HomeMy WebLinkAboutCOW 2010-09-27 Item 3F - Grant Acceptance - 6 Grants for Tukwila Urban Center Access (Klickitat) Co UNCIL A GJ;.NDA SYNOPSIS
---1.,$1 f 4 J Inztzals ITEM NO.
1 Meetznq Date I P,,repared by Ma r zew I ,_.�Counczl review
s= ^t t 7 1 09/27/10 -I' 9 BG n'\).) I L i-. 1 2
tt 10/04/10 Icy BG I I 1
290: I I I I 3.F.
i ITEM INFORMATION
i
CAS NUMBER: 10-110 I ORIGINAL AGENDA DATE. SEPTEMBER 27, 2010
AGENDA ITEM TITLE Accept six grants for the Tukwila Urban Center Access Project (Klickitat)
CATEGORY Z Dzscusszon Motzon Resolution Ordinance P Bid Award 1 1 Public Hearing Other
Mtg Date 09/27/10 Mtg Date 10/04/10 Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date
I SPONSOR Counal Ma Adm Svcs n DCD LI Finance n Fire I 1 Legal 1 I P&R 1 Police PW/
SPONSOR'S Six grants have been awarded to the Tukwila Urban Center Access Project Klickitat).
SUMMARY Although the City has accepted each of the six grants through inclusion in the City's
Capital Improvement Program, this housekeeping process of acceptance will be formalized
by Council action. Three grants have been used for design and the remaining three will be
used for construction. Matching funds will be represented by Local Improvement District
No. 33 and city funds,
REVIEWED BY COW Mtg. 1-7 CA &P Cmte n F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. 1 1 Planning Comm.
DA 1'E: 09/20/10
RECOMMENDATIONS:
SPONSOR /ADMIN Public Works
COMMITTEE Unanimous Approval; Forward to Committee of the Whole
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$0.00 $0.00 $0.00
Fund Source: 104 ARTERIAL STREETS (PG. 15, PROPOSED 2011 CIP)
Comments:
MTG. DATE R ECORD OF COUNCIL ACTION
09/27/10
10/04/10
MTG. DATE ATTACHMENTS
09/27/10 Informational Memorandum dated 09/15/10
TUC Access Project's CIP page 15, Proposed 2011 CIP
Minutes from the Transportation Committee meeting of 09/20/10
10/04/10
63
64
W t.
'`J 4s City of Tukwila
.9 Jim Haggerton, Mayor
905 INFORMATIONAL MEMORANDUM
TO: Mayor Haggerton
Transportation Committee
FROM. Public Works Director
DATE: September 15, 2010
SUBJECT Tukwila Urban Center Access Proiect (Klickitatl
Project No. 98410419
Acceptance of Grants
ISSUE
Formal City acceptance of six grants which have been awarded to the TUC Access Project.
BACKGROUND
Since 2003, staff has been working on the Tukwila Urban Center Access Project to improve traffic
conditions at and around the Klickitat Drive /Southcenter Parkway intersection Funding for the design and
construction of this major project comes from many sources including six grants, impact/mitigation fees,
City funds, and Local Improvement District #33. According to CIP Policy #12, staff must get approval from
the full Council before accepting grants. This policy has been met in the past with the annual adoption of
the CIP and budget showing both the proposed and accepted grants
DISCUSSION
Six grants have been awarded to this project. The first three grants have been fully expended in the
design phase and the remaining three grants will be utilized for construction
Year of Minimum
Grant Award Phase Match Amount
Federal Sec. 117, FFY 2005 Approp Act 2005 Design I 0% $983,928
Federal High Priority Projects (HPP 474) 2006 Design I 0% 719,921
Federal High Priority Projects (HPP 475) 2006 Design 0% 1,574,824
Federal STP Regional 2006 Construction 13.5% 3,000,000
Federal Intersection and Corridor Safety 2006 Construction 0% 250,000
State Transportation Improvement Board 2006 Construction 20% 5,000,000
Total I $1,405,000 $11,528,673
The minimum match listed above would be represented by the LID #33 and City funds Attached is the
proposed 2011 CIP page for the TUC Access Project.
Recent approvals from WSDOT have been given on the updated Hydraulics Report as well as the
Channelization Plans Staff is working with WSDOT and the Transportation Improvement Board to formally
"obligate" the remaining construction funds Pending those obligations and final approval by both agencies,
staff expects to advertise this project before the end of September
RECOMMENDATION
Council is being asked to formally accept the six grants for the Tukwila Urban Center Access Project and
consider this item at the September 27, 2010 Committee of the Whole and the subsequent October 4,
2010 Regular Meeting
Attachment: CIP Page
W' \PW Eng \Old P drive \Cyndy Klickitat \INFORMATION MEMO Grants Acceptance 9 -15 -10 doc
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2011 to 2016
PROJECT: Tukwila Urban Center Access (Klickitat -S1C Pkwy) Project No. 98410419
DESCRIPTION: Improve traffic flow on Southcenter Parkway, Klickitat Drive and Strander Boulevard by constructing an
underpass for the southbound lane on Southcenter Pkwy Coordinate with WSDOT on 1 -5 on- ramps.
JUSTIFICATION: Provide needed future traffic capacity, safety improvements and reduce accidents.
STATUS: Design Report completed in 2005, design in 2006 2007, and LID formation in 2009 Proposed Southcenter
Pkwy /Klickitat road closure for duration of construction will save a significant amount of costs.
MAINT. IMPACT: Overlay on a 10 -20 year cycle.
Project is on Impact Fee List under Zone 1. Federal design funds for $3.25m. Westfield Mall mitigation $579k
COMMENT: cash and $846k ROW, Boeing (Longacres) mitigation is $65k, ACME Bowling $112k. Construction grants; State
TIB $5m, Federal STP $3m and $250k. Local Improvement District (LID) is a range from $6.5 to $10 5 million.
FINANCIAL Through Estimated
(in $000's) 2009 2010 2011 2012 2013 2014 2015 2016 BEYOND TOTAL
EXPENSES
Design 3,341 670 4,011
LID Expenses 197 10 500 707
Land (R/W) 2,408 7 2,415
Const. Mgmt. 2,513 2,513
Construction 16,750 16,750
TOTAL EXPENSES 5,946 687 19,763 0 0 0 0 0 0 26,396
FUND SOURCES
Awarded Fed Grant 974 3,250 4,224
Earmark future) 1,840 435 2,275
Awarded State Grant 5,000 5,000
LID 11,545
11,545
ROW Donation 846 846
Mitigation Actual 759 759
Impact Fees 336 471 S07
City Oper Revenue 1,191 (219) (32) 0 0 0 0 0 0 940
TOTAL SOURCES 5,946 687 19,763 0 0 0 0 0 0 26,396
0 Project Location r7` `1 o
8 138 e'11 at
I 17,P• 1 r, ae
I °S c z i
f 3 I rn r 61v. S'
N I up,.,.e
Ar 1 mlCh E d
w -V E 9.
��`I� >as rm.ne Or
1 1 4 4
S t ewssaw.awulrau.w.�ul:.wwwar. 1,
66
2011 2016 Capital Improvement Program 15
II. BUSINESS AGENDA
A. East Marginal Wav South/South 86 Place Traffic Sienal Pole Bid Award
Staff is seeking Council approval to award a contract in the amount of $35,054 to Signal Electric, Inc. to
replace the traffic signal pole at East Marginal Way South and South 86 Place. This pole requires
replacement due to damage sustained during a vehicular collision. The total cost of the replacement will be
billed to the driver's insurance company via WCIA.
Although this item is under the $40,000 approval threshold for City Council, staff is bringing it before
Council due to the unbudgeted nature of the item and any change orders that could result in a higher
payment amount. UNANIMOUS APPROVAL. FORWARD TO SEPTEMBER 27 COW FOR
DISCUSSION.
B. Annual Traffic Sienal Purchase
Staff is seeking full Council approval to purchase three traffic signal control cabinets from Western Systems
in the amount of $61,787.58.
Funding for this purchase is budgeted in the 104 Arterial Street Fund. The three cabinets will be purchased
as part of the Annual Traffic Signal Program and utilized for expansion of the City's Intelligent
Transportation System (ITS) which provides real -time remote signal and closed circuit television.
The purchase of the cabinets will replace 20+ year old obsolete signal cabinets and enable ITS control at the
following intersections:
Interurban and 58 Avenue South
Interurban and 42n Avenue South
Interurban and 52 Avenue South
The life expectancy of the cabinets can usually be 20 -25 years. UNANIMOUS APPROVAL. FORWARD
TO SEPTEMBER 27 COW FOR DISCUSSION.
4 7
C. Tukwila Urban Center Access Proiect Klickitat)
Staff is seeking formal Council acceptance of six grants that have been awarded to the Tukwila Urban
Center Access Project (Klickitat) as listed below. Two of the six projects require a match which will be
funded through a combination of City and LID funds.
Transportation Committee Minutes September 20. 2010 Paoe 2
Although the City has accepted each of the six grants through inclusion in the City's Capital Improvement
Program, this housekeeping process of acceptance will be formalized by Council's action.
Federal Sec. 117, FFY 2005 Appropriations Act
Federal High Priority Projects (HPP 474)
Federal High Priority Projects (HPP 475)
Federal Surface Transportation Program (STP) Regional 13.5% matching funds
Federal Intersection and Corridor Safety
State Transportation Improvement Board 20% matching funds
UNANIMOUS APPROVAL. FORWARD TO SEPTEMBER 27 COW FOR DISCUSSION.
D. 2010 2 Ouarter Reports
The Committee reviewed the status of program goals as outlined in the 2010 2 "d Quarter Report, and had no
questions. INFORMATION ONLY.
III. MISCELLANEOUS
Staff reminded Committee Members to save the date of Wednesday, October 13, for the Phase II and III TIB ribbon
cutting. Invitations will be sent shortly. 67
68