Loading...
HomeMy WebLinkAboutSpecial 2014-01-13 COMPLETE AGENDA PACKETINTRODUCTION TUKWILA FACILITY NEEDS ASSESSMENT AND FEASIBILITY STUDY SPACE NEEDS ANALYSIS INTERNAL DISCUSSION DRAFT January 6th, 2014 The City of Tukwila is conducting a Facility Needs Assessment and Feasibility Study to plan for the long- term sustainability of the City's facilities, optimize organizational efficiencies, and improve public safety. Phase 1 of the project includes establishing an evidence -based assessment of the City's current facility needs and projected needs thorough 2035, the year for which reliable population and employment estimates are available. This analysis presents a planning -level assessment of the City of Tukwila's current facility needs. Predesign estimates of facility needs: • Estimate the total gross sq. ft. needed to support current City functions. • Will support future evaluations of current facility and site suitability. • Are based on an optimized interior plan layout. Constraints of current buildings layouts or other factors may increase the planning target for some departments. • Often assumes a standalone function, future project phases will establish colocation opportunities that may reduce the necessary space to accommodate circulation, building mechanics, or other non - rentable space. A list of current City facilities is presented in Appendix A. APPROACH & PRELIMINARY SPACE NEEDS ESTIMATES Different city functions have different facility needs. This analysis estimates current facilities needs and projected facility needs according to workgroups delineated in collaboration with City staff. The analysis uses two approaches to estimate space needs. The first is an staffing -based approach that uses evidence -based space metrics established by agencies. If established metrics are not available, we examined a sample of similar facilities to determine a suitable metric. The second is a program -based approach using identified program elements or similar facilities in other jurisdictions. This document reviews the methods employed establishing current and future space needs. Staffing -based Estimates Space needs of nine workgroups were estimated based on standard space allocations and current staffing counts. Exhibit 1 illustrates the approach with descriptions of calculation inputs following the diagram. :i11 BERK Rlcergu,SwluER ARIH II ter n r141111ue TUKWILA FACILITY NEEDS ASSESSMENT AND FEASIBILITY STUDY SPACE NEEDS SUMMARY I INTERNAL DISCUSSION DRAFT 1 -6 -2014 4 Exhibit 1 Staffing- driven Estimates Approach employees s.f. metric I'f 1 t grossing factor Notes on inputs and assumptions: • Employees. Employee counts are based on current (2013/4) budget. Executive staff counts of current staff were corroborated through payroll records. • Sq. ft. metric. A space metric is a net unit of square footage of space assigned to a single individual. It is used in conjunction with a grossing factor to develop the gross square footage of a building. o General office metric: The Department of Enterprise Services for the State of Washington developed established space planning standards in 2009 including a 215 sq. ft. per person metric for predesign scopes of services for State funded projects. It is a measure designed to provide space at the lowest possible cost in sufficient quantities and qualities for programs to function. The 215 sq. ft. metric is a planning average and assumes a balance of approximately 90% cubicles and 10% enclosed office spaces. Exhibit 2 presents a prototypical 30,000 sq. ft. (gross) office layout with permanent occupied workspace seating for approximately 85 people. This plan shows approximately 352 sq. ft. (gross) per person, slightly less efficient than our metric which yields 322 sq. ft. (gross) per person. ❑ ▪ c ■ O Exhibit 2 Prototypical Office Space Layout o Police metric: Police services are highly variable by agency and do not lend themselves to an industry standard metric. To develop a net space metric, the architectural team interviewed 2 TUKWILA FACILITY NEEDS ASSESSMENT AND FEASIBILITY STUDY SPACE NEEDS SUMMARY I INTERNAL DISCUSSION DRAFT 1 -6 -2014 police department personnel and reviewed current services based on a space checklist developed by the International Association of Chiefs of Police (IACP). The interviews identified specific functions to be accounted for in space needs planning. To identify a suitable metric, the analysis draws from the findings by Revenue & Cost Specialists, LLC, Fullerton California in a review of space utilization by 23 police stations with space resources ranging from 2,000 to 150,000 sq. ft. The study found that the average gross square footage was 347 sq. ft. per person. In addition to reviewing current space use, the study qualitatively assessed the adequacy of space. Policing agencies with less than 250 sq. ft. per person reported routine and specific dysfunction from space constraints. As space use exceeded 250 sq.ft. per person and above, agencies more frequently reported that space was adequate or manageable, though many could use more space. Based on these two inputs, the analysis recommends 240 sq. ft. (net) per staff count (or 360 sq. ft. gross when using a 1.5 multiplier) to arrive at an approximate facility size to house the identified program spaces. Exceeding the 347 sq. ft. recommended by the study is a professional judgment based on the number of functions identified by city staff. • Grossing factor. The total area of a building (area enclosed by exterior walls) is a combination of assignable (net) space and non - assignable space (building structure, mechanical /electrical service space, and vertical circulation for example). To arrive at a gross area the net area is multiplied by a "grossing factor ", yielding the total building area. This factor is generally determined by the building function being served. Generally, a building of low complexity (warehouse space) will have a low multiplier (1.16 for example), and higher complexity (laboratory space), will have a higher multiplier (1.8 to 2.0). The use of 1.5 is a professional determination and judged to be adequately conservative for the nature of spaces under examination. Exhibit 3 presents the preliminary Employee- Driven Estimates for space needs based on the assumptions discussed above. Exhibit 3 Preliminary Staffing -based Estimates Department DCD Finance Fire (administrative) Human Resources Information Technology Mayors Office Parks & Recreation Administration Public Works (admin.) Police Total Counts 2013 Employees Gross S.F. Need 28 12 14 4 8 17 27 22 92 Grossing Current Metric (s.f.) Factor Need (s.f.) 215 1.5 9,030 215 1.5 3,870 215 1.5 4,515 215 1.5 1,290 215 1.5 2,580 215 1.5 5,483 215 1.5 8,708 215 1.5 7,095 240 1.5 33,120 224 75,690 Program -based Estimates Prescriptive estimates are based on comparable facilities use and program design. This approach was employed for the following uses: 3 TUKWILA FACILITY NEEDS ASSESSMENT AND FEASIBILITY STUDY SPACE NEEDS SUMMARY I INTERNAL DISCUSSION DRAFT 1 -6 -2014 Council Chambers The space needs estimate for Council Chambers involved an analysis of the facilities at Burien, SeaTac, Federal Way and Renton as comparables. The Burien Council Chambers, depicted below, has an estimated floor area (of the chambers) of 2,100 sq. ft. and seating for 128 in the configuration illustrated. A standalone facility of the same configuration would require the 1.5 grossing factor for a total of 3,150 sq. ft., or 25 sq. ft. per dedicated seat. Exhibit 4 Burien City Hall Council Chambers 1600 Tukwila's current council chamber has dedicated seating for 72 (6 rows of 12 seats). City staff report that current seating is insufficient for special presentations or other meetings holding significant public interest and that seating for 100 would better meet the City's current needs. For planning purposes, the study uses a predesign target of seating for 128 and assumes a "standalone" space, resulting in a planning target of 3,150 gross sq. ft. In addition to chamber space of 3,150 the council chamber estimate includes office space for 4 using the 215 sq. ft. average metric and 1.5 grossing factor amounting to a pre- design estimate of 4,440 sq. ft. for council chambers. This allowance is expected to diminish in the next planning phase as department spaces are collocated. Emergency Operations Center The City of Tukwila does not currently have a dedicated Emergency Operations Center (EOC). To calculate a predesign space allowance for an EOC, the analysis uses a prototypical space diagram developed by Homeland Security. City ECO management personnel reviewed the prototypical space diagram (depicted below) to identify necessary components for the City of Tukwila. The predesign space needs estimate is based on the prototypical layout illustrated in Exhibit 5 and the maximum personnel count expected for an emergency. The total net square footage is 5,202 sq. ft. (the sum of space estimates indicated in red). The greater specificity provided by the prototypical plan allows less 4 TUKWILA FACILITY NEEDS ASSESSMENT AND FEASIBILITY STUDY SPACE NEEDS SUMMARY I INTERNAL DISCUSSION DRAFT 1 -6 -2014 allowance for circulation and structural space needs. The analysis is based on a multiplier of 1.16 (as opposed to 1.5 for general office space) resulting in 6,032 gross sq. ft. As with Council space, it is expected that collocation will lead to a smaller square footage allowance later in the process. Exhibit 5 Prototypical Emergency Operations Suite, Indicating Use and Space Needs • T-Fiai-F41g- Communications Policy Board! : -Gemmel-eider H/ 300 sq. ft. .4 Conference Room ► ■11. 400 sq. ft. Two I . p I I Offices 400 sq. fi. Map Room - 100 sq. fP. Operations Room 1600 sq. ft. 4I■ 'Vf rich ■11 GiTreer- Data 7 Tefecomn , 0 Lobby Equipment 100 sq. ff Room 150 sq. ft. Break -out 150 sq, ft. Break -out 150 sq. ft. Mechanical Roam 200 sq. ft, Parks & Recreation Maintenance Iran uu (cart -uu Storage 400 sq. ft. • Dining Kitchen 160 160 sq. ft, 150 sq, ft, Sleeping Quarters Exercise Showers and Toilets L 950 sq. ft. The current space used by Parks and Recreation maintenance functions is considered adequate for the City's current needs. The predesign space needs analysis uses the current square footage of 7,300 sq. ft. as an estimate. Public Works (shops) An expert architectural review of the Public Works space at both the Minkler Shops and at George Long concluded that the space is deficient solely by inadequacies in the plan (the layout of the buildings, rather than building size). In comparison to modern shop facilities, the Minkler plan is highly inefficient. The layout consists of a series of short span, long serpentine spaces that have very little flexibility and inhibit any real reconfiguration or logical planned expansion for growth. In particular, the storage bins are designed in a long "shotgun" style without opportunities for conversion unless very awkward interior circulation patterns are used. An ordered rectangle space would make gains through large clear span spaces allowing lots of opportunity for both reconfiguration and expansion. To estimate current space needs, the analysis applies a multiplier on current rentable (net) space of 1.5 at Minkler and 1.1 to George Long. The existing square footage grossed up by the associated multiplier will account for properly designed circulation space, centrally located mechanical/ electrical space, and vertical transportation space (stairs) to enable efficient use of second story development. Site planning both facilities together in one building envelop may make addition gains in efficiency, as well as and considering two story options for office spaces, lockers, kitchens, or diagnostics spaces as done by more contemporary designs. 5 TUKWILA FACILITY NEEDS ASSESSMENT AND FEASIBILITY STUDY SPACE NEEDS SUMMARY I INTERNAL DISCUSSION DRAFT 1 -6 -2014 Fire Operations The fire operations space needs estimates are based on an average station size of 9,828 sq. ft. This figure is based on the combined average of three VRFA station sizes with staffing that is equivalent to Tukwila's current stations, as well as eight recent replacement stations in the City of Seattle that match the designated staff baseline of Tukwila's current stations. None of the comparable stations include bays for on -site vehicle maintenance or specialized training facilities such as a training tower. Courts The program -based method used for the Courts calculation is taken from the "U.S. Courts Design Guide, 2007 Edition." It delineates the component parts and relative size for different models of courtroom design, as a guide to the planning process. Exhibit 6 presents the preliminary prescriptive estimates for Tukwila facilities. Exhibit 6 Preliminary Program -based Estimates Council EOC Parks & Recreation Maintenance Public Works (shops) Fire (operations) Courts Total Gross S.F. Need 2013 Employees 8 10 43 54 11 Current Need (s.f.) 4,440 6,032 7,300 62,919 43,826 5,029 126 129,546 PRELIMINARY FUTURE SPACE NEEDS PROJECTIONS To determine a planning -level estimate of future space needs, the current needs methodology was updated based on preliminary planning estimates of future staffing levels. The main driver in estimating future staffing levels are population and employment growth. We tested two sources of growth projections. The first is BERK's analysis of historical growth trends conducted in 2012 for a baseline fiscal assessment of the City's operating budget. The historical data came from the 2007 King County Buildable Lands report on residential and commercial development from 1996 to 2005. These data are from a "normal" market period, and do not include the downturn experienced in the recent recession. Residential growth is forecasted at slightly higher rate than the 10 -year annual averages based on the professional opinion of City staff about likely growth and known developments. Commercial growth is forecasted similar to the 10 -year average, though assumes a slightly higher ratio of retail /office space compared to industrial space. The second forecast is PSRC's Land Use Targets, representing the allocation of the City's adopted growth targets. This forecast represents the number of people and jobs the City is required to plan for and is more closely tied to the development capacity in the City's comprehensive plan. Exhibit 7 presents comparisons of projected population and employment growth for Tukwila. 6 TUKWILA FACILITY NEEDS ASSESSMENT AND FEASIBILITY STUDY SPACE NEEDS SUMMARY I INTERNAL DISCUSSION DRAFT 1 -6 -2014 Exhibit 7 Comparison of Historical -based and PSRC Forecasts, 2013 - 2040 POPULATION 35,000 30,000 25,000 19,091 19,160 20,000 18,000 15,000 10,000 5,000 26,872 21,512 29,226 22,492 31,579 23,472 24,452 1 -PSRC -*-Historical -0-Actual 2007 2010 2013 2015 EMPLOYMENT 80,000 70,000 60,000 50,000 47,006 40,000 30,000 20,000 10,000 2025 2030 2035 2040 62,543 65,217 68,607 49,979 - I-PSRC tHistorical tActual 2007 2010 2013 2015 2025 2030 2035 2040 2013 2035 2013 - 2015 Estimate Projection Change %Change Population 19,160 Historicals based projections (2012) 23,472 4,312 22.51% PSRC LUT Forecasts 31,579 12,419 64.82% Difference 8,107 42.31% Jobs Historicals based projections (2012) PSRC LUT Forecasts 39,530 48,044 8,514 21.54% 68,607 29,077 73.56% Difference 20,563 52.02% Source: BERK analysis of development, 2012; PSRC Land Use Target Forecasts, July 2013 7 TUKWILA FACILITY NEEDS ASSESSMENT AND FEASIBILITY STUDY SPACE NEEDS SUMMARY I INTERNAL DISCUSSION DRAFT 1 -6 -2014 PSRC forecasts a more significant rate of growth than Tukwila has experienced in the recent past including 8,107 more residents and 20,563 more jobs in Tukwila by 2035. The scale of difference between the two projections will be a consideration in the development - planning phase of the project. For projecting future space needs, this analysis uses the historical -based projections and a planning horizon of 2040 to align with regional planning efforts. The projections assume an increase of 5,292 residents and 10,449 jobs between 2013 and 2040, as presented in Exhibit 8. Exhibit 8 Growth Assumptions for City of Tukwila, 2013 — 2040 Compound 2013 2040 Change Total Growth Annual Growth Residents 19,160 24,452 5,292 27.62% 0.91% Employment 39,530 49,979 10,449 26.43% 1.07% Residents + jobs 58,690 74,431 15,741 26.82% 1.09% The gross level demand drivers (population and jobs growth) were adjusted to reflect actual service drivers by department and reasonable estimates of the economies of scale in staffing. For each department, a growth driver and an elasticity factor were selected. The growth driver determines the basis for future staffing levels, while the elasticity factor estimates the degree to which future growth in the driver relates to growth in staffing. For example, in police services the underlying driver is the growth in the sum of residents and jobs, acting as a good proxy for overall demand in service calls. However, there are a number of functions within the department which are not significantly affected by changes in call volume, such as administrative functions and senior chain of command positions. As a result, an elasticity factor of 0.8 is used to reduce the impact of the underlying driver on overall staffing. In effect, this factor suggests that approximately 80% of the staffing will be affected by the underlying driver, while 20% would remain fixed. At this level of analysis, it should be emphasized that these are very high level planning estimates and that the primary goal is to develop a sound basis for facility planning which reasonably accounts for some of the key factors affecting staffing demand by department. This is not intended to be an actual staffing forecast, since staffing levels will ultimately be determined by factors beyond the scope of this analysis such as changes in technology, policy decisions regarding level -of- service and future budget considerations. Given this, the departmental analysis uses the following growth driver assumptions: • Residents + Jobs. Future service demands in the majority of the direct service departments are assumed to be driven by growth in residents and jobs. While the underlying driver is the same for each, the elasticity factors vary from 0.8 for police and fire to 0.5 for the other departments reflecting a greater ability to achieve economies of scale in these functions. • Residents. Parks and recreation services were assumed to be driven primarily by resident population growth with an elasticity factor of 0.5 to reflect that a key constraint to growth will be the availability of facilities from which to offer recreation services. • Constant. At the scale of growth envisioned in this analysis, it is assumed that both the Council and Mayor's Office staffing will remain constant over the planning horizon. • Overall staffing. Human resources and Information Technology are driven by changes in overall city staffing, reflecting that these are primarily internal service functions. Human resources was assigned 8 TUKWILA FACILITY NEEDS ASSESSMENT AND FEASIBILITY STUDY SPACE NEEDS SUMMARY I INTERNAL DISCUSSION DRAFT 1 -6 -2014 a 0.5 elasticity factor, while IT was given a 0.8 elasticity factor to reflect a greater variable cost for IT services. • Departmental Staffing Growth. Some of the administrative functions of specific departments are called out separately (Fire & Public Works) and so these positions are driven by the operational staffing levels within these departments. Both assume an elasticity factor of 0.5. For each department the Growth Factor represents the percent change in the growth driver. For example, the growth in residents is expected to be 22.51 %, thus the growth factor is listed as .23. Exhibit 9 presents the preliminary 2035 staffing estimate analysis, showing a growth factor based on the assumed growth driver and elasticity factor by department. Exhibit 9 Future Space Needs Estimates Current Growth Elasticity Projected 2040 Department Staffing Factor Factor Staffing Growth Driver Council 8.0 0.00 1.00 8.0 Constant Courts 11.0 0.27 0.50 12.5 Residents + Jobs DCD 28.0 0.27 0.50 32.0 Residents + Jobs Finance 12.0 0.27 0.50 13.5 Residents + Jobs Fire (operations) 54.0 0.27 0.80 65.5 Residents + Jobs Fire (administrative) 14.0 0.21 0.50 15.5 Fire Operations Human Resources 4.0 0.15 0.50 4.5 Overall staffing Information Technology 8.0 0.15 0.80 9.0 Overall staffing Mayors Office 17.0 0.00 1.00 17.0 Constant Parks & Recreation Administration 27.0 0.28 0.50 30.5 Residents Parks & Recreation Maintenance 10.3 0.00 0.50 10.5 Parks Facilities Police 92.0 0.27 0.80 111.5 Residents + Jobs Public Works (admin.) 22.0 0.14 0.50 23.5 Pub Works Ops Public Works (shops) 43.0 0.27 0.50 49.0 Residents + Jobs Total 350.25 402.50 Source: BERK, 2013 Exhibit 10 presents estimated future space needs determined by applying the current space needs methods to the future staffing levels. The staffing -based estimates are a straightforward application of the space per employee method, while the program -based analysis determines space needs by applying the employee ratios established in the current needs analysis to the future staffing levels for these functions. 9 TUKWILA FACILITY NEEDS ASSESSMENT AND FEASIBILITY STUDY SPACE NEEDS SUMMARY I INTERNAL DISCUSSION DRAFT 1 -6 -2014 Exhibit 10 Preliminary 2040 Space Needs Estimates Staffing -based Estimates Counts Gross S.F. Need 2040 Metric (sq. Grossing Future Need Department Employees ft.) Factor (sq. ft.) DCD 32.0 215 1.5 10,320 Finance 13.5 215 1.5 4,354 Fire (administrative) 15.5 215 1.5 4,999 Human Resources 4.5 215 1.5 1,451 Information Technology 9.0 215 1.5 2,903 Mayors Office 17.0 215 1.5 5,483 Parks & Recreation Administration 30.5 215 1.5 9,836 Public Works (admin.) 23.5 215 1.5 7,579 Police 111.5 240 1.5 40,140 Subtotal - Employee Driven 257.0 87,064 Program -based Estimates Counts Gross S.F. Need 2040 Current Future Need Employees Ratio (sq. ft.) Council 8.0 555.0 4,440 EOC 6,032 Parks & Recreation Maintenance 10.5 712.2 7,478 Public Works (shops) 49.0 1,463.2 71,698 Fire (operations) 65.5 811.6 53,159 Courts 12.5 457.2 5,715 Subtotal - Prescriptive 145.5 148,522 Totals 402.5 235,586 Source: BERK, 2013 10 APPENDIX A Current City Facilities Exhibit 11 Current Employee Space, 2013 Building 6300 Building City Hall George Long Minkler Fire Station 51 Fire Station 52 Fire Station 53 Fire Station 54 Records /Evidence (Sabey Lease) Records /Evidence (Old FS #53) Southcenter PD Neighborhood Resource Center Tukwila Heritage and Cultural Center Old Water District 125 Maintenance Tukwila Community Center Parks /Golf Maintenance Facility Foster Golf Links Clubhouse Total Area Occuppied Included in Total Employee 2008 Study s.f. Floor Area yes 50,526 50,526 yes 24,991 24,991 yes 25,640 25,640 yes 21,000 21,000 yes 17,700 17,700 yes 3,350 3,350 yes 14,000 14,000 yes 5,300 5,300 no 6,651 6,651 no 6,100 6,100 no 900 900 no 900 900 no 2,500 2,500 no 550 550 no 48,000 784 no 7,300 7,300 no 14,400 600 249,808 188,792 2008 Recommendations seismic retrofit seismic retrofit reolace seismic retrofit reolace seismic retrofit condition ok seismic retrofit not part of 2008 study not part of 2008 study not part of 2008 study not part of 2008 study not part of 2008 study not part of 2008 study * not part of 2008 study not part of 2008 study * not part of 2008 study Gross Sq. Ft. Leased/ Owned owned owned owned owned owned owned owned owned leased owned leased leased owned owned owned owned owned :111 BERK RICrei"gU.SMILLER AAGNILEC,URF g PLANNINA f+ i a) ci) ci) 7:3 cn a) • a� V3z CD Ca 46 ca c v IL co a 0 (5))u) 0 • DRAFT PACKET U) a N N LL Z 0 — a) a) W N cn � Y N 0 cp N a) ca T - U W co O _ QQ LL a i 0 • DRAFT 1 -6 -2014 Project Workplan Overview of Current Needs Overview of Projected Needs Questions & Next Steps U) a N Z o E w cn N N O a) ca Z T cp -U w a u_ a DRAFT 1 -6 -2014 N N C • E ca 0 • ...7. w .02 o_ 4-, O O F. > v a..+ to 4) as C .° V S . >% •_ w co o v — O CD ‘I •cQ 4-• (1) 0 g CM C C — O •- O ca }' -0 (.9 ca CU 0 :0 .N 0 c c) 5 ni = w L ET = '� a O W cn O L • CL thimi • - a ■Maximize City of Tukwila A Facilities Needs Assessment and Feasibility Study • • roach PHASE 1 WORKSESSION DRAFT 1 -6 -2014 L V Low estimate of future space needs Facilities Planning Target Estimate current 0 mi a, a) c a, V f6 Q N Identify current use V in c v a) c +.. a) CU U Q a, a) t I- to +r x •- J .0CMCZI.C= 4 ` =1 d- City of Tukwila A Facilities Needs Assessment and Feasibility Study • • roach PHASE 1 WORKSESSION DRAFT 1 -6 -2014 Assess suitabili Assessment of suitability & condition O 0 O x O x x x x x x O x • Site considerations • Assess condition CD CD ro C ro U E CD • considerations U 2 • Functional life City of Tukwila A Facilities Needs Assessment and Feasibility Study • • roach PHASE 1 WORKSESSION DRAFT 1 -6 -2014 Assess Alternatives Plan Implementation PHASE 5: Facility Design O O x c a) E Q a) a) c O 0. 0 O x O O x O Establish evaluation ej DISCUSSION C C" U C.j 2 LL ftF 8 PHASE TUREE C At Li - Cir v 2 06 CD C/,1 0 ▪ _ C17 LL 410- el C w E� Le) tv • S N ao a w wi s} L9 m - C. cIt u_ a 47 n, (y} pp C 4) a E co co cu T (- \J N 0 = as E• o . E ▪ • en s4 C7 n • i m = V) [-_,_ = 4o -E o . L' E 4t of • a) ▪ < R Cr) �• E - 0_ 8 Project Future Space Neds Work Session Adoption Work Session Work Sesion rk S,?ssion 1/13 1N3W3OVlN31VN831NI E E n C m Cy 0 = ▪ ▪ 0 7 o < C)- w Ci Q, 1N3VJ39VON3 TM U31U3 Risk Assessment t L t Q 0,- C 0 L R7 c c EL M 0 . E C7 i .--i cU i 4 a) C U � 47 T E may= o ■ 62 C) i L6 N C ai 3 'a. U a) co C C) CD (L SD 4I5 d E 4 � CU L3.0 cO CJ7 U C7 2 G i3.la*'.ORr7,1 II iplant" DRAFT 1 -6 -2014 cn a) E w a) a i4= sam *Elm a • Department Head /Staff Questionnaires Existing Building Analysis City Council Member Interviews C co -o L C6 C N C6 N CO E U C -o a) • • •Mm grossing factor U Q,7 E employees Program -based Estimates 4 z • Space Metrics Comparison of other facilities • -o C a) a) 4J U C q—(13 tio a) N a, 0 -0 roE C6 CQ Q E nA 0 - • •, Steering Committee feedback . U) a N cc N LL Z 0 cn cn N E Cn cn � Y N 0 O ca Z T cp co O -• Q LL a DRAFT 1 -6 -2014 Estimates Gross S.F. Need N C 0 U r CVCV U M IC) a) I U LC) IC) O LC) • +L+ N C N N a) _ 2 N N a) a) E w External Services (DCD, PW Admin, Parks & Rec, Mayor) N N O) r Internal Services (IT, Finance, Human Resources) a) a Fire Admin O O CO Sri ti N 0 I- ram -based Estimates O L a Gross S.F. Need Cn a) a) >, O N C. E w O o-) CV 'Od' 00 rn CO in N CO N T 6) M d' CO N dP tC) N External Services 0 in- 0 U 0 w 0 C 0 U C .C) 2 in 0 Q O o t N C Fire Operations CO M N Lf) C N C L() M N O H U) a N cc N LL Z 0 cn cn a) E (n CL N Ids 0 N a) CO N T cp - N W O QQ a Fk4 DRAFT 1 -6 -2014 _ o E C.) ca ' cr. CL E co (n 0 a) w Q 4- U) Cr.) 0 - 0 + 4-) 0 C▪ Z U) W Growth Driver a--+ C CO 4 4�-+ (1) v) —0 C C 0 0 v U U cc Mayors Office Parks & Recreation Administration Residents + Jobs Residents + Jobs Residents + Jobs N U • 0 co U 0 Residents + Jobs Fire (operations) Residents + Jobs Residents + Jobs Public Works (shops) Overall staffing Human Resources Overall staffing Information Technology Fire Operations Fire (administrative) Parks Facilities Parks & Recreation Maintenance Pub Works Ops Public Works (admin.) 0 City of Tukwila Facilities Needs Assessment and Feasibility Study PHASE 1 WORKSESSION ?RAFT 1 -6 -2014 Estimates a) N Gross S.F. Need N C z O U a) a) Z a) U • L y_ O y U O 66 N 0 'L Ca) G co co o a) N • C CO 0~0 LO LO Lc) • r N N N N y a) 0 • 0 o a) 0 N a E w O O U) LO O Cj r Ln O N r U[) External Services (DCD, PW Admin, Parks & Rec, Mayor) Internal Services (IT, Finance, Human Resources) Fire Admin ram -based Estimates O L a Gross S.F. Need N C 0 U d Z • O L L U 0 0 N CO 10 CO CS) 0) LO N O O - co Co CO- 0 N N- LO y a) a) 0 Q E w External Services (Parks & Rec Maint., Council, EOC, Courts) Fire Operations R 0 H CO CO Ln Ln N City of Tukwila • Facilities Needs Assessment and Feasibility Study Pro • ection In uts PHASE 1 WORKSESSION DRAFT 1 -6 -2014 O v O N CO Is- LO in N LO LO LO 6) Lf) a) Lf) 1.0 LO -0 C O N M Cr) LO N d- Lf) O M .� E co - - O - ,- N V r N O L a Growth Factor Growth Driver co f-- 00 N N M 00 U) N N N N- LC) O' N N O O O O O O O O O O O O O O O O LO Lf) LC) LO CO CO LC) LC) Co LO LC) LC) f O O O O O O O O O O O O O CO I� ti LC) LS) N- O d' O O N N N N N N N N- N- N O . . . O O O O O O O O O O O O 0 0 0 0 0 0 Ca U) N + + + + + + U N- U U U N U) U :0 U 7 U E ' ' ' ' U U) a) as c E Q � D U Mayors Office Parks & Recreation Administration U) 0 U o N 0 0 .� 0 o it Fire (operations) Overall staffing Overall staffing Information Technology Fire Operations Fire (administrative) Parks Facilities & Recreation Maintenance U) CD d Pub Works Ops c E -o La U) I- 0 U 0 d U) N 0 U) N U) M U) O H N r-I A U) a V) N LL Z 0 cn N W N cn N Q N ca N cp co - U W O _ QQ a cn cu ci) ‘r< DRAFT 1 -6 -2014 N 0) 0 0 a) 0) V O L o .� ♦-+ (/) o L ep. eL 0 cts o _c V CL Assessment of current facilities suitability and condition M ci