HomeMy WebLinkAboutTrans 2010-04-05 Item 3B - Grant Application - Boeing Access Road Bridge ReplacementCity of Tukwila TO: Mayor Haggerton Transportation Committee FROM: Public Works Director. DATE: March 31, 2010 ISSUE BACKGROUND DISCUSSION RECOMMENDATION Attachments: Project Application 2010 CIP Page 9 INFORMATIONAL MEMORANDUM SUBJECT: Boeing Access Road Over BNRR Bridge Replacement Project Project No. 94 -RWO8 Grant Application Authorize the submittal of a grant application for funding from the Federal Highway Bridge Program to replace the Boeing Access Road Bridge over BNSF Burlington Northern Railroad (BNRR). The Washington State Department of Transportation has issued a Call for Projects to compete for approximately $70 million of Federal Highway Bridge Program funds. Tukwila currently has only one (1) bridge that qualifies for funding. The Boeing Access Road Bridge over BNRR is structurally deficient and is programmed in the City's 6 -year Transportation Improvement Program (TIP) and the Capital Improvement Program (CIP) for replacement beginning in 2011 (contingent upon available funding). A project funding application was submitted in 2008 and was unsuccessful in receiving funds. Grant Applications are due by April 30, 2010. A preliminary grant application totaling $30,734,000.00 has been prepared. The Call for Projects indicates that 20% in matching funds should be assumed. This would require $6,146,800.00 in local matching funds. The grant application assumes that the project start would be delayed one year to 2012. Discuss with the Transportation Committee the decision to authorize the submittal of a grant application for the replacement of Boeing Access Road Bridge over BNRR. W:\PW Eng\PROJECTSIA- RW RS Projects \94RW08 BAR Br Repl \BRAC Application\2010 Application\Grant App memo TC 3- 30- 10.doc Jim Haggerton, Mayor Federal Highway Bridge Program Project Application Agency Name: City of Tukwila Bridge Name: Boeing Access Road Bridge Number: 0 0 0 0 TUK12 Contact Person: Robin Tischmak Phone: 206) 431-2455 (Sufficiency Rating: 21.86 SD 1 Structure ID: 08002500 Brief Project Description (including bridge replacement type) Rep1arP t-.hP BrPtng— A.ccPsR R_o_a_c_bri dgP nvP.r railroads (both BNRR_� TT_PRR) wi th —a —p� Pmt rPRRPd non_c_r .P g±r.d Proposed Length: 3 6 4 Width (Curb to Curb) 8 8 Rehabilitation /Replacement /Preventative Maintenance Projects PE Costs (approx 25% of total) $3,500,000 (Soils, Environmental, Design Documents, Plans Prepara n, etc.) Right of Way Costs (Purchases, Relocation and Construction Easem Pick one of the following: Q Replacement Candidate o Rehabilitation Candidate 10 Preventative Maintenance Scour Mitigation Electrical Mechanical Seismic Retrofit Bridge Strengthening Deck Repair Painting N Construction Costs (Environmental mitigation, approach cost! structure costs, etc.) Construction Engineering (18° 0 Contingency (15%) 41A Mobilization (10 Inflation Factor 5% per year, based on projected Ad date below Please send copies of the latest inventory and inspection reports, load ratings summary, accident data, any other pertinent information, and electronic photos (640 x 480 pixels minumum .jpg) with this questionnaire by the due date specified in the cover letter. $17,800,000 $3,204,000 $2,670,000 $1,780,000 $1,780,000 Total Rehabilitation /Replacement /Preventative Maintenance Project Costs:* $30,734,000 If a Rehabilitation, what would be the Replacement cost for that same structure (including PE, Right of Way, and Construction)? Realistic Start Dates (Month, Year): Preliminary Engineering 1 Right of Way Purchases 1 Construction Apr 2012 1 Sep 2013 Projected Advertising Date (Year): 2014 Project cost estimates may be updated on this form until October 31, 2010. Provide comments below Apr 2014 r a rri P� ��r�.l__ar_ P r A a3 r_� t n� a id all r1 c 4 n r i r l d. l E r. r l a rP? Lt 111a.fa r t i :�g T arP ri v� 3.].[Cl, r P IDoP'� �est rrn q CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2010 to 2015 PROJECT: Boeing Access Rd over BNRR Bridge Replacement LINE ITEM: 104.01.595. .51 PROJECT NO. 99410408 DESCRIPTION: Replace the existing bridge with a 340' long concrete or steel bridge structure. It will be 110' wide curb to curb and have sidewalks on both sides. The existing bridge is structurally and seismically deficient. Several pedestals are leaning, have concrete JUSTIFICATION: spalls, exposed rusty anchor bolts and reinforcements and some cracks. The existing railings do not meet standards. Type, size, and location draft report (specifically required for bridges) was completed in 2005. Federal grant STATUS: application was submitted in 2008. City will continue to submit application for funding as federal bridge funds are made available. MAINT. IMPACT: Maintenance will be reduced. COMMENT: New bridge will be constructed in phases to allow continued traffic use. Construction of projects over $10 million are only funded at 80% for federal funding. A Bond issue will be required for the City match. FINANCIAL Through Estimated (in $000's) 2008 2009 2010 2011 2012 2013 2014 2015 BEYOND TOTAL EXPENSES Design 52 1,750 1,750 3,552 Land (R/W) 0 Const. Mgmt. 1,602 1,602 3,204 Construction 12,015 12,015 24,030 TOTAL EXPENSES 52 0 0 1,750 1,750 13,617 13,617 0 0 30,786 FUND SOURCES Awarded Grant 0 Proposed Grant 1,400 1,400 10,894 10,894 24,588 Bond 350 350 2,723 2,723 6,146 Mitigation Expected 0 City Oper. Revenue 52 0 0 0 0 0 0 0 0 52 TOTAL SOURCES 52 0 0 1,750 1,750 13,617 13,617 0 0 30,786 c Project Location 2010 2015 Capita! Improvement Program 9