Loading...
HomeMy WebLinkAboutTrans 2009-01-20 Item 3B - Final Acceptance - 2008 Overlay and Repair by Watson Asphalt CompanyTO: City of Tukwila Attachment: Dept of Revenue Notice of Completion INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Public Works Directoy VV DATE: January 13, 2009 SUBJECT: 2008 Overlay and Repair Program Project No. 08 -RW01, Contract 08 -078 Project Completion and Acceptance ISSUE Accept contract as complete and authorize for release of the retainage. BACKGROUND The Notice to Proceed for Contract No. 08 -078 with Watson Asphalt Co. of Maple Grove, Washington, was issued on September 2, 2008 for construction of the 2008 Overlay and Repair Program. Project 08 -RWO1 provided pavement repairs and overlays on nine road segments in the City. Construction was physically completed on November 14, 2008. Two Change Orders were issued during construction. Change Order No.1 installed a utility vault on East Marginal Way South (Site #5) for the traffic signal system for a fee of $29,300.00. Change Order No. 2 placed approximately 900 lineal feet of 12.5 -foot wide paving fabric underneath the new asphalt layer at a proposed cost of $9,000.00 and deleted approximately 1,500 square yards of pavement planning at a savings of $3,225.00, resulting in a net additional cost of $5,775.00. ANALYSIS The finalized project cost is under the authorized construction budget. Minor unit price underruns stated below were primarily due to fewer construction materials used than originally estimated: Contract Award Amount Change Orders No. 1 and 2 Unit Price Underruns Sales Tax (N /A) Total Amount Paid (incl. retainage) 697,322.75 35, 075.00 (41,401.35) 0.00 690.996.40 Jim Haggerton, Mayor RECOMMENDATION The Council is being asked to accept the contract with Watson Asphalt in the amount of $690,996.40 and consider this item on the consent agenda of the February 2, 2009 Regular Meeting. P:\PROJECTS\A- RW RS Projects \08RW01 2008 Overlay Repair\Consruction Phase\After ConsWcxion \INFO MEMO Closeout 2008 Overlay 1 -14-09 gl.doc State of Washington Department of Revenue I PO Box 47474 REVENUE Olympia WA 98504 -7474 Contractor's Registration No. (UBI No.) 179017188 Date 11/26/08 NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT From: es_ Finance Approval ame City of Tukwila Attn: Diane Jaber 6200 Southcenter Boulevard Tukwila, WA 98188 Description of Contract 2008 Annual Overlay and Repair Project Contractor's Name Watson Asphalt Paving Co., Inc. 9/2/08 Surety or Bonding Company Travelers Indemity Co. Agent's Address P.O. Box 3018 Botthell, WA 98041 -3018 Comments: Retainage Bond Info Only Tax Rule 171 Applies one Notice is hereby given relative to the completion of contract or project described below Contract Number 08 -078 Telephone Number 425 868 -4377 Contractor's Address P.O. Box 845 Redmond WA 98073 -0845 Date Work Commenced Date Work Completed 10/31/08 c/o Hub International Northwest Contract Amount 697,322.75 Additions 35,075.00 Liquidated Damages 0.00 Reductions 41,401.35 Sub -Total 690,996.40 Amount of Sales Tax Paid at 0.0 0.00 (If various rates apply, please send a breakdown.) TOTAL 690,996.40 6 Assigned To Date Assigned Signature Type or Print Name Diane Jaber Phone Number 206 -433 -1871 Date Work Accepted n en U se i Amount Disbursed 690,996.40 Amount Retained 0.00 TOTAL 690,996.40 D isbursing 4 ficelc The Disbursing Officer must complete and mail THREE copies of this notice to the Depatttttent of Revenue, PO Box 47474, Olympia, WA 98504 -7474, immediately after acceptance of the work done under this contract. NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Department's certificate, and then only in accordance with said certificate. To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753 -3217. Teletype (TTY) users please call (800) 451 -7985. You may also access tax information on our Internet home page at http /dor.wa.gov. REV 31 0020e (6- 27 -01)