HomeMy WebLinkAboutCOW 2010-06-14 Item 3 - Public Hearing - Resolution Adopting 2011-2016 Transportation Improvement Programik[eetinx Date Prepared by 06 /14/10 BG 06/21/10 BG ITEM INFORMATION CAS NUMBER: 10-062 ORIGINAL AGENDA DA I'E: JUNE 14, 2010 AGENDA ITEM TITLE Resolution adopting the Six -Year Transportation Improvement Program 2011 2016 CATEGORY Disatssion Motion Resolution Ordinance Bid Award Mtg Date 06/14/10 Mtg Date Mtg Date 06/21/10 Mtg Date Mtg Date I SPONSOR Council Mayor I I Adm Svcs (l DCD I 'Finance n Fire I Leaal I P&'R Police PTV SPONSOR'S SUMMARY Fund Source: Comments: MTG. DATE 06/14/10 06/21/10 MTG. DATE 06/14/10 06/21/10 EXPENDITURE REQUIRED $0.00 COUNCIL AGENDA SYNOPSIS Initials AMOUNT BUDGETED $0.00 1 Mayors review /Cosrnciljview I (a,/ c�(' The Transportation Improvement Program (TIP) is required by RCW to be updated annually. The TIP is primarily a finanical planning document for projects competing for grants. A Public Hearing is scheduled on June 14, 2010 for the 2011 2016 TIP. After the Public Hearing, the TIP is adopted by resolution and is then incorporated into the Regional and State TIPs. REVIEWED BY COW Mtg. n CA &P Cmte n F &S Cmte Utilities Cmte U Arts Comm. n Parks Comm. DA'Z'E: 05/17/10 RECOMMENDATIONS: SPONSOR /ADMIN. Public Works Hold Public Hearing and adopt resolution COMMITTEE Unanimous Approval; Forward to Committee of the Whole COST IMPACT FUND SOURCE RECORD OF COUNCIL ACTION ATTACHMENTS Informational Memorandum dated 05/12/10 Draft Resolution Draft 2011 2016 TIP Spreadsheet Current Adopted 2010 2015 TIP Minutes from the Transportation Committee meeting of 05/17/10 ITEM No. Public Hearing Other Mtg Date 06/14/10 Mtg Date Planning Comm. Transportation Cmte APPROPRIATION REQUIRED $0.00 2 TO: BACKGROUND ACTION TAKEN RECOMMENDATION City of Tukwila INFORMATIONAL MEMORANDUM Mayor Haggerton TRANSPORTATION COMMITTEE FROM: Public Works Director DATE: May 12, 2010 SUBJECT: Six -Year Transportation Improvement Program (2011 -2016) ISSUE Jim Haggerton, Mayor Annual update of the Six -Year Transportation Improvement Program for the years 2011 2016. The Transportation Improvement Program (TIP) is updated annually as required by RCW. The TIP is adopted by resolution after a public hearing at the local agency level and incorporated into the regional and state TIPs. The TIP is primarily a financial planning document for projects competing for grants. Any project submitted for federal grant funding must be included in the local, regional and state adopted TIPs. The TIP is a rolling plan showing various funding sources: grants, developer, and local funds. Projects "roll" as funds or stages occur (design report, final design, and construction). Tukwila's TIP and Capital Improvement Program (CIP) list many of the same transportation- related projects. The TIP lists only those transportation- related projects planned within the next six years that are deemed regionally significant. The City's CIP lists transportation projects planned in the next six years and beyond, as well as water, sewer, surface water, and capital facilities. The TIP is required to be adopted by July 1 on an annual basis, while the CIP is prepared during summer /fall in conjunction with the City's budget preparation. Differences between the two may be due to priority changes, funding availability changes, or other factors that normally occur during the time between adoption of each document. The attached spreadsheet is the "Draft" 2011 2016 TIP and was created by modifying the 2010 2015 TIP to add or remove projects, adjust project costs, and reprioritize the list of projects. Added: No projects were added. Deleted: No projects were deleted. The Council is being asked to approve the resolution for the 2011 -2016 Six -Year Transportation Improvement Program and consider this item at the June 14, 2010 Committee of the Whole with a Public Hearing and subsequent June 21, 2010 Regular Meeting. Attachments: Resolution 2011 2016 "Draft" Transportation Improvement Program (TIP) Spreadsheet Current Adopted 2010 2015 TIP W: \PW Eng \PROJECTS RW RS Projects \TIP \Current TIP \tip2011 memo.doc 3 4 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2011- 2016), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs, and based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2011- 2016); and WHEREAS, on June 14, 2010, a public hearing was held regarding the City's Six Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A six-year Transportation Improvement Program for the calendar years 2011 -2016 is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of 2010. ATTEST/ AUTHENTICATED: Christy O'Flaherty, CMC, City Clerk APPROVED AS TO FORM BY: Office of the City Attorney DRAFT Exhibit: City of Tukwila' s Six-Year Transportation Improvement Program from 2011 to 2016 W:\ Word Processing Resolutions \TIP 2011- 2016.docx RT:GL:kn 5/11 /2010 Dennis Robertson, Council President Filed with the City Clerk: Passed by the City Council: Resolution Number: Page 1 of 1 5 6 J 2011 -20161 TIP 1 PROJECT TITLE 1 1 1 Neighborhood Traffic Calming Program 2 'Annual Bridge Inspections and Repairs 3 Boeing Access Rd Bridge Replacement 4 Tukwila Urban Center Ped /Bike Bridge 5 1Southcenter Parkway (S 180 St S 200 SI 6 Tukwila Urban Center Access (Klickitat) 1 7 S 144 St (Phase II) 8 Annual Overlay Repair Program �I 9 Tukwila Urban Center Transit Center 1 10 (Andover Park West (Tuk. Pkway. Strand 11 Walk Roll Plan (Nonmotorized Trans. P 12 Macadam Rd S 144th St Intersection 13 'Andover Pk E Minkler Blvd Intersection 1 14 (W Valley Hwy S 156 St 15 Andover Park E Industry Dr. Signal 16 S 133 St SR 599 Ramps Intersection 17 ,East Marginal Way (BAR to S 112 St) 18 Interurban Ave S (S 143 St Ft. Dent Wa)f 19 TUC/TOD Pedestrian Improvements 20 Minkler Blvd. (Southcenter Pkwy APW) 21 Tukwila Intl Blvd. (Phase IV) 22 Traffic Signal Interconnect Program 23 SC Blvd Widening (1 -5 61st Ave S Bridgai 24 Tukwila Intl Blvd. S 116 Wy/ SR599 25 S 168 St (S \C Parkway to Andover Pk E) 26 West Valley Hwy (1 -405 Strander Blvd.) 27 [Nelsen Place (S 158 St S 156 St) 28 IS 180 St Andover Park W Intersection 29 1S 144th St Bridge Sidewalks 30 (Greenbelt Multipurpose Trails TOTAL PROJECTS REVISED FROM 2010 -2015 TIP: !None 1 2010 CIP 1 Page No. 1 9 10 14 15 19 20 22 23 24 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 43 44 47 56 1 2011 1 2012 01 145 1,750 1,7501 01 500 27,3531 0 19,227' 0 681 0 1,250 1,250 0 2,300 01 1,461 01 0 01 0 751 0 75 0 0 0 20 0 501 0 01 0 01 0 01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 64 65 50,0771 7,531 1 2013 1 2014 1 01 01 2051 2051 13,6171 100 0 0 0 1,2501 01 0 0 01 0 0 01 01 0! 0 0 0 0 0 01 0 0 01 0 0 0 43 1 15,2151 01 270( 13,6171 1,4001 0( 0 0 1,2501 01 01 01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01 1 16,537 2015 1 2016 01 0 2701 270 0 0 0 0 0 0 01^ 0 0( 1,7501 1,2501 1,2501 01 4,3001 0 01 0 0 0 610 0 6021 0 1,032 0 575 0 630 0 3,300 0 11,100 0 1,1001 0 4251 0 4,5911 01 3,0001 0 20,0001 0 4,6751 0 23,2441 0 6301 0 2001 01 2101 01 1001 01 01 1 1,520( 83,594 FUNDING SOURCES TOTAL 1 Federal 1 State TIB Developer Unsecured City 0 1,365 1 30,7341_ 24,5881 2,0001 400 27,3531 3,550 15,000 19,227 3,477 5,250 1,818 7,500 6,600 452 1,461 0 610 677 1,107 575 650 3,350 11,100 1,100 425 4,591 3,000 20,0001 4,675 23,244 630 200 210 100 172 174,474 32,015 20,702 0 1,365 1 1,600 0 6,307 2,496 9,560 940 1,000 818 7,500 4,620 1,528 1,297 164 0 17 593 75 602 75 440 592 75 500 20 460 170 1,040 1,300 1,010 5,000 6,100 500 600 425 0 216 3,500 875 1,200 1,800 20,000 1,900 2,775 5,300 17,944 530 100 200 30 100 80 100 172 0 26,739 20,020 74,998 CO Washington State Department of Transportation Agency: Tukwila Co. No.: 17 Co. Name: King City No.: 1320 MPO /RTPO: PSRC 1 2 19 1 14 2 11 S Annual Bridge Inspections and Repairs Various City Streets from: to: Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance. 14 3 00 4 16 5 16 6 17 7 Project Identification A. PIN /Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road Ending MP or Road F. Describe Work to be Done 3 Neighborhood Traffic Calming Program Various City Streets from: to: Program to address neighborhood traffic concerns using striping, signage. roadway improvements, traffic calming, and education to reduce speeding and improve safety. 08002500 PE 1/1/2010 BR 2800 700 3500 1750 1750 09 p 1,000 FL P 014 1/1/2012 BR 21788 5446 27234 13617 13617 CE Boeing Access Rd Bridge Replacement No 0 Boeing Access Road from: Airport Way to: 1 -5 Reconstruct bridge. Tukwila Urban Center Ped/Bike Bridge from: Baker Blvd. to: West Valley Hwy Pedestrian bridge over the Green River connecting the CBD and rail station. Southcenter Parkway (S 180 5t S 200 St) Southcenter Parkway from: S 180 St to: S 200 St Construct widening to 4 lanes with center tum pockets including curb 8 gutter, sidewalks, drainage, landscaping, and utility undergrounding. Tukwila Urban Center Access (Klickitat) Southcenter Parkway from: 1 -5 Off Ramp to: S 168 St Design and construct safety and capacity Improvements. S 144 5t (Phase 2) S 144 St from: 42 Ave S to: Tukwila Int'I Blvd Design and construct paving, curb 8 gutter, sidewalks, drainage, illumination, and utility undergrounding. Project Costs in Thousands of Dollars Federally Funded Fund Source Information Expenditure Schedule Projects Only d w E y (Local Agency) E'a .g v t o L Federal Funding R/W S. 0 Required at rd P hase Federal Federal State Slate Local Total 4th Envir. Date E t° o Start Fund Cost by Fund o. Funds Funds Funds 1st 2nd 3rd Thru Type (MMNy) (mm/dd/yyyy) Code Phase Code 6th 4 5 6 7 8 9 10 11 12 1 13 14 15 16 17 I 18 19 20 21 ALL 1/1/2010 I 12 S 03 P 1000 P T W S G C Totals ALL' 1/1/2010 1 Totals 1240 1240 145 145 205 745 1 ,000 Ft Totals 24,588 6146 30734 1750 1750 13617 13617 PE 1/1/2012 Discretionary 100 400 500 500 32 P RW 1/1/2013 Discretionary 20 80 100 100 CE D8 CN 1/1/2014 Discretionary 280 1120 1400 1400 Yes 12/31/13 Totals 400 1600 2000 500 1500 01 S 7,400 Ft W CN 1 1/1/2010 1 Discretionary 1 3683 I OTHER1 150001 12319 1 31002 1 15501 1 15501 I 1 CE T Yes S P G 1/1/2010 Totals 05 p 1,500 Ft W CN 1 1/1/2010 08 T S P O Totals ALL 1/1/2014 Totals 3,683 Discretionary 1 3000 Page 1 I I I Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 6/8/2009 Adoption Date: 6/15/2009 Amend Date: Resolution No.: 1683 I I 1 1240 1 1240 1 145 1 145 1 205 1 745 15000 12319 31002 15501 15501 TPP1 52501 152301 234801 234801 3,000 5250 15230 23480 23480 1750 I 1750 1 1750 1750 1750 1750 CE Yes 1/1/2010 v. 5.7 Supersedes previous editions Washington State Department of Transportation Z771 Agency: Tukwila Co. No.: 17 Co. Name: King City No.: 1320 MPO /RTPO: PSRC 16 10 16 13 14 14 Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road Ending MP or Road F. Describe Work to be Done 3 Annual Overlay and Repair Program Various City Streets from: to: Repair, rehabilitate, and overlay City streets as needed man annual Andover Park West Andover Park West from: Tukwila Parkway to. Strander Blvd. Complete widening for center lett turn lane. 17 12 Macadam Rd S 144 St Intersection Macadam Road from: S 144 St to: 1,000 Ft on south leg Widen Macadam Road to add a northbound left turn lane Andover Park E Mtnkler Blvd. Intersection from: 500 Ft on each leg to' 500 Ft. on each leg Design and construct intersection and traffic signal Improvements and widening for left turn lanes. West Valley Hwy /S 156 St from: Southcenter Blvd. to: 5 158 St Construct additional northbound left turn lane at S 156 St for northbound HOV to northbound I -405. 17 11 32 S Walk Roll Plan (Nonmotorized Trans. Plan) Various City Streets from: to: Select, design, and construct non motorized projects including bike lanes, sidewalks, and trails. 05 P 2000 C G P s T Project Costs in Thousands of Dollars 0 m Fund Source Information a 10 ci Federal Funding a v Phase Federal Federal State 5 o Start Fund Cost by Fund State a (mm/ddyyyy) Code Phase Code Funds 4 5 6 7 8 9 10 11 07 S C ALL 1/1/2010 G 0 P S program. T W Totals 16 9 21 P T CN 1/1/2010 STP(U) 920 Tukwila Urban Center Transit Center W ALL 1/1/2015 CMAQ 3700 Central Business District from: to: S Design and construct a transit center. W Totals ALL 1/1 /2011 Totals ALL I 1/1/2010 Page 2 12 452 4,620 452 Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 6/8/2009 Adoption Date: 6/15/2009 Amend Date: Resolution No.: 1683 Expenditure Schedule (Local Agency) R/W Local Total 4th Envir. Required 1st 2nd 3rd Thru Date Funds Funds 6th Type (M� 13 14 15 16 17 18 19 20 21 7500 7500 1250 1250 1250 3750 7500 7500 928 2300 600 4300 1528 1461 1461 1000 1000 1 1250 1250 1250 3750 1150 1150 6600 1150 1150 4300 1461 1461 1461 1461 200 1 200 200 4300 CE 400 Totals 440 667 1107 75 1032 Federally Funded Projects Only CE Totals 1000 1000 200 200 200 400 05 P 1000 PE 1/1/2010 17 17 17 ALL 1/1/2015 610 610 610 CE Totals 627 627 17 610 12 S 1,000 Ft PE 1/1/2010 75 75 75 ALL 1/1/2015 602 602 602 CE Totals 677 677 75 602 12 P 1,500 Ft T PE 1/1/2010 75 75 75 ALL 1/1/2015 STP(U) U 440 592 1032 1032 CE Yes 12/31/14 No No No No v. 5.7 Supersedes previous editions Washington State Department of Transportation 7 Agency: Tukwila Co. No.: 17 City No.: 1320 1 2 16 15 16 16 16 17 14 18 17 19 16 20 14 21 Co. Name: King MPO /RTPO: PSRC Project Identification A. PIN /Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road Ending MP or Road F. Describe Work to be Done 3 Andover PkE/ Industry Dr. Signal from: 500 Ft. on each leg to: 500 Ft. on each leg Design and construct a traffic signal and intersection improvements. S 133 St/ SR 599 Ramps Intersection from: 500 Ft. on each leg to: 500 Ft. on each leg Design and construct intersection improvements Including a new traffic signal. East Marginal Way East Marginal Way from: Boeing Access Rd to: S 112 St Design and construct widening to 3 lanes including curb gutter, sidewalks, drainage, landscaping, and utility undergrounding. Interurban Ave S Interurban Ave S from: S 143 St to: Fort Dent Way Reconstruct street including paving, curb gutter, drainage, illumination, sidewalk. and landscaping. 32 S TUC/TOD Pedestrian Improvements 06 From: Tukwila Urban Center to: Rail Station Construct bike /pedestrian connection between Tukwila Urban Center and Commuter Rail Station/TOD area. Minkler Blvd Minkler Blvd From: Southcenter Pkwy to: Andover Park W Consruct widening for 3 lanes intcuding curb gutter, sidewalk, drainage, and landscaping Tukwila !nt'! Blvd. (Phase 4) Tukwila Intl Blvd from: Boeing Access Rd. to: S 116 SI Design and construct widening including paving, curb gutter, sidewalk, drainage, illumination, landscaping, and utility undergrounding. Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 6/8/2009 Adoption Date: 6/15/2009 Amend Date: Resolution.No.: 1683 Project Costs in Thousands of Dollars Federally Funded L N Fund Source Information Expenditure Schedule Projects Only (Local Agency) RNv 17; J L F Funding R equired a 3 o_ 4th Date !I Federal Federal State Ph ase Slate Local Total Envir. N m Start F und Cost Fund 1st 2nd 3rd Thru Type (MNl>1'Y) o Funds Funds Funds 6th n. (mm/ddyyyy) Code 4 5 6 7 8 9 10 11 12 I 13 14 15 16 17 Phase Code 18 19 20 21 PE 1/1/2010 575 575 7 5 575 CE 12 P 1,000 Ft W CN 1/112015 No S P G Totals 650 650 75 575 PE 1/1/2011 20 20 20 12 P 1,000 Ft W ALL 1/12015 STP(U) 460 170 630 630 CE T No s G C P Totals 460 190 650 20 630 1 ,500 F[ p PE 1/1/2011 STP(U) qIP 1300 2000 3300 50 3300 CE 03 p S ALL 1/1/2015 STP(U) No T W Totals ALL 1 1/1/2012 03 p 4,500 Ft W Totals ALL 1 1/1/2015 0.75 Totals 04 P 2,000 Ft W ALL 1 1/1/2015 03 p 3,500 Ft P s W 0 Totals ALL 1/1/2015 Totals STP(U) CMAQ 2,500 500 1 1 1 I Page 3 1300 2050 3350 50 2500 1 AIP 1 25001 6100 1 11100 1 2500 6100 11100 1 600 11001 500 600 1100 425 1 425 1 1 I TPP1 35001 10911 45911 4001 I I I 3300 10700 400 10700 1100 1100 425 425 425 425 4591 CE CE CE CE Yes 1/1112 No No No 3500 1091 4591 4591 v. 5.7 Supersedes previous editions Washington State Department of Transportation ®0® Agency, Tukwila Co. No.: 17 Co. Name: King City No.: 1320 NIPOIRTPO: PSRC Ts Project Identification B Bridge No. A, PIN/Federal Aid No. m Y j g N C. Project Title '';26:i"." y m m D. Street/Road Name or Number 6 u U i E. Beginning MP or Road Ending MP or Road F. Describe Work to be Done 4 5 6 3 1 2 12 S 0 E o-z 16 22 14 23 14 24 16 2 14 26 17 27 Traffic Signal Interconnect Program Various City Streets to. from: Design and insta// wire interconnect system between traffic signals and the Traffic Operations Center. SC Blvd. Widening Southcenter Blvd to: 61 Ave 5 from: l -5 Widen Southcenter Blvd. and the 6151 Ave S Bridge to add a lane for future traffic growth. Tukwila Intl Blvd S 116 St Tukwila In /'l Blvd from: 1,000 Ft. on each leg to'. 1,000 Ft. on each leg Design and construct widening on Tukwila Intl Blvd and intersection improvements at T.I 6.75 1 St. S 168 St S 168 St to Andover Pk E from. Southcenter Pkwy Construct new roadway including curb gutter, sidewalk. drainage. illumination, and landscaping. West Valley Highway West Valley Hwy from I -405 to Slrander Blvd Design and construct widening to 7 lanes including curb gutter, sidewalks, illumination, and drainage. Nelson Place Nelson Place to: 5 158 St from: S 156 St utter, sidewalks, drainage, and Design and construct paving. curb g illumination. 16 28 S 180 St /Andover Park W Intersection WI 500 Ft. on each leg from 500 Fl. on each leg Widen for north I south turn lanes. 04 P 04 P 2000 01 P 4,000 Ft P T W 5 05 P 0.5 MI W S P 12 P m m o m U D- Phase Start (mm /dd/yyyy) 7 9 ALL W T G c P S Totals ALL 1 1/1/2015 0.5 C G P S T W G 1000 W Totals 1/1/2015 CMAO ALL( 1/1/2015 P Totals ALL\ 1/1/2015 Totals ALL\ 1/1/2015 03 P 600 Ft T P Totals ALL\ 1/1/2015 Totals ALL\ 1/1/2015 Totals Project Costs in Thousands of Dollars Fund Source information Federal Funding Federal Federal Fuse Fund Cost by Code Phase Code 10 11 12 STP(U) 1900 STP(U) 1200 1,200 1,900 Page 4 Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 6/8/2009 Adoption Date: 6115/2009 Amend Date: Resolution No.: 1683 Federally Funded Projects Only 100 100 State Funds 13 1 Local Total Funds Funds 14 15 1800 3000 1800 3000 20000 20000 20000 20000 2775 46751 2775 4675 23244 23244 23244 23244 630 630 630 630 200 200 200 200 110 210 110 210 Expenditure Schedule (Local Agency) 1st 2nd 3rd 4th Thru 6th 16 17 18 19 3000 3000 20000 4675 23244 Envir. Type 20 21 CE 23244 630 CE 20000 4675 CE 630 200 200 210 210 RNV Required Date (MMJYY) CE CE No Yes 12/31/2015 No Yes 12/31/2015 No No v. 5 Supersedes previous editions Washington State Departm ent of Transportation ray Agency: Tukwila 17 Co. Name: Co. No.: City No.: 1320 MPOIRTPO: Project Identification A, PINIFederai Aid No. c m C. Project Title a or Number u m D. StreetURoad Nam Ending MP or Road 0 0-Z inning MP or Road w E. Beg ork to be Done F. Describe W Kind PSRC 3 8. Bridge No. ii 2 17 29 S 144 St Bridge Sidewalks S 144 St to: 53 Ave S 51 AVe S lxs on bridge over t -S between 51st Ave and 53rd i Wid e sidewa W den existing Ave S. 00 30 ur ose Traits Greenbelt Muttip p to: to pedestrian and bicycle modes of transportation 1n lieu from: ecbons to public trails to promote p sate corn motonzed d ..Fi e 9, c Zri O 0 E o Phase Federal N r a (mrtJdddNYYY) Code Fund 11 12 81 9 I 10 5 6 1/12015 4 P 025 G PE 05 P S T W 32 TOWS P 1/1120 Totals Grand To_als for Tukwila Project Costs in Thousands of Dollars Fund lSource Information I Federal F'�ndt' State Fede ral State Cost by Fund Funds Phase Code Six Year Transportation Improvement Program From 2010 to 6!812009 Adoption Date'. 611512009 Hearing Date: Resolution No.: 1683 Federally Funded Amend Date: projects only 43,39 page 5 13 Local Total Funds Funds 14 15 100 100 Expenditure Schedule (Local Agency) 1 st 2nd 3rd 17 18 16 I 100 100 43 43 172 1 172' 43 L Required RMI 4th Envir. Date Thru Type (MMV') 6111 21 19 20 100 100 43 CE 43 172 43 43 172 43 729 28,002 111,882 183,275 43,761 21570 16,215 101, CE No No v. 5.7 Supersedes previous editions TRANSPORTATION COMMITTEE Meeting Minutes May 17, 2010 5.00 p.m. Conference Room 1 III. MISCELLANEOUS Meeting adjourned at 5:13 p.m. Next meeting: Monday, June 7, 2010 5:00 p.m. Conference Room 1 _Committee Chair Approval Min es o M. Reviewed by GL. City of Tukwila Transportation Committee PRESENT Councilmembers: Verna Seal, Chair; Joan Hernandez and De'Sean Quinn Staff: Bob Giberson, Frank Iriarte, Robin Tischmak and Gail Labanara CALL TO ORDER: The meeting was called to order at 5:01 p.m. I. PRESENTATIONS No presentations. II. BUSINESS AGENDA A. Annual Update to Six Year Transportation Improvement Program 2011 -2016 Staff is seeking Council adoption, via resolution, of the 2011 -2016 Six -Year Transportation Improvement Program (TIP). The TIP is a list of regionally significant transportation projects that have grant funding potential. This list does not commit the City to implement or construct any project. An annual update to the TIP is required by the Revised Code of Washington (RCW). This annual rolling program is generally modified to reflect the City's CIP, as the two are updated at different times of the year. Differences between the two plans are often based on and reflective of the time between the adoptions of each document as well as changes in priority and funding availability. There are no additions or deletions to this year's update, although there are a couple projects that there is currently no funding for including the Neighborhood Traffic Calming Program and the Walk Roll Plan. Items such as these have been left in for granting and documentation purposes. The Committee recommends forwarding the update to COW for discussion. A public hearing will be held on June 14 at the COW. UNANIMOUS APPROVAL. FORWARD TO JUNE 14 COW FOR DISCUSSION. B. 2010 1s Ouarter Reports The Committee reviewed the status of program goals as outlined in the 2010 1s Quarter Report, and had no specific questions. INFORMATION ONLY. 13