HomeMy WebLinkAboutSpecial 2014-01-13 Phase 1 Work Session (Powerpoint Presentation)City of Tukwila
Facilities Needs Assessment
and Feasibility Study
Phase 1 City Council Worksession
RAC ,10 rLER :ill BERK
ARCHITECTURE & PLANNIN' STRATEGY ��ANALY515nCOMMUNICATIONS
DRAFT PACKET
1 -6 -2014
/41
Introduction
City of Tukwila
Facilities Needs Assessment and Feasibility Study
PHASE 1 WORKSESSION
Today's Worksession
■ Project Goals
Approach
Project Workplan
► Overview of Current Needs
• Overview of Projected Needs
Questions & Next Steps
DRAFT 1 -6 -2014
City of Tukwila
Facilities Needs Assessment and Feasibility Study
PHASE 1 WORKSESSION
DRAFT 1 -6 -2014
Project Goals
Provide a long term plan to optimize
organizational efficiencies.
Ensure a financially achievable and
sustainable plan for city facilities.
Maximize public safety.
A • •roach
City of Tukwila
Facilities Needs Assessment and Feasibility Study
PHASE 1 WORKSESSION
DRAFT 1 -6 -2014
Identify current use
I
it
Estimate current
space needs
Low estimate of
future space needs
u
High estimate of
future space needs
Facilities Planning Target
4
Aoh
—imr
As •roach
City of Tukwila
Facilities Needs Assessment and Feasibility Study
PHASE 1 WORKSESSION
Inventory current
facilities
Assess suitability for use
• Location
• Site considerations
• Layout
Assess condition
111111111111 11
I
• Seismic and safety
considerations
• HVAC
• Functional life
Assessment of
suitability & condition
✓ XO
XXO
✓ ✓ ✓
0 x 0
✓ XX
X X 0
DRAFT 1 -6 -2014
5
A • •roach
City of Tukwila
Facilities Needs Assessment and Feasibility Study
PHASE 1 WORKSESSION
Establish evaluation Identify
criteria Alternatives
11nuu
AL
B
Assess Alternatives
✓x00
X XOX
Ox0✓
O ✓x0
Preferred
Development
Option
DRAFT 1 -6 -2014
Phasing &
Funding Plan
Plan Implementation
PHASE 5:
Facility Design
6
Tukwila Facilities Needs Assessment and Feasibility Study
Project Workplan
TillJdi!I1U41 :If it1]614131
W L9
DISCUSSION DRAFT
12 -12 -2013
2013
2014
July
Aug
Sept
Oct
Nov
Dec
Jan
Feb
March
April
May
June
PHASE ON
Administrative Team
7/16
Department Heads
Kick -Off 7/22
Steering Steering
Cmte # 1 Cmte #2
8//2.3 9/13
Councilmember Interviews
a *.S• *•
Compile Information on Existing Facilities
•
Assess Current Space Needs
Project Future Space Needs
Operating &
Capital Funding Situation Assessment
Design Engagement Plan
About the
project
1. Inventory of Existing Facilities
2. Operating & Capital Funding Situation
Assessment
3. Current Space Needs Assessment
4. Outreach & Engagement Plan
PHASE TWO
Administrative
Team
Staff
"°1 Feedback
Steering
Cmt #3
12/23
Assess Facilities Suitability
Council
Sessions
Work Section 1/13
Steering;
Crnte # f
PHASE THREE
Needs Justilication
Cost Matrix
Administrative
Team
Steering
Cmte #5
Fundin kssessment
Work Ses ,ion
What are
the needs
Work Session
1. Assessment of 1. Feasibility
existing facilities Study
suitability and
condition.
PHASE FOUR
I
Administrative
Team
ib Department
Head Workshop
Risk Assessment
Phasing & Prioritization Plan
Work Session Adoption
Community
Workshop
•
kg Plan
Overview
1. risk Assessment
2, Phasing & Fund-
ing Plan
3. Draft Report
4. Final Report
Current Needs
City of Tukwila
Facilities Needs Assessment and Feasibility Study
PHASE 1 WORKSESSION
Staffing -based Estimates
it
employees
s.f. metric
Program -based Estimates
f
f
f
grossing factor
Comparable facilities use and
program design
DRAFT 1 -6 -2014
INPUTS
• Department Head /Staff
Questionnaires
• Existing Building Analysis
• City Council Member
Interviews
• Industry standards and
benchmarks
ANALYSIS
• Space Metrics
• Comparison of other facilities
• Steering Committee feedback
8
Current Needs
City of Tukwila
Facilities Needs Assessment and Feasibility Study
PHASE 1 WORKSESSION
Staffing -based Estimates
Counts
Gross S.F. Need
2013 Metric Grossing Current Need
Employees (sq. ft.) Factor (sq. ft.)
External Services
(DCD, PW Admin, Parks & Rec, Mayor)
Internal Services
(IT, Finance, Human Resources)
Police
Fire Admin
Total
94 215 1.5 30,315
24 215 1.5 7,740
92 240 1.5 33,120
14 215 1.5 4,515
224 75,690
Program -based Estimates
Counts Gross S.F. Need
2013 Current Need
Employees (sq. ft.)
External Services
(Parks & Rec Maint., Council, EOC, Courts)
PW Shops
Fire Operations
29
43
54
Total 126
22,801
62,919
43,826
129,546
Totals
350
205,236
DRAFT 1 -6 -2014
9
Future Needs
City of Tukwila
Facilities Needs Assessment and Feasibility Study
PHASE 1 WORKSESSION
Establish Underlying Drivers:
population + jobs
HELP
WANTED
.1 _
DRAFT 1 -6 -2014
Assess implications
for each department
Department Growth Driver
Council Constant
Mayors Office Constant
Parks & Recreation Administration Residents
Courts Residents + Jobs
DCD Residents + Jobs
Finance Residents + Jobs
Fire (operations) Residents + Jobs
Police Residents + Jobs
Public Works (shops) Residents + Jobs
Human Resources Overall staffing
Information Technology Overall staffing
Fire (administrative) Fire Operations
Parks & Recreation Maintenance Parks Facilities
Public Works (admin.) Pub Works Ops
10
Future Needs
City of Tukwila
Facilities Needs Assessment and Feasibility Study
PHASE 1 WORKSESSION
Staffing -based Estimates
DRAFT 1 -6 -2014
Counts
Gross S.F. Need
2040 Metric (sq. Grossing Current Need (sq.
Employees ft.) Factor ft.)
External Services
(DCD, PW Admin, Parks & Rec, Mayor)
Internal Services
(IT, Finance, Human Resources)
Police
Fire Admin
Total
103.0 215 1.5 33,218
27.0 215 1.5 8,708
111.5 240 1.5 40,140
15.5 215 1.5 4,999
257.0 87,064
Program -based Estimates
Counts Gross S.F. Need
2040
Employees
Current Need (sq.
ft.)
External Services
(Parks & Rec Maint., Council, EOC, Courts)
PW Shops
Fire Operations
Total
31.0
49.0
65.5
145.5
23,665
71,698
53,159
148,522
Totals
402.5
235,586
11
Pro'ection In • uts
City of Tukwila
Facilities Needs Assessment and Feasibility Study
PHASE 1 WORKSESSION
DRAFT 1 -6 -2014
Elasticity Current Projected 2040
Department Growth Driver Growth Factor Factor Staffing Staffing
Council Constant 0.00 1.00 8 8
Mayors Office Constant 0.00 1.00 17 17
Parks & Recreation Administration Residents 0.28 0.50 27 30.5
Courts Residents + Jobs 0.27 0.50 11 12.5
DCD Residents + Jobs 0.27 0.50 28 32
Finance Residents + Jobs 0.27 0.50 12 13.5
Fire (operations) Residents + Jobs 0.27 0.80 54 65.5
Police Residents + Jobs 0.27 0.80 92 111.5
Public Works (shops) Residents + Jobs 0.27 0.50 43 49
Human Resources Overall staffing 0.15 0.50 4 4.5
Information Technology Overall staffing 0.15 0.80 8 9
Fire (administrative) Fire Operations 0.21 0.50 14 15.5
Parks & Recreation Maintenance Parks Facilities 0.00 0.50 10.25 10.5
Public Works (admin.) Pub Works Ops 0.14 0.50 22 23.5
Total 350.25 402.5
Next Ste • s
City of Tukwila
Facilities Needs Assessment and Feasibility Study
PHASE 1 WORKSESSION
DRAFT 1 -6 -2014
Council approval to proceed to Phase 2
Phase Two Analysis
Assessment of current facilities suitability and condition
Begin cost assessments
Identify possible funding options
13