HomeMy WebLinkAbout95-137 - Boeing - Longacres Park Transportation Mitigationq:5-
CITY OF TUKWILA
LONGACRES PARK TRANSPORTATION MITIGATION AGREEMENT
This TRANSPORTATION MITIGATION AGREEMENT "Agreement dated
L14 3 i> 19 ..S is made by and between the CITY OF TUKWILA
"Tukwila a municipal corporation of the State of Washington and THE BOEING
COMPANY "Boeing a Delaware corporation.
RECITALS
WHEREAS, the Boeing Company has proposed to develop an office park
"Office Park at the site of the former Longacres Race Track; and
WHEREAS, several alternatives for the Office Park have been evaluated by the
City of Renton as lead agency in accordance with the requirements of the State
Environmental Policy Act "SEPA and
WHEREAS, significant environmental impacts of the Office Park were identified
in an environmental impact statement for the Office Park issued by the City of Renton in
August of 1994 "Office Park EIS including impacts to the Tukwila transportation
system; and
WHEREAS, measures mitigating the adverse environmental impacts caused by
Boeing's preferred alternative for the Office Park "Alternative 1 are set forth in a
Mitigation Document issued by the City of Renton in May, 1995 "Renton Mitigation
Document and
WHEREAS, the Renton Mitigation Document states that the terms and conditions
for the assessment and collection of mitigation fees for traffic impacts to the Tukwila
transportation system shall be established in a separate agreement between Boeing and
Tukwila; and
WHEREAS, additional evaluation of adverse impacts to the Tukwila
transportation system will be required during the environmental review for each specific
development phase of Alternative 1; and
WHEREAS, significant adverse impacts to the Tukwila transportation system
caused by a specific development phase of Alternative 1 and not previously identified by
the Office Park EIS may be mitigated as a condition of approval of that specific
development phase;
Longacres Park Mitigation Agreement 12/6/95
Page 2
AGREEMENT
NOW, THEREFORE, in consideration of this and other good and valuable
consideration, the sufficiency of which is hereby acknowledged, the parties agree as
follows:
1. EIS Analysis
Mitigation measures set forth in this Agreement "Tukwila Mitigation Fees are
sufficient to mitigate impacts to the Tukwila transportation system of Alternative 1 as
analyzed in the Office Park EIS and summarized in the Renton Mitigation Document.
2. Basis of Mitigation/Mitigation Amount
The Tukwila Mitigation Fees have been calculated according to the methodology
set forth in the Draft Transportation Element in the City of Tukwila Draft Comprehensive
Plan (1993). Using this methodology, the vehicle trips, distribution of trips, and
corresponding mitigation payments generated by Alternative 1, were calculated as
follows:
Intersection
Location
Number of Cost per Mitigation
Veh. Trips Vehicle Trip Cost
1) Southcenter Pkwy/ Strander 156 140 21,840
2) Andover Pk E /Strander 234 135 31,590
3) Andover Pk W /Strander 117 377 44,109
4) S 180 /SR 181 117 475 55,575
5) Andover Pk E /Baker 0 377 0
6) Andover Pk W /Minkler 117 392 45,864
7) Southcenter Pkwy /S 168th 117 278 32,526
8) W Valley /Strander 350 283 99,050
9) Interurban Bridge Interchange 623 $1,122 699,006
TOTAL TRIPS /FEES: 1,831 $1,029,560
3. Payment
Because the construction of Alternative 1 is planned over a 10 -15 year period,
Tukwila has established two optional methods for payment of the Tukwila Mitigation
Fees. Boeing shall exercise, at its sole discretion, one of these options for payment of the
Tukwila Mitigation Fees. Option 1 recognizes the benefits to Tukwila of receiving the
total Tukwila Mitigation Fee in a single payment. In addition to the time value of money,
a single payment would provide Tukwila with a substantial amount of money at once,
thereby (a) avoiding the need to accumulate funds in smaller increments over a long
period of time before meaningful construction could begin and (b) facilitating the
acquisition of matching funds. Payment under Option 1 is nonrefundable and is not
subject to future rate increases. Boeing, as part of its decision to exercise Option 1, may
choose to negotiate with Tukwila to establish how, where, and when early payment
Longacres Park Mitigation Agreement 12/6/95
Page 3
moneys will be expended. Option 2 provides for incremental payments of the Tukwila
Mitigation Fees to mitigate the impacts caused by specific phases of Alternative 1.
The two options are as follows:
3.1 Option 1- December 31, 1995 Payment
The total Tukwila Mitigation Fee will be discounted from $1,029,560 to $830,000
if the total fee is paid before December 31, 1995. If Boeing chooses to construct an
alternative for the Longacres Park office development other than Alternative 1, fees paid
under Option 1 will be credited against any fees assessed to mitigate the transportation
impact of that alternative
3.2 Option 2 Incremental Payments
Tukwila Mitigation Fees will be assessed against each phase of Alternative 1 in
accordance with the specific impact resulting from that phase; provided, that the total
Tukwila Mitigation Fee shall not exceed $1,029,560, unless, additional fees are imposed
pursuant to Section 5 as set forth below.
4. Status of Transportation Projects
The parties acknowledge that several projects referenced in Section 2 of this
Agreement are currently being designed or constructed and in some cases have already
been completed. The current status of such projects shall in no way impact Tukwila's
authority to collect mitigation fees under this Agreement.
5. South 158th Street Limitations, Monitoring, Review
The AM and PM peak hour trips for South 158th Street which are attributable to
and that may be utilized by the Office Park development shall be limited to 390, which is
the "existing condition" for South 158th Street as set forth in the Draft Transportation
Element of Tukwila's Draft Comprehensive Plan (1993) Notwithstanding the foregoing,
capacity on South 158th Street for AM and PM peak hour trips exceeding 390 that is
created as a result of South 158th Street improvements may be utilized by, and only by,
the entity financing those improvements. Improvements that may be necessary to
increase the number of PM peak hour trips on South 158th Street to accommodate
additional traffic generated by Alternative 1 shall be identified through the environmental
review process for each phase of development. Tukwila shall periodically monitor AM
and PM peak hour traffic volumes on South 158th Street to ensure that limitations are not
exceeded by any specifically identifiable entity using the right -of -way. Monitoring will
occur at least annually and more frequently if volumes approach the maximum peak hour
trips. Monitoring methodology shall be consistent with traffic engineering practices and
shall be mutually agreed upon by both parties prior to initiating any monitoring effort. In
the event that peak hour limitations are exceeded, Tukwila reserves the right to review the
need for additional improvements and to assess additional impact mitigation fees against
the entity creating the unmitigated traffic impacts and any such additional impact fees
shall be in addition to and not withstanding the total fees provided for in Section 3.2
above.
Longacres Park Mitigation Agreement 12/6/95
Page 4
6. Assignment
This Agreement shall be binding upon and inure to the benefit of the successors
and assigns of both parties hereto
7. Severability
In the event that a court of competent jurisdiction determines that any phrase,
section, subsection or clause in this Agreement is invalid, all remaining phrases, sections,
subsections, or clauses shall remain in full force and effect.
CITY OF TUKWILA
J Rants, Mayor
Attest/Authenticated:
�k
AGREED TO THIS a day of
C
Jade E. Cantu, City Clerk
THE BOEING COMPANY
By
Nax i�e( J .''J. Nel son
Title. VP -FAMO BCAG
STATE OF WASHINGTON
County of King
ss
Approved As to Form:
//..‘eZ (26
Office of the City Attorney
,199'S
Tom,
On this day of 19 personally appeared before me
An_ S 0 to e known to be the I/Q- r l v %cT /i ,v of
the corporation that executed the within and foregoing instrument, and acknowledged
said instrument to be the free and voluntary act and deed of said corporation for the uses
and purposes therein mentioned, and on oath stated that was duly elected,
qualified and acting as said officer of that corporation, that was authorized to
Longacres Park Mitigation Agreement 12/6/95
Page 5
execute said instrument and that the seal affixed, if any, is the corporate seal of said
corporation.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official
seal the day and year first above written.
NOS PUBLIC in and for the
State of 4.) o yr c �%liw
Residing at
My commission expires