Loading...
HomeMy WebLinkAboutTrans 2010-05-17 COMPLETE AGENDA PACKETIV. Old Business City of Tukwila Transportation Committee y B. 2010 First Quarter Reports Verna Seal, Chair Joan Hernandez De'Sean Quinn AGENDA Item I. Current Agenda Review II. Presentation(s) III. Business Agenda A. Annual Update for Six -Year Transportation Improvement Program 2011 2016 MONDAY, MAY 17, 2010 Time: 5:00 PM Place: Conference Room #1 I. II. Distribution: V. Seal J. Hernandez D. Quinn D. Robertson Mayor Haggerton S. Lancaster K. Matej D. Speck C. O'Flaherty M. Hart S. Norris S. Kerslake B. Giberson F. Iriarte R. Tischmak P. Brodin G. Labanara C. Knighton P. Lau M. Mathia S. Anderson S. Hunstock J. Pace J. Harrison N. Olives Recommended Action Page A. Forward to 6/14/10 C.O.W. with Public Hearing and 6/21/10 Regular B. Information Only. IV. Future Agendas: Next Scheduled Meeting: Monday, June 7, 2010 Committee Goal: Establish a process to provide updates to Council on issues that are brought forward at Council meetings during citizen comment opportunities. The City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206- 433 -0179 for assistance. R. Still M. Miotke J. Trantina C. Parrish B. Arthur File Copy Single side to Ana 3 Extra Copies e -mail cover to B.Saxton, M. Hart, C. O'Flaherty, K. Narog, S. Norris and S. Kirby Pg. 1 Pg. 11 TO: City of Tukwila INFORMATIONAL MEMORANDUM Mayor Haggerton TRANSPORTATION COMMITTEE FROM: Public Works Director DATE: May 12, 2010 SUBJECT: Six -Year Transportation Improvement Program (2011 -2016) ISSUE Annual update of the Six -Year Transportation Improvement Program for the years 2011 2016. BACKGROUND The Transportation Improvement Program (TIP) is updated annually as required by RCW. The TIP is adopted by resolution after a public hearing at the local agency level and incorporated into the regional and state TIPs. The TIP is primarily a financial planning document for projects competing for grants. Any project submitted for federal grant funding must be included in the local, regional and state adopted TIPs. The TIP is a rolling plan showing various funding sources: grants, developer, and local funds. Projects "roll" as funds or stages occur (design report, final design, and construction). Tukwila's TIP and Capital Improvement Program (CIP) list many of the same transportation related projects. The TIP lists only those transportation- related projects planned within the next six years that are deemed regionally significant. The City's CIP lists transportation projects planned in the next six years and beyond, as well as water, sewer, surface water, and capital facilities. The TIP is required to be adopted by July 1 on an annual basis, while the CIP is prepared during summer /fall in conjunction with the City's budget preparation. Differences between the two may be due to priority changes, funding availability changes, or other factors that normally occur during the time between adoption of each document. ACTION TAKEN The attached spreadsheet is the "Draft" 2011 2016 TIP and was created by modifying the 2010 2015 TIP to add or remove projects, adjust project costs, and reprioritize the list of projects. Added: No projects were added. Deleted: No projects were deleted. RECOMMENDATION The Council is being asked to approve the resolution for the 2011 -2016 Six -Year Transportation Improvement Program and consider this item at the June 14, 2010 Committee of the Whole with a Public Hearing and subsequent June 21, 2010 Regular Meeting. Attachments: Resolution 2011 2016 "Draft" Transportation Improvement Program (TIP) Spreadsheet Current Adopted 2010 2015 TIP W: \PW Eng \PROJECTS\A- RW RS Projects \TIP \Current TIP \tip2011 memo.doc Jim Haggerton, Mayor 1 ATTEST/ AUTHENTICATED: Christy O'Flaherty, CMC, City Clerk APPROVED AS TO FORM BY: Office of the City Attorney W:\ Word Processing \Resolutions \TIP 2011- 2016.docx RT:GL:kn 5/11/2010 DRAFT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2011- 2016), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs, and based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2011- 2016); and WHEREAS, on June 14, 2010, a public hearing was held regarding the City's Six Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A six -year Transportation Improvement Program for the calendar years 2011 -2016 is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of 2010. Exhibit: City of Tukwila' s Six -Year Transportation Improvement Program from 2011 to 2016 Dennis Robertson, Council President Filed with the City Clerk: Passed by the City Council: Resolution Number: Page 1 of 1 2 1 ;DRAFT 2011 2016 TIP SUMMARY I I 'Project Costs in Thousands of Dollars 2011 -2016 2010 CIP j TIP 1 PROJECT TITLE Page No. 2011 2012 I 2013 2014 2015 2016 I TOTAL 1 i 1 I I I 1 Neighborhood Traffic Calming Program 4 01 01 0 01 01 01 0 2 Annual Bridge Inspections and Repairs 8 1451 2051 205 270; 2701 2701 1,365 3 Boeing Access Rd Bridge Replacement I 9 1,7501 1,7501 13,617; 13,6171 01 01 30,734 4 Tukwila Urban Center- Ped /Bike Bridge I 10 0! 5001 1001 1,400; 0 01 2,000 5 Southcenter Parkway (S 180 St S 200 S 14 27,3531 0 01 01 0 01 27,353 6 Tukwila Urban Center Access (Klickitat) I 15 19,2271 0 01 01 0 01 19,227 7 S 144 St (Phase II) 19 681 0 01 01 0 1,7501 1,818 8 (Annual Overlay Repair Program 1 20 1,2501 1,250 1,2501 1,2501 1,250 1,2501 7,500 9 Tukwila Urban Center Transit Center I 22 01 2,300 01 01 0 4,300 6,600 10 Andover Park West (Tuk. Pkway. Strand 23 0 1,461 0; 01 0 0 1,461 11 Walk Roll Plan (Nonmotorized Trans. PI 24 0 0 0! 01 0 0 0 12 Macadam Rd S 144th St Intersection 1 27 0 0 01 01 0 610 610 13 Andover Pk E Minkler Blvd Intersection I 28 75 0 01 0! 0 602 677 14 W Valley Hwy S 156 St 29 75 0 0 01 0 1,032 1,107 15 Andover Park E Industry Dr. Signal 30 0 0 0 0 0 575 575 16 S 133 St SR 599 Ramps Intersection 31 20 0 01 0 0 630 650 17 ;East Marginal Way (BAR to S 112 St) 32 50 0 01 0 0 3,300 3,350 18 'Interurban Ave S (S 143 St- Ft. Dent Way 33 0 0 01 0 0 11,100 11,100 19 ITUC/TOD Pedestrian Improvements 1 34 0 0 01 0 0 1,100 1,100 20 !Minkler Blvd. (Southcenter Pkwy APW) 35 0 0 01 0 0 425 425 21 !Tukwila Int'l Blvd. (Phase IV) I 36 0 0 01 0 0 4,591 4,591 22 (Traffic Signal Interconnect Program I 37 0 0 0; 0 0 3,0001 3,000 23 ISC Blvd Widening (1 -5 -61st Ave S Bridge 38 0 0I 01 0 0 20,0001 20,000 24 (Tukwila Intl Blvd. S 116 Wy/ SR599. 1 39 0 0 01 01 0; 4,6751 4,675 25 IS 168 St (S \C Parkway to Andover Pk E) I 40 0 0 0! 01 0 23,2441 23,2441_ 26 !West Valley Hwy (1- 405 Strander Blvd.) I 41 0 0 01 01 0 6301 6301 27 (Nelsen Place (S 158 St S 156 St) 1 43 0 0 01 01 0 2001 2001 28 IS 180 St Andover Park W Intersection I 44 0 0 01 01 0 210 2101 29 S 144th St Bridge Sidewalks I 47 0 0 01 01 0 100 1001 30 Greenbelt Multipurpose Trails I 56 64 65 431 01 0 0 172 TOTAL IPROJECTS REVISED FROM 2010 -2015 TIP: None 50,077 7,531 15,2151 16,5371 1,520 83,594 174,474 May 12, 2010 FUNDING SOURCES Federal I State TIB Developer Unsecured! City 1 1 0 I I 1,365 24,588! 1 6,146 4001 1,600 3,5501 15,000 6,307 1 3,477! 5,250 9,560 1 1,0001 i 452 4,6201 1,297 1 17 1 75 75 440j 75 1 20 4601 1,040; 1,3001 I 5,0001 1 500' 425 1 216! 3,5001 I 1,2001 1 1,900; 5,3001 530 30 172 100 0 2,4960 940 818 7,500 1,528 164 0 593 602 592 500 170 1,010 6,100 600 0 8751 1,800 20,000 2,775 17,944 1001 200 80 100 0 32,0151 20,7021 26,7391 20,020! 74,998 3 Washington State Department of Transportation Agency: Tukwila Tukwila Co. No.: 17 Co. Name: King City No.: 1320 MPO /RTPO: PSRC Project Identification Project Costs in Thousands of Dollars Federally Funded A. PiN/Federal Aid No. B. Bridge No. m Expenditure Schedule Projects Only SI m F un d Source Information o E C. Project Title a d r o r Federal Funding (Local Agency) RIVd To .1 ti Z D. Street/Road Name or Number QF y m Phase Federal Federal State 4th Required E. Beginning MP or Road Ending MP or Road E to- o Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date F. Describe Work to be Done ti (mmPodh'yyy) Code Phase Code Funds Funds Funds 6th Type (M �1 1 2 3 4 5 6 7 8 9 I 10 11 12 13 14 15 16 I 17 18 19 20 21 19 1 12 S ALL 1/1/2010 N I eighborhood Traffic Calming Program Various City Streets from: to: Program to address neighborhood traffic concerns using striping, signage, roadway improvements, traffic calming, and education to reduce speeding and improve safety. Totals ALL 1 1/1/2010 1 14 2 11 S Annual Bridge Inspections and Repairs Various City Streets from: to: Perform load ratings and bi annual inspections as well as construct necessary repairs and maintenance. 14 3 00 4 16 5 16 6 17 7 Totals 1240 1240 145 145 205 745 08002500 PE 1/1/2010 BR 2800 700 3500 1750 1750 1,000 Ft T 09 p CN 1/1/2012 BR 21788 5446 27234 13617 13617 CE Boeing Access Rd Bridge Replacement 0 No Boeing Access Road from: Airport Way to: 1 Reconstruct bridge. Tukwila Urban Center Ped/Bike Bridge from: Baker Blvd. to: West Valley Hwy Pedestrian bridge over the Green River connecting the CBD and rail station. Southcenter Parkway (S 180 St S 200 St) Southcenter Parkway from: S 780 St to: S 200 St Construct widening to 4 lanes with center turn pockets including curb gutter, sidewalks, drainage, landscaping, and utility undergrounding. Tukwila Urban Center Access (Klickita0 Southcenter Parkway from: 1 -5 Off Ramp to: S 168 St Design and construct safety and capacity Improvements. S144 St (Phase 2) S 144 St from: 42 Ave S to: Tukwila Intl Blvd Design and construct paving, curb gutter, sidewalks, drainage. illumination, and utility undergrounding. Totals Page 1 I I I Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 6/8/2009 Adoption Date: 6/15/2009 Amend Date: Resolution No.: 1683 1 1240 1 1240 1 145 1 145 2051 745 Totals 24,588 6146 30734 1750 1750 13617 13617 32 p 1,000Ft PE 1/12012 Discretionary 100 400 500 500 CE RW 1/1/2013 Discretionary 20 80 100 100 08 CN 1/1/2014 Discretionary 280 1120 1400 1400 Yes 12/31/13 Totals 400 1600 2000 500 1500 01 S 7,400 Ft W CN 1 1/1/2010 1 Discretionary1 3683 1 OTHER' 150001 12319 1 31002 1 15501 I 15501 1 I S Yes P G 1/1/2010 Totals 3,683 15000 12319 31002 15501 15501 05 p 1,500 Ft W CN 1 1 /1/2010 'Discretionary! 30001 TPP1 52501 152301 234801 234801 I I CE 08 T T Yes P G 1/1/2010 Totals 3,000 5250 15230 23480 23480 03 p 1000 T ALL 1/12014 I I 1 I 1 1750 1 17501 1 I I 1750 W I S 6 C 1750 1750 1750 v. 5.7 Supersedes previous editions Washington State Department of Transportation Agency: Tukwila Co. No.: 17 Co. Name: King City No.: 1320 MPO /RTPO: PSRC G) 1 2 16 8 16 9 17 11 17 12 14 14 Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road Ending MP or Road F. Describe Work to be Done 3 Annual Overlay and Repair Program Various City Streets from: to: Repair, rehabilitate, and overlay City streets as needed in an annual program. Tukwila Urban Center Transit Center Central Business District from: to: Design and construct a transit center. 16 10 Andover Park West Andover Park West from: Tukwila Parkway to: Strander Blvd. Complete widening for center left turn lane. Walk Roll Plan (Nonmotodzed Trans. Plan) Various City Streets trom: to: Select, design, and construct non motorized projects including bike lanes, sidewalks, and trails. Macadam Rd S 144 St Intersection Macadam Road from: S 144 St to: 1,000 Ft on south leg Widen Macadam Road to add a northbound left turn lane. 16 13 Andover Park E /Minkler Blvd. Intersection from: 500 Fl. on each leg to: 500 Ft. on each leg Design and construct intersection and traffic signal improvements and widening for left turn lanes. West Valley Hwy /S 156 St from: Southcenter Blvd. to: 5 158 St Construct additional northbound lett turn lane at S 156 St for northbound HOV to northbound 1-405. Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 6/8/2009 Adoption Date: 6/15/2009 Amend Date: Resolution No.: 1683 Project Costs in Thousands of Dollars Federally Funded m a to Fund Source Information Expenditure Schedul Projects Only c r i i Federal Funding I (Local Agency) Rf1N c-- rn 9 Phase Federal Federal State Required E l '5 o Start Fund Cost by Fund State Local Total 4th Envir. Date n. (mn✓ddyyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type way?) 4 5 6 7 8 9 10 11 I 12 I 13 14 15 16 17 18 19 20 21 07 5 C ALL 1/1/2010 I 7500 7500 1250 1250 1250 3750 G 0 P S T W Totals 7500 7500 1250 1250 1250 3750 CN 1/1/2010 21 P T ALL 1/1/2015 CMAQ 3700 452 600 4300 1150 1150 4300 CE W Yes P S 12/31/14 Totals 4,620 452 1528 6600 1150 1150 4300 05 P 2000 C ALLI 1/1/2011 I I I I I 14611 14611 1 14611 P S T W Totals 1461 1461 1461 32 S ALL 1/1/2010 I I I I 1000 f 10001 200 I 200 I 200 I 4 CE Totals 1000 1000 200 200 200 400 05 P 1000 PE 1/1/2010 17 17 17 ALL 1/1/2015 610 610 610 CE Totals 627 627 17 610 12 S 1,000 Ft PE 1/1/2010 75 75 75 ALL 1/1/2015 602 602 602 CE Totals 677 677 75 602 12 P 1,500 Ft T PE 1/1/2010 75 75 75 ALL 1/1/2015 STP U 440 592 1032 1032 CE Totals 440 667 1107 75 1032 Page 2 No No No No v. 5.7 Supersedes previous editions Washington State Department of Transportation Agency: Tukwila Co. No.: 17 City No.: 1320 16 16 16 17 14 18 17 19 16 20 14 21 Co. Name: MPO /RTPO: King PSRC Project Identification A. PINIFederat Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road Ending MP or Road F. Describe Work to be Done 3 Andover PkE industry Dr. Signal from: 500 FL on each leg to: 500 Ft. on each leg Design and construct a traffic signal and intersection improvements. S 133 St SR 599 Ramps Intersection from: 500 Ft. on each leg to: 500 Ft. on each leg Design and construct intersection improvements including a new traffic signal. East Marginal Way East Marginal Way from:. Boeing Access Rd. to: S 112 St Design and construct widening to 3 lanes including curb gutter, sidewalks, drainage, landscaping, and utility undergroundmg. Interurban Ave S Interurban Ave S from: S 143 St to: Fort Dent Way Reconstruct street including paving, curb gutter, drainage, illumination, sidewalk, and landscaping. TUC?OD Pedestrian Improvements from: Tukwila Urban Center to: Rail Station Construct bike/pedestrian connection between Tukwila Urban Center and Commuter Rail Station/TOD area. Minkler Blvd Minkler Blvd from: Southcenter Pkwy to: Andover Park W Consruct widening for 3 lanes inlcuding curb gutter, sidewalk, drainage, and landscaping. Tukwila Intl Blvd. (Phase 4) Tukwila Intl Blvd from: Boeing Access Rd. to: S 116 St Design and construct widening including paving, curb gutter, sidewalk, drainage, illumination, landscaping, and utility undergrounding. m� i m r E 4 5 6 7 8 9 10 11 PE 1/1/2010 12 P 1,000 Ft W CN 1/1/2015 S Totals PE 1/1/2011 12 P 1,000Ft W ALL 1/1/2015 S G C P PE 1/1/2011 STP(U) 03 P 1,500 ft 3 ALL 1/1/2015 STP(U) Totals ALL I 1/1/2012 03 P 4,500 Ft W 32 S 06 a N 04 p 2,000 Ft W S P 03 P a U P G Project Costs in Thousands of Dollars d Fund Source Information t Federal Funding Phase Federal Federal State Start Fund Cost by Fund (mnr/dd/yyyy) Code Phase Code Totals Totals ALL 1 1/1/2015 0.75 0 Totals ALL 1 1/1/2015 Totals 3,500 Ft ALL I 1/1/2015 P I S W Totals STP(U) 460 460 STP(U) 1 25001 CMAQ I I Page 3 2,500 500 12 Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 6/8/2009 Adoption Date: 6/15/2009 Amend Date: Resolution No.: 1683 Federally Funded Expenditure Schedule Projects Only (Local Agency) State Funds 13 Local Funds 14 75 20 AlP1 25001 6100 1 Total Funds 575 575 650 650 75 20 170 630 190 650 50 50 AtP 1300 2000 3300 1300 2050 3350 11100 1 2500 6100 11100 500 1 1 1 600 1 11001 15 16 I 17 18 19 75 75 600 1100 425 1 4251 425 425 TPP1 35001 1091 1 45911 3500 1091 4591 4th 1st 2nd 3rd T r 20 20 50 I 1 1 50 3300 4001 10700 I 575 CE 575 630 CE 630 3300 CE 400 10700 1100 CE 1100 425 425 4591 4591 Envir. Type 20 21 CE CE CE R/W Required Date (MANYY) No No No Yes 1/1)12 No No No v. 5.7 Supersedes previous editions Washington State Department of Transportation Agency: Tukwila Co. No.: 17 City No.: 1320 8 0 N 9 rS m .oE 1 2 16 22 CO Co. Name: King MPO /RTPO: PSRC Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road Ending MP or Road F. Describe Work to be Done 3 Traffic Signal Interconnect Program Various City Streets from: to: Design and install hard wire interconnect system between traffic signals and the Traffic Operations Center. 14 23 04 SC Blvd. Widening Southcenter Blvd from: 1-5 to: 61 Ave S Widen Southcenter Blvd and the 61st Ave S Bridge to add a lane for future traffic growth. 14 24 Tukwila Intl Blvd /S 116 St Tukwila Intl Blvd from: 1,000 Ft. on each leg to: 1,000 Ft. on each leg Design and construct widening on Tukwila Int'I Blvd and intersection improvements at T.I.B. /S 116 St. 16 25 01 P S168St S168St from: Southcenter Pkwy to: Andover Pk E Construct new roadway including curb gutter, sidewalk, drainage, illumination, and landscaping. 14 26 05 P West Valley Highway West Valley Hwy from: 1.405 to: Strander Blvd Design and construct widening to 7 lanes including curb gutter, sidewalks, illumination, and drainage. 17 27 03 Nelson Place Nelson Place from: S 156 St to: S 158 St Design and construct paving, curb gutter, sidewalks, drainage, and illumination. 16 28 12 P S 180 St /Andover Park W Intersection from: 500 FL on each leg to: 500 Ft on each leg Widen for north south turn lanes. Project Costs in Thousands of Dollars c Expenditure Schedule d m (Local Agency) d d cI r I Federal Funding c� a 1a. t Phase Federal Fede State State Local Total 4th E t 5 'o d Start Fund Cost by Fund 1st 2nd 3rd Thru Funds Funds Funds 6: (mm/dd/yyyy) Code Phase Code 6th 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 12 s W ALL 111/2015 1 CMAQ 1200 1800 3000 i 3000 T G C P Totals ALL 1 1/1/2015 p 0.5 C G P S 04 P 2000 P 4,000 Ft P T W s 0.5 Mi W T S P G p 600 Ft S T W 1000 W T P Totals ALL I 1/1/2015 Totals ALL I 1/12015 1,200 1 I I 1 Totals 20000 20000 20000 ALL 1 1/1/2015 1 STP(U) 1 1900 1 I 1 2775 1 4675 1 1 1 I 4675 1,900 Totals 23244 23244 23244 ALL 1 1/1/2015 I I I 1 I 630 1 630 I I 1 1 630 Page 4 Totals ALL 1 1/1/2015 1 STP(U) 1 1001 1 1 Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 6/8/2009 Adoption Date: 6/15/2009 Amend Date: Resolution No.: 1683 1800 3000 3000 20000 1 20000 1 2775 4675 4675 23244 1 23244 1 200 200 110 1 2101 iii 23244 20000 630 630 630 200 1 2001 1 200 Federally Funded Projects Only RNV Required Envir. Date Type (MANYV) 20 21 CE CE 200 210 CE CE No CE Yes 12/31/2015 No Yes 12125/2015 No No Totals 100 110 210 210 v. 5.7 Supersedes previous editions W ashington State Department of 'transportation Icy: Tukwila co. Name tuna No.: MpoiRTPO: PSRC r 14o.: 132 e No. Project Identification B. Bridge 3 ral Aid No• o r N A P ro e tTitie umber S or D, StreetfR Name oad Ending MP or Road _'—r'" a tlt2otb v 4 Z F. Beginning rite Work t o 1 05 0.2 G P —pi --i 1 J _I T W 17 29 s 144 St Bridge Sidewalks 44 SL tot5bete 51st Ave Sand Ord trim'. s n4 Sn'ewziks an bridge ove 32 P widen 51 ex Ave S. 00 Greenbelt Multipurpose Trails amore pedestrian and bicycle frrWi desafecon ++e�s ot mat°bnzedveh', I modes or transport Costs to Thousands of D°Ua informat project Fund Source l Total 1st m I Federa- l Funding Slate Slate L °mil Funds o. Federal 1 rostby Fund Funds Funds 1E 14 j 15 krnmiddilit0i Code Phase 0 a F too too 1 Totals G 'Totals for T:ilerrila 43, II Tota sl st Improvement Program Transportation lmp SIX Year TransP From 2010 to 2 e Date'. 5!2009 Adoption D 1683 602009 Adoption l l mend Date' Resolut Expenditure Schedule Funded Amend Date: Federally Fund Projects Only RW1 (Local Agency)_ rr Required q1h Envi. pate Thru t Type IMM" 6th 21 1 19 20 too C E 2nd 17 3rd 16 No too 43 100 100 43 43' 43 C;1: No 172' 172' 43 43 43 172 21570 16,215 109,729 28,002 1118 183,275 43;161 v. 5.7 Supersedes previous editions 10 CITY COUNCIL City of Tukwila FIRST QUARTER REPORT TO COUNCIL January 1 March 31, 2010 Prepared for Transportation Committee Jim Haggerton, Mayor During the February 22, 2010, Committee of the Whole, the City Council implemented a police /procedure relating to tracking of Council goals, initiative and /or projects. It was determined that Council will review the status of such items quarterly at a Committee of the Whole meeting. At the same meeting, there was consensus to begin review of Council goals at the end of second quarter; therefore, a majority of the goals below do not include a status update. BUDGET PROGRAM GOALS: 1. Seek out opportunities for Councilmembers to further their knowledge. experience and awareness of the different cultures represented within the Tukwila community: Assigned to Community Affairs Parks Committee for implementation and /or follow -up. 2. Support proorams and services that provide a sense of stability. community and unity throuahout Tukwila's residential neiahborhoods: Assigned to Community Affairs Parks Committee for implementation and/or follow -up. Councilmembers continue to sponsor a monthly Coffee Chat in the Tukwila community. 3. Work together in cooperation with nearby cities to address common problems in the Hiahwav 99 corridor and Military Road: Assigned to Finance Safety Committee for implementation and/or follow -up. Council staff is working on scheduling a joint small group meeting between the two city councils to take place during the second quarter. 4. Provide Ieaislative support and encouraaement to Tukwila residents livina in rental communities throuah proarams that hold owners and /or property manaaers accountable for providing safe places to live through the implementation of a rental licensing program: Assigned to Community Affairs Parks Committee for implementation and /or follow -up. Tukwila Councilmembers actively opposed SB 6459 during the first quarter. This proposed legislation provides for limitations on rental housing inspections. Department of Community Development staff continues to move forward with developing a rental housing licensing program for Tukwila. 5. Approve and implement standard operatina procedures for the Council. Review and update procedures on a regular basis: Not currently assigned to a specific committee; monitored by the Council President and Legislative Analyst. The Council implemented two policies for incorporation into the standard operating procedure manual during the first quarter (Tracking of Council Goals and Distribution of Information). 6. Support the implementation of City endorsed oroarams (i.e. Walk Roll Plan. Fire Master Plan. Parks Recreation Open Space Plan) throuah oolicv related decisions not associated with direct program funding: Assigned to Community Affairs Parks Committee for implementation and /or follow up. 7. Ensure a commitment to continued human services fundina in relation to the cost of living throuah consistent review of reaional. state and federal budaets affecting human services programs and services: Assigned to Community Affairs Parks and Finance Safety Committees for implementation and /or follow -up. This item will be scheduled for Committee review as budget reviews deem appropriate. 8. Study the feasibility and implementation of televised City Council meetinas: Assigned to Utilities Committee for implementation and /or follow -up. 9. Continue to foster relationships within local. regional and state entities that encouraae opportunities for ioint partnership and outreach: Assigned to Utilities Committee for implementation and/or follow -up. Councilmembers serve as representatives and alternates on local, regional and state boards, committees and commissions including but not limited to: SCATBd, SKEDI, 11 2010 First Quarter Report Prepared for Transportation Committee Page 2 WRIA 9, AHAB, Suburban Cities Association, Association of Washington Cities, Highline Forum and Cascade Water Alliance. 10. Formulate an Adopt -a- Neighborhood program that will provide Councilmembers the opportunity to become more familiar with the chanaina faces of communities and neiahborhoods throuahout the City: Assigned to Community Affairs Parks Committee for implementation and /or follow -up. 11. Research the viability of sponsorina a City -wide Citizens' Academy: Assigned to Community Affairs Parks and Finance Safety Committees implementation and /or follow -up. 12. Establish a process to provide updates to Council on issues that are brouaht forward at Council meetinas durina citizen comment opportunities: Assigned to Transportation Committee for implementation and /or follow -up. During the first quarter, this item was re- assigned to City Administration for completion. City and Council staff as well as the Council President worked towards formulating an efficient process to update Council of such items. PUBLIC WORKS DEPARTMENT 1st QUARTER SIGNIFICANT ISSUES: Promoted Robin Tischmak to City Engineer, after serving as Acting City Engineer for 6 months. Robin joined the City in 1991 as an Associate Transportation Engineer and was promoted to Senior Engineer in 1998. Developed preliminary PW operating budget savings that included not filling several key vacant positions: CERT Trainer, Streets M &O Specialist, Development Engineer, and Senior Transportation Engineer. The Southcenter Parkway Extension project was advertised and good bids were received. Scarsella Bros. submitted the low bid that was approximately $4 million below the engineer's estimate. Construction is anticipated to begin in the second quarter of 2010 and be completed by the end of 2011. Construction is 75% complete and within budget for Phase II Ill of Tukwila International Blvd Improvement Project. Wall construction and fascias are nearly complete and traffic is being shifted from the west side to the east side to allow construction of the roadway improvements on the west side of the street. BUDGET PROGRAM GOALS: Public Works Administration 1. Prepare and present a comprehensive City Facilities Upgrade and Replacement Plan: Developed proposal to resurrect the Plan using in -house staff in Public Works and DCD along with minor on -call consultant support. 2. Evaluate'future arant funding options available and propose a course of action to fund transportation proiects: Received approval to accept EETP grant for the pedestrian and bicycle level of service portion of the Transportation Element of the Comp Plan; received approval to apply for BRAC funds to replace the aging Boeing Access Road Bridge. 3. Implement the Emeraencv Manaaement Community Disaster Education (CDE) Proaram: CERT Program Trainer recruitment on hold due to budget restrictions. 4. Provide quarterly reports on emergency management issues: Mayor and Council are being regularly updated on all issues. 5. Hold auarteriv community informational meetings: Ongoing. Business Services 1. Create a more effective. cost efficient department— oroiectina and monitoring department costs: seekina more cost effective purchasing agreements with vendors: preparing the department's 12 2010 First Quarter Report Prepared for Transportation Committee Page 3 operation. maintenance and capital facilities budaet using a "needs- basis" approach: Ongoing. Each vacant position and seasonal labor will be analyzed to determine if necessary at this time. 2. Review the feasibility of usina Council-approved Local Improvement Districts (LIDs) as a means of financina street improvement projects for residential and commercial areas: Approved Resolution No. 1698 for the Intent to Form a LID and Ordinance No. 2260 was approved to Form LID #33 for the Tukwila Urban Center Access (Klickitat) Project. 3. Review "rate model" for establishina appropriate rates for water. sewer and surface water enterprise funds. investigate the feasibility of a consumption -based sewer rate: The interfund utility tax was implemented to help fund the Howard Hanson Dam Flood Response Plan. The rate model will be adjusted to reflect the utility tax on the enterprise funds. Maintenance Administration 1. Identify operational reauirements (facility space. eauipment. and personnel) for all maintenance functions beina performed: Material staging and storage have been prioritized for the Howard Hanson Dam Flood Response Plan. 2. implement recurrent technical trainina and operational safety programs to maintain employee certification levels to meet current and updated reaulations: Training for fall protection was completed this quarter. 3. Initiate a program that will improve the enerav efficiency of City maintenance operations: As part of the City's Green Team, Public Works is reducing waste and evaluating energy conservation. Engineering Administration 1. Assess standardized contractina procedures for construction and repair projects: City attorney is reviewing all contract templates. 2. Annual assessment and update of transportation impact fees system: A contract with Fehr Peers has been executed to provide a review of the impact fees by June 30, 2011. Development General: 1. Maintain and improve the turn around time for permit review and approval: All performance goals are being met. 2. Work with and support DCD to improve permit processes: Ongoing. Performance: 1. Zero backloas of permits waitina for more than 30 days to be reviewed: Goal being met. 2. Permits for sinale-familv residences issued within 30 days: Goal being met. Facility Maintenance General: 1. Maintain a record keepina and trackina system for facility maintenance work order allocation: Goal being met. Facilities also assessed auxiliary power sources for emergency purposes (i.e. 6300 Building, etc.). 2. Implement the business plan for facility maintenance: Planning is now part of the Green Initiative. Performance: 1. Advertise and award 90% of active Fund 303 Proiects no later than June 1 On budgetary hold. 2. Reduce facility maintenance costs by 10% throuah efficiencies: Implementing lighting HVAC efficiencies. Street Maintenance /General Admin General: 1. Participate in pavement manaaement for the multi -year street overlay proaram: The 2009/2010 Overlay and Repair Program was completed. 2. Assess the Traffic Operations Center (TOC) effectiveness and flexibility with an emphasis on expandina its use by other departments: Analyzing fiber expansion by City crews along E Marginal Way corridor. 13 2010 First Quarter Report Prepared for Transportation Committee Page 4 Performance: 1. Repair City -owned streetliahts within 72 hours. For Seattle City Liaht/Puaet Sound Enerav streetliahts. report within 24 hours: Repairs have been made on City -owned lights as needed. 2. Correct all traffic signal problems within 24 hours: Goal being met. 3. Perform auarterlv preventative maintenance on all City -owned traffic signals: Ongoing. 4. Evaluate reflectivity of all sians once a year: Ongoing. 5. City street cleanina: Goal being met. Residential 100 percent of the streets. twice a year. Arterial residential and commercial /industrial roads six times a year. Arterial commercial /industrial roads eiaht times a year. 6. Potholes shall be repaired within 48 hours of notification: Goal being met 7. Provide auarterlv reports on the effort to remove araffiti from public property: Year -end report being prepared. Residential Streets General Engineering 1. Prioritize. budget. and schedule list of residential street improvement Droiects. includina condition of sidewalks. for inclusion into the City's Capital Improvement Proaram: On hold. 2. Annual update of pavement management system: 2009/2010 Overlay Repair Program construction was completed in 2009. Due to staff workload, the pavement management system will be updated in 2010. Bridges Streets General Engineering 1. Onaoina construction of Phase II Ill of Tukwila International Blvd. Improvement Proiect: Construction is 75% complete and within budget. Traffic will be shifted from the west side of the road to the east side to enable contractor to construct west side improvements. 2. Award construction contract for Tukwila Urban Access (Klickitat) Project: ROW acquisition continuing with certification to follow. Negotiating final design issues with WSDOT. Supplement with HNTB to complete design has been executed pending resolution of design criteria with WSDOT. 3. Award construction contract for Southcenter Parkway Proiect: Project was advertised and 9 bids were opened 3/18/10. Award to Scarsella Brothers is proceeding for Council approval in April. Construction is anticipated to begin in June 2010. Water Utility /Maintenance Operations General: 1. Track backflow prevention compliance for the annual Department of Health report usina the City's cross connection data proaram: Data updates completed and DOH reports have been submitted. 2. Continue the remainina phase of the automatic meter read proaram in the residential areas: Foster area is currently underway (90 services were transferred from Water District 125). 3. Implement a proaram to test the accuracy of water meters 2- inches and larger into standard preventative maintenance procedures: Goal being met. 4. Monitor Water Use Efficiency efforts and provide an annual report: Report sent to Washington State Department of Health. Performance: 1. Install new water meters within 48 hours of the hook -up reauest: Goal being met. 2. Respond to water aualitv concerns within 24 hours: Lake Young's algal bloom issues are causing problems in March and April. 3. Test chlorine residual level bi-monthlv: Goal being met as scheduled. 4. Test coliform levels bi-monthlv: Goal being met. 5. Achieve 10 percent water savinas to meet Water Efficiency Goals established by the Municipal Water Law: Completed 10% for 2009. 6. Regular testina of fire hydrants: Ongoing. 14 2010 First Quarter Report Prepared for Transportation Committee Page 5 General Engineering Services Water 1. Complete construction of Andover Park East Water main Replacement Project: Design is proceeding through the review process. Advertise in third quarter of 2010. Sewer Maintenance Operations General: 1. Evaluate system -wide conditions for possible replacement and /or uoarade: Assessment completed with Infiltration Inflow work. 2. Review results of video loos to identify damaaed areas and locations of possible infiltration /inflow: Repairs have been made as needed based on inspection logs. 3. Implement a system for remote monitoring of lift stations response and corrective action can be achieved from a laptop computer: New software installed and adjustments continue. Performance: 1. TV inspect 20.000 LF of pipe annually: This goal was not met due to the Howard Hanson Dam Flood Response Plan in 2009. Ongoing for 2010. 2. Clean 183.000 LF of pipe annually: This goal was not met due to the Howard Hanson Dam Flood Response Plan in 2009. Ongoing for 2010. 3. Clean and maintain 730 manholes annually: This goal was not met due to the Howard Hanson Dam Flood Response Plan in 2009. Ongoing for 2010. 4. Weekly monitorina of 10 sewer lift stations for pump hours. start counts. and aenerator operation: Routine scheduled monitoring along with cleaning of wet wells. General Engineering Services Sewer 1. Complete construction of the Interurban Ave S Gravity Sewer Project: Design is being modified due to right -of -way issues. Overflow pipe will stay within right -of -way instead of being constructed in an easement. Advertise in third quarter of 2010. Work will precede Interurban Ave S roadway improvements. Surface Water Maintenance General: 1. Participate in development of a multi -year small drainaae Droiect list: Design review for 2010 completed. 2. Provide field support to Enaineerina for GIS inventory: Continuing with Area 6. 3. Investiaate throuah usaae of TV. GIS and flushina tasks to find unmapped systems: Efforts are underway to begin TV work in areas that still need additional mapping. Performance: 1. TV inspect 15.000 LF of pipe: This goal was not met due to the Howard Hanson Dam Flood Response Plan in 2009. Ongoing for 2010. 2. Maintain /clean 3.500 LF of ditches and four large water auality ponds: This goal was not met due to the Howard Hanson Dam Flood Response Plan in 2009. Ongoing for 2010. 3. Clean 1.400 catch basins. manholes and stormceptors: This goal was not met due to the Howard Hanson Dam Flood Response Plan in 2009. Ongoing for 2010. 4. Maintain /clean 15.000 LF of storm lines: Started inspection efforts for 2010. 5. Conduct weekly monitorina of five storm lift stations for Dumb hours. start counts. and aenerator operation: Routine scheduled monitoring Ongoing. Surface Water General Engineering Services 1. Complete small drainaae Proiects identified on the approved list for 2009 -2010: 2009 construction is complete with closeout anticipated in the second quarter of 2010.Design for 2010 underway. 2. Continue adoption and repair of the Private storm systems that have been identified: Scheduled to include 3 sites with the 2010 Small Drainage Program's advertised bid in May /June. 3. Continue development of the G IS as- builts of city infrastructure that complies with NPDES: Area 6 contract is currently underway. 15 2010 First Quarter Report Prepared for Transportation Committee Page 6 Equipment Rental General: 1. Use the Fleet Manaaement Database to recommend a 10 percent reduction in the City's fleet costs: Carpool efforts successful, analyzing fuel costs. 2. Fully implement the Vehicle Replacement Guidelines Procedures: Goal being met. Performance: 1. Return 100 percent of vehicles for preventive maintenance and checkup within the 30 -day timeframe: Ongoing, goal being met. 2. Keep 90 percent of safety vehicles (Police and Fire) available for use: Continuing with goal, with the focus on the Fire fleet. 3. Complete by Aoril 30th. the "Condition of the City's Fleet" Report: Available upon request. 4 Complete 85 percent of the capital eauipment purchases by June 30th: On budgetary hold, only 6 patrol vehicles have been ordered to date. 16