Loading...
HomeMy WebLinkAboutPermit D2000-032 - SABEY CORPORATION - COLUMN REPAIR AND EXTERIORSABEY CORPORATION re 5: e); "; LLI w 0 2 =I' u_ <, Ss2 a 1- 0, Z 1-t aj D: 0: EXPIRED ia iz z; LLI OA . 0 YI E Z D2000-032 OCCUPANT OWNER CONTACT CONTRACTOR, City of Tukwila Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 WARNING: IF CONSTRUCTION BEGINS BEFORE APPEAL PERIOD EXPIRES, APPLICANT IS PROCEEDING AT THEIR OWN RISK. Parcel No: 102304 -9069 Address: 3417 S 120 PL Suite No: Location: Category: AOFF Type: DEVPERM Zoning: MIC /L Const Type: III -N Gas /Elec.: Units: 001 Setbacks: North: Water: 125 Wetlands: Contractor License No: SABEYC *141PH Permit Center Authorized Signature: Signature: Print Name: DEVELOPMENT PERMIT Permit No: Status: Issued: Expires: (206) 431 -3670 D2000 -032 ISSUED 04/05/2000 10/02/2000 Occupancy: OFFICE UBC: 1997 Fire Protection: SPRINKLERS .0 South: .0 East: .0 West: .0 Sewer: VAL VUE Slopes: Y Streams: SABEY CORPORATION Phone: 3417 S 120 PL, TUKWILA WA 98168 THE BOEING COMPANY PO BOX 3707 M/S 1F -09, SEATTLE WA BOB FADDEN Phone: 206 -325 -2553 130 LAKESJE #250, SEATTLE WA 98122 ..SABEY CONSTRUCTION INC.. Phone: 206 281 -8700 101 ELLIOTT AVENUE WEST #330, SEATTLE, WA 98119 . **** * *k* *** * *`k**4 *• *** **** * **ilr***** ** *ikk*• **** * **** *kk***** ** Eck *•k: *** *k *** * **** Permit Description: EXTERIOR RENOVATIONS & COLUMN :REPAIR k*** *k * *, ** ********** k**.*********;** ik*********** k****** * *** * ** * *.** *k ********** ***k** Construction Valuation: $ 50,000.00 PUBLIC WORKS PERMITS: ' *(Water Meter Permits Listed Separate) 'Eng. Appr: Curb Cut /Access /Sidewalk /CSS: N ' Fire Loop Hydrant: N No: Size(in): .00 Flood Control Zone: N Hauling: N Start Time End Time Land Altering: N Cut: Fill: Landscape Irrigation: N Moving Oversized Load: N Start Time: Sanitary Side Sewer: N No: Sewer': Main Extension: N Private: N Public: N Storm Drainage: N Street Use: N Water Main Extension: N Private: N Public: N ********************** * ***** * ** ** * * ***** *** * * ** * * * * ** *sir ** * * ** ** *fit ** * **** *****•* * ** * * * End Time: TOTAL DEVELOPMENT PERMIT FEES: $ 1,710.44 ************* *** ** * * **k *** * * ** * * * * * * * * ** ** ** ** * * *. **k * **** * ** ** * *** * ** * * * * ** ** Date: Date = S =OQ__ I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this develop ► -nt p,e mi t. / This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. ,...._...r,- ...,... .. wna 04 Keo , r . P 4 w 4 MMISaVO IrM rwSm•.an�w W wnmr + nr.,n.mw+rr.m • . ••••""... • CITY OF TUKWILA' Address 3417 S 120 PL , Permit No D2000-032 Suite: Tenant ' Status: ;ISSUED : Type DEVOE App1ed : 02/02/2000 Parcel #: 102304 -9069,' , Issued: 04/05/2000 Permit Conditions: 1. No changeS;Will,be made plans unless approved by the Engineer and the Tukwila Building Division. ' 2. AllkperOitS, inspection records and approved plans •shall 1-1,e;% available at the job site prior to the start of any con--; strmotioW. These-do'6dments-are tg'b'emaintained and avall- oirei until finalinspection!apArOVai 1,s. granted. , / , 3. ElOtriical perniits_shall i*obtaibed.throtgh the Washington State DiViign'-of.La6or:a'n0,-Industries all electrical work will.; be:,inspected.ty'that agency (248-6630). ; 4. 1 be obtained through the SeattleKing:1,y Couny,,Department af Health . Plumbing will be , • inspla,cted,by that agency, including all gas 'piping (2964722),`;. • 5. All\mechapictl work shall be under:separate4i'ermit issyedy:Iy the 'City , 6. All egKstruction to be done in conformance with approved plans and regiireme'nts of the'Uniforiii'Buildirig Code (1997 Editi as amended, Uniform Mechanical Code (IRO Edition, and Washtrigtori Energy (1997 Edition). 7. Validity of0?ermit. The issuance of a permit or approval of plans, specifications, and :computatidns shall not be, con- strued to be a permit for, or an approval of, any • violation of any of the Oro0,isions of the 'building code or of any other ordinance of No permit presuming to give, authority to vigrate.:6r.ancel'the:Orcivisions of this code shall be valid. 8. When special inspection is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name, permit number and type of inspection being performed. 9. The special inspector shall submit a final signed report stating whether the work requiring special inspection was, to the best of the inspector's knowledge, in conformance with approved plans and specifications and the applicable workmanship provisions of the UBC. 10 All structural weldin shall be done by W.A.B.O. certified -- - We'f -a-e -r J -- r'1, Intl 1S G c-v . � T" " _ "nrsv'e - C L 1 Project Name/Tenant:, j-} &I./ RaDo AT ,21DE Value o Construction: sU oc Site Address: City State /Zip: 3 t r1 l 9 Tax Parcel Number: 2 0 162-SG -- e(aC Property Owner: � pJ -`i C�Un- Pon-i fiGd Will there be rack storage? ❑ yes % no Phone: , 1 _ /'-2 /�G6 -2� ' do Street Address: . 0 I Li D (I . Av - ` 4t o State/Zip: gE3l i ip: t x Y G I Fax #: Contractor: S AP � 1 / 4. ? Co ►-)51 12oUTioJ 1 10 G Phone: 2bc, -26' 1 - 424 Street Address: 2 I L ` n L �J _J r City State /Zip: 63o jiq Fax #: Architect: I L • 1/41' M Phone: ` � '' , 7L . 5 2 -' . Street Address: 1 /0 i e s A 2 City S ate /Zi � V 1 �� Fax #: 2 52e O� t Engineer;. co(2,6 0 0 t Phone: r nr t "✓ 1 � - XJ A - � it State/Zip: Street Address f 00t LPWIL) /- Fax 4t: Contact rson: Ge Y 0 97 V) L. -96 H--- Phone: 325 , 25S Street Address: City State /Zip: Fax #: Description of work to be done: -t . 7l0 r2 v . 1 . 0 4 /' o V `mss Existing use: ❑ Retail r ❑ Restaurant CI Multi-family Warehouse El Hospital El Church 5 ❑ Motel /Hotel Office ❑ School /College /University ❑ Other Proposed use: ❑ Retail ❑ Restaurant ❑ Multi - family TgWarehouse ❑Hospital ❑ Church '9" Manufacturing El Motel /Hotel ❑ Office ❑ School /College /University ❑ Other Will there be a change of use? ❑ yes 5 no If yes, extent of change: (Attach additional sheet if necessary) Will there be rack storage? ❑ yes % no Existing fire protection features: ures: sprinklers rVutomatic fire alarm CI none CI other (specify) Building Square Feet: 101 1 "' t xisting Area of Construc (sq. f t.) 10 7 1 j 48? ` Will there be storage of flammable /combustible hazardous material in the building? ❑ yes ISIL,no Attach list of materials and storage location on separate 8 1/2 X 11 paper indicating quantities & Material Safety Data Sheets CITY OF TL''VWILA Permit Center 6300 Southcenter Blvd., Suite 100, Tukwila, WA 98188 (206) 431 -3670 Commercial / Multi - Family Tenant Improvement / Alteration Permit Application Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or facsimile. APNLICANTREQUESTf.FOR PUBLIC.WORKS` SITE /CIVIL PLAN; REVIEW:OF.THEFOLLOWING: •:(Additional`reviews:maybe determined. byahe;Public.WorksDepartment) :: ❑ Channelization /Striping ❑ Curb cut/Access /Sidewalk ❑ Fire Loop /Hydrant (main to vault) #: Size(s): ❑ Land Altering 0 Cut cubic yds. 0 Fill cubic yds. ❑ Sanitary Side Sewer #: ❑ Storm Drainage ❑ Street Use ❑ Water Meter /Exempt #: Size(s): ❑ Water Meter /Permanent # Size(s): ❑ Water Meter Temp # Size(s): Est. quantity: ❑ Miscellaneous ❑ Sewer Main Extension ❑ Water Main Extension 0 Deduct El Flood Control Zone ❑ Hauling ❑ Landscape Irrigation O Private 0 Public O Private 0 Public 0 Water Only gal Schedule: Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. Date a plica io e : n accept - - oo DatA.oplication expires: Appligatlon taken by: (initials) PLEASE SIGN BACK OF APPLICATION FORM CTPERMIT.DOC 1/29/97 BUILDING 0 - OR A Hi RIZED AGENT : Signature: + '' ' Date: .2104 al Print name: F5 AGoe0 Phon?92 5cs Fax a55 ^4 Address /60 yh 442-4-65 City /State /Zip 9 (2 ALL COMMERCIAL/MULTI -FAY TENANT IMPROVEMENT /AL TION PERMIT APPLICATIONS MU BE SUBMITTED WITH THE FOLL • ING: ALL DRAWINGS TO BE STAMPED BY WASHINGTON STATE LICENSED ARCHITECT, STRUCTURAL ENGINEER OR CIVIL ENGINEER • ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN • BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED N/A SUBMITTED ❑ ❑ Complete Legal Description ❑ ❑ Metro: Non - Residential Sewer Use Certification if there is a change in the amount of plumbing fixtures (Form H -13). Business Declaration required (Form H -10). Four (4) sets of working drawings (five(5) sets for structural work), which include : ❑ ❑ Site Plan (including existing fire hydrant location(s) 1. North arrow and scale 2. Property lines, dimensions, setbacks, names of adjacent roads, any proposed or existing easements 3. Parking Analysis of existing and proposed capacity; proposed stalls with dimensions 4. Location of driveways, parking, loading & service areas 5. Recycle collection location and area calculations (change of use only) 6. Location and screening of outdoor storage (change of use only) 7. Limits of clearing /grading with existing and proposed topography at 2' intervals extending 5' beyond property's boundaries 8. Identify location of sensitive area slopes 20% or greater, wetlands, watercourses and their buffers (change of use only) 9. Identify location and size of existing trees that are located in sensitive areas and buffer (TMC 18.45.040), of those, identify by size and species which are to be removed and saved H Z 10. Landscape plan with irrigation and existing trees to be saved by size and species (exterior changes or change CC 2 of use only) 6 11. Location and gross floor area of existing structure with dimensions and setback v O 12. Lowest finished floor elevation (if in flood control zone) 0 13. See Public Works Checklist for detailed civil /site plan information required for Public Works Review (Form H- W = 9). cn u 171 ❑ Floor plan: show location of tenant space with proposed use of each room labeled O ❑ ❑ Overall building floor plan with adjacent tenant use; identify tenant space use and location of storage of any hazardous materials; dimensions of proposed tenant space. rn 7.1 a w ❑ Vicinity Map showing location of site = I- _ ZF.- ❑ ❑ Rack Storage: If adding new racks or altering existing rack storage, provide a floor plan identifying rack z O layout and all exit doors. Show dimensions of aisles, include dimensions of height, length, and width of w w rack. Structural calculations are required for rack storage eight feet and over. 2 o ❑ ❑ Indicate proposed construction of tenant space or addition and walls being demolished U o N ❑ ❑ Construction details w ❑ CI h— Sprinkler details - details of sprinkler hangers, specifically penetrations in structure, i.e., roof; size of u- - water supply to sprinkler vault with documentation from contractor stating supply line will meet or Ili Z exceed sprinkler system design criteria as identified by the Fire Department. 0 o ❑ ❑ Washington State Non - Residential Energy Code Data shall be noted on the construction drawings. 1- El El SEPA Checklist - if intensification of use (check with Planning Department for thresholds). ❑ ❑ Attach plans, reports or other documentation required to comply with Sensitive Area Ordinance or other land use or SEPA decisions. ❑ CO Food service establishments require two (2) sets of stamped approved plans by the Seattle -King County Department of Public Health prior to submitting for building permit application. The Department of Public Health is located at 201 Smith Tower, Seattle, WA or call (206) 296 -4787. (Form H -5) ❑ ❑ Copy of Washington State Department of Labor and Industries Valid Contractor's License. If no contractor has been selected at time of application a copy of this license will be required before the permit is issued OR submit Form H -4, "Affidavit in Lieu of Contractor Registration ". Building Owner /Authorized Agent If the applicant is other than the owner, registered architect/ engineer or contractor;licensed by the State of Washington, a notarized letter from the property, owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal I HEREBY CERTIFY THAT ! HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. CTPERMIT.DOC 1/29/9 ?*- k * *•A *A*AlekA*A * *k *A **A *A * * *k k * * *: **kAA *AA k *:4* *kA'k* * * *AkA* *• *A.4N* D 000 - 9 a " C RfiP'SNIT CT t Y CIF .. I - . 0 f: �4 I L . A . 4'•t N *Akh:4 *AAA** *AA* *A*1.h *:1% * **- k **•.4 *.• •. *A* :h ** * * *A-* * *:1A:1AA *hkA:k:i N TRANSMIT Number 89800262 (niuurst ; 1,292.00 04/05/ 00 1 : i`i Payment Method : C1 i4ot t. ion: SA13EY COt4ST init WEB Permit. No: 1)20.00 -032 fype: t)EV ERM UEVELOPI41it1T PERMTf Parcel No: 102304-•90G9 Site Address e. 141 S 120 PL foia1 Fes: 1,710.44 Payment. 11292.00 TatsI ALL Pmts: i, 710.44 13;x17nce: .00 �a. *. **A* *k*A* ** ** *4- * * *** *Ak * *.A1* * * *AA * ** ** *:1 * *•ksA*4, *1�.+ * **A *Al;* Amato) Acc uric .Code i)e=rr i pt ion Am ) t 000/322.100 BUILDING NONRES /- PLAN CHECK NOWP S 418.44 000/3V6.904 S1 ATE BUILDING SUPCHARGE 4,50 3223 04/06.9717 TOTAL 1292.00 1t *.:4'''r*./:'1 1 to **k i *A h* Cl l':Y OF :.FU K�ITI Wf • *, -k *44•:4kkk *A 47. •k kk* *A **.k* 7.( iNSSM1':1'. Ncl(riper ' • '0 . .'P.aVihen t Method t.. CH EC ' riFrz' PT'4: k�;• wf ;;: : .:.- .;•:.a�,s; �:i�'ti'' ^ t .,:5• '.t. ":; y.�1 .`•ytftrl:,':'u,. ; '.f.y.t.: •x t:' •'t ',F•"• ;;: ^ S � �',[' �,'.`� . ��1,; "•. Vl, "R.t . '.t.r• ,,�, c. ?;}., ,y.F`.tf:,�`d C•T� 'F.'"t ,v t . h+,. •',�4� fyi :�F.t * * *•A4 * *kk:t * * h:1 ;*A** *•1. **:Y*hhk*•d :A4 A **A* A *k* Dzcoo- 032 . It4IN8MIT kh:A:t 'A*'* k*•k *:t••.'t 'A'•.1* +E`**.1 * kh :t•k:k 'hyt :l''h* 4 .•k 4.*'k;1• /; *tt • 629 f1nouritnl • 418.;'!4 02,02/00 17tO.2 Notation: RDUERT FADt)E 1 IlER .1.'i?r1ait Nor. f ?2000`..03: Type I }EVPt:Rtd DEVELOPMENT Pi:ttMl'r 'P.ztr c e1 110 j02804-•r)'0h9 7i:�e':'Adc1r ^GZS: '3 %•11.? 3 1 Pt_ Total legs,.: 1. 10:44 'h i a- Rik y'mer►t 418.44 .1'ctta I 'ALL. f'ttit5 418.44 t flii'1 tit,Ce: 1 • 292.00 *'**** *•,l' **ic* *k:1,.k*• *A4A ** * ** *,l * * *'k 'A ** *A * ** *A* * * * *• * *• *** *.i0 *A * **tt* (4cc pan' `.: 10d.e .'` ' . l >e$or 1 u•t, ion Ainoun F- :',. .i uit.'[ }1 - NO U ES 418.44 tl A .ni ✓.:Uk..Wd:�7..'.i�:x.::" ••.;d..,i! '+' Tint a �`, t1}.:, f ?iti.'P3,�i3:"�r :�1i11:�k: t C4 l a Ng : W ; IL W OO' g rl co Wi S Z ~` H 0` . z H uj V O ff . 0 MA III z V` LL 0 z rz 0 Project: unier (v • , c-_-1 - # Type of Inspe ti GIA Vin Address: 5.POtir9 Date c alle : -1 [ Special instructions: .,•:i GOkey COCP ' :;.i-,r'. ..... Date want d: ' P.m. 11/1 Requirr v v .. Pho ne g010 - 4 1-g240 INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 9818 PERMIT NO. (206)431-3670 " L2r / Approved per applicable codes. Ej Corrections required prior to approval. COMMENTS: cre-b. rix.(11-C. C-crTE CO4VALA-r n $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No: Date: , 411.11,kdiy.'•, Project be She (k 'vi ads,,., Ty of Inspection p 1'o W oYId - Wtnoval Address: I 33)-11-1 S- y t�k*h PI Date called: 1 -1- 5 -.20oo Special instructions: Date wanted: 14 er• Requester: f1 , r K- Phone: INSPECTION NO. Approved per applicable codes. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 9818 Corrections required prior to approval. COMMENTS: 6 ts rt3t4,47 $47.00 REINSPECTION FEE REQUIRED. Prior to in pection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. PERMIT NO. (206)431 -3670 Receipt No: Date: Y44+4 Ydia.ii .. . ur- s� 1:ak��c 84 I �iMLS:C./.4::...,«iAtacaiYn 'iib hrY.'ai`4 !i`uiAi�i:.5!` . �lt Q. iE�+�t 4+1•ltt+i�le i5.' YM ✓.F.i�,3..Y..::tyi;ih 1.%) !!v' z. (k, n. NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT STOP WORK # 26vo • CITY OF TUKWILA Building Division, 6300 Southaenter Boulevard, &lite 100 Tukwila, WA 98188 • -Telephone: (206) 431-3670 , Notice 1 %. , & i) Order (7) ALL PERSONS ARE HEREBY ORDERED TO IMMEDIATELY fife-ce t- 1 ' 9 ' ST RWORK PERTAINING TO CONSTRUCTION, ALTERATIONS OR REPAIRS 0 • ON THE SE PREMISES AT : 71'. ° -- ° PC (< 34/1 /Z) • \ THIS ORDER IS ISSUED BECAUSE Ald / "0 5 /7' I . Ha 04 "/e/ .r/ (in/ t/44 /Lf tt 5/(i 4 /4 POSTED V / : 0 0 0 ( AIV(71A9 )0 „1.9- • 2 4 Name/Title WARNING: Failure to comply with this Notice and Order shall subject the offender to a civil penalty of up to $100.00 for each of the first five days that the violation exists and up to $500.00 for each subsequent day that the violation exists. ) 7 ' COMMENTS: 4C- zX # c 44,7 - TW -eriC7 f{ ., aWcD/ -67 P1-11 The ea- • l 1 CTS/ 447c( gI.ie -r V7 map F r. lit- r5o'c17 . O 4. / 5 l7r' Po 577;4-, Me -140w /7 04 °# t 5/77 (Si 6 COi7 I c7 P. • O C/7 • Specs In structions: /i i`l! � - F Dat ant a.m. p.m. P: e 20 : eie Type4 rr, on: C � mix / 552/7 . O 4. / Date/called: Specs In structions: /i i`l! � - F Dat ant a.m. p.m. '," /t.2Z 3o4 0 R 4crie..s e7/070 l Phone: INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 981 ;8 El Approved per applicable codes. Insp� ! . a �Y5�3k «:. INSPECTION RECORD etain a copy with permit PERMIT NO. (206)431 -3670 Corrections required prior to approval. Da ?: 0 $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100.' Call to schedule reinspection. OD Receipt No: Date: �; - 5 W' 0 0 N D: Nu. W u.Q _ W Z Z O W.W. D o ;0 N D )— WW I rf to al co O ~: Z...." -.• ,• iir • - • —•-• .•'• TO 'REMAIN . . . e ▪ • •• • • : • • • •• • • . •. . • • • • • .• • - • • ••••••:;•.•:... • . • . • - •.• . • . : ; ; -•:••••••••.•••••'.. • • .• • • • • . f ••• • • . •es1.-ff',4.4.! • • • • • ••• ' • • • . . ; • •st- • • .. • •••• • . •.• . • . • • , • • 4 . • • ...• . • . • -. . . . • tt • t, ••',.. • •*;. -.."*•4;1•••••,:1, •••• 7,.*::i.,•, ...*:,-:. ,.. •.%, !'• ''.• •••.!■, - ,c;•t:..-7t* • • •:•;-...=;-:',# .. : • : ''• :;':. ;:4*-w:lr:t: :"*.t...A`"•X'..'4;';i • ?..; ..... .• ,-• , • • : -I .. • : • %la 450•..., g •,-.: .-:...• . ..- .-;.,-; ei .••._,;,.-- •:, --....r.....1;•tt- ..v.:. •:,•;/. : ,,.. ,:, ..... ..* s • , . • :. • •:-.' : • • ''.‘, •• .•.: . ,'. • • r'. ' • '••• . ' ••• .,v.lt,14,.', .• • 'i?.•• . ''.:(4 ../;:f ••''.'• 1 ::. '.*••••, ., '.:I.. „...„..: ;;-.-.., 4. . ,: „!,...... ....,... • • ir. .. ,r;r • ...lat:: 7.. . t . 4 f r •• • * RIM: ,...• :i '......... : • • • A -- 1 . .....4- .... . ird5.441 ..,.. -- ...":•.,,' • WWII.: "..., •':.* :'''. • •v.:' ir,e.F.Ati • 4 . • •• •; i .••,' • • • ... 1, ..i..7 11M1101: tam ilrir4r vq .01 •'.#::• • . i^ .....: • ; , • • :. 1 , ' ''' . Crirtgd ArAtti WWI: grArArifi some . •, . . .• Witilliki • •• ' ,NEW T.S. COL • PER PLAN . •EXIST. COL ;TO BE REPLACED ' • • • . • ..• • . . • • .3)2000032 • WV-01 NA.-1.- 0 cD • 1 P1O (WPT , • . :. • • • • • '• • ' ' : -:;•• • • . • • RECEIVED FEB 2 "LOuti PERMIT CENTER ENG I NE ERS - NORTHWEST INC. P. S. 6869 WOODLAWN AVE, N.E. - SUITE 205 - SEATTLE, WA 98115 - (206)525 -7560 - FAX # (206) 522 - 6698 C ) Joe No. JOB NAME DATE SUBJECT SHEET OF BY Ty C E)6 I -T I t IL V 2" mbx. 12 .0.10. H?om boTtom • • • • cgEG e- -2 • bX Rera k's )4•-"7 Woo cot__ Tb V4 .rvircg tr BXS t" T . cot, k'EA1) NZI GN TOE' br dOL• thY I O DE — FAIL i RECEIVED CITY OF TURWIL, FEB 2 2000 PERMIT CENTER • • • . • • • • " BASE Q w /4 —j "0 KWIK BOLT II (EMBED 8`) NOTE:— PATCH EXISTING BOLT. HOLES EXIST. COL BASE t EXIST. COL do BASE R • • • ` NON— SHRINK . ROUT • NEW T.S. COL PER PLAN • SECTION F -2 . RECEIVED CITY OF TUu&nm FEB 2 2000 PERMIT CENTER 02/02/00 16:02 FAX 206 522 61198 ENW INC ENGINEERS - NORTHWEST, INC.P.S. 6869 WOODLAWN AVE. N.E. (SUITE 205) SEATTLE, WA. 98115 • JOB Project : : - 99149.000 914 aI O Way P Ty?. Q Qjj t' t F roeet - E Marginal CALCULATED PROPERTIES OF SQUARE or RECTANGULAR TUBES and ALLOWABLE LOAD MAR 1 0 2000 F LOL) = D COMMllNITY L(ft)= 2 25 K =1.0 6 DEPTH WIDTH t Corner Wt AREA bat Su Riot Iyy PIT wt it. in. in. Radius lb.Jlt in in in in in' m' in. >k / ft S 6 0.5 3t ` 33.75 9.93 47.04 15.68 2.18 47.04 15.68 2.18 33.78 2t" 35.21 10.36 50.59 16.86 2.21 50.59 16.86 2.21 35.24 L unbraoed Corner KURmin. P allowable ft Radius klps" 28 3t • 143.33 72.18. 28 2t -• 141.17 77.81 25 3t • 137.82 78.04 25 2t " 135.74 83.94 24 3t • 132.31 84.68 24 2t •• 130.31 91.08 23 3t • 126.80 92.21 23 2t" 124.88 99.17 22 3t - 121.28 100.78 22 2t " 119.45 108.39 21 3t • 115.77 110.61 21 2t •• 114.02 118.98 20 3t • 110.26 121.88 20 2t " 108.59 130.81 NOTE: • = ASTM A500 Maximum allowable radius (therefore section properties are minimums). `• per AISC 9th Edition (ASD) tables ••• Axial compression load (w /o bending) 12000 03 2 Page 1 LMA IJ002 /008 SHEET • OF Rev. 11/12/97 CE VED iii. tj PL + LL = S9.S' 4 Ic Vt.( FILE COPY I !.1nci rstrr,;1 tt,r• . RECEIVED CITY OF TUKWILA • FEB 2 2000 PERMIT CENTER 12/8/99 TUBEPROP.XLS X' aye✓ Y).^ !nA'k.�xtF'.�71::R6.17.",d;l:[c ct 0 O; co 0 0W: J u w 0 O } .. g LL Q; .U) 0, O U0 O N I- W O, • Z. U Z 02/0,2/00 16:03 FAX 206 522 6$98 ENW INC JOB.: - 89149.000 Project: - E. Marginal Way ENt3INEERS- NORTMNEST, INC.P.S. 6889 WOODLAWN AVE. N.E. (SUITE 205) SEATTLE, WA. 99115 -, LMA T yP. stn 8 CALCULATED PROPERTIES OF SQUARE or RECTANGULAR TUBES and ALLOWABLE LOAD NOTE: • = ASTM A500 Maximum allowable radius (therefore section properties are minimums). " per MSC 9th Edition (ASD) tables '" Axial compression load (w/o bending) a 003/008 SHEET • OF Rev. 11/12197 Fy() = 46. L(fL)= 26 K =1.0 DEPTH WIDTH t Corner Wt AREA hoc Sax Rroc Iyy Syy Ryy Wt In. it it Radius Ibs.ML n n in it in' in' in. */ ft. 6 6 0.375 2 • 28.63 7.83 39.52. 13.17 2.25 39.52. 1317 2.25 26.66 2t " 27.45 8.08 41.62 13.87 2.27 41.62 13.87 2.27 27.48 L unbtaced Corner KLIRmin. P allowable ft. Radius kips*" 26 3t' 139.91 60.63 IC 6. 26 2t " 137.43 63.65 DL 4 L. ti % A1. c 4. .t Ile .0 ' ' 25 3t • 133.56 65.58 26 2t " 132.15 69.06 24 3t • 12822. 71.16 24 2t " 126.86 74.93 23 3t• 12288 77.46 23 2t" 121.58 $1.59 22 3t • 117.54 64.66 22 21" 116.29 69.17 21 3t' 112.19 92.94 21 21" 111.00 97.66 20 3t' 106.855 101.80 20 2t " 105.72 106.64 RECEIVED CITY OF TUKWILA FEB 2 2000 PERMIT CENTER 12/8/99 Page 1 TUBEPROP.XLS 02/02/00 16:03 FAX 206 522 !6,698 ENVY INC Jos No. 614141 Joe NAME E • 1���GI�A` t. Y )4' rpTIt. PI Lb : I'I L i't- ( P t L [crow wa r-s`I &R ai) C ; pL •. T. 7 k * +- I•.s x 24. IL = 1 ,3 + Z / 211Al x U . are mo t.. D1 (0 . , LMA Z�_ s ENGINEERS INC. P.S. 8889 WOODLAWN AVE. N.E. - SUITE 205 - SEATTLE, WA 98115 - (2061525-7560 - FAX # (206) 522 -6698 DATE H SUBJECT rob - no CI SHEET OF BY 6Ib L VC 7 i (/ 4 T. S c-OL @ c,Q 1p C GO %2 . j 2ok to t 3fl' RI 004 RECEIVED CITY OF TUKWILA FEB 2 2000 PERMIT CENTER I' 02/02/00 16:03 FAX 206 522 6698 "1 ENGINEERS. NORTHWEST INC. P.S. 6869 WOODLAWN AVE. N. E. - SUITE 205 - SEATTLE, WA 98115 - (206)525-7560 - FAX # (206) 5224898 Joe No, 9 Joe NAME e • K I' Y L M . 1 DATE 1 —00 SUBJECT COL -UN1r1 DVS-1 SHEET OF, BY C'�L • 1 J5q.8 (13; P. rn , z k 0 ENV? INC -, LMA ex).7 c . (oL) lei 4o.0k 1 `:) J Lo*F. 9261,1 GAP :34- 4,5 C. Dl, = Air A 244 $ 60' - 22 .71 k L _ x 2 .s < 140 = 3 G. 7C LO�.D T}1AT ef - t tC E Ctfl = Zo- 7 L — z :? �! _ 9.3 DL 34 . 7Z P 10.2 P 2 - w 4 ' z D, 9`` L-L to.z RECEIVED CITY OF TUKWILA F EB 2 2000 PERMIT CENTER It005 /008 j0.3 • ,..tl. ova ?:.+.�:JtL'au:cim viii.d: . uuiv:.:; zvw: �lx�sv. x4nv: u9 ;�.�.4,YLiti`f:Fa;.....n:J.�Is: r.:.e6.rL'L:':i'St;ryt:. '02/,02/00 16:04 FAX 206 522 FM98 ENW INC RISA -2D (R) Version 4.01 Engineers Northwest 6869 Woodlawn Ave, NE, Suite 205 Seattle, WA 98115 E. Marginal Way ___= ___ = = = = = == = Units US Standard Steel Code AISC 9th Edition ASD Allowable Stress Increase Factor 1.333 Include Shear Deformation Yes No. of Sections for Member Calcs 5 Do Redesign Yes P -Delta Analysis Tolerance 0.50% =___ Joint No Joint + No Section Label SEC =_= 1 1 _= X Coordinate ft 1 0.000 2 0.000 =____< Boundary Conditions > = = = == Translation + X Y Rotation K /in K /in K- ft /rad 1 Reaction Reaction 2 Reaction _ == = = =s = = = = = == -, LMA < Joint Coordinates > Y Joint Coordinate Temperature ft °F 0.000 0.00 25.000 0.00 =_ = == _ < Materials (General) > Material Young's Shear Poisson's Thermal Label Modulus Modulus Ratio Coef. Ksi Ksi 10"5°F STL 29000.00 11154.00 0.3000 0.65000 = = =s = == = = == =___ =< Sections > Database Material As As Shape Label Area 0,2 1,3 in "2 TU7X7X5 oR- STL 8.11 1.2 1.2 1.1420(%)(4 _ < Members > Memb Joints Rotate Section Releases Offsets No. I J 90° Set I:AVM J:AVM I -End J -End in in 2 SEC Section Length Member Set ft 1 SEC 25.00 < AISC,NDS Lb -out Lb -in le -out le -in ft ft Parameters > Lcomp K K le -bend out in ft Job : 99149 Page: 1 Date: 1/12/00 File: INTCOL = - ________ = = I 1,3 in "4 59.50 Weight Density K /ft3 0.490 _ CH f�J 006/008 Yield Stress Ksi 36.00 I T 0,2 C in "4 59.50 Inactive? Label i Length ft - - -- 25.00 Cm Cb,B Sway o i RECEIVED CITY OF TUKWILA FEB 2 2000 PERMIT CENTER = _ _ _ =_ ~ W : 00 N rn co Li- la 0 . g Q . N d H W F- 0 Z I; 111 uj D O o N 0 I- LLS = V' O w z 0 Z ' 02/92/00 16:04 FAX 206 522 ,f1698 ENW INC RISA -2D (R) Version 4.01 Engineers Northwest 6869 Woodlawn Ave, NE, Suite 205 Seattle, WA 98115 ' E. Marginal Way _______= =__ _____ _________< Basic Load Case Data >=== == _____= BLC Basic Load Case Load Type Totals No. Description Nodal Point Dist. 1 =__= Joint Number 2 2 ______ = __ = 2 4 LMA ______< Joint Loads /Enforced Displacements, BLC 1 > Is this a Load or Direction a Displacement? (X,Y,Mz) Magnitude K, K -ft, in, rad L Mz 2.125 L Y - 70.000 _ =____ =____ =___= _< Load Patterns >= ___= Pattern Magnitudes Locations Label Dir Start End Start End K /ft, F K /ft, F ft or I ft or % - -- UNIFORM Y -1.000 -1.000 0.000 0.000 m = = =s< Load Combinations >_ = = = ==s_ - === = = = == ___ RWPE No. Description BLC Fac BLC Fac BLC Fac BLC Fac BLC Fac SSdv < Reactions, LC 1 : tl > Joint + Forces + Moment No X Y Mz K K K -ft 1 -0.09 70.00 0.00 2 0.09 0.00 0.00 Totals: 0.00 70.00 Center of Gravity Coords (X,Y,Z) (ft) : 0.000, Job : 99149 Page: 2 Date: 1/12/00 File: INTCOL Ij 007/008 == = _ 25.000, 0.000 = = =______ =____< Member Section Forces, LC 1 : tl >_ =_ _ Member Joints Section I - J 4 Axial Shear Moment K K K -ft 1 1- 2 1 70.00 0.09 0.00 2 70.00 0.09 -0.53 3 70.00 0.09 -1.06 4 70.00 0.09 -1.59 5 70.00 0.09 -2.12 CITY OF TUKWILA FEB 2 2000 PERMIT CENTER ' 02/02/00 16:05 FAX 208 522 6698 ENW INC -, LMA RISA -2D (R) Version 4.01 Engineers Northwest Job : 99149 6869 Woodlawn Ave, NE, Suite 205 Page: 3 Seattle, WA 98115 Date: 1/12/00 File: INTCOL B. Marginal Way ______________________< Member Stresses, LC 1 : tl > = == = = = = = =.=____= =____ =__ Member Joints Section Bending Bending I - J i Axial Shear Top Bottom Ksi Ksi Ksi Ksi 1 1 2 1 8.63 0.02 0.00 0.00 2 8.63 0.02 0.38 -0.38 3 8.63 0.02 0.75 -0.75 4 8.63 0.02 1.12 -1.12 5 8.63 0.02 1.50 -1.50 ______=== =__=== = =___< Member Deflections, LC 1 : tl > = =____ ___ Member Joints Section I - J 4 x y L/n in i 1 1 2 1 0.000 0.000 NC 2 -0.022 -0.052 5774.2 3 -0.045 -0.083 3608.9 4 -0.067 -0.073 4124.4 5 -0.089 0.000 NC 111 008 /008 _ < Member AISC Unity Checks, LC 1 : tl > Member Joints Unity Shear ASD I - J Chk. Loc Chk Loc Fa Fb Cb Cm Eqn. Ksi Ksi 1 1 2 0.876 5 0.002 1 11.57 23.76 1.00 0.60 111 -1 RECEIVED CITY OF TUKWI" FEB 2 2000 PERMIT CENTEF • U U LL w� lL <i •z C� z?= z3 2 0� w _ • ui z NORTHWEST MAR 1 0 200 _cOMMUNITY UtVELOpm E. MARGINAL WAY CORPORATE PARK Column Replacement Project TUKWILA, WASHINGTON STRUCTURAL CALCULATIONS February 1, 2000 ENW Project No. 99149000 EXPIRES 8/28/00 ENGINEERS NORTHWEST, INC. P.S. - STRUCTURAL ENGINEERS 6869 WOODLAWN AVENUE N.E. SEATTLE, WA 98115 (206) 525.7560 FAX (206) 522.6698 u EllvE onderstond that the Check zn-vow.os • 1-.=, r• 7,1 ons: • •(... . " • D E MAR 7 2000 REID MIDDLETON JOB I: - 99149.000 Project : - E. Marginal Way ENGINEERS - NORTHWEST, INC.P.S. 6869 WOODLAWN AVE. N.E. (SUITE 205) SEATTLE, WA. 98115 L unbraced Corner KL/Rmin. P allowable it Radius kips*** 26 3t * 143.33 72.16. 26 2t " 141.17 77.61 25 3t • 137.82 78.04 25 2t " 135.74 83.94 24 3t' 132.31 84.68 24 2t " 130.31 91.08 23 3t • 126.80 92.21 23 2t " 124.88 99.17 22 3t • 121.28 100.78 22 2t " 119.45 108.39 21 3t' 115.77 110.61 21 2t " 114.02 118.96 20 3t' 110.26 121.88 20 2t " 108.59 130.81 TyQ. Qp-ib 1) 1 NOTE :- • = ASTM A500 Maximum allowable radius (therefore section properties are minimums). " per AISC 9th Edition (ASD) tables •" Axial compression load (w /o bending) Page 1 CALCULATED PROPERTIES OF SQUARE or RECTANGULAR TUBES and ALLOWABLE LOAD 1 SHEET OF 6 Rev. 11/12/97 Fy(ksi) = 46 L (tt) = 26 K= 1.0 DEPTH WIDTH t Corner Wt AREA boc Sioc Rxx Iyy Syy Ryy WL in. in. in. Radius IbsJft in in in in. in in in. 9 / ft 6 6 0.5 3t • 33.75 9.93 47.04 15.68 2.18 47.04 15.68 2.18 33.78 2t" 3521 10.36 50.59 16.86 2.21 50.59 16.86 2.21 35.24 r Vi. d , 17 .}. LL = c7.4- IC • 12/8/99 TUBEPROP.XLS JOB 0: - 99149.000 Project : - E. Marginal Way ENGINEERS - NORTHWEST. INC.P.S. 6869 WOODIAWN AVE N.E (SUITE 205) SEATTLE, WA. 98115 Typ @ ID B. 4 CALCULATED PROPERTIES OF SQUARE or RECTANGULAR TUBES and ALLOWABLE LOAD Fy(ksi) = 46 L(fL)= 26 K =1.0 DEPTH WIDTH, t Corner Wt. AREA boc &oc Roc lyy Syy Ryy Wt in. in. in. Radius Ibslft In in in in. in in in. 0/ft 6 6 0.375 3t • 26.63 7.83 39.52_ 1317 2.25 39.52 1317 2.25 26.66 2t •' 27.45 8.08 41.62 13.87 2.27 41.62 13.87 2.27 27.48 L unbraced Corner KURmin. P allowable ft. Radius kips*** 26 3t• 138.91 60.63 26 2t •• 137.43 63.85 Dt- 4 LA, = 041.D L• -I It' .0 k : 6 / 25 3t • 133.56 65.58 25 2t •• 132.15 69.06 24 3t • 128.22 71.16 24 2t •• 126.86 74.93 23 3t • 122.88 77.48 23 2t'• 121.58 81.59 22 3t • 117.54 84.68 22 2t ° 116.29 89.17 21 3t - 112.19 92.94 21 2t '• 111.00 97.86 20 3t• 106.85 101.80 20 2t ~ 105.72 106.84 NOTE :- • = ASTM A500 Maximum allowable radius (therefore section properties are minimums). •• per AISC 9th Edition (ASD) tables ••• Axial compression load (w/o bending) Page 1 2 S SHEET OF ' Rev. 11/12/97 12/8/99 TUBEPROP.XLS '..tu..lud•. x.G:nm 'n.sae'et.'r +Yu+s,; .., azat.. D. w.=.:: ri:, r; uat�. v' ttis :c:::`ri..dtcsl..'.�uublsil. Z4- ENGENGINEERS-NORTHWEST INC. P.S. 6869 WOODLAWN AVE. N.E.- SUITE 205 - SEATTLE, WA 98115 - (206)525-7560 - FAX # (206) 522 -6698 JOB No. y9,4 C1 JOB NAME E. I"AF- GI4L- SUBJECT C r • ,C2, 1v C, WQY re'DTItt ° r PI L : pr L ci-Q fr -c D t L Ccwov3) C w S `c clsr4rl (Q ' p� SEE PG. 9 eF LL = 1M.& + Z‘)( 24.-C x to 10 L4 7 7 ? ��/ T. S COL @ c . D e DATE I 11r" SHEET 3 OF 8 BY 6 IbL t- GO * ;,.... �drxityd'.s �. . r- .',l:-•'+.;:. ENGINEERS - NORTHWEST INC. P.S. 6869 WOODLAWN AVE. N.E. - SUITE 205 - SEATTLE, WA 98115 - (206)525 -7560 - FAX # (206) 522 -6698 JOB No. 9/ JOB NAME . • • "9-6'1 46-4 -- -- SUBJECT C.OL..U,j, b - (C ` Pis: 1 8 k s Its, Z e 4 LdAsP i2.tsyn G PID +2. C. 5 lS. 3" ) - z4 ' 60' = 22 , 7 LL - £0 _ . 04 -7 'CPA) • I°i..3" (LC) (hle,Le..00 be +usr r d c. 4 D 4o.a 1 = sq.g`` D, 9 k LL DATE I- lZ -oo SHEET 4 OF 8 BY DL RISA -2D (R) Version 4.01 Engineers Northwest 6869 Woodlawn Ave, NE, Suite 205 Seattle, WA 98115 i.' E. Marginal Way - =_= Units US Standard Steel Code AISC 9th Edition ASD Allowable Stress Increase Factor 1.333 Include Shear Deformation Yes No. of Sections for Member Calcs 5 Do Redesign Yes P -Delta Analysis Tolerance 0.50% Joint No 1 2 Joint + No Section Label SEC TU7X7X5 0t- 1 1 2 SEC X Coordinate ft 0.000 0.000 Translation X Y K /in K /in 1 Reaction Reaction 2 Reaction < AISC,NDS Section Length Lb -out Lb -in Member Set le -out le -in ft ft ft 1 SEC 25.00 < Joint Coordinates > Y Joint Coordinate Temperature ft °F 0.000 0.00 25.000 0.00 < Boundary Conditions > Rotation K- ft /rad < Materials (General) > Material Young's Shear Poisson's Thermal Label Modulus Modulus Ratio Coef. Ksi Ksi 10"5°F STL 29000.00 11154.00 0.3000 0.65000 < Sections > Database Material As As Shape Label Area 0,2 1,3 in STL 8.11 1.2 1.2 < Members > Memb Joints Rotate Section Releases No. I J 90° Set I:AVM J:AVM Offsets I -End J -End in in Parameters > Lcomp K K le -bend out in ft Job : 99149 Page: 1 Date: 1/12/00 File: INTCOL I 1,3 in 59.50 Weight Density K /ft3 0.490 CH or-S Yield Stress Ksi 36.00 I T 0,2 C in 59.50 Inactive? Label . Length ft - - -- 25.00 Cm Cb,B Sway o i RISA -2D (R) Version 4.01 Engineers Northwest 6869 Woodlawn Ave, NE, Suite 205 � Seattle, WA 98115 E. Marginal Way Job : 99149 Page: 2 Date: 1/12/00 File: INTCOL oP _ < Basic Load Case Data > = BLC Basic Load Case Load Type Totals w ct No. Description Nodal Point Dist. 3 V n 1 2 NS 0 w _ < Joint Loads /Enforced Displacements, BLC 1 > Joint Is this a Load or Direction N LL Number a Displacement? (X,Y,Mz) Magnitude w O ni K, K -ft, in, rad gn 2 L Mz 2.125 w a 2 L Y - 70.000 d 1-w < Load Patterns > z p, Pattern Magnitudes Locations t--C) Label Dir Start End Start End W - K/ft,F K /ft, F ft or % ft or % - -- 2 n 0, UNIFORM Y -1.000 -1.000 0.000 0.000 o, 01-- < Load Combinations > w 4 RWPE () : No. Description BLC Fac BLC Fac BLC Fac BLC Fac BLC Fac SSdv i1 O •Z ; 1 tl 1 1 v0 O ' < Reactions, LC 1 : tl > z Joint + Forces + Moment No X Y Mz K K K -ft 1 -0.09 70.00 0.00 2 0.09 0.00 0.00 Totals: 0.00 70.00 Center of Gravity Coords (X,Y,Z) (ft) : 0.000, 25.000, 0.000 < Member Section Forces, LC 1 : tl > Member Joints Section I - J .& Axial Shear Moment K K K -ft 1 1- 2 1 70.00 0.09 0.00 2 70.00 0.09 -0.53 3 70.00 0.09 -1.06 4 70.00 0.09 -1.59 5 70.00 0.09 -2.12 .... eo..... a.. sta. hLCr1c .WP. e 1 .k n:A" . Engineers Northwest 6869 Woodlawn Ave, NE, Seattle, WA 98115 E. Marginal Way RISA -2D (R) Version 4.01 Suite 205 < Member Stresses, LC 1 : ti Member Joints Section I - J 4 Axial Shear Ksi Ksi 1 1 2 1 8.63 0.02 2 8.63 0.02 3 8.63 0.02 4 8.63 0.02 5 8.63 0.02 Member 1 < Member Member Joints Unity I - J Chk Loc 1 1 2 0.876 5 Job : 99149 Page: 3 Date: 1/12/00 File: INTCOL > Bending Top Ksi 0.00 0.38 0.75 1.12 1.50 7 o F Bending Bottom Ksi 0.00 -0.38 - 0.75 - 1.12 -1.50 < Member Deflections, LC 1 : tl > Joints Section I - J 4. x y L/n in in 1 2 1 0.000 0.000 NC 2 -0.022 -0.052 5774.2 3 -0.045 -0.083 3608.9 4 -0.067 -0.073 4124.4 5 -0.089 0.000 NC AISC Unity Checks, LC 1 : tl > Shear ASD Chk Loc Fa Fb Cb Cm Eqn. Ksi Ksi 0.002 1 11.57 23.76 1.00 0.60 H1 -1 L unbraced IL Corner Radius KURmin. - P allowable kips*** 25 3t • 95.76 113.83 25 2t •• ' 95.33 - 116.09 24 3t • 91.93 119.27 24 2t •• 91.52 121.56• 23 3t • 88.10 124.57 23 2t •" • 87.71 126.90 22 3t • 84.27 129.73 22 2t •" 83.89 132.09 21 3t • 80.44 134.74 21 2t •" 80.08 137.14 20 3t • 76.61 139.62 20 2t •" 7627 142.06 19 3t • 72.78 144.37 19 2t •" 72.45 146.84 DEPTH WIDTH t Corner Wt. . AREA . Doc ' Soc ' Roc lyy Syy :. Ryy ' . Wt in. in. in. Radius tbsJf . ' M ' . M . in in. in • : i • . in. ' 4 / ft. : :i: > # l i. . B: 3t " .25.43 .7.48 73.43 18.36 . 3.13 73.43 ' 18.36 -, 3.13 25.46 2t " 25.80 7.59 75.15 18.79 • 3.15 75.15 18.79 3.15 25.82 Fy(ksi) = L(ft)= I: CALCULATED ;PROPERTIESOF >S�UARE':orRECTAN : ,.... JOBN: ProJect K =1.0 ENGINEERS - NORTHWEST, INC.P.S. 6869 WOODLAWN AVE. N.E. (SUITE 205) SEATTLE, WA. 98115 sr W ii 3..Sr ..: .. .man >..:. .. .. Page 1 NOTE :- • = ASTM A500 Maximum allowable radius (therefore section properties are minimums). •• per AISC 9th Edition (ASD) tables ***Axial compression load (w /o bending) SHEET 7A OF 8 Rev. 11/12/97 3 /8 /00 TUBEPROP.XLS Doug Gamer Curt Wagner Robert Raichle Kim Pearse • .,...._. • • _..__. -- . ,- ....... GEEN OSORGE SUTLER ASSOCIATES, INC. EREtwws • Ar.rtt ees OnelieeeHEetha CC Wm Drive leneeklunzi66 Project Name: Date: Initiated By: With o To 0: ® Phone Call The following column loads are reactions based on the load in McLeod's space only - betwcen column lines C & D ofNorthwest's plans. They do not include loading from the adjacent bays. The reactions do include the roof top condenser weights. Column reaction ( C -10 is 20700 lbs. dead load and 19300 lbs. live load. °"° � Column reaction @ C -7 & C -8 is 20250 lbs. dead load and 18500 lbs. live load. Column reaction a C -4, C -5, C -6, & C -9 is 18500 lbs. dead load & 18500 lbs. live load. The following arc the roof top condenser weights that will be placed in McLeod's space. The (8) 20 Ton roof top condensers that weigh 1000 lbs. each, including the roof curb. The unit is approximately 3' -7" x 10' -4 ". The (1) 8 Ton roof top condensers that weighs 750 lbs., including the roof curb. The unit is approximately 3' -7" x 7' -0 ". Copies to: Original to File a Principal -In- Charge Project Manager Project Architect Other. C: %TMP\Pft0105 - I.WE post -it' Fax Note Phone Fax e Project Record McLeod - Tukwila Project No.: 8952.15 01/05/00 Time: 5 pm Keri McGill Doug Gardner, Sabey Robert Raicble, Northwest Engineers Merino o_ Meeting 0 Job Site Visit Rob Page Todd Hager Adam Kuchl To{jbb e4t e/.�lfz Si22 —(o a I u • uuu .rum L y.dL I . tir.11 t JJ M -x '671 °e tjl fo/ Ae�sP From BILL-...6901244 c° 6,08E Y Phone 0 Pax" Owner Contractor Contractor Supplier Other 01 /10 /00 MON 15:50 ITX/RX NO BOl 51 5. Received By: (Print Name) CY 6. Addressee lee Is paid) 102595.99•B - 0223 SENDER: H p Complete items 1 ark o tor additional services. ,,, Complete Items 3, 4a;-.. 4b. p Print your name and address on the reverse of this form so that we can return this d card to you. a�i p AttachReturn this f orm e to the front of the mailpiece, or on the back If space does not �. permit.' p he ipt to whom article i was delivered the red article nd the number. Receipt date delivered. o '0 3. Article Addressed to: 0- THE BOEING COMPANY O PO BOX 3707 . M/ S. 1F -09 lug SEATTLE, WA 98124. �ts1 6. Signature (Addressee or Age tn f?S Form'3811, December 1994 I also w to receive the follow- ing sr s (for an extra fee): 1. 0 Addressee's Address :. 2. 0 Restricted Delivery 4a. Article Number P -588- 827 -473 4b. Service Type Certified [] Registered Insured 0 Express Mail ❑ Return Receipt for Merchandise ❑ COD c 7. Date of Delivery A " ` i ddress (Only if requested and co Domestic Return Receipt t3dia it iaJk�a Z U� .0: .A 0: 0W; N W W o' g LL'`, • S Z u y W W i0 — 0 Hi W •W I— I-2: LL • 0 t— Z UNITED STATES POSTAL SERVICE First -Class Mail ostage & Fees Paid )SPS "Permit No. G -10 • Print your name, address, and ZIP Code in this box • CITY! >OF �TUKWILA 6300 SOUTHCENTER BL, SUITE 100 TUKWILA, . gas a 8. . ATTN: PERMIT CENTER 11111111111111111111111111111111111 1111111111111111 t f ,1Ut:ss.';ii:: t� re W `. V � U 0; W W J CO U- W0 = 103 W O : H; Do : .O N; , o I—, W ,, HU LL Oi uj Z O F- Z Postmark or Date P 588 827 473 US Postal Service Receipt for Certified Mail ('—') No Insurance Coverage Provided. Do not use for International Mail (See reverse) Sent to THE BOEING COMPANY Street & Number PO BOX'3707 M/S 1F -09 Post Office, State, & ZIP Code SEATTLE, WA 98124 Postage Certified Fee Special Delivery Fee Restricted Delivery Fee Return Receipt Showing to Whom & Date Delivered Return Receipt Showing to Whom, Date, & Addressee's Address TOTAL Postage & Fees 2 -4 -00 . :4;:r; . ... '•stt:utarxk..M.!.:x its vt. zui: x.. ii a3�. iti�. L�J.. w�'? �.'. F. vAx :�S�wiuS.,.:ie Stick postapr tamps to article to cover Flrst.Clas:,'postage, certified mall fe' `d charges tor; ;elected optional services (See front). 1. It u want this receipt postmarke• 'dc the gummed o the right of the retum address leaving the receipt attache y a post office service • f * art�'�t window o r hand it to your rural carrier X. ch � a 911lre . ` • ♦\ 2. If you do not want this receipt pos010, stiVhe g stub to the right of the return address of the article, date, deta retain the receicnd mail the article. 3. If you want a retum receipt, write therereed mgirriumber ur name and address on a retum receipt card, Forrn 3811, an it toftlOf tont o artide by means of the gummed ends if space permits. OthenTriakt to la of artitnEndorse front of article I, RETURN RECEIPT REQUESTED acgacselelte nicoDer. 4. If you want delivery restricted to thTleddressee, or to arlthorized agent of the addressee, endorse RESTRICTED DELIVERY on the front of the article. ; 5. Enter fees for the services requested in the appropriate spaces on the front of this ! receipt. If retum receipt is requested, check the applicable blocks in item 1 of Form 3811. 6. Save this receipt and present it if you make an inquiry. NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT: Feb 04, 2000 VIA CERTIFIED MAIL P- 588 - 827 -473 THE BOEING COMPANY PO BOX 3707 M/S 1F -09 SEATTLE WA RE: SW2000 -006- STOP WORK ORDER /WORK WITHOUT PERMIT Dear THE BOEING COMPANY : King County records indicate that you are the owner of record for the property located at 3417 S 120 PL. This is to inform you that a STOP WORK notice was placed on the site of new construction in progress at the aforementioned location on Feb 02, 2000 by the City of Tukwila Building Department. You are in apparent violation of the City of Tukwila Municipal Code Section 16.04.020. Specifically, you failed to obtain a building permit as provided in this section. You are hereby notified that you must cease work immediately and make application for building permit within 30 calendar days of this letter. Please be advised that if there is any evidence of work continuing prior to the issuance of a building permit, and if a fully completed Building Permit Application has not been received in this office,by that date, this matter will be turned over to the City Attorney for appropriate legal action. Applications and related information explaining the permit process may be obtain at the Department of Community Development Permit Center located at 6300 Southcenter Blvd, Suite 100, Tukwila, Washington. If you should have further questions regarding the issuance of permits, please feel free to call the Permit Center at (206)431 -3670. Thank you in advance for your cooperation in this matter. Sincerely, Brenda Holt Permit Coordinator city of Tukwila `oz Steven M.-Mullet, Mayor Department of Community Development Steve Lancaster, Director 98124 cc: Steve Lancaster, Director Duane Griffin, Building Official 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 INFOPAC PAGE: 8,050 JOB PAM200 KING COUNTY DEPARTMENT OF ASSESSMENTS REPORT PAM20020 -02 PARCEL NUMBERS BY STREET NAME CITY OF TUKWILA SITUS ADDRESS PARCEL - NUMBER TAXPAYER /QTR- SEC- TWP -RGE 4037 S • 119TH ST 734060-0044 -0 SCHALHAMER ROBERT D LOT :2 BLK: NW-10 -23 -4 PLAT:RIVERSIDE INTERURBAN TRS 3329 S 120TH PL 102304- 9068 -0 BOEING COMPANY SW- 10 -23 -4 3417 S 120TH PL 102304 - 9006 -0 BOEING COMPANY SW- 10-23 -4 4202 S 122ND .ST 334740 - 0355 -0 TYE MARGUERITE H LOT:65 BLK:2 SE- 10 -23 -4 PLAT:HILLMANS CD MEADOW GARDENS DIV NO. 01 4206 S 122ND ST •334740- 0360 -0 RAMEY REGGIE R LOT:66 BLK:2 SE -10 -2374 PLAT:HILLMANS CD MEADOW GARDENS DIV NO. 01 4210 • S 122ND ST 334740 - 0365 -0 BEEMAN BETH ANN.- LOT:67 BLK:2. SE- 10-23 -4 PLAT:HILLMANS CD MEADOW GARDENS' DIV NO. 01 4214 S 122ND ST 334740-0370 -0 BLAKE SALLY H LOT:68 -69 BLK:2 SE- 10 -23 -4 PLAT:HILLMANS''CD.MEADOW GARDENS DIV NO. 01 • 4220 S 122ND ST 334740-0380 -0 TAKAI KALAMA I +SESILA LOT:70 BLK:2 SE- 10 -23 -4 PLAT:HILLMANS CD MEADOW GARDENS DIV NO. 01 4310 S 122ND ST 334740 - 0400 -0 ADAIR RONALD & JUTTA LOT:74 -75 BLK:2 SE- 10 -23 -4 PLAT:HILLMANS CD MEADOW GARDENS DIV NO. 01 • 4402 S 122ND - ST 334740- 1165 -0 MELLINGER JUDY A LOT:31 -32 BLK:5 SE- 10 -23 -4 PLAT:HILLMANS CD GARDENS DIV NO. 01 4408 S 122ND ST 334740-1170 -0 SHAFLIK GREGG A LOT:33 -34 i ' BLK:5 5E= 10-23 -4 PLAT:HILLMANS:CD MEADOW GARDENS DIV NO. 01 • • 4430 S 122ND ST 4502 S 122ND ST 334740-1185 -0 'MJF HOLDINGS INC LOT:36- 37- 38 BLK:5 SE-10-23 -4 PLAT:HILLMANS CD MEADOW GARDENS DIV NO. 01 4510 S 122ND ST 334740-1190 -0 MJF HOLDINGS INC LOT:38 - 39 BLK:5 SE- 10 -23 -4 PLAT:HILLMANS CD MEADOW GARDENS DIV NO. 01 4602 S 122ND ST 334740-1400 -0 RICKETTS CRAIG L LOT:15 BLK:6 SE- 10 -23 -4 PLAT:HILLMANS CD MEADOW GARDENS DIV NO. 01 4602 S 122ND ST 334740 - 1405 -0 RICKETTS CRAIG L LOT:16 BLK:6 SE- 10 -23 -4 PLAT:HILLMANS CD MEADOW GARDENS DIV NO. 01 4604 S 122ND ST 334740 - 1415 -0 BUI QUEN VAN +NGUYEN,CHUC LOT:17 -18 BLK:6 SE- 10 -23 -4 PLAT:HILLMANS CD MEADOW GARDENS DIV NO. 01 4620 S 122ND 4705 S 122ND PAGE 185 DATE 07/04/99 334740- 1180 -0 MJF HOLDINGS INC LOT:35 - 36 _3 BLK:5 SE- 10-23 -4 PLAT:HILLMANS CD MEADOW GARDENS DIV NO. 01 ST 334740 - 1420-0 BUI QUEN VAN +CHUC THI LOT:18 -19 BLK:6. SE- 10-23 -4 PLAT:HILLMANS CD MEADOW GARDENS DIV NO. 01 ST 017900- 1115 -0 - MADRIAGA LORELEI T LOT:1 -2 -3 - •BLK:6 SE- 10-23 -4 PLAT:ALLENTOWN ADD • February 9, 2000 Dave Swanson, P.E. Reid Middleton 728 - 134th Street SW, Suite 200 Everett, WA 98204 Dear Mr. Swanson: City of Tukwila Department of Community Development Steve Lancaster, Director RE: Structural Review Intergate Technology Campus East — Building #2 (D2000 -032) Please review the enclosed plans and documents for structural compliance with the 1997 Uniform Building Code. If you should have any questions, please feel free to contact me at (206)431 -3672. Sincerely, 4ufridk k i- Brenda Holt, Permit Coordinator encl xc: Permit File No. D2000 -032 Steven At Mullet, Mayor 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 Reid iddleton March 9, 2000 File No. 26 -00- 005- 007 -02 Mr. Duane Griffin City of Tukwila 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Subject: Building Permit Plan Review - Final Submittal East Marginal Way Corporate Park (D2000 -032) Dear Mr. Griffin: We reviewed the proposed project for compliance with the structural provisions of the 1997 Edition of the Uniform Building Code as amended and adopted by the City of Tukwila. The applicant has responded successfully to our comments. Enclosed are the drawings, structural calculations, and correspondence from the engineer for your records. If you have any questions or require any additional clarification, please call. Sincerely, David B. Swanson, P.E., S.E. Bryce Falkin, E.I.T. Director, Structural Engineering Group Plan Review Engineer bjr\ 26se\planrevw \tukwila\00,t007r2.doc\bf Enclosures cc: Bob Fadden, Lance Mueller & Associates RECEIVED MAR 1 0 2000 COMMUNITY DEVELOPMENT Washington Oregon Alaska Engineers Planners Surveyors Reid Middleton, Inc. 728 134th Street SW Suite 200 Everett, WA 98204 Ph: 425 741 -3800 Fax: 425 741 -3900 Reid iddleton March 2, 2000 File No. 26 -00- 005- 007 -01 Mr. Duane Griffin City of Tukwila 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Subject: Building Permit Plan Review — First Submittal Intergate Technology Campus East — Building #2 (D2000 -032) Dear Mr. Griffin: MAR 0 6 2000 COMMUNITY DEVELOPMENT We reviewed the proposed project for compliance with the structural provisions of the 1997 Edition of the Uniform Building Code as amended and adopted by the City of Tukwila. The following comments should be addressed by the permit applicant. A copy of this letter was forwarded to the project contact for your convenience. 1. The following list of comments should be responded to in itemized letter form. The permit applicant should have the Engineer of Record respond and resubmit two copies of revised structural drawings and one copy of supplemental calculations. All information should be submitted directly to Reid Middleton, Inc. 2. Shop drawings dated 1/14/00 have been submitted for review; however, the structural drawings and calculations should be sealed and stamped by the Engineer of Record per UBC Section 106.3.2. A complete structural review will be performed during the next submittal. 3. Several structural details have been submitted on 8 1/2 by 11 sheets. The City of Tukwila requires that all design drawings be included in a complete set of full size plans, sealed by a structural engineer licensed in the state of Washington. Corrections and comments made during the review process do not relieve the project applicant or designer from compliance with code requirements, conditions of approval, and permit requirements; nor is the designer relieved of responsibility for a complete design in accordance with the laws of the state of Washington. This plan review check is for general compliance with the Uniform Building Code as it relates to the project. If you have any questions or require any additional clarification, please call. cerely, iddleton, Inc. ryce Falkin, E.I.T. Director, Structural En:' ring Group Plan Review Engineer David B. Swanson, P. bjr\ 26se\ plvuevw \iukwi1a\00\t007r1.doc\bf cc: Bob Fadden, Lance Mueller & Associates RECEIVED 4si Washington Oregon Alaska Engineers Planners Surveyors Reid Middleton, Inc. - 728 134th Street SW Suite 200 Everett, WA 98204 Ph: 425 741 -3800 Fax: 425 741 -3900 SABEY CORPORATION September 20, 2001 Ms. Stefania Spencer Permit Technician Cit}� of Tukwila 630b Southcenter Boulevard, Suite #100 Tukwila, WA 98188 RE: Permit Status D2000 -032 3417South 120' Place Dear. Ms. Spencer, The following is in response to your letter dated 9/17/01 to Mr. Bob Fadden, Lance Mueller & Associates, regarding file closeout of permit number D- 2000 -032 at 3417. South 120 Place, Tukwila, Wa: _ This work has been completed under two separate building permit numbers. Please call me should you need additional information to closeout the permit files. Thank you for notification of this matter. Sincerely, SABEY ARCHITECTURE Permit # D2000 -032 Column Repair: Special inspections of structural steel welding and erection. Final Inspection — 5/11/00 • Permit # D01 -128 Exterior Renovations: Installation of an aluminum frame, glass spandrel curtain wall on existing tilt up concrete panel building at NE corner of structure. Final Inspection — 8/28/01 Fred Allie - Tel: 206/277 -5272. . Project Manager . REAL ESTATE DEVELOPMENT CONSTRUCTION SERVICES VENTURE FUNDING Cc: John Sabey — Sabey Corporation Bob Fadden —Lance Mueller & Associates RECEIVED SEP 21 2001 COMMUNITY DEVELOPMENT 12201 Tukwila International Blvd. Fourth Floor Seattle, Washington 98168 -5121 206/ 281 -8700 main line 206/ 282 -9951 fax line www.sabey.com RECEIVED CITY OF TUKWILA SEP 2 1 2001 PERMIT CENTER September 17, 2001 Mr. Bob Fadden 130 Lakeside, #250 Seattle, WA 981,22 RE: Permit Status D2000 -032 3417 South 120th Place Dear Mr. Fadden: City of Tukwila Department of Community Development Steve Lancaster, Director In reviewing our current permit files, it appears that your permit for exterior renovations and column repairs, issued on April 5, 2000, has not received a final inspection by the City of Tukwila Building Division as of the date of this letter. • Per the Uniform Building Code and /or Uniform Mechanical Code, every permit issued by the building official under the provision of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time for a period of 180 days, after the work is commenced. Based on the above, if the final inspection is not called for within ten (10) business days from the date of this letter, the Permit Center will close your file and the work completed to date will be considered non- . complying and not in conformance with the Uniform Building Code and /or Mechanical Code. Please contact the Permit Center at (206) 431 -3670 if you wish to schedule a final inspection. Thank you for your cooperation in this matter. Stefania Spencer Permit Technician \c: Permit Pile No. D2000 -032 Duane Griffin. Building Official Steven M. Mullet, Mayor 6300 Southcenter Boulevard, Suite 11100 • "Tukwila, Washington 98188 • Phone: 206-431-3670 • Fax: 206 -431 -3665 04,07/2000 13:17 4258203909 • AGRA ENGINEERING GLOM SOLUTIONS April 7, 2000 0 -91 M- 13422 -0 Sabey Construction 101 Elliott Avenue E., Suite 400 Seattle, Washington 98119 -4220 Attention: Subject: Dear Mr. Gonzales: Mr. Bill Gonzales, Project Manager KEN SAHI Summary of UBC Special Inspection Services City of Tukwila Permit No." D2000 =032' .: Intergate East Building 2 3309 S. 120 Place Tukwila, Washington AGRA Earth & Environmental, Inc. (AGRA) respectfully submits this letter as our final summary of UBC special Inspections for the above - referenced project. AGRA performed inspections for this project beginning on F ruary 1, 2000 through February 4, 2000 as requested and scheduled by representatives of Saf 'Construction. Daily Field Reports were prepared and distributed at the time our services were provided. These Daily Field Reports are attached and form the basis for this final summary of our inspections. AGRA performed Inspections for the following items: 1. Visual inspection of structural steel welding and erection. 2. Installation of Hilti Expansion bolts. s:1WORDPROCWO Pr o)ict0SYiWe 13000013422 Sabey Constructiominter:ate East Bunting 2,wpo APR -07 -2000 01:12PM TEL)4258203909 ANIIIIIIIIIPr ID) RECEIVED MAY 15 2000 COMiiviil !; r DEVEf-4N4 :. :,:y PAGE 01 AIRA Earth a Environmental, Inc. 11338 NI 122nd Way SIi 100 KiIdend, ~anew USA 11/0344910 TA (4$)•20-4001 Fax (424) 121.3914 PAGE:001 R =98% U (g; W = w o '. ga u. z pi , z o -, . ,O I— CU 10. • Z U (n; O z 04/07/2000 13:17 . Sabey Construction April 7, 2000 4258203909 KEN SAHI In our opinion, the work which was inspected as referenced in our daily field reports was performed in general conformance with the approved plans and specifications. If you have questions or desire additional information, please call at your convenience, Sincerely, othy R. Hyden Associate Ken S. Sahi, P.E. WABO Technical Director TRH /KSS /jdp Attachments: Daily Field Reports Nos. 1 -2 cc: City of Tukwila Sabey Construction $:\WORDPROC100 Prgats\Seattle\17o0001 422 9abey Construct onlInterpts cost Bulldtnp 2,Mpd APR -07 -2000 01:12PM TEL)4258203909 ID) 0 -91 M- 13422.0 Page 2 Fax: 206- 835 -6571 OAGRA PAGE 02 S NGINIEIING GIOIAI SOwt10N3 PAGE:002 R =98: MCVECT 1 Atreg4 ATE e* - r IN' .4:5 '1/Ii• _ - - - - - . /A. . J. .. PPO,aOTNO. REPORT NO. A. mmmms 30 CLIENT • S o '.__ _it CO 6...0-.S et , . niaae," rS do% .,i hw 1 [ Sa .: 4.. PERM I NO. .. . _ = WEATHER ter DATE z � a, eT1tLICTUMLti11G R Q•ief S /3 -1/. .4K/ . • 4,.' ._ a b.. 0 _ � , • . " 4 ... , .. 1 - / - S . / -f'. ,. / . D G .- ..// .. Z AORAPPO.ECTMANAOEWPNON €NO. ,Z7weg 77A. s'cs - P20 - 4 ARC,1«TCCT eXtcr .- . , • .0 / + r - . le e... �/ - - Jr „ .I ./ I M3, r Kl / i L 9t .,..„.. ......, T • ~ ... - . •-t _ C4 f.. S 2 S2'• .- a ti _ • e iz - /tr NO , ...%Sc,6 «.c- Yti--"-me Try CONTPAOTOP S ' y /% %Tf x /NGx TYPE OF INSPECTION J EW,NSPECTION r. _/f f I r ❑ 4 REI NBPEGTION .'J/ :,;.•:r - „ •,x,;: , tq ::..� � ':r , r.::, r : ---- - - - WO N . t ! „ 2 . r: ii'`.: i. t,t . , • : y :.M�' -i. .Yl�•:..:yV - - .. Yi :' - ••.r r. ..A. . tI i! : •.•r':. — h. :t �• ?.' �M..:. ...`• �1" l ii i . - ..'. . . .a., . .4:5 '1/Ii• _ - - - - - . /A. . J. - , e-rr ' ..x% ♦w. .4 44 / h �z.+sto" ao r e CO .. . Co.47 "."5 d C /e,� R��:� D/l Gras 1 _it CO 6...0-.S et , . niaae," rS do% .,i hw 1 [ Sa . .� . 4 CIre 1, ..Cs %14 i epe ,-,4( 4 4 _ 1l! f• /4/1 s~T . T 'Z ...4 .. , - . _ s.. - . • 2 z I S Z Q•ief S /3 -1/. .4K/ . • 4,.' ._ a b.. 0 _ � , • . " 4 ... , .. 1 - / - S . / -f'. ,. / . D G .- ..// .. Z / Cr ) eXtcr .- . , • .0 / + r - . le e... �/ - - Jr „ .I ./ I M3, r Kl / i L 9t .,..„.. ......, T • ~ ... - . •-t _ C4 f.. S 2 S2'• .- a ti _ • e iz - /tr � . i .: ' ., . ° `S OBTAINED (N IrYP E • :. •::' .. To the best of our knowledge. all items Inspected as noted above were "gYes ❑ Preliminary Observations in general conformance with the approved plans and specifications. ❑ No ❑ Deficiency Corrected - Report No 04/07/2000 13:17 4258203909 AGRA ENGINEEIIINO GLOBAL SOLUTIONS 11335 N.E.122b Way, Suite 100 Tel (425) 920 -4699 (Irkiiand, Washington 99034 Fax (425) 621 -3914 AGRA PI • REPRESENTATIVE KEN SAHI ID) DAILY FIELD REPORT PAGE 03 THIS REPORT IS CONSIDERED PRELIMINARY AND SUBJECT TO CHANGE PENDING REVIEW BY OUR PROJECT MANAGER This report is provided solely for the information of our client. This report is not intended to be transmitted to a third party by any means, except in full. Without written permission of AGRA Earth and Environmental, Inc. An1Ci?2 4 v.6e6S APR -07 -2000 01:13PM TEL)4258203909 PAGE:003 R =99% z W J U O 0 W W O g • J: I F W Z � I— O W ui p U O O I— W W I I- H O . W Z N 0 z AtP Al . - ra 5 -r6 ,017 Q€ ve.s- / 1 • • ca„.41,12 .16- A L IN Z 00 a If 1 lir /1 # id w .=-ifo SIR eget l a 7Z 4 1- 41 n yiCalarouslyi L.,A0ZA, "Zo Ida 4 I .4, ,�E$tdJ . , - .k. 406 , e4.- .....- - _ / ,. e - _ ,. - -' _... -- - ...1 ,i,sidates_tal_____k_q;_nsta _d_eglirz, , / / .- ..1 ... " • ; . L .. Z..' • 0 • ' .0V-C° • A L Al AP , . • ht.t ir td./ / / -.!. ....„.,, La) lief_ oeC,,k,_:_vi , *ell .8 TS 1 # I w . _ ,.: . .,.. ..e • • . .• i::•. , ii .„..:..,..% , ."-• To the best of our knowledge, all Items inspected as noted above were • 2 0 Preliminary Observations in general conformance with the approved plane and specifications. 0 No 0 Deficiency Corrected - Report No. • 04/07/2000 13:17 4258203909 AGRA ENGINEERING MORAL SOLUTIONS 11 335 N.E. 122" ViaY, Suits 100 Tel (425) 820Q1089 Kirkland, Washington 98034 Fax (425) 821-3914 KEN SAHI PAGE 04 DAILY FIELD REPORT PROJECT NAN 3Arr ei.Gs frre isa4i mien' Cio-e-e-er RERUCTURAL ENGINEER ARCHITECT A *41 42 10 44- 074117nrit. atria. -- 0 MrTNjEP 032- wEarNER AGRA PficuECTS NE VPHO NO. AGRA MELO REPRISORATIVE/RWER NO. REPORT NO. °ATE °I 424:12 PAGE (hisess bat Roods) I OF / SW-rwo-of AGRA FIELD RE EaElsITATIV . THIS REPORT IS CONSIDERED PRELIMINARY AND SUBJECT TO CHANGE PENDING REVIEW BY OUR PROJECT MANAGER This report is provided solely for the information of our client. This report is not intended to be transmitted to a third party by any means, except in full, without written permission of AGRA Earth and Environmental, Inc, (14.4400) PPR-07-2000 01:13PM 7E04258203909 ID) PAGE:004 R=99% z Z 6 00 U) w W uj 0 g -71 < • CO Ci I- ILI Z I.- 0 Z I- LU 0. uj 0 0 - 1— tu u_ z eu co 0 - 0 I— 04/07/2000 13:17 APR-07-2000 01:14PM 4258203909 TEL )250283909 KEN SAHI ID) PAGE 05 PAGE:005 R=99% vIvers, It •AGRA ENGINEERING GLOBAL SOLUTIONS April 7, 2000 0 -91 M- 13422 -0 Sabey Construction 101 Elliott Avenue E., Suite 400 Seattle, Washington 98119 -4220 Attention: Subject: Dear Mr. Gonzales: Mr. Bill Gonzales, Project Manager Summary of UBC Special I City of Tukwila Permit N Intergate East Building 3309 S. 120'" Place Tukwila, Washington AGRA Earth & Environmental, Inc. (AGRA) respectfully submits this letter as our final summary of UBC special inspections for the above - referenced project. AGRA performed inspections for this project beginning on February 1, 2000 through February 4, 2000 as requested and scheduled by representatives of Sabey Construction. Daily Field Reports were prepared and distributed at the time our services were provided. These Daily Field Reports are attached and form the basis for this final summary of our inspections. AGRA performed inspections for the following items: S:IWORDPROC■00 Projects\Seattle113000s113422 Sabey Construction\Intergate East Building 2.wpd 1. Visual inspection of structural steel welding and erection. 2. Installation of Hilti Expansion bolts. REG ED APP 1 0 2000 COMMUNI DEVELOPME AGRA Earth & Environmental, Inc. 11335 NE 122nd Way Suite 100 Kirkland, Washington USA 98034-6918 Tel (425) 820 -4869 Fax (425) 821 -3914 no U O; co w; a LL. w O; g` J LL Q; Z' z ~: Lij V Z , z APR 1 0 2000 0-91M-13422-0 Page 2 COMMUNITY DEVELOPMENT In our opinion, the work which was inspected as referenced in our daily field reports was performed in general conformance with the approved plans and specifications. If you have questions or desire additional information, please call at your convenience. Sabey Construction April 7, 2000 Sincerely, b y R. Hyden Associate TRH /KSS /jdp Ken S. Sahi, P.E. WABO Technical Director Attachments: Daily Field Reports Nos. 1 -2 cc: City of Tukwila Sabey Construction S \WORDPR0C100 Protecls%SeatUet13000s \13422 Sabey ConslrucuonUnlergate East Building 2.wpd AGRA Fax: 206 - 835 -6571 ENGINEERING GLOBAL SOLUTIONS :e: ... . COMMENTS . . .s , ...467e1 sownded / co- S. A cJ' tey✓asAc 71‘ pe∎Mar. 4, / t,_,,,■ i�rvcA),.. i V 0r o 6 re /ter //s• e t err e.. s. .. I. /A , /f%7 a r9 /i� c.S! ,�G/� /f.. 4.,. t /o %a.E. CO A.•.T /r c 4,p i t /Cp 4 ,. 9// 4/01.7 C" 7 CO 40•40.11 q,..7 n ecri TS eo%. .n1' pt/ xN1 (S/2 c a _....1l/ei, vc / 1.7../ Gv #/2o i...e. de.-- - /¢l., C. / ov-. •s v.r, S�tJ444/ '7 ,, Z - 70 /,,Y c 4t-7 ( /oc tt - � 4 e 4 in ,.. -4 I ( 7 " /7 „ 7// /1 9 42 o - P C o ‘ . . . . , . , . . . 7 4 , c . , / , ' e , ca.• „_eL. t.c.,/ e t , " 4 le /4, . / s 4 2 ,SL, Al2 fSL s ? cress i2 c, /- //. 4./e/04 4,1 c! / /,i' e. %c 1.. A6-• , G 7C t I -7( ' /3G Secep 000-e- ' 1 tIs L,/ 41.1• \ L its .//, D,G - rn /„..,..1 ,.„.// vtJ-/ ‘e_. /t Le Z. / _1Ca/e..it 9Zro UCl• C iZ [/1e. cyc /'Y /'t/a" /i • /T Y.tsprgl,'o,-. 4/ C.„..,( Q .4„..-.„-......., u T q .e....SGC{r'i -ea.. 4" Ft, e‘ I, . / 3 /$Z 7' 'S �7i -� 6„1// iw� cc7" I. rc. c. 1 j ' ' /. c' h'e ,✓e , -e coa /i�+s , - cc. 44,, '/1 .s f s , 'as Tioaf. / 474,4 SAMPLES OBTAINED (NOJSIZE/TYPE) SUMMARY To the best of our knowledge, all items inspected as noted above were r �-.Yes ❑ Preliminary Observations in general conformance with the approved plans and specifications. ❑ No ❑ Deficiency Corrected — Report No. PROJECT NAM l Arra"& 1 A7E E AS T E Lb� C rf �i/. /e p a,'/ �� PROJECT NO. d9 //k - i 72�C) PERMIT NO. .. .- . O 32 REPORT NO. A. DATE 2 i p 0 ADDRESS y ., 30' S o a e _ - h- ; ~�' - CLIENT 5;447 A P P 1 (1 ;11(1(1 WEATHER / z e 's PAGE (Indudes Test Rivals) /OF/ STRUCTURAL ENGI ER Cr) Nii MUiN ITY AGRA PROJECT MANAGER/PHONE NO. 7. f 5'cs - 8 2 o - 5'66 AGRAFIEL REPRESENTATIVE/PAGERNO. Z V Sc%. �" Yes 7� 'Yf TYPE F INSPECTION �J INSPECTION ` / /tr J / /3ol�r%1 ❑ RE-INSPECTION ARCHITECT Uiw \I Lut`'IVIL.I"I l CONTRACTOR <�ade 7. K „� /' 1 � ✓e � 1 T / j' • AG RA ENGINEERING GLOBAL SOLUTIONS 11335 N.E. 122nd Way, Suite 100 Tel (425) 820 -4669 Kirkland, Washington 98034 Fax (425) 821 -3914 DAILY FIELD REPORT AGRA Fl I REPRESENTATIVE REVIEWED BY THIS REPORT IS CONSIDERED PRELIMINARY AND SUBJECT TO CHANGE PENDING REVIEW BY OUR PROJECT MANAGER This report is provided solely for the information of our client. This report is not intended to be transmitted to a third party by any means, except in full, without written permission of AGRA Earth and Environmental, Inc. AG19372 (Rev.6 1 atti �' t ..:.wfav4�@ �NS?aW S+T;gs KYaft n? qt eR7 un Nr,�u� ho whn�w.rr 1 .. �w .uYw.rq.flYa9V.�� to C!A'Mb!T?Y U O CO CO 0 W • LL WO 2 • d Z' W O W O • D. ca WW a. O ii Z O 1- z .. , .. .... • :COMMENTS.. x -.. • , ,. v. .. r 44, -A- 0"/' s'i -7'6" A7 a YeSe,.... � �i, d �, 4.__ 1 4.2._4 7 1,„„,....e. WQ�.t 1Z' ak L!/�c7� a„ _.--82,:00 * 4- S 4i,AP� L //1/rr // 7v. L /A,c /'/ 4 /I a r,t/e.e d•4r,,c (Ll ei4 4410e1 a 0 enJ (etc h o.,,i6.2e� .t-ae !., /c2X,4- ' % Le/ ' c5 k WQL 4 II4 e2,6 / ai itt.- . o F 4e-A-0240, Lde Ira /e 4-rn,1e Toe Apc `ol az S' /Nib/. 742 ji/U. q -77 ag 4 co ,,,,,e p «mss. Leatdi,o L /0-q-ex-w.Nase b e o c ,. . lie -ace. 2 •:r oe % rc r1 Le' W Jd1 2 r PI ad c 4'c,t � iC " . iv ! 6 k v 13rAcr+ Se;ye /4-eat 7S C,Aini at- 4c # 4 F -,1--Cons, 1 /c 1/ t' /deQQ e- hd�•Q. 7 L i1n -gc,. 7 ' /< 9 74 -- /Puz e /i ce . SAMPLES OBTAINED (NOJSIZE TYPE) ° " ' ifi ,;P WEATHER SUMMARY To the best of our knowledge, all items inspected as noted above were s ❑ Preliminary Observations in general conformance with the approved plans and specifications. ❑ No ❑ Deficiency Corrected - Report No. PROJECT NAME 6-R.A 475 e c tit-1)A Lw v � l PROJECT NO. f' 13�'L2 --O REPORTNO Z ADDRESS . '1301 S - /1O //ft PL • - rt)K- i✓t ,fir �.. PERMIT NO. 2/1,74. o r03 s L DATE y / 43,c, 43,c, CLIENT !y` ° " ' ifi ,;P WEATHER PAGE (Includes Test Reports) I OF / STRUCTURAL ENGINEER AGRA PROJECT M NAGER/PHONENO. ARCHITECT .. , 1 . )M M U N I ! Y r) \k E LO P M E N1� AGRA FIELD REPRESENTATIVE/PAGER NO. �'F•� 7A/.17Y1 Si /a 4 CONTRACTOR Sg t /(,1f7j TYPE OF INSPECTION `�' �J / NEW INSPECTION ./ � L / lyuJ RE-INSPECTION . 0 AGRA ENGINEERING GLOBAL SOLUTIONS 11335 N.E. 122nd Way, Suite 100 Tel (425) 820 -4669 Kirkland, Washington 98034 Fax (425) 821 -3914 AGRA FIELD RE RESENTATIV THIS REPORT IS CONSIDERED PRELIMINARY AND SUBJECT TO CHANGE PENDING REVIEW BY OUR PROJECT MANAGER This report is provided solely for the information of our client. This report is not intended to be transmitted to a third party by any means, except in full, without written permission of AGRA Earth and Environmental, Inc. AG19372 (Rev.6/99) a�, "S'.�_ .a�cS41 1.5 ;; 4Sq':MC;x. #,e61, ua?!'b1'P;Y[e'9i T;tiff:3 Mr?om Tn : y.E0.2 • n. . ,,, ,,,,.. ... w,.. 7 rrr�,..,'>,. m: xltyc• . w.rr ;: y'K +Y4' "i zF4H?.t 7AVI'IMlFkft'S75 -VIM DAILY FIELD REPORT REVIEWED BY Z U V 0 w W . WD g a d Z � Z ILI la 2 o U O N O H WW I- IL' 0 - OH z S 400, 111 . 1101 " 1 " "mas . " Anil "TIMIS :)14.11OpYina'ancitilii4MaatolDolliki'i"t osvm so Assodont loss es pm LE8 VM 1N3)$ IS HILO 3S VLLLL 86CCE 08 iVd <0013010 :seildx3 SItlVd *0 NV1V (Diva 1130113* aniuma su9-995 :amid Ot£L-LOS2 VACeitulA 09 Od SIVI31.410 DNICI11(111 NOILVIDOSSV NOLONIIIISWA i . • WABOCertlfiedWelder Process qualifications are based on the following standards: STRUCTURAL WELDING SHEET STEEL WELDING ALUMINUM WELDING . WABO Standard No. 27-13 WABO Standard No. 27-13 WABO Standard No. 28.2 t18C Standard No. 27-13 • UBC Standard No. 27-13 IJBC Standard No. 28-1 ANSUAWS D1.1-98 ANSUAWS D1.3-81 ANSUAWS 012A-83 • /..■• • abiscard must besigned by the certified welder) - 4 SIGNATURE OF CERTIFIED WELDER ' • • ' • * * * SIGNATURES OF EMPLOYERS Tlesection on facing page most be SIGNED and DATED by an Employei/Conttactod Welder Exandner verifying that this welder has perfonned satisfactory production welding Ok b elow,Falsification of signatures on this yard is illegal. •.' the peocessiesi listed on Me face of this card during the quantity period designated I • '` • •:•'.zzT. • .;;;;•1.r 1 • • •• saA': isppwice■rsagadaadevpavbeelluppee Ping 72 940010 ailtor Ir.,,eit.zaanplawmtu. .194107 fr-4.:adrdpina an *Pion d 30PlatiosiP=90A 11V auomliht • . 2ini • liniUM Taggart •AVMS woolauTtant )1312113M 7VVfL1.1112111S January - March NAME: Flax April - June NAME: FIRM: July. September NAME RRM: October Decem NAME Dam Title; Dam Dam Title: I NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. mo • 40 • . 0 • • r --3 • ""---= • , T - F14 -7 C= U ACTIVITY NUMBER: D2000 -032 DATE: 2 -3 -2000 PROJECT NAME: SHELL RENOVATIONS XX Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # _ After Permit Is Issued DEPARTMENTS: Bujl ingDivision IIIII Public Works MAIM — 4 - c0 DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP till Fire Prevention lif 4 —e-Q9 Structural Al -5 -09 Incomplete TUES /THURS ROU ING: Please Route Structural Review Required Comments: REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: (ten days) Approved n Approved with Conditions CORRECTION DETERMINATION: Approved n Approved with Conditions \PRROUTE.DOC 5/99 n=.52=xc "•n .tt•UM :. REVIEWER'S INITIALS: REVIEWER'S INITIALS: /u6r Plannin Division kp 2-- i!sLoa Permit Coordinator DUE DATE: 2 -8 -2000 Not Applicable No further Review Required DUE DATE 3-7-2000 Not Approved (attach comments) DATE: DATE: DUE DATE Not Approved (attach comments) DATE: • , • F62$-052-00 (8197) • ,.?•,; • '; ,•.‘ • •• . ••:, • ; • • . A. • • . . Detach And Display Certificate REGISTERED AS PROVIDED BY LAW AS CONST CONT GENERAL :.,• REGI ST # EXP. DATE CC01..0SABEYCI0331* 12/31/2000 EFFECTIVE :DATE •:* . . *•'` 05/14/1997 SABEY• CONSTRUCTION • INC . 101 ELL IOTT AVE W,. - STE : 330. . ' SEATTLE:'WA 98119" • • • • * • ' Signature Issued by DEPARTMENT OF LABOR AND INDUSTRIES Please Remove And Sign Identification Card Before Placing In Billfold .01 OVERALL SITE PLAN BUILDING 3 BUILDING 5 BUILDING 4 BUILDING 1 atm. rsaryttec.r PROPOSED BUILDING REPAIR & RENOVATION n -- -- 1 %4TII DfiI1 ■ � 1 OWNER: ZONING: SITE AREA: BUILDING AREA: SEISMIC ZONE: el 1:6 N'oV 07p000 PARKING REQUIRED: OFFICE INDUSTRIAL WAREHOUSE TOTAL REQUIRED PARKING PROVIDED: VICINITY MAP PROJECT DATA SABEY CORPORATION ICI ELLIOT AVE. W. SEATTLE, WA 98119-4220 MICA MANUFACTURING INDUSTRIAL CENTER/LIGHT MICA. MANUFACTURING INDUSTRIAL CENTER/HEAVY TAX LOT AREA 102304- 9069 4620388 t ACRES 134060 -0580 23880 t ACRES 134060 -0385 1.8033 I ACRES 134060 -0430 1.1600 t ACRES BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4 BUILDING 5 BUILDING 6 TOTAL AREA 3 109,324 SF. • 3/1,000 321 STALLS 141,406 SF. • I/1,000 141.4 STALLS 388135 S.F. • 211j000 134 STALLS c LECTDIC AL ❑ PLU, 0 GAS F■PING DIV DV "1140 -LA BUILDING DIVISION 1)2000-D32 98,554 SF. 101489 S.F. 258,489 SF. 120121 SF. 201,644 SF. 5352 SF. 138154 SF. 552 STALLS 830 STALLS I understand that the Flan Check approvals are St0iect 10 errer5and omissions and .0i0V31 of plans does not author ∎ze tua a!auen,of con �d na Recent - dented code cr 0. I ed trac plans acknowledged. , ' °f O to P : eI 1 Z north w 0 U } O 0 0 m m 0 sheet :LOOK PLAN BUILDING 2 i i LANCE MUELLER ASSOCIATES ASSOCIATES m _ N A R C - -H -I T -E -C T 8 • Al A 130 LAKESIDE • SEATTLE, WA 98122 • 206 325 2553 INTERGATE TECHNOLOGY CAMPUS EAST BUILDING 2 Tukwila, Washington 99 -153 job no HC drawn 6F checked 2,2/00 date revision date •® N C SECTIOPAINT FACE FOR D OF B I Po NEN . SEE RNT CF ACCENT STRIPE. , I DEM. OtEHEAD I DOOR AtBJ IIAN DOOR i P ANT MAN BCD: COLA2 TTPK.AL " NEW EFS FEATURE ADJACENT CORNER CURfAINLALL SYSTEM. SEE (WALL. SECTIONS. TO A v B NEW SPN OWN. BUILDING SECTIONS >.... �.,. -. ... a... .... ...,, ., F > . ... •, =. -� w .. ' _<. � s .-.. :.. .._rim w., 'M...._ a ..� . �.. 3� ez3ok -.� 3 ��� ..._� �« .z.;�.�. ..,� ._e � - �= >� ��.= iwz� -, y. . .� = - -r ;:= �;. -� ....� 't" Via: �.._'- .. : v. yX'_ =rc- - � ��� : { =$--- ....:.�.�,.�. S+ °. .�_..v_�., ����l.. =' - n.. � &- - ,�".::..a> BE ..,...: . �.. a,..* »ate.:... "".. r _ 3_.0 .2, - _'-�� Li r_. _mss E H EAST ELEVATION Scale: 1/16". I' -0" NEW SPANDREL d AFF CURTAINWALL FEATURE AT BUILDING COWER SEE WALL. SECTIONS NEW EIFS FEATURE AD J T T CORNER CURTARIWALL SYS SEE WALL SECTIONS. EXISTING OYERIEAD DOOR AND MAN DOOR PANT MAN BODY COLOR TYPICAL NEW El. FEATURE CORNER CURIA SEE WALL SECTIONS JCCENT TO L SYSTEM: PAINT FACE OF BUILDNG. SEE SECTION C FOR DIMQNTION PONT OF ACCENT STRIPE. NEW E. FEATURE ADJACENT TO CORNER CURTANWALL SYSTEM_ SEE WALL SECTIONS. ACCENT COLOR •3 EMMEEE mmmmmmi 32'-0" 1)2 oo&-c:32 • FEATURE DIMENSIONS TO BE ADJUSTED TO INCORPORATE DOWNSPOUT LOCATIONS INTO EPS FRAM. ELEMENT AS NEEDED SPANDREL GLASS COLOR'I NEW SPANDREL GLASS CURIAIWUALL FEATURE AT BUILD. CORNER SEE WALL SECTIONS, S 45 COLOR , 2 SPANDREL ra A45 CoLOR'I 0'-0" FNISH FLOOR EX1 t0 NOV 0 7 Z000 O SOUTH ELEVATION Scale: I/16 "= I' -0" PAINT FAQE OF BUILDING. SE SECTION 4 FOR DIME POI OF ACCENT STRIPE. EXISTING OVERF{ DOOR AND M DOOR PAINT MAN Y COLOR TYPIC 0 ® Q ® ® 0 SALLULT EXISTNG. CONCRETE '.PANEL FOR NEW ENTRY. DOORS GRADE AT SOUTH'.SI OF BUILDING. GRADE AT NORTH SIDE PROVIDE STAIR OR RAMP AS REOD. NEW EIFS FEATURE WIN CURTAIN.UALL SYSTEM. SEE SIM. WALL SECTIONS. DREL GLASS 4LL FEATURE AT CORDER SEE WALL SPANDREL GLASS COLOR 1 MAN BODY COLOR ACCENT COLOR 9 SPANDREL GLASS COLOR .2 13'•d" POTENTIAL MEZZANINE FLOOR,NEIGNT MAN BODY COLOR SPANDREL GLASS CoLOR'I VISION OR SPANDREL GLASS SINGLE OR DOUBLE ENTRY DOORS FINISH FLOOR Aecerven cm or TUKwiu FEB 2 2000 N C LC W 6 V) O D Cl- 0 sheet N Z J 5 CO b3 � T.O. FEATURE e TA.Og2fAINIIWLL ® REOLET AT CANOPY Scale: 11/2"GI' -0" TILT -LIP CONCRETE PANEL (PAINTED, NEW EFS PSNLL OF EXITING OH DOOR OPENING. SEE ELEVATIONS FOR LOCATIONS PRE- PRIMED 24 GA METAL COP. OU IR" EXTERIOR PLYWOOD ON METAL BUD FRAMING, PAINT TO MATCH EIFS SYSTEM CONT. CLEAT OPE TA. EXISTING PANEL EIFS SYSTEM OVER I/2" EXT. GIB OVER METAL STUD FRAMING O EIS FEATURE Scale: 1 I/2 " =1' -0" NOTE: BUILDING HEIGHT BASED 2e' -0" HIGH TO TOP OF PANEL/ PLATE IF PANEL HEIGHT IS HIGHER, ADJUST FEANRE/OURTANWALL HEIGHT UP ACCORDINGLY. 9 SIM. Nil a it TM Ott /\ CL./.T1P11.1 L1 CICG CC ATIIL9C /IAICII 1 REMOVE EXISTING COF... WHERE FEATURE OCCURS. FLASH OVER EXISTING NAILER MD CANT STRIP FASTENER WITH NEOPRENE WAS4ER AT le" OA. EXISTING CCNC2TE PANELS, WALL AND CEiLNG INSULATION EXISTING BLR ON PLYWOOD DECK ON 2x ROOF STIFFENERS ON 4x EIFS SYSTEM OVER 1/2" EXT. GUB OVER 4" METAL STUD FRAYING EDGE OF FEATURE BEYOND 1 BO. FEATURE SIPS [WILL O.W. DOOR Scale: 1 I/2 -0" '- EXISTIG DOOR TO BE REMOVED. TWILL EXISTING OPENING WITH EIFS SYSTEM. SURFACE TO BE FLUSH 119TH EXISTIFG PM:ELS EXISTING CONCRETE PANEL. PANT PER ELEVATIONS EFS SYSTEM OVER IQ" EXT. GIB OVER 4" METAL STUD FRAM. TYPICAL O.FI- DOOR HEAD Scale: 1 1/2 " =1'-0" l\ Ce/e*IM l /AI Ills A lA. 1111 A 1 1 CC A WI I/4s /-\ ds•••••••• l w s..rim...2 • l "1 • 1 i EXISTING CONCRETE PANELS AND WALL INSIIATON EXSTNG DOOR TO BE REMOVED. PALL EXISTNGOPENPG WIiN EFS SYSTEM. SURFACE TO BE FLUSH WITH EXIST. PANELS MU R -II EMR INSULATION UV VAPOR BARRIER PREFNSIED 24 GA METAL COPNG. TO MATCH COSBAPBWLI. SYSTEM TO. EXIST. PANEL V4" SPANDREL GLASS WITH OPAQUE CERAMIC FRIT N 6" MOO. ALUM. CURTANWLL STSTBT ANCHORED TO EGSTIN G CONCRETE PANELS- NOTE: OdNTANUALL CONRROCTOR TO moms BWaR DONE N ATTACHE NT CF SYSTEM TO OSSI G CCFL 4 G. WALL PARS AND PROVIDE STRII.RIRN CAW/ATMORS Bf A BASH.STATE LICENSED BNGNEER O SILL AT DRIVE —IN DOOR Scale: 11/2 " =1' -0" 0"52, TILT-UP CONCRETE PAWED) I NEW EFS WILL CF EXITING OR DOOR SEE ELEVATIONS FOR LOCATIOG • MEMOVE EXSTNG COP. el-ERE MARNE OCCURS. F315N OVER EXST@G NAILER AND CAM STRIP d CoW EXISTING CONCRETE PA ELb, WALL AND "_EIL NG INSULATION EXPIRED Nov 0 7 2000 II, SPANDREL GLASS WIN ORACLE CERAMIC,. FRR N b" MOD. ALUM OIRTAINLLWLL SYSTEM A CHORD TO EXISTING COME PANELS. DIM PT ,DPT. PT TYPICAL OA. DOOR JAMB Scale: 1 lr " =1' -0" EXISTING CONCRETE PANELS AND WALL INSULATION -_ Ight 1/4" SPANDREL GLASS WITH OPAQUE CERAMIC FRIT N 6" A.D. ALUM STEEL ANGLE AT CURTANWALL SYSTEM ANCHORED TO IXIbTNG E CF CURTAINVALL ANCHOR TO EXISTING CCNCRETE PANEL , - CONCRETE PANELS. Ili B.O. OURTAINUALL EXISTING GRADE EXISTING CONCRETE PANELS AND WALL INSULATION FEB 2 2000 PERMIT CENTER v � m TN O Y a v 1� 0 pl U i 1 1- 111 Q 0 sheet U ,44.0 — -1 64x34} 64x34 6x33 6 6}x33 6 ;x33 64x33 ! 4 i 18 64x31 4,31 8' -10' 1gT " 1 . -0 ... <y -, ■ To FIT J-12. 64x33 60' —C EXIST. 1" CDX 6 PLY) PLV,VOCD rTP. ".,' R P x D.F. 24 "o /c 1,&11.42 U24 HNGRS • 64x34, '64x31 q . ".64x36; '64,36' '64x36 i.6'�x36.• 5ix21 61•21; 6 v"fd I!.. a "ka E'tf €31+e Yd i l k^1:; fG1�21i�NYIIF�ii�$7'8il � emm131t �7FGSS't&9i911tl011tl .. i?J'lIf5Htla.` ?LLWN,ll rpit9 19,36116 i:il�''i19: 9ilSllvel'1 0 111 rY1n9N M "ataNlim • L' EM'S °Ci115+ . Ctllti9IEi19 liMIDFdI:: "'hi55� -. IFl6iL9tN`c :tY9�i36i�i`" t}lCi910191 ttarJ li'7911 Ei" EXPIRUD NOV 2. ... IP 7 naa REVIEWED ❑ REVISE AND RESUBMIT !7 REJECTED ❑ SUBMIT SPECISIED ITEM. ❑ MAKE CORRECT ONS NOTED '. ANu cnNc OF NAT of ,IN A SAFE SP:fI= AC Y ENGINEERS NORTH INC. 0,YE Z -1 -OD EY IF SPECIAL INSPECTION IS REQUIRED THEN BY WHAT TESTING LAB: PHONE: YES NO MILLCERTS REQUIRED CONTRACT ALLOWS FOR A MAXIMUM OF 14 DAYS FOR SHOP DRAWING APPROVAL. SHOP DRAWINGS SUBMITTED: BACKCHA?RGES WILL NOT BE ACCEPTED UNLESS APPROVED IN WRITING BY B &B FABRICATORS — I - 14 =rao PEA APP'L NOTE: CONTRACTOR PLEASE RESPOND TO ALL QUESTIONS, VERIFIES, AND CLOUDED ITEMS ON •' BOTH ERECTION DRAWINGS AND SHOP DRAWINGS;'. ALL VERIFIES NOT RESPONDED TO WILL BE CONSIDERED CORRECT AS SHOWN. FAILURE TO L: RESPOND DURING APPROVAL PROCESSTOTHIS ;-' REQUEST WILLAFFECTTHE DUE DATE. s PABIRICToRS Got.UNMI.! 'I.oGATly i t PtA�►.J CAT., 71) "ILA. , WO\ SPPt*i DRYIN.BY CHM BY 7301 197TH PL. N El • ARLINGTONM TEGftgoLchoe CAMAJS"' OA E JOB N0. 19 S7./, y98223 &'1'`( MCi.9. LEL'. - rH &Rio o 1AT 24' -3'4 vs 1 lAV Z -9 q. P3 ' 'AyJ 25 t24 t UM 25 =1 D5 ! TO 1& -3!i 1%0 j IOC 25= - -4 1 5 8 P { t13D 25 - 08 j I6f 244+ 04 I l H 24'- -34 oto 1Fi 24 =3�s a/ I ISt+P, 24 =Gti E3 t i l8J 25 =3g e4- tap =5= a E 5 s 104 W=3a HCo I IBT 15' 4 51 . lBV 25 E0 W 24 '-4 24- ICA 2.4!-3 Elo Ice 24... "3'2 F2 MI Icc 24' - 4 1 2 P3 Mill tc- EgEll F4 _ . III icP 29=4 F' IIIIIIIIIIIESEI } tcK. 25 -q r7' t IcM 25 -3 f8 1 f tct-i z414 Fq tcp 24' A Flo aif wu►b LFaJG Grzl Me IA 24' -IdI 132 ( le- 14L1. S 3 V- Z -t`e. Pa tr7 2' -"i4 5.5 I,P Zro ='l3to gu j IN 25t'im F,ri { (I - 2' -1 pro 7'S I I lM 24'- '11.40 81 I tit Z4' -1561; 1310 l P 24'-0 P 2 I 1 , 7.4' - 613 t i I T 2 -0 H 4 I 25 N 5 I,w _ 2a-IA HCo I AAA 25' WI i A13 2 -0 OS I AC 24- 1- 1,A47 24' -&b 1-no (CT( me. ao Leo -n0 cp ONE 1AF 25- C.4 ( IAH 25 G [AR _ 24.'44 - Gt.. l AM 2 61 IA<4 25' CZ3 j I AP 24=I010 C_`1 { [AS 24' -3 cta TT ` 1 E3-E, To BEF iiT �StrcTiQ J -2 -Q PA u-rr 44e 4--I- g &44, QUAv,IT1Ty Sl- # LE1.IGTH5' D SEE 5414S2ULE AT 1211-1T rcqz fv1C Qua'JT 1Tr, SIZE L5061'145 Fog. Ts g .-s . 1.4 PA11.11 (DI TS - r (oz�x2 X32 NOV 0 7 2000 0 ( REVIEWED ❑ REVISE AND RESUBMIT 7 REJECTED ID SUBMIT SPECIFIED ITEM ❑'MAKE CORRECTIONS NOTED • COPP.ECTIONS C I MADE ON THE SHOP DATE 2_ I 0O BY a,-D�ea n TS of I IS CHE C'A. IS O Nty THE FOP REV, '1 OF t :F vIT 1 DESIG RONC_ T OF T4� ( T A�= ',SCR ?L EO' "P I I, IkITH. THE ■NFOR AT' VE I. i ONTRAC T DOC,MENTS THE CONTRACTOR Yl. IS RI E., CONFIRMING AND CORRELATING AL ANO DIMENSIONS RELEC1ING Fh RIC 110N PR I GE A ID T CHNOUES OF CONSTRUCTION CC, V1ORK t' H THAT OF ALL G <, J, Enr Or'. At., . WORK IN A SAFE AND SATISFAC ENGINEERS NORTHWEST, INC. NO.TO SHIP 8 d l dI2� d 1�2 SHIP MARK lAf AT 1.4'5 ASS'v MARK G�- TH RWJ IAi7 1.8 lAs lcP ZZ. (1\208 BILL OF MATERIAL SECTION T L, A4,0 T5 8 tt ;4 ' E4 Ts k,e6, g' v1440.iP new: et,LTt C2 ;4 FT. SEE see 24 LENGTH ScH 2 SIN 0 d Pert APa'L In RECEIVED CITY OF TUKWILA FEB 2 2000 PERMIT CENTER REMAFIKS To 5e F;EL6' GJT TO P T REf: Secno.ti- Z lew Stx-T -1 APP€.CL .. SET - 1 IN H j- I h r rr l f - 4 - , I-4:4 I t i� ' I; wFroHr f H DEM WELDERS WABO END 6 EDGE DISTANCE U.N. PAW SSPC. SP 2 OR 3 W/ FABRICATORS STD RUST INHIBITING SHOP PRIMER 2.0 TO 2.5 MIL D.F.T. ITEM CoLUMitd, . SABese PRINTS DATE 1 -14 REV. APPEL d ; L 4 . � 4 R�1S FA1 7301 197TH PL. • ARLINGTON, WAI,9N223 tOrtit— i TC-cI+ ot.c aP4 CAMPUS EAST I.GCAnoN ill KW 11..A t JA. i_I }" BASE P w/4 — } "0 KWIK BOLT II (EMBED 8 ") -- - NOTE:— PATCH EXISTING BOLT HOLES EXIST. COL. BASE P - EXIST. C OL - - -- &BAS }" NON - SHRINK GROUT - - - - -- -- SECTION A -1 35 sss+ s c� R HO �o �< EXIST 6 }x3O/ ®' EXIST 6 }x34/ ISO 6 }x347 EXIST 6 x34 EXIST 6} 9 7" 60' —O" EXIST 6 }x30 u EXIST 6x30 'EXIST 6 }00' 'EXIST 6 1x30 EXIST 6 }x30 EXIST 8 }x341 EXIST 6 }x30 SECTION B -1 60' -0" :EXIST 6 }x30 --w - EXIST 6 }x30 - 'EXIST I6 }x33 EXIST 6 }x33 EXIST :6 }x33- EXIST 6 }x33' I I ! EXIST I6 }x33 'EXIST '6 }x33 EXIST 6 }x33 EXIST 6.x31 EXIST 6 }x 313 EXIST 6 }x311 EXIST *31} EXIST 6 }x317 EXIST 614317'. EXIST 6 }x317 'EXIST '6 }x33 EXIST 6 }x30 :EXIST 6 }x30 EXIST 6 }430 'EX6T 6 }x30 EXIST 6 }x30 EMST 61.0 'EXIST 6 1. x30 EXIST '6 }x33'. • . ` r EXIST 6 }x31 EXIST ¢ }x36 KNOT 6 }x36 XIST 6 }x36 EXIST 6x36 1ST 6x36 EXIST 6 }x36 EXIST 6}x EXIST 6 }x36 EXIST 6 }x36 ! !EXIST 6 }x21 r —• ;EXIST !G }N21 ,I EXIST 6 }x21 EXIST 6 }x33 r 60' -0" EXIST 6 }x31/ EXIST 6 }x33 a EXIST 6x31 r— b EX6F 6,: 4 �a ' _ _ _ 6 :x33 ROOF FRAMING PLAN NOTES 18" = 1' -0" 1.) CONTRACTOR TO FIELD VERIFY ALL EXIST. CONDITIONS DIMENSIONS & TO NOTIFY ENW OF ANY CONFLICTS BETWEEN EXIST.. AND ADDED MEMBEI . 0) GREPLARID CE'A B & GRID PMBER COLUMNS EXCEPT 0 EXIST. PARTITIONS ( G. ). SECTION C -1 t BEAM & COL DETAIL c —c 60' -0" EXIST 6 }x317 I, 8' -10" I 60' -0" 2OD C)37- By I R E 11) . I I IJ �' . I NC. Cod< Revie. Con,ulun, 'EXIST ;6 }x21 • EXIST i 6 }421 EXIST 6 }x21 EXIST 6 }x21 REVIEWED API RE NOV 0 J 2000 This plan ,icwcd For general conformance with the following:; ❑ WaMingner Sm< Energy Codc .O 51 - WOHI nr Jurisdiction G I'rY or Date 3/ ..'i dE -9al7 :` MAR 1 0 2000 \ J \ i:Ci'v�7diJ�a �( DEVELOPMENT EtEgWEIN MAR -7 2000 SHEET NO S i JOB N0: 99149. ENGINEER:. G.LALAS DRAWN: D.G. DATE: 2 -1 -2000