Loading...
HomeMy WebLinkAboutTrans 2008-11-12 Item 3A - Bid Award - East Marginal Way South Fiber InterconnectISSUE BACKGROUND ANALYSIS INFORMATION MEMO To: Mayor Haggerton From: Public Works Director( Date: November 3, 2008 Subject: East Marginal Way South Fiber Interconnect Project Project No. 08 -RWO1 BID AWARD Award the bid for construction of the East Marginal Way Fiber Interconnect Project as a portion of the 2008 Annual Overlay Repair Program. This project will provide the installation of vaults, conduits, and junction boxes at 16 locations within the right -of way of East Marginal Way South, between Boeing Access Road and just north of S 81S Place. Bids were solicited for this project from the Small Works Roster beginning on October 17, 2008 and bids were opened on October 30, 2008. Eight bids were received with the apparent low bid of $147,303.15 from Dennis R. Craig Construction, Inc. The engineer's estimate was $147,100.00. The bids were reviewed and tabulated and there was neither error nor irregularity found in the Dennis R. Craig Construction bid. Dennis R Craig has provided successful projects for the City in the past. This project will use the remaining budget of the 2008 Annual Overlay Repair Program that had a surplus of approximately $207,000. This budget surplus is adequate to cover the low bid and the 10% contingency. BUDGET AND BID SUMMARY 2008 Annual Overlay Budget 2008 Overlay Construction Contract COs East Marginal Wy S Fiber Contract 147,303.15 10% contingency 14330.31 Subtotal 162.033.46 RECOMMENDATION Attachments: City Clerk Bid Results Vicinity Map EMW Fiber Bid Overlay Balance 940,000.00 732,397.75) 207.602.25 Award the construction bid for the East Marginal Way Fiber Interconnect Project to Dennis R. Craig Construction, Inc. in the amount of $147,303.15. Forward this bid award straight to the November 17 Regular Meeting as the next COW is on November 24 and the following Regular Meeting is on December 1 This saves two weeks at this critical time of the year for starting a new construction project. P:\PROJECTS\A- RW RS Projects \O8RW012008 Overlay Repair'East Marginal Way Fiber Optic Interconnect\ Before Construction\ Info Memo Bid award Dennis F. Craigdoc SECURITY GRAND TOTAL ADDENDUMS APPARENT BIDDER NAME BID Including Sales ACKNOWLEDGED LOWEST BIDDER DATE STAMP OF RECD.? Tax (2) (RANK ORDER) RECEIPT Dennis R. Craig Construction, Inc. 10/30/08 8:35 AM Yes 147,303.15 Yes 1 Henkels McCoy, Inc. 10/30/08 8:35 AM Yes 182,952.00 Yes 3 Construct Co. 10/30/08 8:36 AM Yes 537,450.00 Yes 8 Gary Merlino Co., Inc. 10/30/08 8:37 AM Yes 152,400.00 Yes 2 R.W. Scott Construction Co. 10/30/08 8:45 AM Yes 202,700.00 Yes 5 Cannon Construction, Inc. 10/30/08 8:47 AM Yes 231,070.00 Yes TST, Inc. dba Travers Electric 10/30/08 8:50 AM Yes 199,995.00 Yes Rodarte Construction, Inc. 10/30/08 8:53 AM Yes 217,001.00 Yes BID OPENING East Marginal Way Fiber Interconnect Project 08 -RWO1 DATED this 30 day of October, 2008. CITY OF TUKWILA OFFICE OF THE CITY CLERK Christy O'Flaherty, CMC, City Clerk October 30, 2008 10:00 A.M. /s/ 7 4 6 The above figures appear as written within bid documents; and as read aloud at bid opening. THEY DO NOT however, REPRESENT ANY BID AWARD; apparent low, or otherwise. Christy O'Flaherty, City Clerk East Marginal Way Fiber Interconnect Vicinity Map