HomeMy WebLinkAboutCOW 2010-06-14 Item 3 - Public Hearing - Resolution Adopting 2011-2016 Transportation Improvement Programik[eetinx Date Prepared by
06 /14/10 BG
06/21/10 BG
ITEM INFORMATION
CAS NUMBER: 10-062
ORIGINAL AGENDA DA I'E: JUNE 14, 2010
AGENDA ITEM TITLE Resolution adopting the Six -Year Transportation Improvement Program 2011 2016
CATEGORY Disatssion Motion Resolution Ordinance Bid Award
Mtg Date 06/14/10 Mtg Date Mtg Date 06/21/10 Mtg Date Mtg Date
I SPONSOR Council Mayor I I Adm Svcs (l DCD I 'Finance n Fire I Leaal I P&'R Police PTV
SPONSOR'S
SUMMARY
Fund Source:
Comments:
MTG. DATE
06/14/10
06/21/10
MTG. DATE
06/14/10
06/21/10
EXPENDITURE REQUIRED
$0.00
COUNCIL AGENDA SYNOPSIS
Initials
AMOUNT BUDGETED
$0.00
1 Mayors review /Cosrnciljview
I (a,/ c�('
The Transportation Improvement Program (TIP) is required by RCW to be updated
annually. The TIP is primarily a finanical planning document for projects competing for
grants. A Public Hearing is scheduled on June 14, 2010 for the 2011 2016 TIP. After the
Public Hearing, the TIP is adopted by resolution and is then incorporated into the Regional
and State TIPs.
REVIEWED BY COW Mtg. n CA &P Cmte n F &S Cmte
Utilities Cmte U Arts Comm. n Parks Comm.
DA'Z'E: 05/17/10
RECOMMENDATIONS:
SPONSOR /ADMIN. Public Works Hold Public Hearing and adopt resolution
COMMITTEE Unanimous Approval; Forward to Committee of the Whole
COST IMPACT FUND SOURCE
RECORD OF COUNCIL ACTION
ATTACHMENTS
Informational Memorandum dated 05/12/10
Draft Resolution
Draft 2011 2016 TIP Spreadsheet
Current Adopted 2010 2015 TIP
Minutes from the Transportation Committee meeting of 05/17/10
ITEM No.
Public Hearing Other
Mtg Date 06/14/10 Mtg Date
Planning Comm.
Transportation Cmte
APPROPRIATION REQUIRED
$0.00
2
TO:
BACKGROUND
ACTION TAKEN
RECOMMENDATION
City of Tukwila
INFORMATIONAL MEMORANDUM
Mayor Haggerton
TRANSPORTATION COMMITTEE
FROM: Public Works Director
DATE: May 12, 2010
SUBJECT: Six -Year Transportation Improvement Program (2011 -2016)
ISSUE
Jim Haggerton, Mayor
Annual update of the Six -Year Transportation Improvement Program for the years 2011 2016.
The Transportation Improvement Program (TIP) is updated annually as required by RCW. The TIP
is adopted by resolution after a public hearing at the local agency level and incorporated into the
regional and state TIPs. The TIP is primarily a financial planning document for projects competing
for grants. Any project submitted for federal grant funding must be included in the local, regional
and state adopted TIPs.
The TIP is a rolling plan showing various funding sources: grants, developer, and local funds.
Projects "roll" as funds or stages occur (design report, final design, and construction).
Tukwila's TIP and Capital Improvement Program (CIP) list many of the same transportation- related
projects. The TIP lists only those transportation- related projects planned within the next six years
that are deemed regionally significant. The City's CIP lists transportation projects planned in the
next six years and beyond, as well as water, sewer, surface water, and capital facilities. The TIP is
required to be adopted by July 1 on an annual basis, while the CIP is prepared during summer /fall
in conjunction with the City's budget preparation. Differences between the two may be due to
priority changes, funding availability changes, or other factors that normally occur during the time
between adoption of each document.
The attached spreadsheet is the "Draft" 2011 2016 TIP and was created by modifying the 2010
2015 TIP to add or remove projects, adjust project costs, and reprioritize the list of projects.
Added: No projects were added.
Deleted: No projects were deleted.
The Council is being asked to approve the resolution for the 2011 -2016 Six -Year Transportation
Improvement Program and consider this item at the June 14, 2010 Committee of the Whole with a
Public Hearing and subsequent June 21, 2010 Regular Meeting.
Attachments: Resolution
2011 2016 "Draft" Transportation Improvement Program (TIP) Spreadsheet
Current Adopted 2010 2015 TIP
W: \PW Eng \PROJECTS RW RS Projects \TIP \Current TIP \tip2011 memo.doc
3
4
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION
IMPROVEMENT PROGRAM (2011- 2016), AND DIRECTING THE SAME TO
BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND
THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as
amended, the City Council of the City of Tukwila has previously adopted a
Transportation Improvement Program and thereafter periodically modified said
Transportation Improvement Program by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs, and based upon
these findings, has prepared a Six -Year Transportation Improvement Program for the
ensuing six calendar years (2011- 2016); and
WHEREAS, on June 14, 2010, a public hearing was held regarding the City's Six
Year Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A six-year Transportation Improvement Program for
the calendar years 2011 -2016 is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the
Secretary of Transportation and the Transportation Improvement Board of the State of
Washington.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of 2010.
ATTEST/ AUTHENTICATED:
Christy O'Flaherty, CMC, City Clerk
APPROVED AS TO FORM BY:
Office of the City Attorney
DRAFT
Exhibit: City of Tukwila' s Six-Year Transportation
Improvement Program from 2011 to 2016
W:\ Word Processing Resolutions \TIP 2011- 2016.docx
RT:GL:kn 5/11 /2010
Dennis Robertson, Council President
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Page 1 of 1
5
6
J
2011 -20161
TIP 1 PROJECT TITLE
1
1 1 Neighborhood Traffic Calming Program
2 'Annual Bridge Inspections and Repairs
3 Boeing Access Rd Bridge Replacement
4 Tukwila Urban Center Ped /Bike Bridge
5 1Southcenter Parkway (S 180 St S 200 SI
6 Tukwila Urban Center Access (Klickitat) 1
7 S 144 St (Phase II)
8 Annual Overlay Repair Program �I
9 Tukwila Urban Center Transit Center 1
10 (Andover Park West (Tuk. Pkway. Strand
11 Walk Roll Plan (Nonmotorized Trans. P
12 Macadam Rd S 144th St Intersection
13 'Andover Pk E Minkler Blvd Intersection 1
14 (W Valley Hwy S 156 St
15 Andover Park E Industry Dr. Signal
16 S 133 St SR 599 Ramps Intersection
17 ,East Marginal Way (BAR to S 112 St)
18 Interurban Ave S (S 143 St Ft. Dent Wa)f
19 TUC/TOD Pedestrian Improvements
20 Minkler Blvd. (Southcenter Pkwy APW)
21 Tukwila Intl Blvd. (Phase IV)
22 Traffic Signal Interconnect Program
23 SC Blvd Widening (1 -5 61st Ave S Bridgai
24 Tukwila Intl Blvd. S 116 Wy/ SR599
25 S 168 St (S \C Parkway to Andover Pk E)
26 West Valley Hwy (1 -405 Strander Blvd.)
27 [Nelsen Place (S 158 St S 156 St)
28 IS 180 St Andover Park W Intersection
29 1S 144th St Bridge Sidewalks
30 (Greenbelt Multipurpose Trails
TOTAL
PROJECTS REVISED FROM 2010 -2015 TIP:
!None
1
2010 CIP 1
Page No. 1
9
10
14
15
19
20
22
23
24
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
43
44
47
56
1
2011 1 2012
01
145
1,750 1,7501
01 500
27,3531 0
19,227' 0
681 0
1,250 1,250
0 2,300
01 1,461
01 0
01 0
751 0
75 0
0 0
20 0
501 0
01 0
01 0
01 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
64 65
50,0771 7,531
1
2013 1 2014
1
01 01
2051 2051
13,6171
100
0
0
0
1,2501
01
0
0
01
0
0
01
01
0!
0
0
0
0
0
01
0
0
01
0
0
0
43
1
15,2151
01
270(
13,6171
1,4001
0(
0
0
1,2501
01
01
01
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
01
1
16,537
2015 1 2016
01 0
2701 270
0 0
0 0
0 0
01^ 0
0( 1,7501
1,2501 1,2501
01 4,3001
0 01
0 0
0 610
0 6021
0 1,032
0 575
0 630
0 3,300
0 11,100
0 1,1001
0 4251
0 4,5911
01 3,0001
0 20,0001
0 4,6751
0 23,2441
0 6301
0 2001
01 2101
01 1001
01 01
1
1,520( 83,594
FUNDING SOURCES
TOTAL 1 Federal 1 State TIB Developer Unsecured City
0
1,365 1
30,7341_ 24,5881
2,0001 400
27,3531 3,550 15,000
19,227 3,477 5,250
1,818
7,500
6,600 452
1,461
0
610
677
1,107
575
650
3,350
11,100
1,100
425
4,591
3,000
20,0001
4,675
23,244
630
200
210
100
172
174,474
32,015 20,702
0
1,365
1
1,600 0
6,307 2,496
9,560 940
1,000 818
7,500
4,620 1,528
1,297 164
0
17 593
75 602
75 440 592
75 500
20 460 170
1,040 1,300 1,010
5,000 6,100
500 600
425 0
216 3,500 875
1,200 1,800
20,000
1,900 2,775
5,300 17,944
530 100
200
30 100 80
100
172 0
26,739 20,020 74,998
CO
Washington State Department of Transportation
Agency: Tukwila
Co. No.: 17 Co. Name: King
City No.: 1320 MPO /RTPO: PSRC
1 2
19 1
14 2 11 S
Annual Bridge Inspections and Repairs
Various City Streets
from: to:
Perform load ratings and bi- annual inspections as well as construct
necessary repairs and maintenance.
14 3
00 4
16 5
16 6
17 7
Project Identification
A. PIN /Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road Ending MP or Road
F. Describe Work to be Done
3
Neighborhood Traffic Calming Program
Various City Streets
from: to:
Program to address neighborhood traffic concerns using striping, signage.
roadway improvements, traffic calming, and education to reduce speeding
and improve safety.
08002500 PE 1/1/2010 BR 2800 700 3500 1750 1750
09 p 1,000 FL P 014 1/1/2012 BR 21788 5446 27234 13617 13617 CE
Boeing Access Rd Bridge Replacement No
0
Boeing Access Road
from: Airport Way to: 1 -5
Reconstruct bridge.
Tukwila Urban Center Ped/Bike Bridge
from: Baker Blvd. to: West Valley Hwy
Pedestrian bridge over the Green River connecting the CBD and rail station.
Southcenter Parkway (S 180 5t S 200 St)
Southcenter Parkway
from: S 180 St to: S 200 St
Construct widening to 4 lanes with center tum pockets including curb 8
gutter, sidewalks, drainage, landscaping, and utility undergrounding.
Tukwila Urban Center Access (Klickitat)
Southcenter Parkway
from: 1 -5 Off Ramp to: S 168 St
Design and construct safety and capacity Improvements.
S 144 5t (Phase 2)
S 144 St
from: 42 Ave S to: Tukwila Int'I Blvd
Design and construct paving, curb 8 gutter, sidewalks, drainage,
illumination, and utility undergrounding.
Project Costs in Thousands of Dollars Federally Funded
Fund Source Information Expenditure Schedule Projects Only
d w E y (Local Agency)
E'a .g v t o L Federal Funding R/W
S. 0 Required
at rd P hase Federal Federal State Slate Local Total 4th Envir. Date
E t° o Start Fund Cost by Fund o. Funds Funds Funds 1st 2nd 3rd Thru Type (MMNy)
(mm/dd/yyyy) Code Phase Code 6th
4 5 6 7 8 9 10 11 12 1 13 14 15 16 17 I 18 19 20 21
ALL 1/1/2010 I
12 S
03 P
1000 P
T
W
S
G
C
Totals
ALL' 1/1/2010 1
Totals 1240 1240 145 145 205 745
1 ,000 Ft Totals 24,588 6146 30734 1750 1750 13617 13617
PE 1/1/2012 Discretionary 100 400 500 500
32 P RW 1/1/2013 Discretionary 20 80 100 100 CE
D8 CN 1/1/2014 Discretionary 280 1120 1400 1400 Yes
12/31/13
Totals 400 1600 2000 500 1500
01 S 7,400 Ft W CN 1 1/1/2010 1 Discretionary 1 3683 I OTHER1 150001 12319 1 31002 1 15501 1 15501 I 1
CE
T Yes
S
P
G 1/1/2010
Totals
05 p 1,500 Ft W CN 1 1/1/2010
08 T
S
P
O
Totals
ALL 1/1/2014
Totals
3,683
Discretionary 1 3000
Page 1
I I I
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: 6/8/2009 Adoption Date: 6/15/2009
Amend Date: Resolution No.: 1683
I I
1 1240 1 1240 1 145 1 145 1 205 1 745
15000 12319 31002 15501 15501
TPP1 52501 152301 234801 234801
3,000 5250 15230 23480 23480
1750 I 1750 1
1750
1750 1750 1750
CE
Yes
1/1/2010
v. 5.7 Supersedes previous editions
Washington State Department of Transportation
Z771
Agency: Tukwila
Co. No.: 17 Co. Name: King
City No.: 1320 MPO /RTPO: PSRC
16 10
16 13
14 14
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road Ending MP or Road
F. Describe Work to be Done
3
Annual Overlay and Repair Program
Various City Streets
from: to:
Repair, rehabilitate, and overlay City streets as needed man annual
Andover Park West
Andover Park West
from: Tukwila Parkway to. Strander Blvd.
Complete widening for center lett turn lane.
17 12
Macadam Rd S 144 St Intersection
Macadam Road
from: S 144 St to: 1,000 Ft on south leg
Widen Macadam Road to add a northbound left turn lane
Andover Park E Mtnkler Blvd. Intersection
from: 500 Ft on each leg to' 500 Ft. on each leg
Design and construct intersection and traffic signal Improvements and
widening for left turn lanes.
West Valley Hwy /S 156 St
from: Southcenter Blvd. to: 5 158 St
Construct additional northbound left turn lane at S 156 St for northbound
HOV to northbound I -405.
17 11 32 S
Walk Roll Plan (Nonmotorized Trans. Plan)
Various City Streets
from: to:
Select, design, and construct non motorized projects including bike lanes,
sidewalks, and trails.
05 P 2000 C
G
P
s
T
Project Costs in Thousands of Dollars
0 m Fund Source Information
a 10
ci Federal Funding
a
v Phase Federal Federal State
5 o Start Fund Cost by Fund State
a (mm/ddyyyy) Code Phase Code Funds
4 5 6 7 8 9 10 11
07 S C ALL 1/1/2010
G
0
P
S
program. T
W Totals
16 9 21 P T CN 1/1/2010 STP(U) 920
Tukwila Urban Center Transit Center W
ALL 1/1/2015 CMAQ 3700
Central Business District
from: to: S
Design and construct a transit center.
W
Totals
ALL 1/1 /2011
Totals
ALL I 1/1/2010
Page 2
12
452
4,620 452
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: 6/8/2009 Adoption Date: 6/15/2009
Amend Date: Resolution No.: 1683
Expenditure Schedule
(Local Agency)
R/W
Local Total 4th Envir. Required
1st 2nd 3rd Thru Date
Funds Funds 6th Type (M�
13 14 15 16 17 18 19 20 21
7500 7500 1250 1250 1250 3750
7500 7500
928 2300
600 4300
1528
1461
1461
1000 1000 1
1250 1250 1250 3750
1150 1150
6600 1150 1150 4300
1461
1461 1461 1461
200 1 200
200
4300 CE
400
Totals 440 667 1107 75 1032
Federally Funded
Projects Only
CE
Totals 1000 1000 200 200 200 400
05 P 1000 PE 1/1/2010 17 17 17
ALL 1/1/2015 610 610 610 CE
Totals 627 627 17 610
12 S 1,000 Ft PE 1/1/2010 75 75 75
ALL 1/1/2015 602 602 602 CE
Totals 677 677 75 602
12 P 1,500 Ft T PE 1/1/2010 75 75 75
ALL 1/1/2015 STP(U) U 440 592 1032 1032 CE
Yes
12/31/14
No
No
No
No
v. 5.7 Supersedes previous editions
Washington State Department of Transportation
7
Agency: Tukwila
Co. No.: 17
City No.: 1320
1 2
16 15
16 16
16 17
14 18
17 19
16 20
14 21
Co. Name: King
MPO /RTPO: PSRC
Project Identification
A. PIN /Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road Ending MP or Road
F. Describe Work to be Done
3
Andover PkE/ Industry Dr. Signal
from: 500 Ft. on each leg to: 500 Ft. on each leg
Design and construct a traffic signal and intersection improvements.
S 133 St/ SR 599 Ramps Intersection
from: 500 Ft. on each leg to: 500 Ft. on each leg
Design and construct intersection improvements Including a new traffic
signal.
East Marginal Way
East Marginal Way
from: Boeing Access Rd to: S 112 St
Design and construct widening to 3 lanes including curb gutter, sidewalks,
drainage, landscaping, and utility undergrounding.
Interurban Ave S
Interurban Ave S
from: S 143 St to: Fort Dent Way
Reconstruct street including paving, curb gutter, drainage, illumination,
sidewalk. and landscaping.
32 S
TUC/TOD Pedestrian Improvements 06
From: Tukwila Urban Center to: Rail Station
Construct bike /pedestrian connection between Tukwila Urban Center and
Commuter Rail Station/TOD area.
Minkler Blvd
Minkler Blvd
From: Southcenter Pkwy to: Andover Park W
Consruct widening for 3 lanes intcuding curb gutter, sidewalk, drainage,
and landscaping
Tukwila !nt'! Blvd. (Phase 4)
Tukwila Intl Blvd
from: Boeing Access Rd. to: S 116 SI
Design and construct widening including paving, curb gutter, sidewalk,
drainage, illumination, landscaping, and utility undergrounding.
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: 6/8/2009 Adoption Date: 6/15/2009
Amend Date: Resolution.No.: 1683
Project Costs in Thousands of Dollars Federally Funded
L N Fund Source Information Expenditure Schedule Projects Only
(Local Agency) RNv
17; J L F Funding
R equired
a 3 o_ 4th Date
!I Federal Federal State Ph ase Slate Local Total Envir.
N m Start F und Cost Fund 1st 2nd 3rd Thru Type (MNl>1'Y)
o Funds Funds Funds 6th
n. (mm/ddyyyy) Code
4 5 6 7 8 9 10 11 12 I 13 14 15 16 17 Phase Code
18 19 20 21
PE 1/1/2010 575 575 7 5 575 CE
12 P 1,000 Ft W CN 1/112015 No
S
P
G
Totals 650 650 75 575
PE 1/1/2011 20 20 20
12 P 1,000 Ft W ALL 1/12015 STP(U) 460 170 630 630 CE
T No
s
G
C
P
Totals 460 190 650 20 630
1 ,500 F[ p PE 1/1/2011 STP(U) qIP 1300 2000 3300 50 3300 CE
03 p S ALL 1/1/2015 STP(U) No
T
W
Totals
ALL 1 1/1/2012
03 p 4,500 Ft W
Totals
ALL 1 1/1/2015
0.75
Totals
04 P 2,000 Ft W ALL 1 1/1/2015
03 p 3,500 Ft P
s
W
0
Totals
ALL 1/1/2015
Totals
STP(U)
CMAQ
2,500
500 1
1 1 I
Page 3
1300 2050 3350 50
2500 1 AIP 1 25001 6100 1 11100 1
2500 6100 11100
1 600 11001
500 600 1100
425 1 425 1
1 I
TPP1 35001 10911 45911
4001
I I I
3300
10700
400 10700
1100
1100
425
425 425 425
4591
CE
CE
CE
CE
Yes
1/1112
No
No
No
3500 1091 4591 4591
v. 5.7 Supersedes previous editions
Washington State Department of Transportation
®0®
Agency, Tukwila
Co. No.: 17 Co. Name: King
City No.: 1320 NIPOIRTPO: PSRC
Ts Project Identification
B Bridge No.
A, PIN/Federal Aid No. m Y j
g N
C. Project Title '';26:i"." y m
m D. Street/Road Name or Number 6
u U i E. Beginning MP or Road Ending MP or Road
F. Describe Work to be Done 4 5 6
3
1 2 12 S
0 E
o-z
16 22
14 23
14 24
16 2
14 26
17 27
Traffic Signal Interconnect Program
Various City Streets to.
from:
Design and insta// wire interconnect system between traffic signals and
the Traffic Operations Center.
SC Blvd. Widening
Southcenter Blvd
to: 61 Ave 5
from: l -5
Widen Southcenter Blvd. and the 6151 Ave S Bridge to add a lane for future
traffic growth.
Tukwila Intl Blvd S 116 St
Tukwila In /'l Blvd
from: 1,000 Ft. on each leg to'. 1,000 Ft. on each leg
Design and construct widening on Tukwila Intl Blvd and intersection
improvements at T.I 6.75 1 St.
S 168 St
S 168 St to Andover Pk E
from. Southcenter Pkwy
Construct new roadway including curb gutter, sidewalk. drainage.
illumination, and landscaping.
West Valley Highway
West Valley Hwy
from I -405 to Slrander Blvd
Design and construct widening to 7 lanes including curb gutter, sidewalks,
illumination, and drainage.
Nelson Place
Nelson Place to: 5 158 St
from: S 156 St utter, sidewalks, drainage, and
Design and construct paving. curb g
illumination.
16 28
S 180 St /Andover Park W Intersection
WI 500 Ft. on each leg
from 500 Fl. on each leg
Widen for north I south turn lanes.
04 P
04 P 2000
01 P 4,000 Ft P
T
W
5
05 P 0.5 MI W
S
P
12 P
m m
o m
U D-
Phase
Start
(mm /dd/yyyy)
7 9
ALL
W
T
G
c
P
S
Totals
ALL 1 1/1/2015
0.5 C
G
P
S
T
W
G
1000 W
Totals
1/1/2015 CMAO
ALL( 1/1/2015
P
Totals
ALL\ 1/1/2015
Totals
ALL\ 1/1/2015
03 P 600 Ft
T
P
Totals
ALL\ 1/1/2015
Totals
ALL\ 1/1/2015
Totals
Project Costs in Thousands of Dollars
Fund Source information
Federal Funding
Federal Federal Fuse
Fund Cost by
Code Phase Code
10 11 12
STP(U) 1900
STP(U)
1200
1,200
1,900
Page 4
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: 6/8/2009 Adoption Date: 6115/2009
Amend Date:
Resolution No.: 1683
Federally Funded
Projects Only
100
100
State
Funds
13
1
Local Total
Funds Funds
14 15
1800 3000
1800 3000
20000 20000
20000 20000
2775 46751
2775 4675
23244 23244
23244 23244
630 630
630 630
200 200
200 200
110 210
110 210
Expenditure Schedule
(Local Agency)
1st 2nd
3rd
4th
Thru
6th
16 17 18 19
3000
3000
20000
4675
23244
Envir.
Type
20 21
CE
23244
630
CE
20000
4675 CE
630
200
200
210
210
RNV
Required
Date
(MMJYY)
CE
CE
No
Yes
12/31/2015
No
Yes
12/31/2015
No
No
v. 5 Supersedes previous editions
Washington State Departm ent of Transportation
ray
Agency: Tukwila
17 Co. Name:
Co. No.:
City No.: 1320 MPOIRTPO:
Project Identification
A, PINIFederai Aid No.
c m C. Project Title a or Number
u m D. StreetURoad Nam Ending MP or Road 0 0-Z inning MP or Road
w E. Beg ork to be Done
F. Describe W
Kind
PSRC
3
8. Bridge No.
ii 2
17 29 S 144 St Bridge Sidewalks
S 144 St to: 53 Ave S
51 AVe S lxs on bridge over t -S between 51st Ave and 53rd
i Wid e sidewa
W den existing
Ave S.
00 30 ur ose Traits
Greenbelt Muttip p
to: to pedestrian and bicycle
modes of transportation 1n lieu
from: ecbons to public trails to promote
p sate corn motonzed
d
..Fi e 9,
c Zri
O 0
E o Phase Federal
N r a (mrtJdddNYYY) Code
Fund 11 12
81 9 I 10
5 6 1/12015
4
P 025 G PE
05 P
S
T
W
32
TOWS
P 1/1120
Totals
Grand To_als for Tukwila
Project Costs in Thousands of Dollars
Fund lSource Information
I Federal F'�ndt' State
Fede ral State
Cost by Fund Funds
Phase Code
Six Year Transportation Improvement Program
From 2010 to
6!812009 Adoption Date'. 611512009
Hearing Date:
Resolution No.: 1683
Federally Funded
Amend Date: projects only
43,39
page 5
13
Local Total
Funds Funds
14 15
100 100
Expenditure Schedule
(Local Agency)
1 st 2nd 3rd
17 18
16 I
100 100 43 43
172 1 172' 43 L
Required
RMI
4th Envir. Date
Thru Type (MMV')
6111 21
19 20
100
100
43
CE
43
172
43 43
172 43 729
28,002 111,882 183,275 43,761 21570 16,215 101,
CE
No
No
v. 5.7 Supersedes previous editions
TRANSPORTATION COMMITTEE
Meeting Minutes
May 17, 2010 5.00 p.m. Conference Room 1
III. MISCELLANEOUS
Meeting adjourned at 5:13 p.m.
Next meeting: Monday, June 7, 2010 5:00 p.m. Conference Room 1
_Committee Chair Approval
Min es o M. Reviewed by GL.
City of Tukwila
Transportation Committee
PRESENT
Councilmembers: Verna Seal, Chair; Joan Hernandez and De'Sean Quinn
Staff: Bob Giberson, Frank Iriarte, Robin Tischmak and Gail Labanara
CALL TO ORDER: The meeting was called to order at 5:01 p.m.
I. PRESENTATIONS
No presentations.
II. BUSINESS AGENDA
A. Annual Update to Six Year Transportation Improvement Program 2011 -2016
Staff is seeking Council adoption, via resolution, of the 2011 -2016 Six -Year Transportation Improvement
Program (TIP). The TIP is a list of regionally significant transportation projects that have grant funding
potential. This list does not commit the City to implement or construct any project.
An annual update to the TIP is required by the Revised Code of Washington (RCW). This annual rolling
program is generally modified to reflect the City's CIP, as the two are updated at different times of the year.
Differences between the two plans are often based on and reflective of the time between the adoptions of
each document as well as changes in priority and funding availability.
There are no additions or deletions to this year's update, although there are a couple projects that there is
currently no funding for including the Neighborhood Traffic Calming Program and the Walk Roll Plan.
Items such as these have been left in for granting and documentation purposes. The Committee recommends
forwarding the update to COW for discussion. A public hearing will be held on June 14 at the COW.
UNANIMOUS APPROVAL. FORWARD TO JUNE 14 COW FOR DISCUSSION.
B. 2010 1s Ouarter Reports
The Committee reviewed the status of program goals as outlined in the 2010 1s Quarter Report, and had no
specific questions. INFORMATION ONLY.
13