COUNCIL AGENDA SYNOPSIS
Prepared by
LV
LV
ITEM- INFORMATION
1 ORIGINAL AGENDA DATE: APRIL 12, 2010
ev
Authorize the Mayor to sign various contracts which collectively provide funding and
will allow construction to begin on Southcenter Parkway
Dzircussion Motion n Resolution
Mtg Date 4/12/10 Mtg Date 4/19/10 Mtg Date
I SPC )NSOR n Council Mayor Adm Svcs DCD Finance Fire Legal n P &R Police PI/
The Tukwila South Development Agreement calls for the City to relocate and construct a 5-
lane Southcenter Parkway Extension. To start construction, City needs to accept the
CERB, Capital Projects and TIB grants; to sign an Interlocal Agreement with Highline
Water District; to sign two agreements with PSE; to amend the construction management
contract with KBA, Inc; and to award the construction bid to Scarsella Bros, Inc.
Construction cost is $16,030,030.64 paid by state /federal grants, Highline, and city bonds.
COW Mtg. CA &P Cmte F &S Crnte Transportation Cmte
Utilities Cmte n Arts Comm. n Parks Comm. n Planning Comm.
DA 1 4/5/10
RECOMMENDATIONS:
SPONSOR /ADMIN. Mayor's Office
COMMITTEE Unanimous Approval; Forward to Committee of the Whole
COST IMPACT FUND SOURCE
AMOUNT BUDGETED APPROPRIATION REQUIRED
Initials
Mayor's Btezv 1 ,,siyzncilzeviezv
I'k
n Ordinance
RECORD OF COUNCIL ACTION
ITEM No.
Bid Award n Public Hearing Other
Mtg Date Mtg Date 4/19/10 Mtg Date Mtg Date
Fund Source: Multiple funding sources; see attachment "Southcenter Parkway Expenses /Revenues Chart 4 -5 -10"
ATTACHMENTS
Informational Memorandum dated 4/5/10
State Capital Projects Grant Contract for $3.98 million
State Community Economic Revitalization Board Grant Contract for $6 million
Transportation Improvement Board Grant contract for $2 million
Highline Water District Interlocal Agreement
Puget Sound Energy Project Plan Agreement, estimating costs to be $241,400
Puget Sound Energy Construction Agreement for $241,400
Amendment to Contract with KBA for $2,453,950
Bid Award to Scarsella Brothers for $16,030,030.63
Southcenter Parkway Expenses /Revenues
Minutes from the Transportation Committee Meeting of 4/5/10
1
33
PUGET SOUND ENERGY
Exhibit "A" Project Plan
Schedule 74 Underground Conversion
Attachment 5
City of Tukwila Tukwila South Development
PSE Project Number: 105052358
March 31, 2010
Pursuant to Puget Sound Energy "PSE Rate Schedule 74 and as described in this Project Plan,
PSE will convert its existing overhead electrical distribution system of 15,000 volts or less to an
equivalent Underground Distribution System. This Project Plan describes work to be perfolnied
by PSE and the City of Tukwila (the "City for the conversion of certain PSE electrical
distribution system facilities as described herein (the "Conversion Project Construction of this
Conversion Project is contingent upon and shall not commence prior to both written acceptance
of this Project Plan and written execution of a Schedule 74 Construction Agreement by the City
and PSE.
This Project Plan includes and consists of:
Detailed description of the Construction Work to be performed
Applicable requirements, drawings and specifications for the work (attached)
Operating Rights to be obtained for the Conversion Project (attached)
Construction Work Schedule
Construction Costs Estimate Summary (attached)
Revisions to this Proiect Plan must be mutually aporoved by the City and PSE. including total
construction costs to the Government Entity listed in the Construction Cost Estimate Summary.
This Conversion Project will replace PSE's existing overhead electrical distribution system with
an Underground Distribution System within the following area (the "Conversion Area
Beginning at the northeast corner of the Southcenter Parkway and S. 180 St. intersection
(station mark 109 +00), moving south along the Southcenter Parkway/Frager Road frontage to the
terminus of this overhead system (station mark 151 +00) (this scope excludes the requested OH
facility requested to remain between station mark 127 +00 to 134 +00). Existing overhead
infrastructure exists on both the east and west frontages of the roadway and includes
transformers and services drops to both residential and industrial /commercial customers. Utility
poles along this frontage support street lighting and communications infrastructure. It should be
noted that the proposed Southcenter Parkway extension will not follow the existing Southcenter
Parkway/Frager Road alignment. The installed underground facilities are approximately 3,500
feet in length, including laterals and road crossings.
City of Tukwila
Southcenter Parkway Extension Underground Conversion
n�ne�7C0
,scope of Work
Pagel
223
The Conversion Project includes modification or replacement of all existing services lines within
the Conversion Area to connect to the Underground Distribution System and removal of PSE's
existing overhead electric distribution facilities (including PSE distribution poles and pole
mounted street lights) from the Conversion Area. Costs associated with the installation of new
underground services will be billed to the party placing the new service order per Electric Rate
Schedule 85.
There are no Government Entity Requested Upgrades or Temporary Service elements included
in the Conversion Project Scope of Work.
PSE initiated upgrades included in this project consist of: PSE is installing additional facilities
beyond those required and allowed under Schedule 74 throughout the project. These additional
facilities are identified on the PSE plan set on the vault and the Cable Conduit tables. The
additional facilities will be addressed under the Schedule 85 portion of this job.
City requested upgrades included in this project consist of: None.
Temporary Service included in this project consists of: None for Schedule 74 work.
The following portions of PSE's existing facilities to be converted are located outside of Public
Thoroughfare: The existing overhead system between PEO5 and PEO6 (Schoenbachler Property).
In conjunction with the Conversion Project, PSE will remove its existing street lighting system
within the Conversion Area. Provision of a new street lighting system within the Conversion
Area under terms of applicable PSE Tariff Schedules will be addressed on a separate work order
and work sketch. Additional costs will apply and will be quoted separately.
City Responsibilities
Responsibilities of Parties
a) Provide written notice to customers within the Conversion Area in advance of
Conversion Project Construction Work start. The notice will include contact information
for both the City and PSE, the expected Conversion Project schedule, anticipation of
service interruptions and work required to be performed by customers.
b) Coordinate other utility conversion, removal and relocation from PSE's poles.
c) Provide all surveying for equipment placement, locations, and establish all grade
elevations for the Underground Distribution System within the Conversion Area.
d) Provide all necessary excavation, bedding, backfill, off -site disposal, site restoration and
coordination for installation of the Underground Distribution System. This includes
trenching, backfill, and restoration for cut -over and transfer of existing underground
system and service lines from the existing overhead distribution system to the new
Underground Distribution System.
e) Coordinate private property trenching, excavation and restoration activity with private
property owners affected by this Conversion Project.
f) Provide flagging and traffic control as required for all work performed by the City.
City of Tukwila
2 24 Southcenter Parkway Extension Underground Conversion
105052358
Page 2
g) Install and proof all ducts and vaults for the Underground Distribution System (excluding
work in ducts or vaults containing energized cables or equipment see PSE
Responsibilities) in accordance with PSE standards and specifications using ducts and
vaults provided by PSE. "Proofing" as used herein is defined as verification using a
mandrel that the duct and vault system is free and clear of damage, installed to the proper
grade and at the proper location and contains a pulling line.
h) Provide PSE at least ten (10) business days notice prior to the start of trenching activity to
allow for delivery of PSE materials to the job site and scheduling of PSE's on -site
Inspector. Provide at least two (2) business days notice for scheduled delivery of vaults
from the manufacturer,
i) Provide secure staging and storage area(s) for duct and vault materials provided by PSE.
The City shall be responsible for the security and condition of these materials until they
are installed and accepted by PSE or returned to PSE's custody.
j) Provide labor and equipment for the off loading of PSE duct and vault materials
delivered to the job site.
k) Promptly following notice from PSE that the Underground Distribution System has been
energized, provide notice to customers within the Conversion Area informing them of
their obligation and responsibility to convert their overhead service lines to underground
service lines as provided by state law or to modify existing underground service lines for
connection to the Underground Distribution System. Affected service lines are listed in
the Service Lines section of this Project Plan.
1) Facilitate weekly (or as otherwise agreed by the City and PSE) construction coordination
meetings to include all relevant parties participating in the conversion including PSE and
it's contractor(s), the City and it's contractor(s), and other utilities.
m) Provide any necessary operating rights for the installation of PSE's facilities in
accordance with PSE's Schedule 74 Section 3 and as mutually agreed by the PSE and the
City. Operating rights are further addressed in the Operating Rights section of this
Project Plan.
n) Modify, reroute or replace service lines to City owned facilities to connect to the
Underground Distribution System.
o) Following notification from PSE that Construction Work is complete, provide to PSE any
Shared Government Costs as provided for in the Construction Agreement.
Puget Sound Energy Responsibilities
a) Provide all duct and vault materials, cables, electrical equipment and components
necessary for installation of the Underground Distribution System.
b) Following notice from the City, deliver or cause to be delivered all duct and vault
materials to the designated staging /storage area(s). Acknowledge delivered quantities
and condition of duct and vault materials by signing shipping manifests.
c) Following notice from the City, provide inspection services needed for overseeing the
proper installation of ducts and vaults by the City.
City of Tukwila
Southcenter Parkway Extension Underground Conversion
105052358
Page 3
225
226
d) Accept delivery of the completed duct and vault system once the new system has been
proofed (as described above) by the City. PSE will provide a mandrel to the City to be
used in proofing of the duct and vault system.
e) Provide PSE electrical workers to complete duct installation and proofing when such
work is performed at or in any energized vault containing energized cables or equipment.
f) Install (except for ducts and vaults installed by the City) and energize the Underground
Distribution System. Provide written notice to the City when the Underground
Distribution System is energized.
Perform cut -over and transfer of existing Underground Distribution System and existing
underground service lines from the overhead distribution system to the new Underground
Distribution System where applicable (see City Responsibility item "d" concerning
trenching responsibility). PSE will notify the City for excavation and the affected
customers at least two (2) business days prior to installation, transfer, and connection of
underground service lines. Affected service lines are listed in the Service Lines section
of this Project Plan.
h) Install and connect replacement underground service lines to single family residences and
connect replacement non residential underground service lines provided by customers
within the Conversion Area pursuant to PSE Tariff Schedule 85. Costs associated with
the installation of new underground services will be billed to the party placing the new
service order per Electric Rate Schedule 85. Affected service lines are listed in the
Service Lines section of this Project Plan.
i) Remove the existing overhead electric distribution system including, conductors, street
lights, equipment, down guys, anchors and poles after all service lines to customers
within the Conversion Area are connected to the Underground Distribution System and
all other utilities have been removed from PSE's poles. Holes left following removal of
poles will be filled with crushed rock and compacted in accordance with applicable City
standards or specifications.
Provide flagging and traffic control as required for all work performed by PSE (except as
may otherwise be reasonably provided by the City during installation of ducts and vaults
in conjunction with City performed trenching, excavation, back -fill and restoration).
k) Attend weekly (or as otherwise agreed by the City and PSE) construction coordination
meetings facilitated by the City and its contractor during duct and vault installation and
while line crews are actively working the project.
g)
j)
The Underground Distribution System will be located within Public Thoroughfare except as
described in the Operating Rights Attachment. The Construction Work will not be released by
PSE for construction until i) all operating rights necessary for the installation of PSE's facilities
have been obtained and have been verified by PSE, or ii) the City otherwise signs an agreement
releasing PSE from any and all financial obligations associated with the location or relocation of
City of Tukwila
Southcenter Parkway Extension Underground Conversion
105052358
Operatine Rights
Page 4
PSE facilities resulting from commencement of construction prior to acquisition of all identified
necessary operating rights.
Construction Work Schedule
The work will be performed in accordance with the following Work Schedule, unless this
schedule is revised by mutual agreement of the City and PSE or circumstances beyond the
reasonable control of the City and/or PSE preclude such performance.
Installation of ducts and vaults: Construction to start in summer 2010.
Work Schedule Restrictions: None
Construction Cost Estimate
The estimated costs to perform the Construction Work and the allocation of costs between the
parties are presented in the attached Construction Costs Estimate Summary. These estimated
costs are valid for 90 days from the date on the Construction Costs Estimate Summary page. If
this Project Plan and the Construction Agreement are not fully executed within 90 days, the
estimated cost is subject to revision.
Proiect Assumptions
The project design, construction plans and cost estimates are based on and reflect the following
assumptions. Construction conditions that are not consistent with these assumptions may result
in a request for change or an equitable adjustment to project compensation under Section 6 of the
Construction Agreement.
Cost Assumptions
1. The Construction Work will be performed in accordance with the Construction Work
Schedule.
2. PSE's Project Manager will accept or reject (with written justification) the duct and vault
installation work performed by the City within five (5) business days notice of completion
from the City. In the event PSE rejects any of the ducts or vaults (with reasonable written
justification), the City will perform the necessary remedial work. The City will then re-
notify PSE and PSE shall have five (5) business days to accept or reject the remedial work.
3. All PSE cables can be pulled through the ducts and vaults system to be used for the
Conversion Project utilizing normal cable pulling techniques.
4. A City Street Use permit is the only permit necessary for PSE to perform its work for this
Conversion Project and will be issued within two (2) weeks of PSE submitting a complete
permit application (including any supporting documentation reasonably required by the
City). There will be no charge for the permit or inspection fees.
5. The estimated daily productivity rate for PSE duct and vault installation is based on an
assumed availability of 300 feet of trench per working day. The daily productivity rate is
City of Tukwila
Southcenter Parkway Extension Underground Conversion
105052358
Page 5
227
228
trench per working day. The daily productivity rate is used to calculate the number of days a
PSE provided Inspector will be required. During construction, the Inspector will be
scheduled in full day increments and in one continuous effort. Changes to a continuous
schedule require a minimum of five days advance notice. Inspector time will be charged to
the project for days that are less than the five days notice. Actual Inspector time will be
trued -up to the estimated productivity rate by Change Order. Since additional PSE facilities
beyond those allowed by Schedule 74 will be installed in a common trench, total Inspector
time for the project will be allocated 20% to the Schedule 74 contract and 80% to the other
portions of the project, within the conversion area.
6. This proposal assumes the use of two flaggers, basic signage and simple channelization.
Additional traffic control measures are not included.
7. Work to be performed by PSE does not include installation and/or removal of Temporary
Service facilities at the request of others during construction.
8. All cut -over and transfer work will be completed during regular working hours.
9. Installation of protective bollards may be necessary at some locations and may not be
included in the project design. In the event unplanned bollards are required, the associated
installation cost will be a shared cost.
10. Where noted on the plans, existing ducts, either empty or currently used, are to be utilized for
new cables. The Construction Costs Estimate assumes that such ducts are in place and
available for use to pull in new cables using the same equipment and effort as newly installed
ducts.
11. The Construction Costs Estimate assumes that guy anchors are installed prior to the
installation of the ducts in the area. Installation of guy anchors in the same area as newly
installed conduits may be subject to Change Order.
12. The labor rate assumption used in the Cost Estimate is based on 2009 rates. Any work
performed on this project during 2010 is subject to Change Order based on 2010 labor rates.
Schedule
1. There will be a total of two (2) PSE crew mobilizations as follows: i) one mobilization of an
underground line crew for installation of underground conductors and equipment; and ii) one
mobilization of an overhead line crew for removal of the existing overhead facilities. Once
mobilized PSE crews will have continuous productive work until all PSE Construction Work
is complete.
2. All PSE Construction Work will be performed during regular working hours from 7:00 AM
to 10:00 PM weekdays and 8:00 AM to 9:00 PM weekends, excluding holidays, and
excluding the intersection of S 180 St and Southcenter Parkway. In the event that lane
closures are necessary for performance of work, P SE shall be limited to working during
hours as directed by City. PSE will provide a weekly construction schedule during the
weekly meeting. Once approved, PSE crews will be allowed to complete the work as
scheduled, without changes and work stoppages caused by other construction activities.
City of Tukwila
Southcenter Parkway Extension Underground Conversion
105052358
Page 6
3. Work requiring scheduled interruption of electric service (cut -overs and transfers) will be
performed during the working hours specified in Schedule Assumption #2 above, and will be
scheduled with at least two (2) business days notice. PSE will notify customers of scheduled
service interruptions.
City of Tukwila
Southcenter Parkway Extension Underground Conversion
105052358
Additional Considerations
Service Lines
Service lines within the Conversion Area must be replaced or modified to provide underground
service from the Underground Distribution System as described in the attached Service Lines
Replacement Modification Requirements List. PSE Tariff Schedule 85 and it's associated
charges, will apply to perfouuiance of this work. The individual addresses to be converted are:
18800 Southcenter Pkwy. (M &P Company property)
**18010 Southcenter Pkwy. (Segale Properties /law office property)
Cut -overs and Transfers
PSE customers within the Conversion Area will experience interruption of electric service during
performance of the Construction Work when transferring system and customer loads from the
overhead distribution system to the Underground Distribution System. PSE will notify
customers at least two (2) business days in advance of expected service interruptions. Customers
may request that cut -over and transfer work affecting their service be performed outside the
regular working hours listed above subject to the customer's written agreement to reimburse PSE
for the additional cost (at overtime rates) to perform such work outside the regular working
hours.
New Service
Connection of new or increased load for City facilities (such as new traffic signals) under terms
of PSE Tariff Schedule 85 will be addressed on a separate work order and work sketch.
Additional costs may apply and will be quoted separately.
PSE Desien Construction Standards
This Conversion Project has been designed and will be constructed in accordance with PSE
design and construction standards in effect as of the date of this Project Plan. PSE standards
applicable to Construction Work to be perfouiied by the City have been provided to the City in
PSE's "Electric Distribution Trench/Duct/Vault Construction Standards, 2005 All relevant
PSE standard described above are attached to this Project Plan by this reference.
Page 7
229
230
Temporary Support (Holdinel of PSE Poles
Whenever any pole(s) are required to be temporarily supported due to excavation in proximity to
such poles, the City will coordinate with PSE to provide such support. The need to temporarily
support such poles shall be determined by PSE, and if required, such support shall be provided
by PSE. As used herein, "temporary support" means supporting one or more poles for a
continuous working period of ten hours or less.
Acceptance of Pro,iect Plan
The City and PSE mutually agree to and accept this Project Plan as of the date indicated below:
For the City: For PSE:
By: By:
Its: Its:
Date: Date:
City of Tukwila
Southcenter Parkway Extension Underground Conversion
105052358
Page 8
Construction Estimate
PUGET SOUND ENERGY
Date: 3/26/2010
Project Title: Tukwila South Conversion
Project Description: Conversion of the existing overhead didtribution system along Frager Rd from South 180th St approximately
Rate Schedule:
Project Manager/ Phone
Project Engineer Phone
Municipal Liaison Mgr Phone
Project
Revision
Revision Date:
Company
Labor
Materials
Equipment
inspection
Service Provider Outside Services
Operating Rights
Overhead
Government Entity
Labor
Operating Rights
Construction Costs Totals
74
Jose Vega 425- 766 -0993
Scott t3ostrom 253 -606 -4552
Cody Olson 206 992 -3315
105052358
0
Private
Shared Costs Conversion
1 Estimate I Estimate
1$
2,000
314,600
11,000
195,900
80 „000
1
594,400
Construction Costs Estimate Summary 1'2
100% Government Entity Reimbursable Costs
Prior
Gov Reg Temporary Conv /Reloc
Upgrade Services Within 5 Years
Estimate i Estimate Estimate
3,100
500
3,600
Projected allocation of Estimated Construction Costs at Completion of Construction Work
Company 356,600
Government Entity 237,800
Total 100% GE
Reimbursable 100% PSE Construction
Costs Costs Costs Totals
Estimate 1 Estimate Estimate
of
Estimate prepared in accordance with Sections 6 8 11 of Schedule 74 Design Agreement and Section 7 of Schedule 74 Construction Agreement.
2 All amounts shown in this estimate are rounded up to the next $100
Shared Costs are allocated 40% to the Government Entity and 60% to the Companv if the Conversion Protect is completed
Total Costs excludes Govemment Entity costs of trenching, restoration, and surveying
3,600
3,600
2,000
317,700
11,000
185,900
81,400
598,000
-�5
356,600
241,400