$84,2541
TOTAL FEE
$533,8161
HNTB Corporation
05-071, Supplement No. 9
Supp_9_Exhibits_B_&_C_split_v10.xls Page 1 of 2
HNTB Corporation
Labor Hours Estimate
Tukwila Urban Center Access Project: Klickitat/Southcenter Parkway
Supplement No. 9 - Final Design
Staff Cassifications
HNTB Corporation
05-071, Supplement No. 9
Page 2 of 2
Principal
Project
Mgr.
Sr. Eng.
Mgr.
Sr.
Arch.
Mgr.
Sr.
Project
Eng.
Project
Eng.
Design
Eng./
Traffic
Eng.
Landscape
Architect
Sr. Tech.
Project
Admin.
Admin
Assist/
Clerical
TOTAL
,n? :` `.
12
, ,°162
=
_-
-
68
-
242
.._.'•21;111rojecf/41anagemenrt•:.n
21.1.1
Issues Resolution
10
10
21.1.2
Project Requirements
20
20
21.1.3
Budget Performance
12
8
60
80
21.1.4
Schedule Conformance
24
24
21.1.5
Communicate Progress
32
32
21.1.6
Consultant Team
32
8
40
21.1.7
Manage Quality
20
20
21.1.8
Manage Change
16
16
- W2t.4
R adway i 3 ;„•.
_
• 52
32..
; 176
60
.
144
160
• 192
_
-
816
21.4.1
Roadway Design
4
8
12
21.4.2
Signals and ITS
4
24
64
72
164
21.4.3
Illumination
4
24
60
40
128
21.4.4
Site Preparation
4
32
40
40
116
21.4.5
Traffic Control Plans
4
32
36
21.4.6
Detour Plans
24
32
40
40
136
21.4.7
Signing
4
24
28
21.4.8
Landscape Design & Arch. Treatments
4
32
160
196
, 272
,
480
184
936
21.5.1
Stormwater Report
120
160
80
360
21.5.2
Drainage Plans & Details
120
260
80
460
21.5.3
TESC Plans & Details
32
60
24
116
=*--- 2f:
$trti01449. . :_. .:�
`4
16
-
62
. . -.
203 '
- 61
-
"
' 14
3611
21.6.1
”
Bridges & Walls
4
16
62
203
61
14
360
rvey�nt�r `�
21.7.1
Field Survey for Design
4
4
21.8.1
Coordination w/ Utilitiies
4
4
21.8.2
Utility Design
4
4
219
SPECialPt TSTOtti -,:.
4 i
; 16
_ :.
? ' _
60
-
-
, .
. _.
-
76
21.9.1
Special Provisions
16
60
76
21118
Q0aittIt%s'00 S E fl t
v
. 4
..
-
40
..
_
.
21.10.1
Quantities Quantities & Cost Estimate
4
40
44
>21,.<i1
..
t###M.�d idy ContraCfa PlartStte�ei9�r
.:
, w
- `4
. �
... _
8
.<
,
#6•
_
'
,.
21.11.1
100% & Ad Ready Contract Plan Sheets
4
8
16
28
`.2 12
G1 • dul6' "` " ... '
4:
a°' . -
_
...4
_-
_
..
_
-
• 28
21.12.1
.t1n9
Construction Schedule
4
24
28
1.13
JtSsiStatictal ii iii j 1?erto :.
a
16 ...
»
24
. ... -
_
' 40.
21.13.1
Assistance During Bid Period
16
24
40
Total Hours by Classifications
12
274
16
32
666
60
827
160
453
68
14
1 2,582
HNTB Corporation
05-071, Supplement No. 9
Page 2 of 2
Exhibit B-2
HDR Engineering, Inc.
Subconsultant Fee Determination
Summary Sheet (Lump Sum)
Tukwila Urban Center Access Project: KlickitatlSouthcenter Parkway
Supplement No. 9 - Final Design
LABOR COSTS
Staff Classification
Hours Rate Total Cost
Principal
Project Manager
QA/QC
Lead Designer
Sr Civil
Civil EIT
Sr Structural Design
Structural Design
CAD Technician
Project Controller
2 $213.06 $426
54 $194.91 $10,525
24 $194.91 $4,678
120 $129.68 $15,562
310 $119.00 $36,891
280 $91.40 $25,592
28 $188.41 $5,275
40 $146.13 $5,845
200 $113.90 $22,780
22 $107.93 $2,374
Total Hours 1080
1
TOTAL LABOR COSTS
$129,9491
REIMBURSEABLE COSTS
Local Travel (Mileage/Parking):
Reproduction:
Postage, Express Mail, Courier
Other:
$400
$2,500
$0
$0
TOTAL REIMBURSEABLE COSTS
$2,900
1
TOTAL FEE
$132,8491
HDR Engineering, Inc.
05-071, Supplement No. 9
Page 1 of 2
HDR Engineering, Inc.
Labor Hours Estimate
Tukwila Urban Center Access Project: Klickitat/Southcenter Parkway
Supplement No. 9 - Final Design
HDR Staff Cassifications
Task
Principal
Project
Manager
QA/QC
Lead
Designer
Sr Civil
Civil EIT
Sr
Structural
Design
Structural
Design
Cadd
Tech.
Project
Controller
TOTAL
x:.21:-iPrbi
i li i6 x_`Ft: `',,
;
54
_
.
22
78
21.1.1
Issues Resolution
6
6
21.1.2
Project Requirements
4
4
21.1.3
Budget Performance
4
4
21.1.4
Schedule Conformance
-
21.1.5
Communicate Progress
4
18
22
21.1.6
Consultant Team
32
32
21.1.7
Manage Quality
2
4
6
21.1.8
Manage Change
4
4
24
:°
:118
300
280
28
40
' 200
:..
..
,z 990
21.4.1
Roadway Design
24
100
240
240
80
684
21.4.2
Signals and ITS
-
21.4.3
Site Preparation
21.4.4
Illumination
-
21.4.5
Traffic Control Plans
-
21.4.6
Detour Plans
-
21.4.7
Signing
18
60
40
28
40
120
306
21.4.8
Landscape Design & Arch. Treatments
-
21.18
AsSistiiiciiiattrbiliad Pedod > s
e° .
i
f
2
10
-
_
° 12
21.13.1
Assistance During Bid Period
2
10
12
Total Hours by Classification
2
54
24
120
310
280
28
40
200
22
1,080
HDR Engineering, Inc.
05-071, Supplement No. 9
Page 2 of 2
Exhibit B-3
PACE Engineers, Inc.
Subconsultant Fee Determination
Summary Sheet (Lump Sum)
Tukwila Urban Center Access Project: Klickitat/Southcenter Parkway
Supplement No. 9 - Final Design
LABOR COSTS
Staff Classification
Hours Rate Total Cost
Senior Principal Surveyor
Engineer PM
Survey PM
Project Engineer
Project Surveyor
Instrument Person
Survey Tech II
CAD Drafter II
Admin
74 $135.00 $9,990
196 $125.00 $24,500
60 $95.00 $5,700
152 $110.00 $16,720
24 $100.00 $2,400
24 $95.00 $2,280
136 $60.00 $8,160
70 $100.00 $7,000
23 $88.00 $2,024
Total Hours 759
TOTAL LABOR COSTS
$78,7741
REIMBURSEABLE COSTS
Travel: $0
Reproduction: $750
Traffic Control/Flaggers 32 $40 $1,280
Utility Potholing Service - APS 16 $200 $3,200
Misc. $250
TOTAL REIMBURSEABLE COSTS
$5,480
TOTAL FEE
$84,2541
PACE Engineers, Inc.
05-071, Supplement No. 9
Page 1 of 2
PACE Engineers, Inc.
Labor Hours Estimate
Tukwila Urban Center Access Project: Klickitat/Southcenter Parkway
Supplement No. 9 - Final Design
PACE Staff Cassifications
Task
Sr
Principal
Surveyor
Engineer
PM
Survey
PM
Project
Engineer
Project
Surveyor
Instrument
Person
Survey
Tech II
CAD
Drafter II
Admin
TOTAL
=21:11?'i
ectMattage`ri eitt : _,
: • . : 12
.-
_
18
30
21.1.1
Issues Resolution
-
21.1.2
Project Requirements
-
21.1.3
Budget Performance
12
18
30
21.1.4
Schedule Conformance
-
21.1.5
Communicate Progress
-
21.1.6
Consultant Team
-
21.1.7
Manage Quality
-
21.1.8
Manage Change
-
21.2
32
--- :, ,ra
•Oft•
.... :,a:..
,,.!
-,
86
- _
168
21.2.1
Legal Descriptions & Easements
8
-
-
16
24
21.2.2
Right of Way Plans
24
40
80
144
_'. 20
;,24
24',
40
- ;,,, i,,,143-
21.7.1
Field Survey for Design
30
20
24
24
40
5
143
152
-
, -
70
.
418
21.8.1
Coordination w/ Utilitiies
24
12
4
40
21.8.2
Utility Design
12
160
140
66
378
Total Hours by Classification
74
196
60
152
24
24
136
70
23
759
PACE Engineers, Inc.
05-071, Supplement No. 9
Page 2 of 2
Exhibit B-4
Summary of Hours - All Firms
Tukwila Urban Center Access Project: Klickitat/Southcenter Parkway
Supplement No. 9 - Final Design
05-071, Supplement No. 9
Page 1 of 1
HNTB
Hours
HDR
Hours
PACE
Hours
TOTAL
Hours
.., °21y1
Project Management
242
78
' 30
350
21.1.1
Issues Resolution
10
6
-
16
21.1.2
Project Requirements
20
4
-
24
21.1.3
Budget Performance
80
4
30
114
21.1.4
Schedule Conformance
24
--
24
21.1.5
Communicate Progress
32
22
-
54
21.1.6
Consultant Team
40
32
-
72
21.1.7
Manage Quality
20
6
-
26
21.1.8
Manage Change
16
4
-
20
• 21.2
Right of Way
-
168
168
21.2.1
Legal Descriptions & Easements
-
-
24
24
21.2.2
Right of Way Plans
-
-
144
144
%'.
21.3.1 NPDES Stormwater Permit for DOE
-
-
-
-
21A :;;
816
" 990
..
• 1,806 ,
21.4.1 Roadway Design
12
684
-
696
21.4.2 Signals and ITS
164
-
-
164
21.4.3 Site Preparation
128
-
-
128
21.4.4 Illumination
116
-
-
116
21.4.5 Traffic Control Plans
36
--
36
21.4.6 Detour Plans
136
-
136
21.4.7 Signing
28
306
-
334
21.4.8 Landscape Design & Architectural Treatments
196
-
-
196
21.5 prairfae::_:-".. `4 ..
936
-
-
. 936
21.5.1 Stormwater Report
360
-
-
360
21.5.2 Drainage Plans & Details
460
-
-
460
21.5.3 TESC Plans & Details
116
-
-
116
• 21.6 Structures
' 360
360
21.6.1 Bridges & Walls
360
-
-
360
3[.7 Survsyit:=:
4
. -
143
147
21.7.1 Field Survey for Design
4
-
143
147
8 Utiii
8
-
418
; 426
21.8.1 Coordination w/ Utilitiies
4
-
40
44
21.8.2 Utility Design
4
-
378
382
21:9 Special- Provisions•• : :::: r ; .
76
-
•
. 76
21.9.1 Special Provisions
76
--
76
1O -Q
44
21.10.1 Quantities & Cost Estimate
44
--
44
2i 91' i'0O%.andM Ready Contract Plan Sheets '
. . 28
_
-
28
21.11.1 100% & Ad Ready Contract Plan Sheets
28
--
28
• mg CoflStfti titch Schedule
28
-
• . 28
21.12.1 Construction Schedule
28
--
28
Alai 3A.esistariie During. Bid Period
40
12
. -
52
21.13.1 Assistance During Bid Period
40
12
-
52
Total Hours by Firm
2,582
1,080
759
4,421
05-071, Supplement No. 9
Page 1 of 1