HomeMy WebLinkAbout05-086 - WA State Department of Transportation (WSDOT) - Tukwila Urban Access Improvement (Klickitat)06/20/06 14 28 FAX 206 440 4806 O1.'ht(A11u Ig u 01
,iUN -20 -2006 TUE 01 20 PM FAX HO, 3.56822
Washington Slate
Department of "Transportation
(Agency
City of Tukwila
Federal Aid Project Number
STPD- 1037(003)
Project Description
Name Tukwila Urban Access Improvement
Termini
Description of Work 21 No Change
PE
100
Federal Aid
participation
Ratio for FE
Right of Way
o. TO Piz Cost Eslimato (a +b +c +d)
f. Agency
9.Olhor
h Other
I. Stale
i. Total R/W Cost Estimate (r +q +h +1)
Construction k Contract
1. Other
m. Other
fd
Federal Aid
Participation
Ratio for RW
Federal Ald
Participation
Ratio for CN
Agency
Consultant
b. Other
c. ier
d. State
n Other
o. Agency
Agency Offici -1
Title iszayor
Cl 12�
I
i7 'f li A
DOT Farm 140 -041 EF
Ravised 4 /2CC3
Type of Work
Agreement Number
LA -5950
Previous
AgreemenvSuppl.
GSi,333.00
OS-6860 (e--)
Local Agency Agreement Supplement
Supplement Number
1
CFA No 20,205
(Catalog of Federal Domestic Ass'sisnce)
The Local Agency desires to supplement the agreement entered into and executed on
Ail provisions In tho basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows.
Reason for Supplement
Round 2 Awards n F FPY2005 Section 117 Project additional funding made available totalling S983 928
10,000.00
661,333.001
T'
661,333.00!
By
(2)
Supplement
322,595.00
322,595,00
Posit -its' Fax Note 7671
I� /J
IC aJDep k 2'ir! k•/i/
I Phonu
r ux
322,595.00
Washington S Dep
Assistant Secretary for Frig
Date Executed
Length 0.23
Estimate of Funding
(3) (4)
Estimated Total Estimated Agency
Proiect Funds Funds
973,928,00
10,000.00
983,928.00
j of J
[Data ,A/ "`As
I a
(From
�/f
{Phone �l
i Fex tF
983,928.00
e. Slate
n, Total CN Cost Estimate (k+i•m+n+c +o)
r Total Project Cost Estimate (e+l+q)
The Local Agency further stipulates that pursuant to said Title 23 regulations and policies and procedures, and as a condition
to payment of the Foceral funds obligated, it accepts end will compty with the applicable provisions.
rtment of Trayf sportation
r
a•
ways and Local Programs
PAR 2 6 no
o--7/
5)
Estimated
Federal Funds
973,923.00
10,000 00
983,928.00
983,923.00
Agency City of Tukwila
Address 6200 Southcenter Boulevard
Tukwila, WA 98188
The Local Agency having complied, or hereby agreeing to comply with the terms and conditions set forth in (1) Title 23 U S. Code Highways, (2) the
regulations issued pursuant thereto, (3) Office of Management and Budget Circulars A 102, A -87 and A 133 (4) the policies and procedures
promulgated by the Washington State Department of Transportation, and (5) the federal aid project agreement entered into between the State and
Federal Government, relative to the above project, the Washington State Department of Transportation will authorize the Local Agency to proceed on
the project by a separate notification. Federal funds which are to be obligated for the project may not exceed the amount shown herein on line r column
3 without written authority by the State, subject to the approval of the Federal Highway Administration. All project costs not reimbursed by the Federal
Government shall be the responsibility of the Local Agency
Project Description
Name Tukwila Urban Center Access Improvements (Klickitat) Length 0.23
Termini
Description of Work
Design of a grade separated facility primarily at the Klickitat/Southcenter Parkway intersection. Southbound traffic on Southcenter Parkway will travel
under a partial lid suppdrting Klickitat Drive. Provisions would be made to accomodate turning movements both to and from Klickitat Drive and allow
for driver selection of most appropriate route as motorists approach the Southcenter Parkway /Strander Boulevard intersection. Southcenter Parkway will
be widened to the east, toward Southcenter Mall No changes to the 1 -5 off -ramps are anticipated. A new signal at the Klickitat Drive /SB 1 -5 On -ramp on
the west side of 1 -5 will also be included.
PE
100
Federal Aid
Participation
Ratio for PE
Right of Way
Federal Aid
Participation
Ratio for RW
Construction
Federal Aid
Participation
Ratio for CN
Washington State
Department of Transporta..
Type of Work
a Agency
b. Other Consultant
c. Other
d State
e Total PE Cost Estimate (a +b +c +d)
f Agency
a. Other
h Other
i State
j Total R/W Cost Estimate (f +q +h +i)
fr Contract
I Other
m Other
n Other
o Agency
p State
q Total CN Cost Estimate (k +I +m +n +o +p)
r Total Project Cost Estimate (e +j +q)
Agency Offic'al
By
Title Mavnr
DOT Form 140 -039 EF
Revised 01/2004
Washington State Department of Transp rtation
c
By
1
Project No
Agreement No
Date Executed
Luca ,-agency Agreement
CFDA No 20.205
(Catalog of Federal Domestic Assistance)
STPD- ko Yt(
LA 595 0
Estimate of Funding
(1)
Estimated Total Estimated Agency Estimated
Project Funds Funds Federal Funds
1
651,333 00 i 651,333 001
1
10,000 00 10,000 001
661,333 00 661,333 001
661,333 001
For OSC WSDOT Use Only
Assistant Secretary for Highways and Loc 6�po n
rY `L, 7 /L -on5
661,333 001