INTERLOCAL AGREEMENT FOR
THE ADMINISTRATION OF THE
GREEN RIVER FLOOD CONTROL ZONE DISTRICT
PREAMBLE
THIS AGREEMENT "Agreement is entered into pursuant to Chapters 86 15 and 39 34 of the
Revised Code of Washington (RCW), by and between the municipal county and city
governments signing this Agreement, that are located in King County lying wholly or partially
within those areas of the lower Green River watershed that are within the boundaries of the
Green River Flood Control Zone District as shown in Appendix A (collectively the "Parties
The Parties share interests and responsibility for addressing flood hazard reduction planning,
river facility project construction and repair, and maintenance and operation of critical flood
protection facilities within the lower Green River watershed, and wish to provide for planning,
funding and implementation of programs, activities and projects therein The Parties have
actively participated in these interests and responsibilities through the Green River Basin
Program since its inception in 1978 In addition, in 1990 the Parties pledged their support for
activation of the Green River Flood Control Zone District by King County
It is the purpose of this Agreement to extend and renew the principles embodied in the 1985
Green River Management Agreement and 1992 Green River Basin Program Interlocal
Agreement in order to provide a coordinated program for achieving the goals contained in these
two agreements The Parties further agree that flood hazard reduction, flood warning and
emergency response, and integrated resource management is best achieved throughout the
approximately 68 square miles of the lower Green River basin through multi jurisdictional
coordination as provided for in this Agreement.
The Green River Flood Control Zone District is a quasi municipal corporation of the State of
Washington, authorized by Chapter 86 15 RCW, which provides a permanent and reliable
regional funding source to accomplish the following purposes. to repair and maintain flood
protection facilities, to operate and maintain pump stations in the lower Green River watershed,
to implement King County's comprehensive flood hazard reduction plan for the Green River
Flood Control Zone District; and to coordinate with federal, state and other local agencies for
July 2002 Page 1 of 17
floodplain management, disaster response, and the protection and restoration of habitat for
threatened and endangered salmonid species
MUTUAL CONVENANTS AND AGREEMENTS
1 DEFINITIONS For purposes of this Agreement, the following terms shall have the
meaning stated below
11
1.2
13
14
JURISDICTIONS "PARTIES The governments participating in this
Agreement as Parties are the County of King and the Cities of Auburn, Kent,
Renton and Tukwila. Each of the Parties is a municipal corporation of the State
of Washington
BOARD OF SUPERVISORS Pursuant to Chapter 86 15 050 RCW, the King
County Council members are the Board of Supervisors of the Green River Flood
Control Zone District.
EXECUTIVE COMMITTEE The Executive Committee referred to herein is the
governing body responsible for providing advisory policy guidance and
recommendations under the terms of this Agreement, as more fully set forth in
Section 4 1 below The membership of the Executive Committee shall consist of
the following the mayors of the Cities of Auburn, Kent, Renton and Tukwila, the
King County Executive, and a King County Council member representing the
Board of Supervisors The Executive Committee is responsible for reviewing and
providing recommendations on the Green River Flood Control Zone District's
annual budget and work program and other related matters as may come before
this Committee, and for providing recommendations on these matters, as
appropriate, to the Board of Supervisors
TECHNICAL COMMITTEE The Technical Committee referred to herein is the
cooperative body composed of the public works or department directors and /or
their designated representatives of each of the Parties, and any other persons
who are deemed by consensus of the Parties to be appropriate participants in
addressing the cooperative administration of the Green River Flood Control Zone
District and its annual work program and budget, as more fully set forth in
Section 4 2 below The Technical Committee is the body responsible for
recommending actions to the Executive Committee related to flood hazard
reduction planning and project implementation, and other basin -wide activities
July 2002 Page 2 of 17
directly related to the purposes of the Green River Flood Control Zone District
and the terms of this Agreement.
1 5 GREEN RIVER FLOOD CONTROL ZONE DISTRICT "DISTRICT This
district is a quasi municipal corporation and independent taxing district
authorized for the purposes contained in Chapter 86 15 RCW
1 6 ADMINISTRATOR. Administrator, as used herein, means collectively the
employees, specialists, technicians, fiscal agents and other personnel supplied
by King County to and for the administration of the Green River Flood Control
Zone District in accordance with Chapter 86 15 RCW and the administration of
the activities and purposes undertaken pursuant to the terms of this Agreement.
1 7 AD VALOREM TAX LEVY The ad valorem tax levy, which is based upon the
total assessed valuation of property within the District, is the revenue source
historically and currently used to fund the flood hazard reduction planning,
facilities operation and maintenance, and project and program implementation
within the Green River Flood Control Zone District.
2 PURPOSES The purposes of this Agreement include the following
2 1 Continue to provide a vehicle for interagency coordination and cooperation
among the Parties on flood hazard reduction planning, programs and projects
within the Green River Flood Control Zone District.
2.2 Continue to provide integrated policy and technical advisory input to the Green
River Flood Control Zone District through the Executive and Technical
Committees
2 3 Develop and implement contemporary standards and procedures for operating,
maintaining and repairing river flood protection facilities and pump stations within
the Green River Flood Control Zone District to maximize public health and safety
that are consistent with the requirements of the federal Endangered Species Act
and other applicable federal, state and local laws and regulations
2 4 Provide a coordinated interjurisdictional mechanism to (a) more efficiently and
effectively implement flood hazard reduction measures and programs in the
Green River Flood Control Zone District; (b) cooperate with federal, state, local,
and other agencies and parties having jurisdiction and /or resources to support
enhanced flood hazard reduction in the Green River Flood Control Zone District;
and (c) coordinate and improve flood warning, emergency response and disaster
July 2002 Page 3 of 17
recovery with the Federal Emergency Management Agency, the U S Army
Corps of Engineers, the Washington State Emergency Management Division,
and, as appropriate, other federal, state and local agencies
3 EFFECTIVE DATE AND TERM This Agreement shall become effective upon its
execution by the five (5) eligible jurisdictions within and representing the geographic
areas comprising the Green River Flood Control Zone District, as authorized by each
jurisdiction's governing body Upon the effective date, this Agreement shall remain in
effect for a term of ten (10) years; provided, however, that this Agreement may be
extended for any such additional terms as the Parties may agree to in writing, in
accordance with the Amendment provisions of Section 11 below
4 ORGANIZATION AND RESPONSIBILITIES OF GREEN RIVER FLOOD CONTROL
ZONE DISTRICT The Parties to this Agreement hereby agree to participate in and
promote the purposes of the Green River Flood Control Zone District and to establish an
Executive Committee as the governance structure for promoting and implementing the
purposes of this Agreement, and a Technical Committee for promoting and
implementing the purposes of this Agreement. These committees will be staffed by King
County, which is the Administrator of this Agreement, and which is also the Administrator
of the Green River Flood Control Zone, under the provisions of Chapter 86 15 RCW
4 1 Green River Flood Control Zone District Executive Committee The
Executive Committee shall
4 1 1 Select from among its members a chairperson to chair the Executive
Committee and to oversee and conduct its annual meeting and any other
meetings that may be scheduled, select a vice chairperson to perform the
functions of the chairperson in the event of the chairperson's absence,
and adopt rules and procedures for the Executive Committee's
operations
4 1 2 Meet at least annually, no later than October 15 of each year, to review
the status of the then current year's flood reduction budget and work
program, and to make budget and work program recommendations for
the following calendar year The Executive Committee shall forward their
budget and levy rate recommendations for the following year to the Green
River Flood Control Zone District's Board of Supervisors no later than
July 2002 Page 4 of 17
October 31 of each year, and shall also make recommendations on other
program and financing proposals as may come before the Executive
Committee
4 1 3 Adopt other rules and procedures necessary for the implementation of
this Agreement.
4.2 Green River Flood Control Zone District Technical Committee The
designated representatives of each of the Parties to the Technical Committee will
undertake the responsibilities identified immediately below Representatives
from other municipalities and resource agencies may also participate in
Technical Committee meetings and activities based on consensus of the Parties
and on an as needed basis. The Technical Committee shall
4.2 1 Meet at least six times per year and be responsible for the following
primary responsibilities and activities.
Carry out the directives of the Executive Committee.
Formulate and recommend the annual work program and budget for
the Green River Flood Control Zone District for consideration by the
Executive Committee
Establish and recommend the Green River Flood Control Zone District
annual repair and maintenance program priorities
Review all policy questions and technical issues relevant to the
annual work program and budget.
Make recommendations to the Executive Committee on work program
and budget initiatives including revenue enhancements and the
annual levy rate for the Green River Flood Control Zone District.
Review and coordinate all other matters that may come before the
Technical Committee
4.2.2 Provide performance and peer review of existing technical work products
and plans and make recommendations for action, including initial
decisions related to the work program, service contracts, and budget and
financial operations, for the duration of this Agreement.
4.2 3 Provide and carry out actions necessary to ensure that quality services
are efficiently, effectively and responsibly delivered in the performance of
the purposes of this Agreement.
July 2002 Page 5 of 17
4 2 4 Work with property owners and development interests to ensure that the
ongoing structural integrity and flood protection performance of the Green
River Flood Control Zone District's levees and revetments will not be
compromised by local land use actions This shall include, at a minimum,
maintaining existing easement areas and /or tracts of land established for
this purpose Local land use actions shall also provide for the obtaining
of any additional easement areas or tracts of land reasonably necessary
to accommodate levee structural integrity and slope stability needs. Such
needs shall be determined in a manner consistent with applicable federal
levee engineering guidelines, and with any additional engineering or
geotechnical studies prepared for this purpose.
4 2.5 Coordinate flood hazard reduction planning and projects with the WRIA 9
Forum's plans and projects relating to conservation and restoration of
salmon and salmon habitat, and other projects of mutual benefit.
4 2 6 Coordinate flood emergency preparedness, response and post- disaster
recovery throughout the Green River Flood Control Zone District.
4.2 7 Work directly with the U S Army Corps of Engineers to coordinate dam
operations and other flood damage reduction programs and projects
4 3 Green River Flood Control Zone District Administration In accordance with
and as authorized by Chapter 86 15 RCW, King County shall administer the
Green River Flood Control Zone District and serve as the lead administrative and
technical agency for the Executive and Technical Committees under this
Agreement. Certain employees of King County will be assigned to work on the
implementation of the goals and objectives of this Agreement. King County
further agrees to
Administration and Budget
4 3 1 Present for review by the Technical and Executive Committees the Green
River Flood Control Zone District's annual work program and budget.
4 3 2 Use funds raised within the boundaries of the Green River Flood Control
Zone District in a manner consistent with the purposes of Chapter 86
RCW and the annual Resolutions authorized by the Board of Supervisors
that establish the annual budget and work program for the Green River
Flood Control Zone District.
July 2002 Page 6 of 17
4 3 3 Distribute an annual report to the Technical Committee by May 31 of each
year accounting for the revenue, expenditures and work accomplished by
the Green River Flood Control Zone District during the previous year
Expenditures shall be categorized either as the costs for administration of
the Green River Flood Control Zone District or as the costs for
maintenance and repair of flood protections facilities and pump stations
within the Green River Flood Control Zone District. The annual report
shall include an accounting of the Green River Flood Control Zone
District's designated and undesignated fund balances
4 3 4 Pursue to the fullest extent practicable all federal, state and local funding
opportunities, grants and disaster assistance funding to maintain, repair
and /or retrofit the Green River Flood Control Zone District's flood
protection facilities This shall include, where feasible, the purchase of
rights and interests in lands and structures for the purposes of flood
control and /or flood hazard reduction and mitigation
Maintenance and Repair
4 3 5 Maintain existing levees, revetments, access roads and other flood
hazard protection facilities and any appurtenances thereto, within public
easements granted for these purposes and /or within publicly owned tracts
of lands that lie within the Green River Flood Control Zone District. Such
actions and the repair of any damages caused by flooding at these
facilities are subject to budget availability and repair priorities.
4 3 6 Design and construct all levee and revetment retrofit/reconstruction repair
projects in a manner consistent with the guidelines and standards of the
"Guidelines for Bank Stabilization Projects in Riverine Environments of
King County (1993)," attached as Appendix B, as amended, revised or
updated from time to time by King County
4 3 7 Design and construct all levee and revetment repair, retrofit, and
reconstruction projects in a manner consistent with slope stability findings
and structural design recommendations developed by Shannon and
Wilson, Inc., and set forth in their Summary Report: Slope Stability
Analysis of Four Green River Bank Stabilization Projects for King County
(January 1999), and any subsequent updates and revisions
July 2002 Page 7 of 17
4 3 8 Design and construct all levee and revetment repair projects in
compliance with any requirements of the Endangered Species Act, and
other local, state and federal regulations.
4 3 9 Operate and maintain the Black River (P -1), Tukwila (P -17) and Segale
pump stations.
4 3 10 Perform project monitoring, as necessary, to evaluate facility performance
and to ensure that project design is in conformity with the requirements of
the Endangered Species Act and other conditions of federal, state and
local permits
4 3 11 Complete annual levee inspection reports for the Tukwila and Horseshoe
Bend 205 projects for the U S Army Corps of Engineers.
4 3 12 Coordinate the Green River Flood Control Zone District's projects and
activities with, and participate in, the WRIA 9 Forum's planning efforts for
salmon conservation This will include continued support for and
participation in the U S Army Corps of Engineers' Green Duwamish
Ecosystem Restoration Project, to the extent that such Project involves or
affects any of the Green River Flood Control Zone District's flood
protection facilities
4 4 Pump Operations Procedures Plan The Parties agree to abide by the 1986
Pump Operations Procedures Plan "Plan as amended by the June 30, 1992
Green River Basin Program Interlocal Agreement, establishing specifications for
the operation of the Black River (P -1) and Tukwila (P -17) pump stations The
Plan as amended is attached hereto as Appendix C This Plan may be amended
by the Executive Committee upon unanimous approval of the representatives on
such Committee The Parties further agree as follows
4 4 1 Pump station operation and discharge shall be coordinated with gauged
flows in the Green River, up to the U S Army Corps of Engineers' Green
River Standard Project Flood flow profiles
4 4.2 All new drainage systems discharging directly into the Green River
downstream of the Auburn gauge (USGS #12113000) must be designed
to cease operation when Green River flow reaches 12,000 cubic feet per
second at the gauge, unless adequate mainstem levee and /or channel
capacity improvements are completed to accommodate the added
discharge, and provided that a minimum of two -foot of freeboard above
July 2002 Page 8 of 17
the Standard Project Flood elevation(s) over all affected mainstem levees
is maintained
4 4 3 All pump stations are subject to shutdown in the event that the director of
King County's Department of Natural Resources and Parks, or the
director's designee, determines that there exists a substantial risk of
imminent levee failure or overtopping, or for public health and safety
emergency purposes
4 4 4 All new drainage outfalls discharging directly into the Green River shall be
designed to cease discharging and to store up to the 100 -year, seven -day
flood event when flows in the Green River equal 12,000 cubic feet per
second, as measured at the Auburn gauge, unless a party to this
agreement is granted an exemption subject to the guidelines established
in Sections V and VII of the 1986 Pump Operations Procedures Plan, as
amended
4 5 Flood Warning and Emergency Response For the purposes of coordinating
flood warning and emergency responses within the lower Green River basin, the
Parties agree as follows
4 5 1 All Parties, subject to limitations of available staffing, technology, data
and funding shall provide accurate flood warning information within their
respective jurisdictions regarding the magnitude, timing and duration of
flood peaks in order to give floodplain residents, property owners,
business owners and others time to react to flood events by evacuating or
taking steps to protect property, improvements and possessions
4 5.2 All Parties shall implement as necessary the Post -Flood Recovery Plan
for the Lower Green River Basin (1994) after flood events, and request
and coordinate federal and state flood disaster assistance
4 5 3 King County shall staff flood patrols in the lower Green River basin
consistent with King County's flood warning procedures, and complete
river facility damage assessments as needed during and after flood
events and other major community disasters
4 5 4 King County shall coordinate Howard Hanson Dam operations with the
U S Army Corps of Engineers to ensure that release rates during and
after flood events will minimize as much as possible flooding in the lower
Green River basin and damages to the Green River Flood Control Zone
July 2002 Page 9 of 17
District's flood protection facilities Information on dam operations during
flood events will be shared with the Parties
4 5 5 King County shall, prior to each annual flood season, hold an annual
interagency flood preparedness meeting at a location in the Green River
Flood Control Zone District in order to review and update coordination
efforts with other agencies and businesses that participate in providing
flood warning and emergency response services.
4 6 Supplemental Work Program Supplemental Work Program tasks, attached
hereto as Appendix D, will be incorporated into annual work program and budget
recommendations for the District and provided to the Executive Committee and
Board of Supervisors for review and approval
5 TERMINATION This Agreement may be terminated by any party, as to that party only,
upon sixty (60) days' written notice to the other Parties The terminating party shall
remain fully responsible for meeting all of its obligations through the last day of the sixty
day notice period
6 HOLD HARMLESS AND INDEMNIFICATION To the extent permitted by law, and for
the limited purposes set forth in this Agreement, each Party shall protect, defend, hold
harmless and indemnify the other Parties, their officers, elected officials, agents and
employees, while acting within the scope of their employment as such, from and against
any and all claims (including demands, suits, penalties, liabilities, damages, costs,
expenses, or losses of any kind or nature whatsoever) arising out of or in any way
resulting from such Party's own negligent acts or omissions that may occur in relation to
such Party's participation and obligations under this Agreement. Each Party agrees that
its obligations under this subsection extend to any claim, demand and /or cause of action
brought by or on behalf of any of its employees or agents. For this purpose, each Party,
by mutual negotiation, hereby waives, with respect to the other Parties only, any
immunity that would otherwise be available against such claims under the industrial
insurance act provisions of Title 51 RCW The provisions of this subsection shall survive
and continue to be applicable to Parties exercising the right of termination pursuant to
Section 5
July 2002 Page 10 of 17
7 NO ASSUMPTION OF LIABILITY Except as otherwise specifically provided for herein,
the Parties do not intend to assume any responsibility, risk or liability of any other Party
to this Agreement, or with regard to any other Party's duties, responsibilities or liabilities
under federal, state or local laws or regulations.
8 VOLUNTARY AGREEMENT It is acknowledged and agreed by each Party that this
Agreement has been entered into on a voluntary basis and that no obligations other than
those provided for in this Agreement are being assumed by any Party as a result of
entering into this Agreement. This Agreement does not create, supplant, preempt or
supercede the existing authority or jurisdiction of any of the individual Parties
9 NO PRECLUSION OF ACTIVITIES OR PROJECTS Nothing contained in this
Agreement is intended or shall be construed to preclude any one or more of the Parties
from funding or implementing any work, activities or projects associated with any of the
purposes addressed by this Agreement through separate agreement or action, provided
that any such agreement or action shall not impose any funding, participation or other
obligation of any kind on any other Party, which is not also a party to such agreement or
action
10 NO THIRD PARTY RIGHTS Nothing contained in this Agreement is intended to, nor
shall it be construed to, create any rights in or any liability to any third party, including but
not limited to the members of the Executive Committee and Technical Committee in their
individual capacity, any agency or department of the United States government or the
State of Washington, or any other entity or person not a Party to this Agreement.
11 AMENDMENTS This Agreement may be amended only by the unanimous written
consent of all of Parties. Any such amendment shall require approval by the governing
body of each of the Parties
12. APPROVAL BY PARTIES' GOVERNING BODIES This Agreement has been
approved for execution by appropriate action of each Party's governing body
July 2002 Page 11 of 17
IN WITNESS WHEREOF, the Parties hereto have executed this Agreement on the day
CITY
By
Its.
of
CITY ENT
'4W4
By
Its
CITY OFENTON
By
itS. M Jesse Tanner F "17` e.2
ATTEST )607..41 LE. a Z.-del./t
CITY OF TUKWILA
Bonnie 1 Walton,
By
Its
By
Its
Mayor
KING COUNTY
July 2002
2002
City
Clerk
Approved -s t90.
By
By
it A rne
Approved as to form
By
s City Attorney
,App'd as to form
City Attorney
App ie s s to fo n
By' 't',
City Attorney
Approved as to form
King County Attorney
Page 12 of 17
FEDERAL
WAY
GREEN RIVER
FLOOD CONTROL
ZONE DISTRICT
KING
COUNTY
King County
1
April 2002
2 Miles
Map produced by King County
Department of Natural Resources and Parks
GIS and Visual Communications Web Units
0204FCZDmap.pdf WGC
APPENDIX B
GUIDELINES FOR BANK STABILIZATION PROJECTS
IN RIVERINE ENVIRONMENTS OF KING COUNTY
Bound separately from this agreement.
July 2002 Page 14 of 17
APPENDIX C
GREEN RIVER PUMP OPERATIONS PROCEDURES PLAN
Bound separately from this agreement.
July 2002 Page 15 of 17
APPENDIX D
SUPPLEMENTAL WORK PROGRAM
PUMP STATIONS In association with the operation and maintenance of the pump stations,
King County is to
1 Develop a scope of work to reevaluate and, if appropriate, develop an update to the Pump
Operations Procedures Plan that is consistent with contemporary standards and operating
requirements. This evaluation may include, as appropriate, the following
Hydraulic analyses evaluating current conditions in order to provide the technical basis
for the monitoring and operation of the pump stations as they interrelate to interior runoff
and flow discharge of the Green River
A pump rating analysis of the Black River (P -1), Tukwila (P -17) and Segale pump
stations.
The development of a spill response plan for the Black River pump station that identifies
and addresses the specific operating procedures of the pump station in the event that a
hazardous substance enters into the Springbrook Creek sub -basin drainage
Study the feasibility of improving upstream and downstream fish passage at the Black
River pump station
2 Seek federal and state disaster mitigation grant funds to complete seismic upgrades to
above ground diesel fuel tanks of the Black River pump station in order to ensure
compliance with Washington State codes and standards.
3 Develop an amortization schedule for the Green River pump stations' facilities and
equipment, and develop a repair and replacement plan consistent with the fund balance of
the Green River Flood Control Zone District that is designated for those purposes
POST -FLOOD RECOVERY PLAN The Post -Flood Recovery Plan for the Lower Green River
Basin (1994) shall be updated following any significant alteration in the lower Green River
basin's physical environment that would affect how the Plan may be implemented
STUDIES The following studies, in addition to any others determined to be necessary towards
achieving the goals and objectives of the Green River Flood Control Zone District, will be
coordinated and reviewed by the Technical and Executive Committees for the purposes of
providing recommendations for consideration by the Board of Supervisors.
July 2002 Page 16 of 17
1 Financina Alternatives Analysis In accordance with the direction given by the Executive
Committee at its annual meeting in October 2001, King County will further evaluate the
bond financing mechanisms available to the Green River Flood Control Zone District for
its major maintenance and operations projects, and provide to the Executive Committee
a detailed financial and expenditure plan that addresses the need for additional revenue
based upon issuance of a King County financed bond
2 Risk -Based Flood Damaae Analysis King County will further pursue risk -based flood
damage analysis for the Green River Flood Control Zone District in order to more
accurately determine potential flood related damages and the expected average annual
avoided damages The results of the analysis are intended to provide King County and
other municipalities with an baseline foundation for developing a prioritized long -term
levee and revetment repair, reconstruction and maintenance plan, and to provide the
basis for securing additional revenue sources to accomplish the necessary maintenance
and repair projects.
MILL CREEK. King County, the Cities of Auburn and Kent, and other interested parties will
jointly work to finalize the Mill Creek/Mullen Slough Basin Action Plan The Plan
recommendations will include a set of projects and policies designed to minimize chronic
flooding, improve drainage and conveyance conditions; improve agricultural waterways, and
enhance riparian /salmonid habitat. King County and the Cities of Auburn and Kent will reinitiate
the Mill Creek Flood Management Plan Interlocal Agreement to implement the projects and
policies contained as recommendations within the Mill Creek/Mullen Slough Basin Action Plan