HomeMy WebLinkAbout04-023 - King County / City of Renton - Trans-Valley Corridor Intelligent Transportation System0,2,3
AGREEMENT
AMONG KING COUNTY AND THE CITIES OF RENTON AND TUKWILA
FOR THE DESIGN AND CONSTRUCTION OF
THE TRANS- VALLEY CORRIDOR
INTELLIGENT TRANSPORTATION SYSTEM
THIS AGREEMENT is made and entered into by and among King County, a political
subdivision of the State of Washington, hereinafter called the "County the City of Renton,
hereinafter called "Renton and the City of Tukwila, hereinafter called "Tukwila' The County,
Renton, and Tukwila are collectively referred to as the "Parties" Renton and Tukwila are
collectively referred to as the "Cities
1 SCOPE OF WORK
RECITALS
A. The County has a Capital Improvement Project (CIP #400400) along the Trans Valley
corridor "Comdor for the purpose of designing and constructing the integrated traffic
signal program for the Corridor, hereinafter called the "Project"
B The Corridor is defined as starting from SE 151st Street on Petrovitsky Road and follows
along on SE 176 Street, Carr Road, SW 43 Street, and onto S 180 Street where it ends
at Southcenter Parkway Portions of the Comdor are located in Renton, Tukwila, and
unincorporated King County
C Tukwila, Renton, and the County own traffic signals and related equipment along the
Comdor All additional equipment provided by the County as part of the Project will be
owned by the party with junsdiction
D The Parties agree that the construction of the Project would optimize the use of existing
signals and turn lanes along the Corridor
E. It is in the best interest of the Cities for the County to implement the Project.
NOW, THEREFORE, the Parties hereby covenant and agree as follows
AGREEMENT
The Project's scope of work includes the following design and construction of ITS
(Intelligent Transportation System) solutions to reduce existing corridor delays and improve
incident management for the Corridor The solutions include the following specific design
requirements
Install Eagle M -50 controllers or controller with equivalent software throughout the
1
CAG -04 -034
Corridor
All controllers within each junsdiction will communicate over a fiber bundle owned by
that agency, separate from other agencies' controllers, back to the communication hub
All equipment will be routed to the County's central system server, located within the
King County Traffic Control Center (TCC), to allow for advanced traffic management
along the Comdor, 1 e Traffic Responsive and Adaptive Traffic Control
Equipment within the Corridor communication hub will allow Renton to reroute Renton
owned controllers to the Renton Traffic Management Center (TMC) via fiber optic cable
installed along Oaksdale Avenue
Equipment within the Comdor communication hub will allow Tukwila to reroute
Tukwila owned controllers to the Tukwila Traffic Management Center (TMC) via fiber
optic cable installed along Andover Park East.
Arterial and intersection surveillance installed using video cameras and loop detectors
Transit Priority Request (TPR) equipment will be installed at two intersections within
Tukwila to allow transit signal pnonty to be offered.
Design of the project will provide each agency the ability to control the network
remotely
Renton and Tukwila will receive Actra workstations
Tukwila will be given access to the County's regional TPR server
2. COUNTY RESPONSIBILITIES
2 1 The County is the lead agency for the Project and is the lead agency with regard to
design, right -of -way acquisition, construction, NEPA review, permitting, ISTEA
funding and all other matters pertinent to the accomplishment of the Scope of Work.
The Cities shall provide all necessary penults for that portion of the Project within
their jurisdiction It is desirable to have necessary permits issued at no cost to the
County
2 1 1 The County will provide 30 60 and 90% plans and specifications to the
Cities for review The Cities will provide written comments, if any, to the
County within fourteen days after the Cities receive the plans and
specifications
2 1 2 The final design shall be mutually agreed upon by the Parties
2 2 The County shall be responsible for all costs associated with the Project, subject to
Renton's $50 000 commitment as described in Section 3 3
2 3 The County shall be responsible for coordinating the public information and
involvement process and shall meet with the Cities to develop the Public Involvement
Plan The Cities shall be given the opportunity to attend and participate in any public
meetings
2 4 The Parties shall appoint a contact person or persons to act as a liaison for the Project.
2
3. RENTON RESPONSIBILITIES
4 TUKWILA RESPONSIBILITIES
These contact persons will meet on an "as needed" basis to serve as a coordination
body among the Parties
2 5 The final acceptance of the Project shall be by the County after review and approval
by the Cities
2 6 The schedule for the Project shall be mutually agreed upon by the Parties
2 7 Training shall be provided by the County to the Cities for the signal controllers and
cabinets installed with this Project.
2 8 Training shall be provided by the County to Tukwila for the Transit Pnonty Request
equipment installed with this Project.
3 1 Renton shall provide written comments, if any, to the County within fourteen days
after Renton receives the plans and specifications that affect the portion of the Project
within Renton The County Road Engineer and the Renton City Manager shall make
the final determination whether any changes shall be made, if feasible
3 2 Renton hereby grants the County nght of entry into the corporate limits of Renton for
the purpose of performing any and all tasks necessary to complete the Project.
3 3 Renton shall commit $50,000 for design and construction of the Project.
3 3 1 The County will bill Renton for the $50,000 commitment upon approval of
this Agreement.
3 3 2 Renton shall pay the County within thirty days of receiving the invoice
3 4 As an alternative to the $50,000 commitment from Section 3 3, Renton has the option
to construct Renton's own project to provide the installation of fiber optic cable
between the Renton TMC and the Trans Valley ITS Corridor "Renton Project All
costs associated with the Renton Project, whether or not in excess of $50,000, shall be
the full responsibility of Renton
4 1 Tukwila shall provide written comments, if any, to the County within fourteen days
after Tukwila receives the plans and specifications that affect the portion of the
Project within Tukwila. The County Road Engineer and the Tukwila City Engineer
shall make the final determination whether any changes shall be made, if feasible
3
4.2 Tukwila hereby grants the County right of entry into the corporate limits of Tukwila
for the purpose of performing any and all tasks necessary to complete the Project.
Right of entry is contingent upon City of Tukwila approval of site specific traffic
control plans pnor to construction Changes or modifications (of a significant nature)
to the construction plans or approved traffic control shall be approved by Tukwila
pnor to construction
4 3 Tukwila shall design and construct Tukwila's own Green River Interconnect project
"Tukwila Project that installs fiber optic cable on S 180 Street between
Southcenter Parkway and Oaksdale Avenue, on S Carr Road between 106 Ave S
and SR 515, and on SR 515 between Carr Road and Benson Road S Tukwila shall
complete the Green River Interconnect project no later than July 1St 2004 All costs
associated with the Tukwila Project shall be the full responsibility of Tukwila.
5 CONSTRUCTION CONTRACT BIDDING
5 1 The County shall prepare the contract bid documents.
5 2 The County shall advertise the contract in the official legal publication for the County
and, if necessary, other newspapers to provide the widest possible coverage
commensurate with the size of the Project. The Cities will be responsible for
additional notification, such as door -to -door flyers
5 3 The County will provide to the Cities two copies of the plans and specifications
advertised for the contract.
5 4 The County will open the bids, which is typically three weeks after the Project is
advertised. The Cities are invited to attend the opening of the bids.
5 5 The County will tabulate the bids The County shall provide a dated, verified copy of
the bid tabulations to the Cities The bid tabulations will identify the estimated
construction, inspection and overhead cost, based upon the lowest responsible bid.
5 6 The County shall award the contract to the lowest responsible bidder for the Project,
subject to applicable laws and regulations
6. CONSTRUCTION CONTRACT ADMINISTRATION
6 1 The County shall provide the necessary engineering, administrative, inspection, and
clencal services necessary for the execution of the Project. In providing such services
within the Cities, the County Road Engineer may exercise all the powers and perform
all the duties vested by law in the City Engineer or other City officer or department
charged with street administration
4
7 DURATION/TERMINATION
8. DISPUTE RESOLUTION
6 2 The Cities may furnish an inspector at the Cities' expense to insure proper
compliance with requirements during the construction of the Project. The Cities'
inspectors shall advise the County of any deficiencies noted. The Cities' inspectors
shall not communicate directly with or instruct the contractor directly on any matters
regarding contract performance
6 3 The County will at all times keep the Cities advised as to the progress of the Project
and shall not order or approve any changes in the approved project design which
substantially change the nature of the portion of the Project within the Cities, or its
basic design, unless the County first obtains the wntten approval of such changes
from the affected City
7 1 This Agreement shall remain in effect until final acceptance of the Project and
payment by Renton of all monies due from Renton to the County or, if Renton so
elects, construction of the Renton Project, and construction of the Tukwila
Project, subject to the early termination provisions in Section 7.2 and 7 3
7 2 If expected or actual funding from sources other than the Cities and the County is
withdrawn, reduced or limited in any way pnor to the completion of the Project,
any Party may, with thirty (30) days written notice to the other Parties, terminate
this Agreement.
7 3 In the event of termination prior to completion of the Project.
1) All direct and indirect phasing -out costs shall be paid by the Party requesting
teiuiination
2) Termination costs payable shall not exceed the actual costs incurred as a result of
termination of the Project.
3) The other Parties shall be released from any further obligations under the
Agreement.
In the event of a dispute between the Parties regarding this Agreement, the Parties shall
attempt to resolve the matter informally If the Parties are unable to resolve the matter
informally within thirty (30) days, the matter shall be decided by the Director of the King
County Road Services Division.
5
9 LIABILITY
10 OTHER PROVISIONS
Washington State law shall govern the respective liabilities of the Parties to this Agreement for
any loss due to property damage or injury to persons arising out of activities conducted pursuant
to this Agreement.
10 1 The Parties agree to negotiate a separate agreement for the operation and
maintenance of the ITS within the Comdor
10.2 The County shall be deemed an independent contractor for all purposes and the
employees of the County, or any of its contractors, subcontractors and their
employees shall not in any manner be deemed to be employees or agents of the
Cities
10 3 Nothing contained herein is intended to, or shall be construed to, create any rights
in any person or entity not a signatory to this Agreement, or to form the basis for
any liability on the part of the Cities, the County, or their officials, employees,
agents or representatives, to any person or entity not a signatory to this
Agreement.
10 4 Waiver of any breach of any provision of this Agreement shall not be deemed to
be a waiver of any prior or subsequent breach and shall not be construed to be a
modification of the terms of this Agreement.
10 5 Each Party shall retain ownership and usual maintenance responsibility for the
road, drainage system, signs, sidewalk and other property within its junsdiction
10 6 The headings in this Agreement are for convenience only and do not in any way
limit or amplify the provisions of this Agreement.
10 7 If any provision of this Agreement shall be held invalid, the remainder of the
Agreement shall not be affected thereby if such remainder would then continue to
serve the purposes and objectives of the Parties
10 8 This Agreement contains the entire agreement of the Parties and any
representations or understandings, whether oral or wntten, not incorporated herein
are excluded.
10 9 This Agreement may be amended only by an instrument in writing, duly executed
by all Parties
IN WITNESS WHEREOF, the Parties have executed this Agreement effective as of the
6
date last signed below
CITY OF RENTON
44-eki7i,t0hazek
City Mayor
Date
Attest
APPROVED AS TO FORM.
City Attorney
KIN C UNTY
Bonnie I Walton, City Clerk
lkVctor, King County Depart ent of Transportation
Date 6
APPROVED AS TO FORM.
B put)Prosecuting Attorney
MEM
CITY OF TUKWILA
�L (e L YVN rvl aX?c 4-
CJi ity Mayor
2 104
Date
APPROVED M
f 1
Ci ttorney